katie wilson, r.e.h.s senior environmental health specialist public swimming pools tim dutcher,...

51
Mecklenburg County Public Swimming Pools 2015 Katie Wilson, R.E.H.S Senior Environmental Health Specialist Public Swimming Pools Tim Dutcher, R.E.H.S Environmental Health Supervisor

Upload: priscilla-roach

Post on 15-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Mecklenburg County Public Swimming Pools

2015Katie Wilson, R.E.H.S

Senior Environmental Health Specialist Public Swimming Pools

Tim Dutcher, R.E.H.SEnvironmental Health Supervisor

Website Enforcement and ADA Compliance Construction VGB and PDSC Forms Permitting and Applications Stormwater Discharge Regulations and Best

Practices

Topics

Time extensions within Mecklenburg County are no longer being granted◦ Contrasting color bands◦ Fencing issues◦ Construction issues

If an extension is required, a formal appeal must be made to the state◦ Process can be found on the Intent to Suspend

form which is issued during the inspection

Enforcement?

Do not put chlorine in your pool to rapidly increase your chlorine unless you are shocking your pool ◦ This includes chlorine pucks, granular, sticks, etc

An Immediate Suspension will be issued if staff see this

Pool Maintenance Reminder…

Meck Co. pool inspectors are NOT enforcing ADA compliance with lifts◦ What does this mean for your permit? ADA

regulation does not affect your operating permit or your inspection. It is enforced by Code Enforcement.

◦ New construction and construction on existing pools will be required to be ADA compliant in accordance with going through plan review

See ADA website for details at http://www.ada.gov/index.html or call 311 to speak with a Building Inspector

ADA Compliance

Changing anything pertaining to the pool, pool equipment or pool buildings from what was originally approved during the initial plan review

What is considered construction?

1. A pool facility wants to add a step to a shallow end of a pool.

Yes2. A pool is renovating a pump room and changing

filters/pumps/etc. Yes

3. A pool facility is replacing deck markers and No Diving markers on the deck.

No

Is Plan Review Required?

4. A pool facility is renovating it’s restrooms and adding/deleting toilets and sinks or changing floors.

Yes 5. A pool facility is changing out like for like in the

pump room. No

6. A pool facility is doing a deck renovation including concrete or paver replacement or expansion.

Yes

Is Plan Review Required?

If there is a question as to whether plan submittal and review is required, please contact myself or Troy Purvis

Contacts◦ Regarding plan submittal or plan review questions

call Troy Purvis 704-621-2299

◦ Regarding plan review or construction questions call Katie Wilson 704-309-5494

Plan Review and Construction

Virginia Graeme Baker Act

The law became effective on December 19, 2008.◦ What does this mean?

All drain covers had to be in compliance by the 2009 season.

All equalizer line covers had to be in compliance by the 2010 season.

Under the law, all public pools and spas must have compliant drain covers installed and a second anti-entrapment system installed, when there is a single main drain other than an unblockable drain.

Virginia Graeme Baker Act

Pool Safety Data Compliance Form

Install Dates are new to form!! Must be completed!

All expired drain covers or equalizer line covers must be replaced before the 2015 season

All pools are required to submit an updated PDSC form this upcoming season◦ A permit will not be issued until an up to date

form is on file and approved

VGB and Current Standards

All previously submitted PDSC forms are online on our webpage◦ Go to meckpools.charmeck.org◦ Click on icon, “Print Applications and Permits”

◦ Look up facility by Pool ID, Name, or Address◦ File is listed as “Master File”

PDSC Forms – Online

Some pool operators began changing out drain/equalizer covers in 2014

A current list on our website◦ “Master for List for Pool Data Safety Compliance

Forms”◦ The list shows whether or not we have a PDSC on

file and the dates the main drain covers and equalizer line covers were installed

PDSC Forms – Online

◦ It is the responsibility of the operator or facility to maintain covers and assure they are in compliance

◦ Form must be re-submitted if changes are made to your pool pump(s), drain covers or skimmer equalizer covers Note: Changes are considered items different than what

was originally installed. Example: A Hayward drain cover is installed instead of an

Aquastar drain cover Example: A Pentair pump is installed instead of Hayward

pump

VGB Reminders

A “How To” PowerPoint presentation has been placed on our website at meckpools.charmeck.org

A How To Guide

How Do I Fill the PDSC Form Out?

If new form is filled out, all portions must be completed◦ Even if you did not replace the equalizer line

covers, installation date must be put on form

Keep a copy of the completed form for your personal records◦ All completed PDSC forms will be available online

once submitted and approved

Tips for Completing Your PDSC Form

2015 Permitting

2015 Permitting

Renewal Notice Sent out 2nd week of January

2015 Permitting - Website

Application ◦ Fields populated with most

current info from our database

◦ Make any changes to owner, operator, phone number, email address, etc. by striking through and writing in new information

◦ Return to health department with the permit fee

2015 Permitting – Application Process

New for Permit Application◦ Equalizer and drain

covers in compliance with VGB?

◦ If no, a completed PDSC form must be submitted and approved before the permit will be issued

2015 Permitting – Application Process

Permit fees will stay the same◦ Seasonal Fee - $130◦ Annual Fee - $250

Late fees have not changed = $120

2015 Permitting - Fees

Payment Invoices will be available again this year

2015 Permitting – Application Process

Payments can be submitted by check or through credit card

If submitting a payment separate from the application, write the permit ID on bottom of check

How to Pay

Reminder letter mailed to owners, facilities, and operators.

