kanban project scheduling

13
Kanban Project Scheduling Dynamic Scheduling for Today’s Agile Projects Alan Hill

Upload: zarek

Post on 23-Feb-2016

54 views

Category:

Documents


2 download

DESCRIPTION

Kanban Project Scheduling. Dynamic Scheduling for Today’s Agile Projects Alan Hill. About Alan Hill. Developed numerous business models and operational tools: Kanban Scheduling Model Talent Management Business Model Veteran Network Services Operating Model - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Kanban  Project Scheduling

Kanban Project Scheduling

Dynamic Scheduling for Today’s Agile ProjectsAlan Hill

Page 2: Kanban  Project Scheduling

About Alan Hill Developed numerous business models and operational tools:

Kanban Scheduling Model Talent Management Business Model Veteran Network Services Operating Model Organizational Resistance Model Health Care Business Model Company Cultures Assessment Latent Value Management Model System Scalability Model

Provided mobile architecture strategy for an innovative HR application Re-engineered support processes as part of IT re-alignment Architected functional model for weekly job fair - increased attendance

1,200% Created system architecture for intranet procedures website (Opsweb) Created “One Sheet” Dashboard of key Dot Com metrics for CEO Created transition strategy for Data Center support of Dot Com systems 24/7

Page 3: Kanban  Project Scheduling

The Waterfall Fallacy – Precision Planning

Page 4: Kanban  Project Scheduling

What’s Wrong With This Picture?Not flexible – can’t change task priority or

scheduleCan’t iterate – no cyclical development (no

agile)Not scalable – hard to add or remove tasks &

peopleIntolerant of change – new scope = new

projectWhat else do you struggle with?

Soooo….. Why use broken tools and broken methods?

Page 5: Kanban  Project Scheduling

New Tools For New Thinking

Page 6: Kanban  Project Scheduling

Dick MorleyRichard Morley is known as the "father" of the programmable logic controller since he was involved with the production of the first PLC for General Motors, the Modicon, at Bedford and Associates in 1968. Wikipedia

“Factories are havens of erratic behavior, places where everything is going wrong all the time. Abandon the illusion that you can predict these technological headaches, or that you can avert them with forward planning.”

FAST COMPANYThe Man From CHAOSBy William Green, October 31, 1995

"You don't have a prayer in hell of ever understanding factories. You really don't have control. By striving to get control, you only make it worse."

Page 7: Kanban  Project Scheduling

CHAOS Paint Booths

Morley's system changed the game: it enabled the paint booths to "bid" for the right to paint certain trucks. If a particular booth had been painting black trucks all day, it would bid to paint any subsequent trucks that were to be painted black. "The booth is empowered to decide what it does."

"It ran beautifully, it saved $1 million a year in paint alone."

Page 8: Kanban  Project Scheduling

Kanban Project Management

http://www.agileproductdesign.com/blog/2009/kanban_over_simplified.html

Still not ‘pull’ based: Throughput limited by # of open slots

Page 9: Kanban  Project Scheduling

Kanban ‘pull’ workflow with room for expansion

Workers ‘bid’ on tasks from various projects – not ‘held captive’ to one project

Verifies task meets requirements, as usual

Page 10: Kanban  Project Scheduling

Expanded to include offshore and freelance help

Page 11: Kanban  Project Scheduling

Workers can bid on any task: Experience factor affects their total bid value

Page 12: Kanban  Project Scheduling

Tasks have ‘Reward Points’ exchangeable for rewards in the Reward Bank

QA assures task meets requirements before reward is assigned

Page 13: Kanban  Project Scheduling

Your Turn - DiscussionFeature enhancements for the way you really

work?Manual vs. automated?How to ‘socialize’ acceptance in your

company?