KENDBIP: Programme Implementation Update
KENDBIP Local Stakeholders
Consultation Meeting,Gold Standards Agriculture.
Nairobi, 29th May, 2015.
1
Background:
• KENDBIP is part of Africa biogas partnership programme
(ABPP).
• Donor Dutch Govt( DGIS), principal partners: -Hivos, SNV,
GoK & KENAFF.
• Multi-sectoral approach – Private public partnership.• Phase I:- 2009 -2013.
Stimulating demand and strengthening supply capacity.• Phase II:- 2014 – 2017.
Commercialization - private sector development2
How we work
3
Programme Update• 14109 plants installed 2009/14 • 87% satisfaction rate.• Functionality issues: mainly
user related.• Technology reliability : 95%• Energy savings:
– Firewood reduction - 66%.– Charcoal reduction - 51%.– Kerosene reduced - 21%.
• Reduced chemical fertilizer : 84%.
• Living conditions improved : 89.7%.
4
User training Slurry use training
5
Other key sector developments.• Introduction of alternative digester designs.– Plastic – Fixed & floating drum designs.– Tubular designs.– Low cost masonry designs.
• Increased Government support.• Development of National biogas training
curriculum. • Development of national biogas standards.• Establish a customer service/call centre – quality
assurance.6
Feedback from LSC 19th Oct 2011
• Continuous input mechanism:– Continuous input process log-book: at Prog &
KENAFF regional Offices.– Telephone access (KENDBIP Hotline): +254
719635516.– Internet & E-mail access: www.kenaffbiogas.org ;
E-mail: [email protected].– Social media: Twitter @biogaskenya; Face book - Kenya national domestic biogas programme
– Additionally: Direct feedbacks during regular meetings at provincial & regional levels
7
www.kenaffbiogas.org KENDBIP Face book page
8