journal of xi'an university of architecture & technology...

20
Public Private Partnership Approached to Affordable Housing Provision in Abuja Nigeria. Yahaya Ahmed 1&4* , Ibrahim Atan Bin Sipan 2* Dzurllkanian Zulkarnain bin Daud 3* Hariati Binti Abdullah Hashim 4* 1,2,3,4 Faculty of Built Environment and surveying, University Technology Malaysia, 81310 Skudai, Johor, Malaysia, 4* *Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa, Nigeria. ([email protected]) ABSTRACT The perspective review of this study is the issue of public private partnership with regard to the approached of which it has become more important in upgrading an affordable housing provision in Nigeria. Furthermore, this study aims to identify the challenges of public private partnership for affordable housing provision and proffer an alternative means of providing an affordable housing in Nigeria. Based on previous studies public private partnership has not made any important contribution to affordable housing; rather it is unexpectedly change approached by providing housing for high- income earners. Data were achieved using an expert opinion to identify the PPP problems and critical success factors to build up questionnaire survey. In total, 256 responses were obtained and analyzed using statistical tools to identify the challenges of public private partnership for housing provision in Abuja. This study found that lack of sound legal framework, a paucity of funds, lack of experience in PPP, funding constraints, and lack of proper monitoring are the major challenges of public private partnership housing provision. Furthermore, this study also found that adequate legal framewrok, sound financial package and judicious government control are the success factors of affordable housing in Nigeria. Therefore, this article indicate that self-help options and government assisted housing options, accessibility by Nigerians to mortgage facilities, funds from the contribution pension scheme, provision of land at no cost should be considered in the PPP housing scheme. However, it’s recommended that a good framework is required on the constituent factors of PPP for affordable housing using the adequate legal framewrok, sound financial package and judicious government control. Keywords: Affordable housing, Public Private Partnership, Abuja, Nigeria Journal of Xi'an University of Architecture & Technology Volume XII, Issue III, 2020 Issn No : 1006-7930 Page No: 4847

Upload: others

Post on 17-Nov-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Public Private Partnership Approached to Affordable Housing Provision in

Abuja Nigeria. Yahaya Ahmed1&4*, Ibrahim Atan Bin Sipan 2* Dzurllkanian Zulkarnain bin Daud 3* Hariati Binti

Abdullah Hashim 4* 1,2,3,4 Faculty of Built Environment and surveying, University Technology Malaysia, 81310 Skudai,

Johor, Malaysia, 4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Nigeria.

([email protected])

ABSTRACT

The perspective review of this study is the issue of public private partnership with regard to the

approached of which it has become more important in upgrading an affordable housing provision in

Nigeria. Furthermore, this study aims to identify the challenges of public private partnership for

affordable housing provision and proffer an alternative means of providing an affordable housing in

Nigeria. Based on previous studies public private partnership has not made any important contribution

to affordable housing; rather it is unexpectedly change approached by providing housing for high-

income earners. Data were achieved using an expert opinion to identify the PPP problems and critical

success factors to build up questionnaire survey. In total, 256 responses were obtained and analyzed

using statistical tools to identify the challenges of public private partnership for housing provision in

Abuja. This study found that lack of sound legal framework, a paucity of funds, lack of experience in

PPP, funding constraints, and lack of proper monitoring are the major challenges of public private

partnership housing provision. Furthermore, this study also found that adequate legal framewrok,

sound financial package and judicious government control are the success factors of affordable

housing in Nigeria. Therefore, this article indicate that self-help options and government assisted

housing options, accessibility by Nigerians to mortgage facilities, funds from the contribution pension

scheme, provision of land at no cost should be considered in the PPP housing scheme. However, it’s

recommended that a good framework is required on the constituent factors of PPP for affordable

housing using the adequate legal framewrok, sound financial package and judicious government

control.

Keywords: Affordable housing, Public Private Partnership, Abuja, Nigeria

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4847

Page 2: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Introduction

Just like most places in the world, Nigeria faces many difficulties in providing adequate housing

development. The government has made several trial in the past few decades to address the current

housing problem for all income groups that are the majority of urban residents in Nigeria (Federal

Republic of Nigeria, 1991). However, Awotona (1990) and Oruwari (2006) observed government

failures over the years to address the rapid increase in housing problems, especially among the lower

income groups. Aluko and Amidu (2006) illustrate that low-income groups represent all wage earners

and self-employed people whose annual income is 20% or below the maximum annual income level

of the highest wage level in the Specific Public Service Structure in Nigeria. The group comprises

people earning an average annual income of approximately N 1414, 912 (the US $ 2,861.5) or less

and is now estimated to be 80% of the Nigerian population of 60 million). However, the UN Centre

for Human Settlements report shows that housing failure is becoming more critical especially as cities

such as Abuja and Lagos (UN-HABITAT, 2006; World Bank, 1993), contributing to 100 slums with

poor housing and living conditions with most low-income groups between 1985 and 2006 (Ibem,

2011). According to Ibem (2011), several factors that contribute to the increase in housing difficulties,

including skills & acquisition issues, institutional problems, financial problems, legal frameworks

and political problems are a major element of the housing crisis in sub-Saharan Africa.

