Review of the TA programme on Mainstreaming PPPs at the State level
and Central Infrastructure Ministries
Presentation byArvind Jadhav
Principal SecretaryInfrastructure Development Department
Govt. of Karnataka
23 Mar, 2009___________________________________________________
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
2
Content
• Formulated First Infrastructure Policy in 1997• New Infrastructure Policy issued in Jul 2007• PPP cell set up in Jun ’07• Dist Level Committee Set up• GoK Signs MOU with GOI for Tech Assistance
• Events– Govt Taking over on 26th May ‘08– Further on resources have been deployed to make
these policy decisions effective
16 Jul ’07
Infrastructure Policy Issued
21 Mar’ 07
Institution of PPP Cell
Aug ’07
Dist Level Committee Set up
18 Jun
‘07 PPP Cell Formed
PPP Single Window Agency Formed
4 Oct ’07
GoK signs MOU with GoI
3
Policy and Developments
State Govt.’s PPP Policy/Legislation• Government of Karnataka (GoK) issued infrastructure policy in
2007– Review is being initiated
• Objective– To provide a fair and transparent policy framework to facilitate and
encourage Public Private Partnership (PPP) in upgrading, expanding and developing infrastructure in the State.
– Features• Touchstone Principles• Procurement Process• Contractual Structure• Regulatory framework• Incentives and Concessions• Assignment and Mitigation of Risks
– Features of New Single Window Policy• Single Window Agency clearance • State high Level Committee clearance • Viability Gap Funding introduced
– Swiss Challenge to encourage the initiator and innovator– Covers 10 sectors 4
• Statutory basis for the formation of PPP Cell– Formed through the New
Infrastructure Policy ‘07• Mandate of the PPP Cell
– To Mainstream PPP in Infrastructure Sectors
• Scope of Activities– Assist Line Departments in all
phases of Project Development
• Sector Study• Project Identification• Project Development• Transaction Management• Project Implementation• Monitoring Project Operation
– Capacity Building and PPP related Training
PPP Cell: Origins and Envisaged RoleChallenges and Innovative steps
• Role of PPP cell defined
5
• Undertake Sector Study
• Identify Sector Requirement, Demand, Policy, Regulation, Legal Tariff
ActivitiesActivities
OutputOutput
PROJECT DEVELOPMENTPROJECT IDENTIFICATIONSECTOR STUDY
• To identify, conceptualize and create a shelf of projects in consultation with the line Departments
• To Recommend suitable projects for implementation on PPP route.
• To assist different Government Departments in preparing the pre-feasibility reports through consultants.
• To develop internal evaluation guidelines in consultation with the respective Departments to evaluate and assess the projects whether the projects are to be funded by the State Government, or implemented with Private Sector participation.
• Whether to Utilize Existing Asset/ Create new assets
• Technology to be adopted• Create a Shelf of Projects
Envisaged Role & Scope of PPP Cell-1
• To appoint / select consultants to develop the projects in consultation with the concerned Department
• To assist the respective Departments in preparing the Detailed Project Reports.
• To interact with the Government of India and other funding agencies for obtaining their support.
• To recommend projects to Government of India for grants under Viability Gap Funding Scheme.
• Develop viable projects further for private participation
• Project Ready for implementation
PROJECT OPERATION
CAPACITY BUILDING, MIS
• To help respective Departments to conduct the bidding process for selection of developers.
• Developer on Board
ActivitiesActivities
PROJECT IMPLEMENTATION
• To inspect, visit, review and monitor any PPP Project under implementation in the State.
• Implement project
• To act as the nodal agency for capacity building for PPP in the state, conduct/recommend exposure visits and training programmed on PPP.
