KICK OFF MEETING WP-210 (PQ TOOLS)Kegiatan: Pengkajian dan Penerapan Teknologi Konversi dan Konservasi EnergiSubkegiatan: Pengembangan Teknologi Operasi Tenaga Listrik Untuk Mengontrol Power Quality (WBS-200)
4/8/2014
![Page 2: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/2.jpg)
Outline• Personil WP-210• Instruksi Group Leader WBS-200• Uraian Kegiatan• Jadwal Kegiatan• Evaluasi Kegiatan• Tugas Tambahan
4/8/2014
![Page 3: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/3.jpg)
Personil WP-210• Leader: Eka Rakhman Priandana (system designer)• Member:
1. Agus Suhendra (teknisi litkayasa)2. Zaenuddin (drafter)3. Yuli (system designer)4. Asih (system designer)5. Ifah (system designer)6. Yadi (umum)
4/8/2014
![Page 4: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/4.jpg)
Instruksi Group Leader WBS-200Meningkatkan Technology Readiness Level (TRL) dari Dynamic Voltage Restorer (DVR) dan Hybrid Power Conditioner (HPC) melalui:1. Pengadaan peralatan dan bahan.2. Mempersiapkan sumber daya manusia.3. Mengevaluasi hasil kinerja DVR dan HPC terkini.4. Mempublikasikan DVR kepada publik.5. Inventarisasi peralatan dan komponen di laboratorium.6. Membuat Standard Operational Procedure (SOP)
penggunaan peralatan laboratorium.
4/8/2014
![Page 5: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/5.jpg)
Uraian Kegiatan1. Pengadaan bahan dan peralatan
• Koordinator: Eka dan Hendra• Anggota: Eka, Hendra, Yadi• Job desc:
1. Menerima permohonan pengadaan peralatan (alat ukur, alat kerja).2. Menerima permohonan pengadaan komponen.3. Menerima dana anggaran belanja dari Program Manager.4. Penyusunan daftar belanja.5. Pembelanjaan bahan dan peralatan.6. Pelaporan dan rekapitulasi hasil belanja.
4/8/2014
![Page 6: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/6.jpg)
Uraian Kegiatan2. Mempersiapkan Sumber Daya Manusia (SDM)
• Koordinator: Eka, Hendra• Anggota: Eka, Hendra, Ifah, Yuli, Asih, Yadi. • Materi training:
1. Pengenalan komponen listrik dan elektronika (kegiatan dilakukan saat melakukan inventarisasi komponen).
2. Observasi rangkaian DVR, VSG dan HPC.3. Kajian rangkaian modul dan komponen DVR, VSG dan HPC.4. Penggunaan Field Programmable Gate Array.5. Penggunaan alat ukur laboratorium (AVO, PQ-tools, Oscilloscope).6. Implementasi desain (penyolderan, wiring, drilling, cutting, mounting).
4/8/2014
![Page 7: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/7.jpg)
Uraian Kegiatan3. Evaluasi hasil kinerja DVR dan HPC terkini
• Koordinator: Eka• Anggota: Eka, Hendra, Jajang, Ifah, Yuli, Asih, Yadi. • Job desc DVR:
1. Penambahan sistem pengaman pada DVR (rangkaian charge-discharge).
2. Desain break-out board FPGA Opal Kelly XEM6001 yang baru untuk menyesuaikan tingkat keamanannya.
3. Pengujian DVR di laboratorium dengan beban lampu.4. Persiapan scale-up DVR (MOSFET diganti IGBT, driver diganti,
rangkaian akuisisi data diganti, dipindah ke cubicle besar).5. Pengujian scaled-up DVR.6. Pengujian scaled-up DVR di gedung tekno 3.
4/8/2014
![Page 8: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/8.jpg)
Uraian Kegiatan3. Evaluasi hasil kinerja DVR dan HPC terkini
• Koordinator: Eka• Anggota: Eka, Hendra, Jajang, Ifah, Yuli, Asih, Yadi. • Job desc HPC:
1. Redrafting cubicle HPC.2. Redesain pintu panel utama HPC (cubile 2) supaya dapat dipasang
HMI touchscreen LCD.3. Penyolderan PCB sistem kendali HPC.4. Redesain casing sistem kendali HPC.5. Redesain inverter HPC.6. Redesain chopper HPC.7. Rework trafo dan choke.8. Reassemble HMI dan control HPC9. Reprogramming HMI HPC.
4/8/2014
![Page 9: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/9.jpg)
Uraian Kegiatan4. Mempublikasikan DVR kepada masyarakat
• Koordinator: Eka• Anggota: Eka, Hendra, Ifah, Yuli, Asih, Yadi. • Job desc:
1. Menyempurnakan VSG dan DVR.2. Berpartisipasi pada Hari Teknologi Nasional pada bulan Agustus 2014.3. Memperbarui banner.4. Membuat presentasi slide show.5. Membuat paper dan presentasi untuk konferensi nasional dan
internasional (IEEE).