African countries cannot cope with the crisis of protection because of our inefficiency or even refuse

to accept change and transform our organization closer and our values to the ever-changing positive

situation. Wibowo & Aifen (2015) and Kavishe, 2018, suggests that both the public and private

sectors in the African region have occupied an incorrect organizational framework and a non-

functional housing delivery system in the past, and hence, the housing challenges in the continent

have increased rapidly. Among the international developments, the United Nations Global Strategic

Organization Shelter has called on the government to withdraw from housing as it cannot meet the

growing demand for housing, as the government's failure to provide an approach to addressing

quantitative and qualitative deficiencies and housing challenges affordable in many less developed

countries (Ahmed and Sipan, 2019ª; Ameyaw, & Chan, 2015).

One of the recommended UN solutions is that the Nigerian government has to put more responsibility

for housing provision in the private sector through Public-Private-Partnerships (PPPs) (Ibem1 and

Aduwo, 2012). Miraftab (2004) finds that public-Private Partnerships (PPPs) are recognized as an

arrangement and an approach of alternative institutions that can be seen to make public services to

cities in developing countries. In the provision of housing, PPP is promoted on the assumption that it

will increase the interest of sectors, housing sector capabilities, and the expansion of housing

capabilities and facilities (Shelter Afrique, 2008). Satisfied with this visible benefit, the Nigerian

government in 2004 adopted the PPP to propose an increase in housing supply in the country (Owei,

2007). In the cities of Abuja and Lagos, for example, there is a change in service through the PPP

approach, particularly in the areas of housing development, solid waste management and

transportation. The government believes that the PPP involved will improve efficiency in public

administration and service delivery through injection of private and professional funds (Lagos State

Government, 2008). However, to date, there is little evidence to prove how PPP has addressed

housing problems in the cities as there is very little research that can be proven on the matter. Thus,

the success of PPP projects is determined by the critical success factors of PPP.

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4848

Page 3: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

This background study is to identify the PPP problem and determine the CSF PPP for affordable

housing in Nigeria. This study aims to review the problems and success of PPP in the provision of

affordable housing in Abuja Nigeria. Based on the findings, this paper provides recommendations for

better PPP outcomes for affordable housing in Abuja and other cities in Nigeria.

Nature of Nigeria’s Housing problems.

Housing problems have been generally accepted as an increase and complex. In the spectrum of these

problems, one can identify quantitative and qualitative shortcomings. (Abiodun, 1985) quoted by

Olayiwola et al. (2005). Identify major housing problems in Nigeria due to the instability of human

needs for housing. This problem is worldwide and its recurrence. Actually, it is doubtful if any

country in the world can satisfy its housing needs satisfactorily. In Nigeria, most people live in low

quality housing and in a clean environment. This inadequate housing problem has been compounded

by rapid urbanization and economic growth. Housing problems are more serious for low-income

groups where the problem has been complicated by rapid growth, rising property value, speculative

activity, poor immigrant entry and lack of planning (Ibem 2011). One can also be a growing place in

the form and design of housing from home forms to single-family homes and forms as factors

responsible for poor housing shortages for the low income group (Okpala, 1985; Waziri and Roosli,

2013). Inadequate housing problems are experienced in the urban and rural areas of Nigeria. For

example, NISER in rural housing studies in nine countries in southern Nigeria found that "the

predicted demand for housing units on average six for one residential unit for nine states was 5.2

million in 1990, 7.0 million in 2000, 9.5 million in 2010 and 12.7m in 2020. "Other manifestations

of housing problems are high rent in the housing market, inadequate mortgage finance, and mortgage

loan facilities. This problem has caused congestion, inadequate socio-social facilities, unsustainable

social and economic conditions and urban poverty, an absence of open space, land area development

resulting in congestion, facilities in residential areas, and inadequate Building materials (Onibokun,

1985) quoted by Olayiwola, O Adeleye (1985).

Affordable Housing Need and Productive Demand

With increased population and inland urban migration in Nigeria, affordable housing issues are a

basic necessity for individuals to enjoy. Affordable housing is described as housing for rent or

purchase that is affordable for all income groups. Household constraints with the proportionate

financial capacity to secure private housing constrained (Milligan, 2009). The gap between housing

demand and the ability to acquire. There is a gap between affordable housing requirements and the

ability to effectively acquire housing needs with the challenge of affordable housing demand in the

country (Woetzel et al, 2014; Yap and Hua, 2017).

Housing Demand

There is no limit to claiming regardless of those who have housing and those who do not have a home

still need more, those who still need more rooms or improve the current situation. However, there is

a demanding challenge that affects the needs and wants of the people, with related financial problems.

An Inconsistency of housing demand and provision of housing supply in Nigeria that faces rapid

population growth, the rapidly developing township of the non-built financing system (Walley, 2014).

There are some economic factors that cause demand, such as rural urban migration and increased

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4849

Page 4: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

economic activity which leads to increased demand for lobour (Finmarktrust, 2010). The violation of

the government's efforts to provide housing and realize achievements during the period was

uncontrolled and worsened by population growth of around 42 million in 1960 and around 200 million

in 2016. Temporary housing expenditure is about 100,000 units per year, as well as the need for

around 700,000 units each year and that has increased the total housing deficit to about 23 million

units (ACEC, 2015). In addition, in some major urban areas (such as Abuja, Kano, Logos, and

Kaduna), the increase in housing demand is about 20% per annum (Okonjo-Iweala, 2014). Vision

development strategy aimed at building 10,398,650 housing between 2012 and 2020 (Odia, 2010).