• To develop a MIS to cover project development life cycle
TRANSACTIONMANAGEMENT
OutputOutput
• To monitor the quality of service delivery
• Measure Customer Satisfaction
7
Envisaged Role & Scope of PPP Cell-2
• Project development and MCAs– Review for Non-Metro Airport MCA at Delhi from
GoK point of view.– Review of proposed State Support Agreement
• Assessment of – Consistency of SEZ policy and industrial policy
with Infrastructure policy• Development of Eco system
– Empanelment of Transaction Advisors• 5 Members for conducting transaction up to Rs 50
Crore• 4 Members for conducting transaction of Rs 50
-250 Crore– Preparation for Empanelment of Independent
Engineer/ Financial Auditor• Development of Database of Developer Contacts for
Targeting for Infra Projects including for 10000 KRDCL Roads– Can be used by other State on Request
Enablers for PPP
8
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
9
Content
• Training of Officials– Three training programs conducted at Administrative Training Institute
• 80 Officers trained– One More Scheduled for this month in coordination to KSHIP/ ATI
• To complete target of 100 for the year• Work Shops
– Presentation on PPP at Health Dept Workshop on PPP Initiatives in Heath Sector
– Contribution to Workshop on PPP Initiatives in North Karnataka by Belgaum Division
– Participated in Work shop on PPP framework for Road Sector at LBSNAA
• Info Dissemination – In Industry forums- 4– Visiting foreign Delegations – 3 Occasions
Capacity Improvement
10
• Guidelines for Use of Transaction Panel in Karnataka– Based on central guideline and additional panel of Karnataka
• Formats issued for – project identification, – Single Window Agency approval
• Procedure on Formulation, Appraisal of PPP projects for the state (Working Draft)
• Procedure for Swiss Challenge (Proposed)
Guidelines Development
11
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
12
Content
183
17 164 2 2 1 1
020406080
100120140160180200
Distribution of Projects Sector wise in Nos
Nos
84333
42489
1621
145049522
50 0 00
10000
20000
30000
40000
50000
60000
70000
80000
90000
Distribution of Projects Sector wise in Value (Rs Cr)
Value
• Of the 226 no of projects of value Rs 152519 Cr,
– transportation is leading the way with 183 projects of value Rs 84333 Cr
– followed by Urban and Municipal Infrastructure with 17 projects with 42489 Crores.
• Other Key sectors are Energy and Industrial infrastructure
• Many of the projects have come in Physical infrastructure
• In the next phase the focus will also be on social infrastructure-Education and Health, Consumer Infra- Tourism
Distribution- Sector Wise
13
Sector NosValue (Rs
Cr)Transport 183 84333Urban and Municipal Infrastructure 17 42489Tourism 16 1621Energy 4 14504Industrial Infrastructure 2 9522Other 2 50Agri-Infrastructure 1 NAHealthcare 1 NA
Total 226 152519
Distribution- Sub-Sector Wise
14
• Projects are Spread over 23 Subsectors
• With 30 Project Proponents – Handling 1 to
63 projects – Each project
of value ranging from few crores to 40000 crores
103
62
9
8
6
6
4
4
4
3
2
2
2
2
1
1
1
1
1
1
1
1
1
0 20 40 60 80 100 120
Road
Transport - terminal
Hotels/ Resorts
MSW
Airport
Rail
Commercial Development
Entertainment
Power
Port
Information Technology
Township Development
Water Supply & Sewerage
Others
Agruculture and holticure markets
Bio-technology
Common User facilities
Cultural Centres
MRTS
Theme Park
Health Infrasruture and facility
Urban Infrastructure
Warehousing infrastructure
Distribution of Projects Sub Sector Wise in Nos
Nos
PPP Projects at different Stages
• Progress In Nov ‘08– 65% in Identification– 17% under Bidding Phase
• Progress In Mar‘09– 38 % in Identification– 45% under Bidding Phase
• Largely possible due to – The launch of 52 packages of
10000 kM core road network development through out the state
– Speeding up of project clearances etc
15
Stage Nos Value (Rs. in Cr.)Identification 86 19971.32Development 10 9464.50Bidding 103 75562.23Construction 21 44197.88Operation 6 3322.78
Total 226 152518.71
• Identification- Through Ranking Study– 20 Sector Prefeasibility Studies Initiated
• Impact: 20 Studies Estimated to generate 50-70 Projects– Another 26 List of studies Drawn up
• Project Preparation– Developing programs than projects– Coordination on several projects till bidding commences
• Coordination for SH 132 Bidding• Documentation for NH 206• Drawing up Plan for 10000 KM road Network (Underway)
• Administrative Action– PPP Compilation Shared – Administrative action on 75 cases/ files (Conservative Estimate) related to PPP
Projects– Operationalising the Cell activities
• Project Structuring– Review of the Bellary Bypass Concession Agreement vis-à-vis the Model
Concession Agreement.
