    SKEMA TEKNOLOGI KEJURUTERAAN (Kertas 2)Soalan Percubaan Negeri Kedah 2010

    Jawapan : No. 1

    a) choose the right electrode size and electric current rating for the work piece- hold the work piece with a suitable clamp

    - for stronger joint, provide a groove for filler metal.- start the arc by tapping the tip of the electrode to the base metal- weld a few spots on the work piece in order to hold the work piece.- start welding by maintaining the proper arc gap or distant along the joint length- leave the work piece to cool down, next, knock the joint to remove the slack.- clean up the work piece using a metal brush.

    1 x 1 = 8 marks

    b)

    ADVANTAGES DISADVANTAGES

    ARC

    WELDIN

    G

    - use portable equipment- able to weld thick metal

    -no need high skill welder

    - require high voltage- only suitable work on land

    -high risk of fire sparks

    OXY-

    ACETYLENE

    - lower maintenance cost- can weld various type of metal- can weld any metal thickness

    - the joint quality depends on thewelders skill

    - not economical for specific metal- high cost for gases

    C)

    ARC WELDING OXY - ACETYLENE

    - joint by heat from electric arcbetween electrode and workpiece

    - electrode with flux as a filler metal- use an electricity as a power

    supply

    - joint by heat of flame which isproduce by oxygen and acetylene.

    - Didnt used any power supply- Thin diameter of filler rod.

    d) - soldering- brazing- adhesive

    (mana-mana 2x1 M)

  • 8/8/2019 KEDAH-SKEMA P2

    2/7

    Jawapan : No. 2

    2. a) X - Penerima FMY Penghantar FMZ Penggabung

    ( Setiap jawapan 2 x 3 = 6 markah)

    b)

    (4 Markah)

    c) - Denyut segerak terdiri daripada denyut segerak mengufuk dan menegak.

    - Penghantar TV berperanan memproses isyarat audio dan video- Isyarat audio dihantar secara FM- Isyarat video dihantar secara AM- Kedua-dua isyarat digabungkan- Isyarat termodulat dikuatkan ke peringkat yang sesuai untuk dihantar ke

    udara.- Pada penerima proses heterodin berlaku untuk menghasilkan frekuensi

    pertengahan.- Isyarat dikuatkan kembali dalam bentuk video rencam- Isyarat denyut segerak dan isyarat video diasingkan.- Isyarat seterusnya dikuatkan dan dihantar keTiub Sinar Katod.

    (1x10= 10 Markah)

    Jawapan : No. 3

    (a) Luas bahagian berdinding = 10.5m 13.0m= 136.50m2

    Kos bahagian berdinding = 136.50m2 RM550.00= RM7507.50

    Luas bahagian teres terbuka = [4.5m 8.0m] + [2.0m 5.0m]= 36m2 + 10m2

    = 46m2

    Kos bahagian teres terbuka = 46m2 RM300.00= RM1380.00

    (Setiap jawapan 2 x 4 markah = 8 markah )

    Denyut SegerakDenyutPadaman

    IsyaratVideo

  • 8/8/2019 KEDAH-SKEMA P2

    3/7

    (b) Dimension Form :Borang Dimensi :

    NumberNombor

    SizeSaiz

    VolumeIsipadu

    RemarksKeterangan

    10

    12.0m

    0.8m0.3m

    28.8m3

    Digging and building the strip foundation.

    Mengorek dan membina asa jalur.

    81.7m0.4m0.4m

    2.18m3Building the concrete column.Membina tiang konkrit.

    11.5m4.5m 6.75m2

    Building the plastered brick wall.Membina tembok bata berlepa.

    11.5m8.0m 12.00m2

    Building the plastered brick wall.Membina tembok bata berlepa.

    11.5m2.5m 3.75m2

    Building the plastered brick wall.Membina tembok bata berlepa.

    1

    1.5m

    5.0m 7.50m2

    Building the plastered brick wall.

    Membina tembok bata berlepa.

    11.5m2.0m 3.00m2

    Building the plastered brick wall.Membina tembok bata berlepa.