However, the number of Nigerians living in urban areas between the 1930s was 7% and 10% in the

1950s while 20%, 27%, and 35% between the 1970s and 1990s (Ajibola & Sanmi, 2015). The number

of Nigerians living in urban areas has now risen to 50% causing some problems that resulted in

housing shortages, the congestion of nearly 60% of Niger's unmarried people (FGN, 2013).

Housing supply

Views of housing supplies in Nigeria can be based on formal and informal sectors. Formally refers

to supply from the private sector and various elements of the public sector. Common problems stop

the world city boom from losing this opportunity. Although there is a divergence scale, the limitation

of providing more affordable housing is very similar worldwide and regionally. This can be

categorized as a barrier that leads to a lack of demand and restricts the ability of developers to produce

sufficient numbers and prices for the mass market (Walley, 2014).

There are many challenges in the supply side, especially access to land rights and property rights

lacking the housing industry to produce in large quantities of affordable housing. Regulatory

obstacles, such as challenges in the registration of obsolete building codes or building codes, and the

time and cost of constructing the limit of home-limited advertising limitations (Olotuah and Aiyeta,

2015). Developers find it difficult to access suitable and long-term financing and may be required by

the lender to provide the document as a potential feasibility study based on the financial status in the

field. Effectively, the housing industry is hindered as borrowers are unwilling to take risks associated

with new developments that target social demand. The lack of public finances can also prevent state

or local authorities from providing appropriate infrastructure or equipment to housing projects

(Walley, 2014).

The scattered housing units built in Nigeria The main component of the successful housing delivery

program is the ability of the housing units to target consumers. Housing is reasonable only when it

does not spend more than 30% of household income (Muhammad & Johar, 2018). Thus, housing

capability is a function of housing and household income. Therefore, this section attempts to

determine the affordability of housing units built in the study area by linking household income to

home prices. Questions asked about housing prices are: what is the selling price of a home unit? There

is a voice response among key actors (government agencies and the private sector), that houses are

sold at a higher price than originally agreed. Farm managers representing Terraquest Development

Company Limited (ESM) said: "... house units will be built at N3.4 million for 2 bedrooms and N4.95

million for 3 bedrooms but because the government can not provide funds for infrastructure the

private sector forced separately funds to finance infrastructure, resulting in an increase from N3.4

million to N4.2 million (semi-detach semi-part houses) and N4.95 million to N5.9 million (3 semi-

detached houses) to cover the cost of infrastructure provision ". In the same tone, ADH said:

"The State Government can not provide the infrastructure as agreed, private companies do so. The

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4850

Page 5: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

government can not pay the amount spent;

The company is advised to provide infrastructure cost factor to the cost of housing which then

increases the price from N3.4 million to N4.2 million (2 semi-half houses) and N4.95 million to N5.9

million for 3 bedrooms. "In conclusion, after the completion of the housing unit, prices rose by 23.5%

and 19% for 2 semi-bedrooms and 3 separate bedrooms. In addition, the government could not control

the project due to the inability to carry out its responsibilities as contained in the contract agreement,

hence the arrangement early on that the payee will pay 10% and 20% of the prepayment (for 2 semi

detach and 3 bedrooms respectively) while the FMBN will pay the balance to be repaid from wages

through an unsecured installment deduction (ADH & MGO) Target group unable to pay openly

because of the low pay structure; As a result, the housing units were vacant for some time and some

houses were demolished, as the State Government buyers and dispose of home units. Thus, private

companies have devised four ways to remove open house units for ram ai: 1) payment of 10% and

20% of the total cost of housing as per i deposit for 2 bedrooms 3 bedrooms; 2) Rent (between N60,

000 - N70, 000 per annum for 2 twin detached rooms and N80, 000 - N100, 000 per annum for 3

separate bedrooms); and 3) open sales for those who can afford it. The 2 bedroom semi-detached

housing cost is N4.2 million which will be paid within 30 years which amounts to N140, 000 a year;

30% of the annual income of the recipient who earned N420, 000 will amount to N126, 000 which is

much lower than the amount required as an annual repayment for housing. During the interview, the

representative of the consignee agreed unanimously, that the price of the home unit cannot be

estimated as the level of income of civil servants in the study area. Therefore, this indicates that

housing units built under this rule fail in capacity testing. Ibem and Aduwo (2012) report in similar

studies conducted in Ogun State, Nigeria, that the cost of home units built through PPP is much higher

than those constructed through non-PPP arrangements. In addition to the cost of home units,

beneficiaries are often required to provide sureties and meet other requirements to qualify for

mortgage loans which are always hard-to-find (PSAF, 2018).

One of the reasons for adopting PPPs for housing provision that is contrary to the direct approach is

to make housing more affordable to the target group. However, studies show that the housing units

provided are not available to most low-income people.

Government owned housing

These houses are allocated to civil servants or certain levels and federal and state-level staff categories

with a small amount of money to be deducted from their monthly salary. The government for that

business almost provides 25% of the public slave accommodation through this type of housing (Talba,

2004). The government has two types of housing, government reserve (GRA) and low-income

housing for workers (NDUBEUEZE, 2009). This government reserve is almost found in major cities

in Nigeria. They are derived from British colonial administration culture building European quarters

that provide protection to the increased number of colonial administrators in the 1920s. The GRA

houses consist of a single family center based in the west with a wide plot size and open space. It has

the least density of urban housing with almost one unit of every two hectares with little variation

between cities (Mba, 1993). Senior officials take advantage of GRA as a luxury housing subsidy

with British exit after independence. Low and medium income provides with self-government who

hates in the effort to provide affordable housing to employees closer to their workplace. This type of

housing is far less attractive than their GRA counterparts. This housing is the only one or two bedroom

apartment in a separate, semi-detached or consecutive house in smaller plot sizes. These houses

provide ample basic amenities and utilities and often provide better accommodation than some in

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4851

Page 6: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

high-income neighborhoods/ neighborhoods with reasonable subsidized rates for employees who

benefit from such housing (Osei-Kyei and Chan, 2015).