Initiatives for Project (Pipeline) Development -1
16
Project Prefeasibility
17
SL. No. Name of the Projects
1 River Front Development in Karnataka
2 Development of Intermodel Transit Hubs at Belgaum, Hubli-Dharwad, Mysore, Bangalore (Dabaspet), Bellary and other places
7 Development of Honnavar Port to meet Iron Ore & steel sector needs to import coal etc (The requirement need to be reviewed given that Haldipur port is being proposed on swiss challenge)
8 Tumkur Solid Waste Management
9 Feasibility Study for Car Parking (including busses and passenger amenities) at Brundavan gardens in Mysore
12 Development of Modern Foot Over Bridges on PPP format for each City in Karnataka
13 Development of Multi-level Car Parking Plazas in major Cities of Karnataka, viz: Bangalore, Belgaum, Hubli-Dharwad & Mangalore
14 Water Supply, Sanitation & Solid waste Management as a single package for each city for Top 10 CMCs in Karnataka
21 Development of Agri-market and Logistics Hubs across the state
25 Development of urban entertainment centers in Major Cities of Karnataka
26 Development of Lake Conservation Projects30 Development of Education Infrastructure across the state31 Development of Health Infrastructure across the state44 Rejuvenation of Urban Zones (Peta Area)45 Eco-tourism feasibility at different places in Karnataka46 River Development: Mangala Corniche
• Project funding Support– IIPDF Applications and follow up
• To DEA on 12 Projects development Funding- Only 1 approved due to technical reasons
– Viability Gap Funding (VGF)• For 3 projects, VGF funding of Rs 120 Crore received for 3 Road Projects
• Project Clearance– Conducting Fourth Single Window Agency– Conducting Fifth Single Window Agency
• Fifth SWA doubled the no of projects cleared
• Project Evaluation– Review of Bijapur Tender Evaluation
• Selection of TA– Selection of Transaction advisors for Projects-4 Nos– Selection of Transaction advisors for projects-3 Nos (underway)
Project (Pipeline) Development -2
18
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
19
Content
• Basic Database– Through Excel Sheet put in place
• Work plan drawn up for IT enablement• Analysis of requirement
– Centralized Project/program management System
– Flexible Planning System– Issue & Change Management– Document Management– Resource Management– Cost Management– Work Collaboration– Early Warning Indicators– Reporting– Real-time Information access
• Discussion with Vendors initiated• To proceed RFQ shortly
Management systems
• Website Design– Design Completed by MIS
Expert– Reviewed by PPP Expert– Internally Discussed– Vendor identified• To be completed in one month
20
• Project List has grown steadily from 39 in Jun’08 to 226 in Mar’08– With the resources joining
• MIS expert- Mar• PPP Expert- Jun • Further Deputation of 4
Engineers- Nov-Feb– Govt Taking Over – Jun 08– Guidance of Nodal Officer– Putting enablers in place– Times lines of
procurement being updated currently to be completed by 31 Mar’09
– Verified Nos to be available shortly
Project List and Case Studies
Month No of Project
Total No of Tech Personnel
Events
Feb’08 NA 1 • Director in place
• MIS Expert JoinsJun’08 39 2 • Govt Taking Charge after
Governor’s rule
• PPP Expert JoinsSep’08 ~100 3 • Current Nodal officer
takes charge
• 2nd director takes chargeNov’08 127 4 • MIS Expert withdrawn by
parent organisation
• 2 Engineers joinFeb’09 168 5 • Junior Programmer joinsMar’09 226 7 • 3rd Director takes charge
• 2 Engineers join
21
Sno Name of the Project Approx. Cost
1. Project INR 522 Cr.2. near BIAL (new airport) INR 9000 Cr3. Mega Convention Hall (near Devenhalli, BIAL) INR 540 Cr.4. Tourism - Dev. of Hotels, Theme park,
restaurant, organised retail etc.INR 400 Cr.