    (Markah maksima =6 markah)

    List of Quantity Form :Borang Senarai Kuantiti :

    Work Detail

    Butiran Kerja

    Unit

    Unit

    Quantity

    Kuantiti

    Rate

    Kadar

    Total

    JumlahDigging and building strip foundation.Mengorek dan membina asas jalur. m3 28.8 300.00 8640.00

    Building concrete column.Membina tiang konkrit. m3 2.18 220.00 479.60Building the plastered brick wall.Membina tembok bata berlepa. m2 33.00 80.00 2640.00Overall cost.Kos keseluruhan. 11 759.60

    (Markah maksima= 6 markah)

  • 8/8/2019 KEDAH-SKEMA P2

    4/7

    Jawapan : No. 4

    Back SightPandanganBelakang

    IntermediaeSight

    PandanganAntara

    Fore SightPandangan

    Hadapan

    RiseNaik

    FallTurun

    ReducedLevel

    Aras Laras

    ChainageRantaian

    RemarkCatatan

    0.590 75.550 . BM1 = 75.550

    1.210 * 0.620 * 74.930 * 0 Point ATitik A

    0.930 * 0.280 * 75.210 * 20Point BTitik B

    0.730 * 0.200 * 75.410 * 40Point CTitik C

    1.420 0.930 0.200 * 75.210 * 60Transfer point DTitik pindah D

    1.500 * 0.080 * 75.130 * 80Point ETitik E

    0.980 * 0.520 * 75.650 * 100Point FTitik F

    0.430 0.550 * 76.200 * 120 BM2 = 76.300

    2.010 1.360 * 1.550 0.900 * 76.200 . ErrorRalat =

    = 76.300 76.200= 0.100

    1.360 0.900 75.550 .

    0.650 0.650 0.650 .

    - * Mana mana 7 jawapan = 1 markah X 7 jawapan (7 markah)- Setiap kumpulan jawapan 2 markah = 2 markah X 4 kumpulan (8 markah)

    ImaginarydatumDatumkhayalan

    = 74.000

    Reduced LevelAras Laras 74.9

    30

    75

    .210

    75

    .410

    75

    .210

    75

    .130

    75

    .650

    76

    .200

    ChainageRantaian

    0.0

    0

    20.0

    0

    40.0

    0

    60.0

    0

    80.0

    0

    100.0

    0

    120.0

    0

    x- Plot mana-mana 5 titik = 1 markah X 5 titik (5 markah)- Jawapan : No. 5

    2

    A

    BC

    D E

    F

  • 8/8/2019 KEDAH-SKEMA P2

    5/7

    (Maximum marks = 16 (berserta lakaran dan penerangan)

    ii. Aluminium[2 marks]

    iii.Light, Good workability, Easy to forge, Easy to machine, Easy to cast, Resist corrosion- Any 2 answer [2 marks]

    Safety BracketPendakap Keselamatan

    TanggaLadder

    Book ShelfRak Buku

    RollerRoda

    [4 marks]

    [4 marks]

    [4 marks]

  • 8/8/2019 KEDAH-SKEMA P2

    6/7

    Jawapan : No. 6a. i. Enjin 4 lejang, ii. Enjin 2 lejang, iii. Enjin Diesel.

    b. i. Lejang Mampatanii. Lejang kuasa dan ekzos

    iii. Lejang masukan

    c.E. 4 lejang E. 2 lejang E. Diesel

    Kebaikan - Kuasa keluaran tinggi- Kos penyenggaraanrendah

    -Daya kilas tinggi-Kos penyenggaraan rendah

    -Kos lebih murah

    Kelemahan -Daya kilas rendah- Kos penyenggaraan tinggi

    - Kuasa keluaranrendah- Banyak asapekzos

    - Memerlukan bahanbinaan enjin dapatmenahan tekanantinggi

    (Mana-mana jawapan 1 markah)

    d) Rujuk muka surat 124-126 (Teknologi Kejuruteraan T4).( Markah maksima 8 M)

    Jawapan : No. 7

    i. -Litar yang bersesuaian dengan ciri yang dinyatakan ialah Litar C.Alasan -Motor M1 hidup dahulu dan diikuti M2

    -Jika berlaku beban lampau , kedua-dua motor akan berhenti

    -Litar yang ditolak ialah Litar A.Alasan Litar M2 hidup dahulu diikuti M1

    - Mempunyai hanya 1 geganti beban lampau

    - Litar yang ditolak ialah Litar B.Alasan Hanya satu motor pada satu-satu masa

    - Hanya satu motor dimatikan jika berlaku beban lampau.

    [2 markah bagi setiap jawapan dan alasan yang betul]

    ii. - Apabila PM1 ditekan, P1 menjadi elektromagnet.

    - Litar menjadi lengkap dan menghidupkan M1- Apabila menghidupkan M2, punat tekan PM2 ditekan- M2 terus berkendali kerana sesentuh tambahan P1 berada dalam keadaantertutup.

    - Motor M1 dan M2 terus berkendali kerana tindakan litar pegang.- Motor M1 dan M2 akan berhenti apabila PH1 ditekan.

    [8 markah]