Mass Public Housing

The creation of the Federal Housing Authority (FHA) shortly after independence under Decree no.

40 of 1973 with the responsibility of making proposals for housing programs and government

approvals from project implantation. Some housing estates were built by FHA under the National

Housing Program. The Implementation of this program is in line with the country's National

Development Plan (NDP). For example, the National housing program built the town festival and

Ipaja City in Lagos between 1975 and 1980. Likewise, from 1981-1985 the National Housing

program also plans to build 350 medium and high-rise housing units in each federal state (Itsmeizic.

2011). On the other hand, the NHP suffered many abandoned housing projects from 1986-1993 which

resulted in the failure of the program. This period marks the period of consolidation for this reason.

Therefore, the government places emphasis on completing a suspended housing program instead of

a new program. The National Housing Program 1994-1995 is designed to build 121,000 homes across

the country for all income groups. The first low-cost housing estate was built by FHA in the capital.

That's the first affordable housing to provide in this country with a mortgage repayment time log

system (Jiboye, 2011).

Private Sector Housing

Despite the emphasis on public mass housing policy earlier, the government remains a key sector in

the development of Nigeria housing. Despite the level of implementation, the amount and type of

public housing are too limited to influence the size and structure of urban housing demand, affecting

rent or transfer of any filtration process in the country (Ozo, 1990; Megginson, & Netter, 2001). The

National Housing Policy Verily recognizes that the private sector contributes more than 90% of

housing stocks in the country (Federal Government of Nigeria, 2002). The private sector is usually

referred to as a combination of individuals, small builders, developers / commercial housing agencies,

banking and non-banking financial intermediaries, and industrial and commercial organizations that

invest in housing with the aim of making profits. Hence its use here basically covers most other forms

of housing that are not served by government agencies.

Individuals and Households

Individuals and households are the most dominant sub-sectors in the private sector in the provision

of urban housing in the country. In fact, more than 70 percent of the total stock of urban housing

(including housing owners and rental housing) in Nigeria is provided by individuals (UNCHS, 1993).

Although this sub-sector contributes most of the rented housing in urban areas, self-interest is a very

strong motive. In doing so, the type of housing provided cuts across different income groups from

luxury dwellers to lower housing including unofficial standards. Given that the vast majority of

households in the city are made up of most low-income and middle-income households, they are in

the housing sub-market for these groups that they are most visible. Most homeowners rent an

apartment and extra room in their home to revive their housing investment and increase the role of

housing for major private sector actors discussed below. Household income (Roumboutsos et al.

2013).

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4852

Page 7: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Housing in Abuja

According to Isma'il et al. 2014 Abuja the Capital Federal Territory of Nigeria consists of most

government headquarters and government headquarters parastatals of several private firms, foreign

organizations and investors, offices and companies. It is a great development area, with the majority

of offices, headquarters and firms located in the federal capital. Due to the level of development, the

high number of municipalities by the public not only moved from rural areas, but also by people

moving from other parts of the states to Abuja to find a better job. As the metropolitan economy

continues to improve, the public gets and continues to become richer. In connection with the rush of

people from various parts of the country, housing and land are seen by wealthy individuals as

consecutive materials and therefore bought and built in the most central city (Amba and Ekanem,

2012).

As identified by Muhammad and Johar (2018), land entrepreneurs, including Landlords, Entrepreneur

Developers, Transport and Utility Companies, Banks and Companies, and others, regard the home as

a dwelling place, but also as a product the real estate market, which can be bought and exchanged,

thereby providing exchange and use value to producers (entrepreneurs) and consumers (consumers),

and therefore try, through collective action and in most cases in federation with other operators,

improve the future of land use in the area. Therefore, Abuja is now a city with buildings, scenarios,

offices, organizations, parks, open spaces, and so on, but also a very expensive city for housing people

working in the city, except in high class and some individuals in the upper middle class society

(Giddings, 2007). There are several types of housing in the city, consisting of luxury homes, duplexes,

bungalows and apartment blocks but all are very expensive. Due to the continued influx of people to

the city, the Government and some private investors have built and are still building plantations and

housing developments in FCT to accommodate the growing population. The Master Plan contains

proposals for housing programs combined with subsidies to the housing sector, offering strategies to

improve housing conditions in other urban areas of Nigeria. The program is based on the following

principles:

i. Sufficient layout of plots and appropriate infrastructure standards allow for increased standards

when increasing economic capacity

ii. A broad scope of housing alternative for all income groups, from separate homes, flats, to a large

number of traditional families, or accommodation and accommodation services Increase dependence

on local building materials, reducing the finishing level and careful management controls to ensure

that construction costs are reduced and maintained at the lowest level.

iii. Site and service approach, use of self service and self help to reduce costs. Center for Ownership

and Expulsion Center & Center for Social and Economic Rights (Bredenoord, 2017).