4/8/2014
![Page 10: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/10.jpg)
Uraian Kegiatan5. Inventarisasi peralatan dan komponen di laboratorium
• Koordinator: Hendra• Anggota: Hendra, Ifah, Yuli, Asih, Yadi.• Job desc:
1. Mempelajari komponen listrik dan elektronika.2. Mencatat semua daftar komponen yang tersisa di laboratorium, detail
dengan jenis, tipe, dan jumlahnya.3. Mencatat semua peralatan yang dimiliki laboarorium, termasuk alat
ukur, alat kerja, komputer, dlsb.4. Membuat buku dan form peminjaman alat laboratorium.
4/8/2014
![Page 11: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/11.jpg)
Uraian Kegiatan6. Membuat Standard Operational Procedure (SOP)
penggunaan peralatan laboratorium.• Koordinator: Hendra• Anggota: Hendra, Ifah, Yuli, Asih, Yadi.• Job desc:
1. Memahami penggunaan alat ukur laboratorium (AVO, PQ-tools, Oscilloscope).
2. Memahami penggunaan alat kerja laboratorium (mesin bor, genset, solder blower).
3. Mendiskusikan penyusunan SOP dan melakukan pembagian konsentrasi penulisan.
4. Membuat SOP penggunaan peralatan.
4/8/2014
![Page 12: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/12.jpg)
Jadwal KegiatanNo Kegiatan Maret April Mei Juni Juli Agustus September Oktober November Desember1. Pengadaan Komponen dan Peralatan
2.
Studi literatur dan observasi rangkaian DVR, VSG, dan HPC. Studi literatur pemrograman Python. Studi literatur buku First Course in Power Electronics dan Practical Electronics for Inventors
3.Pelatihan intensif Altium, Xilinx ISE, dan Opal Kelly FPGA
4. Pengujian dan debugging DVR5. Publikasi prototype DVR6. Perancangan Scale-up DVR7. Re-drafting cubicle HPC8. Penyolderan PCB HPC9. Re-engineering trafo HPC10. Re-design choke HPC11. Re-engineering Inverter dan Chopper HPC12. Re-wiring HPC13. Re-design pintu panel HPC14. Re-assemble HMI dan control HPC15. Re-programming software HMI HPC16. Pengujian dan debugging HPC17. Workshop dan presentasi paper18. Stok opname komponen dan peralatan19. SOP penggunaan peralatan
4/8/2014
![Page 13: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/13.jpg)
Evaluasi Kegiatan1. Pengadaan peralatan dan bahan.
• Input:1. Instruction Sheet mencari info kebutuhan bahan dan alat (2A2a8b).2. Instruction Sheet pelaporan belanja (2A2a9a).
• Output:1. Worksheet daftar belanja (2A1a9a).2. Worksheet rekapitulasi belanja (2A1a10c).3. Bon-bon belanja.4. Invoice belanja impor.5. Faktur pajak impor.6. Daftar pengajuan bahan dan peralatan ke Program Manager, cq.
Supriyadi Setiawan.7. Print out rekening koran patty cash WP-210.
4/8/2014
![Page 14: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/14.jpg)
Evaluasi Kegiatan2. Mempersiapkan sumber daya manusia.
• Input:1. Instruction Sheet melaksanakan observasi (mengamati) (2A2a6a).2. Instruction Sheet melaksanakan explorasi (mencari tahu) (2A2a5a).
• Output:1. Worksheet pernyataan telah melakukan observasi (2A1a7c).
a. Logbook uraian singkat cara kerja DVR (+ foto).b. Logbook uraian singkat cara kerja VSG (+ foto).c. Logbook uraian singkat cara kerja HPC (+ foto).
2. Worksheet pernyataan telah melakukan analisis observasi (2A1a7d).• Technical note berisi opini dari logbook observasi (2B4a) x 3.• Makalah (3Ae) dan presentasi (2A2c2).
3. Worksheet pernyataan telah melakukan eksplorasi (2A1a9a).a. Logbook uraian singkat prinsip kerja rangkaian sensor dan akuisisi data (+ foto).b. Logbook uraian singkat prinsip kerja rangkaian switch device driver (+ foto).c. Logbook uraian singkat cara mendesain FPGA dengan Xilinx ISE (+ screenshot).d. Logbook uraian singkat cara mendesain PCB dengan Altium (+screenshot).