5. Airports (Bijapur, , Shimoga, Hassan) INR 800 Cr.6. Express Rail Link to BIAL INR 3716 Cr7. Minor Ports - Dev. of Ports (Malpe, Honaver) INR 2450 Cr.8. Roads - Construction of around INR 5000 Cr.9. Roads - Construction of STRR and ITRR in
Bang. Metropolitan RegionINR 5250 Cr.
10. Roads – NHAI projects in the State INR 11873 Cr.11. Transport - Commercial development of Bus
stands and KSRTC propertiesINR 2000 Cr.
12. Township - Township Development at Bidadi (By DLF)
INR 40000 Cr.
13. Bus and Transit Terminal facilities with commercial development by BMTC
INR 10016.03 Cr.
14. Energy - Coal based power plants
(3 nos.)
INR 5000 Cr. Each
22
Project List
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case Information
• Strategy for FY 10– On all above areas
23
Content
Flagship Program- 10000 KM Core Roads
• Honourable Chief Minister of Karnataka has launched MRDPK on 28th January 2009
• Development of 66,000 km of Roads of Core Road Infrastructure Development– Phase I – 10,000 kms – 52 Packages– Phase II – 40,000 kms– Phase III – 16,000 kms
• 12600 Km village roads also given to the developer
• The 10,000 km length proposed are having 10,000 PCU and above. Negative grants expected. Cost 32500 Crore
• Action is being initiated for the formulation of Karnataka Road Sector Policy 2009 comprising of– Karnataka Road Fund– Tolling Policy
• New Concepts– Use of Satellite imagery 24
M AHAG AON
H EG GA DAD EVAN AKO TE
S HE LAV AD I
AN K AL I
M AN G S ULI
E XA MB A
KUDAC HIMAN AGU LI
DO BB AS PET
HO M NAB AD
MALAV ALL I
H UL S O OR
KUDTHI NI
B A D AMI
G AN G AWATI
BELU R
KHAN AP UR
MAH ALIN GAP UR
RAM AN AG ARA
M AD DUR
MU DHO L
N AN JAN A GU D
H ULIYAR
CHAN NARAY AP ATNA
KAN AK APU R A
S IRA
NAR AS IM HARAJA PUR A
H ON NALL I
NAG AM AN GALA
NAV ALG UND
M O LKALN URU
KUS TAGI
S IR UG UPPA
H UNS UR
K O NA NURU
HO LE N ARAS IPURA
B OR GAO N
B AN AV AS I
KO TU MAC HAG I
KAM PLI
GH ATAP RAB HA RS
TER AD AL
CHAN N AP ATN A
BH AD RAV ATI
NAR GU ND
KAB B UR
G UD IB AN DE
A.P B OR DE R
HU NGU ND
KARNATAKA S TATEKARNATAKA S TATE HIGHWAYS IMPROVEMENT PROJECT
KS HIP - II & KRDCL ROADS
KOTT URU
TIKO TA
TALI KO TA
HALI YAL
K UD AL A
P ATTA D AKA L
T.N B O RD ER
A .P BO RD ER
N H212
KU NIG AL
HAR PAN AHALL I
TAVA RAG ERE
DEVAPUR
BIR UR
A .P BO RD ER
A.P BO RD ER
H .DURG A
MH BO R DE R
M H B OR DER
THIN THINIBHAT N AGU R