Methodology

This study uses a sequential mixed approach. The purpose of the sequential design approach involves

the first qualitative data collection process to explore phenomena and then assemble quantitative data

to clarify current relationships in qualitative data. This study used a focus group discussion with

public private partnership experts and acknowledged relevant success factors for the provision of

public private partnership affordable housing in Nigeria as determined from the literature. The

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4853

Page 8: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

professional background respondents to the group interviews have identified their understanding of

the public private partnership project. A pioneer surveys were conducted to test the efficiency of

research tools using Cronbach Alpha and Kaiser-Meyer-Olkin statistical approaches. The mechanism

was found to be reliable and effective in preparing the questionnaire.

As described by Sykes et al. 2016 and Kumar, 2005, the questionnaire project should be from a

literature review and validated through focus group interviews and tested before being used for

comprehensive data collection. The questionnaire was circulated to stakeholders involved in public

and private developers who provide public private partnership in Abuja, Nigeria. A total of 350

questionnaires were randomly give to FCT's target audience (stakeholders of public and private sector

officials) to participate in public private partnership housing and real estate developers, which

returned 254 questionnaires. Factor analysis using SPSS software and intelligent partial least test

analysis of the data used to analyze the data from the questionnaire.

Results and Discusion

1. Results and discussion a. Demographic of the respondent

Figure1 Age group and types of PPP project Participated

Figure 2 Profession and Work experience

Most of the participants have work for several years with public private partnership housing project.

As shows from Figure 1(a), respondents have the necessary experience to conduct this research survey

because 78.9% of respondents have at least 1-20 years of work experience, while those over 20 have

with 25.8% of experience, only 10.9% of PPP projects are inexperienced. Figure 1(b) shows the type

of public private partnership project in Nigeria, with the highest participation in public private

partnership housing projects at 72.3% and 13.3% for infrastructure development, while those engaged

in public private partnership projects did not participate in any projects. Project, but there is a 14.5%

knowledge of public private partnership.

The role of different professionals in the public private partnership housing project in Nigeria is

shown in Figure 2(a). Respondents in financial institutions accounted for 13%, and real estate

developers accounted for 54%, of which 32% came from government civil servants. These indicate

14.50%

68%

21.50%

0.00% 20.00% 40.00% 60.00% 80.00%

Less than 25 years

25 to 40 years

Over 41 years

(a)

Age Group

14.50%

72.30%

13.30%

0.00% 20.00% 40.00% 60.00% 80.00%

None

Housing provision

Infrastructure

(b)

Types of PPP project Participated

32%54%

13%

0% 10% 20% 30% 40% 50% 60%

Government servant

(c)

Profession

10.90%78.90%

9.80%

0.00%20.00%40.00%60.00%80.00%100.00%

No experience

over 20 years

(d)

Work Experience

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4854

Page 9: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

that the respondents are from the field of research being investigated. This indicates that the data used

in the study is reliable.

Figure 2(b) shows the familiarity of respondents in the Nigerian public private partnership housing

project. The response showed that 78.9% of respondents were closely related to the public private

partnership housing project, while persons with more than 20 years of practice were 9.8%, while

those who worked for public private partnership and had inexperienced knowledge were 10.9%. It is

worth noting that about 88.7% of the respondents are completely familiar with, familiar or familiar

with the public private partnership housing project in Nigeria.

Figure 3. Focus Group Agreement Index

Figure 3. Indicate that the experts reached a 73.5% agreement with the public private partnership

critical success factors to deliver affordable housing. According to expert opinion, thirty-nine critical

success factors are very important for affordable housing provision in Nigeria. However, these 39

critical success factors were used for pilot studies and find out their reliability and effectiveness. After

finding the reliability, validity, and sampling appropriateness of the study tools, the study conducted

a broad questionnaire in consequent chapters.

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4855

Page 10: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Figure 1 PPP Problem Model

Figure 6.1 shows the Model Public Private Partnership Issues by constructing the second order and

the Tables 6.1 and 6.2 reveal the reliability of composites, the validity of convergence and the

validity of discrimination. The reflective measurement model for the Private Public Partnership

Problem under the five construction described above, Skills & Procurement Problems comprises

four indicators: PPP10, PPPP9, PPPP18 & PPPP12), Institutional problem as the second

construction also consists of three indicators (PPPP7 (PPPP6, PPPP4), the third construction is a

Financial Problem with three indicators (PPPP3, PPPP2, PPPP11), while the Fourth Legislative

Framework is constructed with four indicators namely PPPP23, PPPP20, PPPP22, PPPP13) is a

Political problem, indicator (PPPP19, PPPP17, PPPP16).

Table 1.1 Composite Reliability and Convergent Validity of Public Private Partnership

problems Model.