4. Worksheet pernyataan telah melakukan analisis eksplorasi (2A1a6d).• Technical note berisi opini dari logbook eksplorasi (2B4a) x 3.• Makalah (3Ae) dan presentasi (2A2c2).
4/8/2014
![Page 15: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/15.jpg)
Evaluasi Kegiatan3. Evaluasi hasil kinerja DVR dan HPC terkini.
• Input:1. Instruction Sheet menyajikan peralatan pengujian (2A2a4a).2. Instruction Sheet instrumen perolehan data (2A2a4b).3. Instruction Sheet instrumen pengolahan data (2A2a4c).4. Instruction Sheet metode dan startegi pengujian (2A2a4d).5. Instruction Sheet interpretasi hasil pengujian (2A2a4e).6. Instruction Sheet pemilihan dan penetapan sasaran pengukuran
(2A2a7a).7. Instruction Sheet metode pengukuran (2A2a7a).8. Instruction Sheet modifikasi produk (2A2a8a).9. Instruction Sheet over haul (2A2a9b).
4/8/2014
![Page 16: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/16.jpg)
Evaluasi Kegiatan3. Evaluasi hasil kinerja DVR dan HPC terkini.
• Output:1. Worksheet konfigurasi pengujian VSG+DVR (2A1a5a).2. Worksheet benda yang diuji (+foto VSG+DVR) (2A1a5b).3. Worksheet penginderaan pengujian DVR (2A1a5c).4. Worksheet perolehan dan pengolahan data (2A1a5d).5. Logbook pengujian VSG+DVR (2A1a5e).6. Worksheet analisis data pengujian DVR (2A1a5f).7. Worksheet interpretasi data pengujian DVR (2A1a5g).8. Logbook pengukuran DVR dengan Janitza (2A1a8c).9. Worksheet analisis data pengukuran DVR dg Janitza (2A1a8d).10. Worksheet interpretasi data pengukuran DVR dg Janitza (2A1a8e).11. Worksheet perbaikan HPC (2A1a9a).12. Worksheet modifikasi HPC (2A1a9b).13. Worksheet overhaul HPC (2A1a10c).14. Technical Note (2B4a) X3 + bahan presentasi (2A2c2).
4/8/2014
![Page 17: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/17.jpg)
Evaluasi Kegiatan4. Mempublikasikan DVR kepada masyarakat.
• Output:1. VSG yang telah diperbaiki.2. DVR yang telah disempurnakan (telah berfungsi penuh).3. PQ-Cube Janitza.4. Banner-banner baru.5. Slide show presentasi.6. Paper in english (3Ac).7. Paper bahasa Indonesia (3Ad).8. Bahan presentasi in english untuk konferensi internasional.9. Bahan presentasi untuk konferensi nasional.
4/8/2014
![Page 18: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/18.jpg)
Evaluasi Kegiatan5. Inventarisasi peralatan dan komponen di laboratorium
• Output:1. Buku besar peminjaman alat laboratorium.2. Form peminjaman alat laboratorium.3. Database XLS daftar komponen dan jumlahnya.
4/8/2014
![Page 19: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/19.jpg)
Evaluasi Kegiatan6. Membuat Standard Operational Procedure (SOP)
penggunaan peralatan laboratorium.• Output:
1. Dokumen SOP AVO meter 1.2. Dokumen SOP AVO meter 2.3. Dokumen SOP PQA Kyoritsu.4. Dokumen SOP Oscilloscope Tektronix.5. Dokumen SOP Oscilloscope analog.6. Dokumen SOP Function Generator.7. Dokumen SOP Genset.8. Dokumen SOP Mesin Bor.9. Dokumen SOP Blower Solder.10. Dokumen SOP Janitza.11. Dokumen SOP VSG.12. Dokumen SOP DVR.
4/8/2014
![Page 20: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/20.jpg)
Evaluasi Kegiatan7. LEADER WP-210
• Output:1. Presentasi Kick-Off (2A2c1).2. Presentasi Hasil Pengujian DVR (2A2c2).3. Presentasi Progress Kerja (resume ISGL) (2A2c1).4. Technical Report pengujian VSG + DVR (2B5a).5. Technical Report pengukuran DVR dengan Janitza (2B5a).6. Technical Report perbaikan dan modifikasi HPC (2B5a).7. Permohonan SK Bekerja Dengan Resiko (2A1b, 2A2d, 2B9) untuk
semua yang tergabung dalam WP-210.
4/8/2014
![Page 21: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/21.jpg)
Tugas Tambahan• Membuat jadwal harian
4/8/2014
![Page 22: kick off meeting power quality tools](https://reader034.vdocuments.site/reader034/viewer/2022051501/577c7d401a28abe0549dfdf1/html5/thumbnails/22.jpg)
TERIMA KASIHWP-210 SGPQ 2014