IC HALK ARAN JI(M H B O RD ER)
(G O A B O RD ER)
B AG EWAD I
B ELAV AN AK I
G ADH
AP B O R DER
DHA DE S UGU R
KUDLIGI
JOG FALLS
PAD UB IDRI
K ARK ALA
G AN GAM ULA
KOTT IG EHARA
KUDUR EM UKH
TIPTUR
KER ALA B OR DER
PIR IYAP ATN A
T. NAR AS IPURA
B AN NUR
CH IKB ALLAP UR
AP BO R DERM ULA BAG AL
A P B O RD ER
MH BO R DE R
N IPPA NI
YED IYUR
RON
KALGHATAGI
KARWAR
S HIK ARIPUR
SULYA
GUNDLUPET
CHIKANAYAKANHALLI
S INDH ANUR
KOLLE G ALA
H O S KO TE
KIR AN G UR
TURUVEKERE
YELANDUR
BYADGI
SHAHPUR
H OS PET
B.NORTH
B.SOUTH
NELAMANGALA
DEVANAHALLI
DODDABALLAPURA
BAGEPALLI
GU B BI
TIRTHAHALLI
SAGARA
CHALLAKERE
HIRIYUR
HARIHAR
ARASIKERE
S AK ALE S H PUR A
ALUR
KADURKOPPA
SRINGERI
TARIKERE
B AN TWAL
PUTTUR
KUNDAPURA
HU B LI
HONNAVAR
SHIGGAON
RANIBENNUR
SIDDAPUR
YELLAPUR
ANKOLA
KUMTA
SUPA
ATHANI
HUKKERI
GOKAK
SINDGI
BILGI
SHORAPUR
JEVARGI
HAGARI BOMMANA HALLI
MANVI
LINGASUGUR
NH-13 NH-48
NH-13N
H-218
NH-63
NH-63
NH-63
NH-63
NH-17
NH- 17
NH-4NH-17
NH-17
NH-13
NH-63
NH-13
NH-13
NH-48
NH-48
NH-207
NH-207
NH-7
NH-4
NH-4
NH-4
NH-4
NH-4
NH-4
NH-4
NH-7
NH-7
NH-209
NH-209
NH-212
NH-212
NH-212
NH-67A
NH-206
NH-206
NH-206
NH-206
NH-4A
NH-9
NH-9
NH-218
NH-4A
NH-13
NH-218
S6
S4
E6
S UB RAMAN YA
HALAGERI
ANANDAPURA
AYAN UR
KR NAG ARA
MA AGALU
T.N B OR DER
B ER YA
C H IK KO D I
CH OWD APU R
M M HI LLS
2B2E
4A
4B
4C
6A 6B
6C
10A
10B
12AS AN G A MA
12B
13A
13B
14B
15A
15B 16A 17A
17B
19A19B
19C19D
20A
20B
20C
20D
21A
21B
21C
21D21E 21F
21G
22A 22B
25A
26A
27A
27B
27D
27C
31A
31BKAN AK AGE R I
31C
33A
33B
39A
42A
42B
48A 49A
49B
51A
53B
53C
53A
54A
P UR A
54B
54C
55D
K ATTE M ALA LVA AD I
R A MA NATH A
55A
55B
55C
57A
57B
KO WD LE Y
57C
59A
59B
59C
60A
62A
62B
63A
63B
63C
63D
63E
64A
64B
64C
64D
64E
67A
64F
64G
64H
65A
65B
65C
65D
65E
65F
65G
67B
67C
M1A
M 1B
M 1C
M 1D
M2A
S AL IG RA MA
M 2B
M 3A
M 4A
M4 B
M 5AM 5BM 5C
M5 D
HAN UR
M 6AM6B
M6C
M 7A
AN AV ATTI
M7B
TAD AS
32A
HO RAN AD U
JAN AP URA
LEGEND:NH-4
G AJENDRA
K O D L IPE T
2A
M UDAG AL
KALM ALA
E4
S AN K E S H WAR
L O KAP U R
Y ARAG ATT I
M AVIN G U N DI
S AD AS HI VA G ARH
BU D UG U M P A
TE KKAL AKO TE
NELLIGERE
MANATHAVADI
H ALL IM ARI YAMM AN A
KAVITAL
KU MB ARA WAD A
RAM AN AG AR
AL NA VAR
H ULIK ATTI
KIBBAN AHAL LI
HATTIGUDUR
ITTAG I
CHINYA
Image Fusion
FCC of Rural area in Northern Karnataka
Image fusion of LISS 4
and CARTO1 PAN with improved
spatial and spectral
discrimination.