1st order

Construct

2nd order

Construct

Items Measurement

Model Type

Loading CR AVE

PU

BL

IC

PR

IVA

TE

P

AR

TN

ER

SH

IP

PR

OB

LE

M M

OD

EL

Skill &

Acquisition

Problems

PPP10

PPPP9

PPPP18

PPPP12

Reflective

0.725

0.761

0.671

0.708

0.809 0.514

Institutional

problems

PPPP7

PPPP6

PPPP4

Reflective

0.777

0.768

0.788

0.821 0.605

Financial

Problems

PPPP3

PPPP2

PPPP11

Reflective

0.778

0.733

0.733

0.793 0.56

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4856

Page 11: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Legal

Framework

PPPP23

PPPP20

PPPP22

PPPP13

Reflective

0.748

0.709

0.748

0.742

0.83 0.55

Political

problems

PPPP19

PPPP17

PPPP16

Reflective

0.727

0.734

0.760

0.785 0.548

Table 1.3 Discriminant Validity PPPPF1 PPPPF2 PPPPF3 PPPPF4 PPPPF5

SAP

IP 0.569

FP 0.544 0.556

LFP 0.689 0.529 0.69

PP 0.532 0.673 0.772 0.693

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4857

Page 12: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Skill & Acquisition Problems (PPPP) Construct

Skill and acquisition problems include four variables, skilled manpower (PPPP10) with loading

points (0.725), technical knowledge (PPPP9) with loading points (0.761), Less experience in PPP

(PPPP18) and Growth in building materials (PPPP12) charge (0.708).

As shown in Table 6.3 the reliability value of Skills & Earnings Problems is (0.809) satisfying

higher than the acceptable minimum of 0.6. This shows that the value of composite reliability is

steady (Civelek, 2018; Hair et al., 2014). Nevertheless, the AVE is a Skills & acquisational

Problem (0.514) also indicates that convergence validity has been accepted, as the value received

by AVE <0.5. The problem of the institution is to have the AVE (0.605), while Financial Problems

have AVE (0.56), Legislative Framework (0.55) and Political Problems (0.548), which indicates

convergence validity has been establish. This shows that Skills and procurement problems have a

significant impact on PPP for affordable housing provision in Nigeria.

Therefore, there is need to share abilities, knowledge and concepts. For example, we are

establishing training and meetings to share concepts and knowledge. Share expertise; use technical

support from various private organizations. However, one of the greatest significant ideas and

features of partnership is sharing.

Institutional problems Construct

Institutional problems as shown in Table 6.4 contain three variables, the lack of overall view of

the national development goals (PPPP7) with loading points (0.777), Institutional Framework

(PPPP6) with the loading point (0.768) PPPP4) (0.788). However, the value of composite

reliability for institutional problems has a combined reliability value (0.821) and AVE (0.605).

Therefore, the results show that the reliability of composites and AVE has significant and steady

value because the value is slightly higher than the minimum value.

Therefore, we have an obligation to ensure that the process is clear, competitive and transparent.

These essential be reflected and consolidated in the procedure we adopt. Therefore, compared

with other countries in the world, the government Nigerian needs to implement a new framework

to support public private partnership to meet these challenges. Malaysia, the United Kingdom and

Australia as example.

Financial Problems (PPPP) Construct

Financial problems as shown in Table 6.5 have three latent constructs, including Paucity Fund

(PPPP3) with loading point (0.778), base instability and turning point (PPPP2) with the discharge

point (0.733) and unstable building material prices PPPP11) also with loading point (0.733).

Therefore, Financial Problems have composite reliability values (0.793) and AVE (0.56). CR and

AVE financial issues show significant and credible value because of the higher value of the

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4858

Page 13: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

acceptable minimum.

However, due to insufficient funding sources, high interest rates and lack of government policies,

financial problems are mainly affecting Nigeria's public private partnership. Therefore, the

Nigerian government needs to support public private partnership through alternative funding,

through the establishment of more financial institutions like the federal mortgage lending

institutions, and the need to ease or control high interest rates.

Legal Framework (PPPP) Construct

As shown in Table 6.6 the Legal Framework has four variables, the lack of proper monitoring

(PPPP23) with the discharge point (0.748), lack of awareness among stakeholders (PPPP20) with

discharge point (0.709), Poverty Challenge (PPPP22) point (0.748) and inefficient equipment

(PPPP13) with charge point (0.742). The Legal Framework also has a composite reliability value

(0.83) and AVE (0.55). Therefore, the Legal framework has important and credible CR and AVE.

Therefore, the government needs to support public private partnership by providing relevant

policies and is responsible for controlling public private partnership affairs to provide affordable

housing.

Political problems (PPPP) Construct

Political problems have three variables, high cost social facilities (PPPP19) with loading points

(0.727), Lack of political will (PPPP17) with discharge point (0.734), and Financing constraints

(PPPP16) with discharge point (0.760). CR issues are (0.785) and AVE (0.548). Therefore, the

results show that the reliability of composites and AVE has significant and steady value because

the value is slightly higher than the minimum value. The force of the electoral phase and the lack

of political environment caused by inadequate services may create problems for starting or

retaining public-private partnerships. Governments must, as much as possible, to ensure that these

political factors do not undermine contractual partnerships with private sector partners. Thus, all

the formation under the public private partnership model as shown in Table 6.1 proved a significant

impact on PPP in which all variables are in acceptable value. This shows that the PPP problem has

a significant impact on affordable housing in Nigeria. Therefore, critical success factors of public

private partnership will be the effective means of solving the problema of public private

partnership for affordable housing provision in Nigeria.

Therefore, public private partnership can profer a solution to affordable housing in Nigeria using

the adequate legal framewrok, sound financial package and judicious government the key success

factors to affordable housing in Nigeria as found in this study.

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4859

Page 14: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Adequate Legal Framework (ALF) Construct.

Table 6.12 Composite Reliability and Convergent Validity of Adequate Legal Framework (ALF)

Construct.