Permit application and fee returned to health department.

Pools opening before May 18th – schedule a pre-permit

inspection

Pools opening on May 18th or later – no changes to inspection process

2015 Permitting

2015 Permitting – Application Process

Note: Opening and closing date will be used for

issuing of permit.

** Any pools indicating

opening prior to May 18th will require a pre-

permit inspection to receive their

permit **

If pool wants to open before May 18th, a pre-permit inspection must be scheduled

A list of every pool and their assigned inspector will be posted on our website: http://meckpools.charmeck.org under Inspector Assignment List◦ Go to the website, look up your pool, and contact

the inspector to schedule an inspection

2015 Pre-Permit Process

Pre-Permit Checklist

Any item on the pre-permit checklist is not correct

Permit fees are not paid

Incomplete or incorrect application information

PDSC not approved or on file

Why Can’t I Get My Permit After My Inspection?

Once a pre-permit inspection is successfully completed, the permit will be posted on our website at http://meckpools.charmeck.org within 3 days

Look for the icon located in the right corner of the page

I Passed My Pre-Permit Inspection – Where is my permit?

Will return to previous years inspection process

All permits will be batch issued May 18th for any remaining pools that have not received their permit◦ Permits will be available online◦ An inspection can be conducted at any time

Permitting After May 18th orAnnual Pools

A hard copy will not be mailed to operators

Print off the permit from our website and post in a visible location

Note: Permit stickers will no longer be issued

Permits – Changes

Visits made again at pools throughout the 2015 Season starting after Memorial Day

These are visits, NOT inspections

Looking at critical violations◦ Checking chlorine and pH; clarity of water◦ Ring buoys/body hooks◦ Emergency telephones◦ Gates◦ Equalizer line covers and drain covers

Summer Environmental Assistants

February 27, 2015 – Last day to submit permit fee without paying a late penalty

March 18, 2015 – Pre-Permit inspections may begin

April 1, 2015 – Start of the 2015 Seasonal Pool Season

May 15, 2015 – Last day for pre-permit inspections

Dates to Remember

Katie Wilson [email protected](704) 309-5494

Tim [email protected](704) 336-5553

General [email protected]

http://meckpools.charmeck.org

Contact Information

Craig Miller◦ Charlotte Mecklenburg Stormwater Services

Water Quality

Questions?

Stormwater Rule Compliance & Best Practices

Pool Construction, Maintenance and Operation

January 21, 2015

Stormwater Pollution Control Ordinance

• No person shall cause or allow the discharge or disposal of non-stormwater, either directly or indirectly, to the storm water system, waters of the state, or upon the land in a manner or amount that is likely to reach the stormwater system or waters of the state except as described below in Section 18-81.

• Sec. 18-81. Permitted Incidental Non-Stormwater Flows Examples:

– Landscape irrigation;– Uncontaminated, pumped groundwater;– Collected infiltrated stormwater from foundation drains or

footing drains;– Air conditioning condensate; – Dechlorinated swimming pool discharge

Pools & Spas as a Pollution Source

• Draining (chlorine, chloride & other chemicals)

• Filter backwash• Construction• Maintenance (acid washing,

grouting, plastering, etc.)

Pool & Spa Draining

• 3 Options– Yard or landscaped area– Storm drain system– Sanitary sewer system

Yard or Landscaped Area

• Pump at slower rate to allow percolation.• Move hose occasionally.• Avoid flooding and nuisance conditions on

neighboring properties.• Stop if discharge is entering storm drain system

and chemical concentrations haven’t been lowered.

Storm Drain System

• Dechlorinate to <0.1 mg/L by allowing to sit for 1 week or lowering with dechlorination additive.

• Do not add other chemicals for 1 week before draining.

• Ensure pH is 6-9.• Remove/strain out algae and debris.• Saltwater pools and spas are not allowed to be

discharged to storm drain (high chloride levels).

Sanitary Sewer System

• Contact Charlotte Water (formerly Charlotte-Mecklenburg Utility Dept) at 704-336-4407.

• Follow requirements provided by them.• Subject to issues such as

– chemical concentrations (limits/treatment)– location (is local system running at capacity; overflows)– timing (avoid peak times, after rain, etc.)

• Discharge into sewer cleanout pipe, not through a public manhole (not allowed).

• Watch for backups into home.

Filter Backwash Discharge

• Discharge filter backwash to sanitary sewer or landscaped area, not storm drain system (many are directly connected to sanitary sewer).

• Dispose of filter material and debris in trash.• Rinse filters over lawn or landscaped area.

Pool Construction & Maintenance

• Use erosion control to prevent sediment from discharging offsite.

• Keep wastewater from plastering, grouting, guniting, acid washing and other operations from entering storm drains.

• Contact Charlotte Water regarding discharge pf wastewater to sanitary sewer, OR

• Pump wastewater into containers/totes and dispose of it through an environmental disposal facility.

• Rinse tools and equipment off where discharge won’t enter storm drain system.

Illicit Discharge Example – Acid Washing

• Craig Miller– [email protected]– 704-336-7605

• Questions??