Processed at RRSSC-B
Flagship Program- 10000 KM Core Roads
– New Concepts• State Highways Authority to have development and planning rights
over a length of 1 km on each side for 2L carriageway, 2 kms on each side for 4L carriageway and 3 km on each side for 6L carriageway
• The first rights of development should be given to the developer at the rate of one acre for every 5 kms to provide for way side amenities
• A corpus fund of Rs.500 Cr. provided to KRDCL is being proposed • Multilateral Agencies will be tapped for funding- options to be availed
by developer• Banks being roped in to fund• KRDCL will work as a partner with a concessionaire for 66,000 km
Core Road Network.• KPWD, KRDCL, IDD will provide all necessary support for
implementation of project.• Status
– RFP MCA- Issued– 1st prebid conducted 28th Feb 09
• Large bidder interest seen
– 2nd Prebid scheduled shortly– Bid Submission April 17 ‘09
26
Selected Sectors- Aero• PPP Projects - Airports
– 1 Major Airport operational (BIAL)– 4 Minor airports under PPP modality
• 3 Awarded (Shimoga and Gulbarga to Maytas, Hassan to Jupitor Aviation)
• Bijapur: Project to be awarded shortly• Bellary: In Principle approval
– Total Project Cost of 3300 Cr (USD 0.75 Bn)• PPP envisaged for Bellary Airport• Up-gradation of Airport at Hubli, Mangalore,
Belgaum and Mysore. • To allow Bidar Airforce airport for civilian use• Karwar Airport to be taken up for Extension• 11 Airstrips proposed in the state
– 5 under implementation– District Admn. on land identification for rest 6– Agency identified for Transaction Advisory services
• 22 Helipads approved for encouraging Tourism27
28
PPP Projects in Selected Sectors
• PPP Projects - Tourism– No of Projects – 16 Nos of – Value Rs 2126 Crs – For theme park, cultural centre, Entertainment
(Golf Course, Aquamarine Park, Tourist Train, Facilities)projects
• PPP Projects - Heritage Projects– No of Projects – 39 Nos Identified
• Era, Empire, personality Visits etc
– Prefeasibility Study underway (INTACH Invited)
• To specify Minimum Development Obligation• Important aspects that need to be built into the CA
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
29
Content
• 7 strategic actions– Formation of PPP cell as a society
with Resources and Funding mechanism
– Setting up ATI as regional Hub for PPP training
– Implementation of MIS to monitor and control programs
– Program Approach to PPP Development
– Further Development of Eco System– Knowledge Management– Development of Case Studies/ Case
Templates
Strategy for FY 10 (First Half)
30
PPP cell as a society with Resources and Funding mechanism
1. Institution Building
Formation of PPP cell as a society to be registered under the societies act.
- Need and Benefit
• As the state nodal agency, a stronger and flexible cell improves the sustainability of the PPP program in the state
- Broad strategy
• Registration of society, Building up of Organisation structure, Staffing and logistics, funding mechanism, with clear objectives, functions, mandate
- Work Plan • To be set up in Six months-Implementation
• Government order to Go ahead
• Govt Order on Funding Mechanism etc- Responsibility Matrix
• Guidance of IDD Principal Secy with PPP Expert Assistance
• Central / ADB assistance to solicited for the State Infrastructure Development fund
31
ATI as regional Hub for PPP training
2. Capacity Building Setting up ATI as regional Hub for PPP training- Need and Benefit
• Requirement to train nearly 500 officers in the state for Capacity Building
- Broad strategy
• Development of Curriculum,
• Course Material for 3 day, 2 day, 1 Day program
• Selection of PPP Faculty (Industry)
• Train the Trainer Program
• Funding Mechanism- Work Plan
• To be set up in Three months
-Implementation
• Drawing up detailed plan with ATI for having one program every month for first 6 months (for Karnataka only)
• Drawing up detailed plan for other states- Responsibility Matrix
• GoK (PPP cell in IDD) with Central/ ADB/ World Bank Assistance
• 30 Days required of other PPP experts(volunteers) in the Region
32
3. MIS Implementation of MIS to monitor and control programs - Need and Benefit
• Rs 150000 Crore investments are already in the pipeline, 5% cost escalation would cost the state 7500 Crore
• To oversee planning, co-ordination and monitoring the implementation of on-going / proposed mega infrastructure projects
- Broad strategy
• Centralized Program management System for Monitoring and control, knowledge management, Early Warning Indicators
• Distributed Project management System for Planning, Issue & Change Management, Contract Management, Document Management, Resource Management, Cost Management, Work Collaboration
• Reporting to Various Levels through Dash board and MIS for all levels of Projects managers upto Head of State
- Work Plan • To be set up in Three months-Implementation plan
• Issue of RFQ
• Selection of Technology
• Selection of Implementation Consultant
• Drawing up off User Specification
• Selection of Vendor- Responsibility Matrix
• GoK with DEA/ ADB Assistance as this will have a impact on PPP projects in the country
• 60 days of other state MIS consultant required
Develop and Implement MIS
33
4. Program Approach to PPP Development Develop Multiple programs in all Sectors with State wide impact
- Need and Benefit
• The infrastructure requirement for the State is huge to make a difference to GDP.