1st order

Construct

2nd order

Construct

Items Measurement

Model Type

Loading

(> 0.7)

CR

(>0.6)

AVE

(>.5)

Critical Success

Factors Of Public-

Private

Partnership

Model

Adequate

Legal

Framework

(ALF)

ALF2

ALF4

ALF5

ALF6

ALF7

ALF8

ALF9

Reflective 0.695

0.705

0.738

0.708

0.742

0.710

0.719

0.881 0.514

Table 6.12 shows adequate legal framework as one of the first construct which consist of the

commitment/responsibility of public/private sectors (ALF2) with loading point (0.695),

identification and understanding of client/owner requirement (ALF4) and a loading point of

(0.705), project technical feasibility (ALF5) also has a loading point of (0.738), technology transfer

(ALF6) with loading point (0.708), available of competent personnel (ALF7) and a loading point

of (0.742), sound legal basis (ALF8) with a loading point of (0.710), and robust and clear

agreement (ALF9) also with a loading point of (0.719) respectively. Meanwhile, an adequate legal

framework has a composite reliability value of (0.881) and AVE of (0.514); this shows that

adequate legal framework construct is very significant with a perfect model fit.

However, from the above Table 6.12, Nigeria cannot provide affordable housing without adopting

the use of an adequate legal framework. Adequate legal framework serves as one of the important

success factors with sub factors of the commitment/responsibility of public/private sectors,

identification and understanding of client/owner requirement, project technical feasibility,

technology transfer, available of competent personnel, sound legal, and robust and clear

agreement. This factors will help to ensure the program stability and the recognition of

beneficiaries as rights holders in Nigeria, this is because some countries like Malaysia, UK, and

Australia among other countries in the world have succeeded in improving affordable housing

condition for all income group

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4860

Page 15: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Sound Financial Package (SFP) Construct.

Table 6.14 Composite Reliability and Convergent Validity of Sound Financial Package (SFP)

Construct.

1st order

Construct

2nd order

Construct

Items Measurement

Model Type

Loading

(> 0.7)

CR

(>0.6)

AVE

(>.5)

Critical Success

Factors Of Public-

Private

Partnership

Model

Sound

Financial

Package

(SFP)

SFP1

SFP2

SFP3

SFP4

SFP5

Reflective 0.753

0.752

0.805

0.799

0.697

0.901 0.581

Sound financial package (SFP) consists of five variable, Stable currencies of debts & equity

finance (SFP1) with loading point of (0.733), repayment of the debt (SFP2) and a loading point of

(0.752), access to alternative fund (SFP3) has a loading point of (0.805), financial capability

(SFP4) with a loading point of (0.799), and assessment of cost-benefit (SFP5) with loading point

of (0.697). However, the CR and AVE of the sound financial package (SFP) are (0.901) and

(0.581), respectively. This indicates a significant fit model that all variable fall within the accepted

value.

From the above table, the result proves that PPP can provide adequate and affordable housing

without the financial package. The ability to finance a project is one of the most important aspects.

Therefore, the government of Nigeria needs to support the PPP through an alternative mean of

funding, by creating more financial institution like the federal mortgage institutions, also the need

to reduce or control the high-interest rate, provision of subsidy will help reducing the cost of

housing to the middle and low income earners (Ahmed and Sipan, 2019b).

Judicial Government Control (JGC) Construct.

Table 6.16 Composite Reliability and Convergent Validity of Judicial Government control (JGC)

Construct.

1st order

Construct

2nd order

Construct

Items Measurement

Model Type

Loading

(> 0.7)

CR

(>0.6)

AVE

(>.5)

Critical

Success

Factors Of

Public-Private

Partnership

Model

Judicial

Government

control

(JGC)

JGC10

JGC11

JGC12

JGC2

JGC3

JGC5

Reflective 0.690

0.738

0.660

0.723

0.703

0.674

0.874 0.573

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4861

Page 16: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

JGC7

JGC8

JGC9

0.726

0.744

0.715

As indicate in Table 6.16 judicial government control (JGC) construct consist of six variables,

such as; action against errant developers (JGC10) has a loading point of (0.690), access to land

(JGC11) with loading point (0.738), appropriate risk allocation (JGC12) with loading point of

(0.660), sound economic policy (JGC2) with loading point (0.723), stable political environment

(JGC3) with loading point (0.703), strong political support (JGC5) has a loading point of (0.674),

share authority between the public & private sector (JGC7) with loading point (0.726), strong

government support (JGC8) also has a loading point of (0.744), and consistent monitoring (JGC9)

with a loading point (0.715). The judicial government control (JGC) construct has a CR of (0.874)

and AVE of (0.573). Therefore, the judicial government control (JGC) model indicate a significant

and accepted point. Judicious government control (JGC) involving government control exercises

to ensure that all parties comply with established rules and regulations and discharge their

responsibilities wisely. The variables under construction are based on the success factors identified

from the literature studied (Chan et al. 2005).

The government is the brain behind the success of PPP in the world. Therefore, the success of PPP

depends on strong government support. The result in the above Table 6.16 proves significant for

judicious government control as one of the key success factors of PPP to provide affordable

housing in Nigeria. The continued improvement in the rule of law will help build investor

confidence and promote greater growth. Ensure that the government exercises certain rights

granted by the project agreement or certain rights derived from national laws, such as foreign

exchange levy guarantees, to ensure that the company will not be requisitioned without proper

compensation and will not stop the project company (Ahmed and Sipan, 2019b).