- Broad strategy
• Program level approach to Prefeasibility, Transaction, Implementation and Operation
• Program level Best practices/ KPI- Work Plan • To be set up in two months (Already started)-Implementation plan
• Prefeasibility Study involving Multiple Places
• Appointment of Program managers
• Launch of at least 3 program level PPP projects in the state
• Packaging of projects with more than one impact city/place
• 10000 Km road network launched with 52 packages (Already in Bidding Phase)
- Responsibility Matrix
• GoK (PPP cell in IDD)
• 60 days of other state PPP consultant(volunteers) required
Program Approach to PPP Development
34
Further Development of Eco System
5. Development of Eco System
Empanelment of Independent Engineers and Financial/ Risk Auditors
- Need and Benefit
• As the projects go into construction phase monitoring, financial auditing and risk analysis would reduce project risks
- Broad strategy
• Selection of Panel for IE for each sector and Financial/ Risk Auditors through RFQ
• Can be for a central panel- Work Plan • To be set up in three months (Initial work Started)-Implementation plan
• Option I: Through Appointment of Consultant (If it is a central panel) with Karnataka and other state PPP Expert assistance
• Option II: Internally if only for KarnatakaResponsibility Matrix
• GoK (PPP cell in IDD) / Central Assistance
• 30 days of other state PPP consultant(volunteers) required
35
Knowledge Management
6. Knowledge Management
Conducting Work Shop in Transport Sector/ Regional Airports
- Need and Benefit
• Information dissemination
• Learning for the State
• Incorporation of learning for future state/ central- programs/ projects
- Broad strategy
• Conduct 1 Day Workshop in Karnataka with Experts drawn from all across the country/ internationally
- Work Plan • To be Conducted in four months -Implementation plan
• Program Schedule
• Signing of Experts
• Venue Booking
• Others- Responsibility Matrix
• GoK (PPP cell in IDD) with Central/ADB Assistance for signing up Speakers
36
7. Case Studies Development of Case Studies/ Case Templates
- Need and Benefit
• Case Studies for Training purpose
• Case Templates for Financial modeling, VFM analysis and Public Sector Comparator
- Broad strategy
• Undertake development through 4 Summer trainees (Cost of 2 Lacs)
- Work Plan • To be developed in 3 months -Implementation plan
• Identify cases
• Recruit Summer Trainees
• Deliver Work Products (6 Case Studies, 4 Financial Models)
- Responsibility Matrix
• PPP Expert with Assistance of Summer Trainees
• Funding for Summer Trainees
Development of Case Studies/ Case Templates
37
• Assessment of Work undertaken– PPP Policy Assessment and Development
work – Capacity Improvement– Guidelines Development– Project (Pipeline) Development– Management Systems– Project lists– Case studies
• Strategy for FY 10– On all above areas
• Challenges and Issues
38
Content
• Funding– Special funding for program based PPPs– Karnataka Infra Devp Fund
• Project Development • Skilled Resources
39
Challenges and Issues
Mr Arvind JadhavPrincipal Secretary, IDDGovt of KarnatakaRoom No 8, Vikasa Soudha, Dr Ambedkar Veedhi, Bangalore- 560001, KarnatakaPhone 080-22035085 Email: [email protected]
Rabi SahooAsian Development BankPPP Expert, KarnatakaRoom No 28, Vikasa Soudha, Dr Ambedkar Veedhi, Bangalore- 560001, KarnatakaPhone 080-22034070Fax 080-22034078Email: [email protected]@gmail.com
Thank You