Conclusion

The main reason for PPP in housing is to provide adequate and affordable housing for all income

groups. As a research find, PPP in the study area faces serious challenges in providing affordable

housing. These challenges include acquisition and access to land, implementation of poor housing

policies, adequate housing finance, access difficulties to mortgage facilities and land titles, large

rural urban migration and cost recovery among others. Just like the previous public housing

delivery strategy, this approach cannot be a home for high-income and middle-income earners in

Abuja Nigeria. However, provision of affordable housing has not yet been reached in the study

area. The point that there is no consensus on the National Policy on PPP in housing in Nigeria is

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4862

Page 17: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

anxiety. Since PPP for affordable housing in Abuja Nigeria is unclear. Hence, it shows that PPP

practices for affordable housing are then considered as governance controls as the main component

of affordable housing.

However, findings of this study accept the initiatives of government and the private developers to

create an opportunity of providing affordable housing, although affordability relies on income and

expenditure with the theories of securing affordability, refund affordability and income

affordability as component of affordability as said by Gana and Hill, 2008.

It is therefore recommended that a good policy framework for the implementation of other PPP

variants in fulfilling affordable housing in Nigeria should be a consonant on the parameters of

affordable housing constituencies. First of all, it will wipe out all the undetermined constraints of

local government authorities and grassroots organizations in PPP for affordable housing, and then

provide the needs of different socioeconomic groups in the country's sub sector of housing in

Nigeria. Land allocation and government rights documents at premium cost add to the cost of

housing provided by PPP.

To this end, the government may consider providing free land for affordable housing to ensure the

capabilities and benefits of commercial sector partners. We can also go behind the example of

Malaysia to provide affordable housing for all income groups, so that cheaper and local materials

can be used instead of expensive and imported building materials in building affordable housing

units. Similarly, self-help options and government-assisted housing options should be incorporated

into the PPP housing scheme to provide affordable housing for all income groups at a reasonable

rate.

References

Abiodun, J.A.1985. Housing Problems in Nigeria Cities Onibokun p ed Housing in Nigeria: A book of

Reading NISER, Ibadan Pp 49-63, 1985.

Ahmed Y. and Sipan I.A. (2019a). Critical Factors for Implementation of Public-Private Partnership for

Affordable Housing in Nigeria. International Journal of Scientific & Technology Research Volume 8, Pp

1125-1131, ISSUE ISSN 2277-8616.

Concept of Affordability

Income affordability

Refund affordability

Securing affordability

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4863

Page 18: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

Ahmed Y. and Sipan I.A. (2019b). Public Private Partnership as a Determinant Factors of Affordable

Housing in Abuja Nigeria. The International Archives of the Photogrammetry, Remote Sensing and Spatial

Information Sciences, Volume XLII-4/W16, Pp 71-78, 2019.

Ajibola G.B & Sanmi A. (2015). Housing Rehabilitation Strategy as Enabling Approach for Development

of Rural Housing Poverty in Nigeria. World Journal of Social Sciences and Humanities Vol. 1, No. 1, 2015,

pp 11-17. doi: 10.12691/wjssh-1-1-3

Aluko, B. T., & Amidu, A. (2006). Urban low-income settlements, land deregulation and sustainable

development in Nigeria. Paper for the 5th FIG regional conference, promoting land administration and good

governance, Accra, Ghana, March 8–11, 2006.

Amba and Ekanem, 2012. "A Model of Housing Design and Neighborhood Planning in Abuja - Nigeria"

(2012).Master of Technology Management Plan II Graduate Projects. Paper 8.

Ameyaw, E.E. & Chan, A.P.C., 2015. Risk allocation in public-private partnership water supply projects

in Ghana. Construction Management and Economics.. 33(3), pp. 187-208.

Association of Consulting Engineering Companies, (2015). Understanding Public Private Partnerships in

Canada. Report, p.36. Access on: 12 October, 2018 at http://www.acec.ca

Awotona, A. (1990). Nigerian government participation in housing: 1970–1980. Habitat International, 14

(10), 17–40.

Bredenoord J (2017) Sustainable Building Materials for Low-cost Housing and the Challenges Facing their

Technological Developments: Examples and Lessons Regarding Bamboo, Earth-Block Technologies,

Building Blocks of Recycled Materials, and Improved Concrete Panels. J Archit Eng Tech 6: 187. doi:

10.4172/2168-9717.1000187

Chan et al., 2005Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective.

Federal Republic of Nigeria (1991) National Housing Policy (Lagos: Federal Government Press).

Federal Government of Nigeria (2002) Government white paper on the report of the Presidential committee

on urban development and housing The Federal Government Printer, Lagos

FGN (2013). Mid-Term Report of the Transformation Agenda. Abuja: Federa Government of Nigeria.

Finmarktrust 2010. Overview Of The Housing Finance Sector In Nigeria Access to Housing Finance in

Africa. Lagos: Commissioned by EFInA and FinMark Trust.

Giddings, W. (2007). Housing Challenges and Opportunities in Sub-Saharan Africa. Washington, D.C:

Intertnational Housing Coalition, Housing For All.

Ibem O.E. (2011). Public-Private Partnership (PPP) in Housing Provision in Lagos Megacity Region,

Nigeria. International Journal of Housing Policy. Vol. 11, No. 2, 133–154, June 2011

Ibem, E. O. & Aduwo, E. B. 2012. Public-Private Partnerships (PPPs) in Urban Housing in Nigeria:

Evidence from Ogun State. International Journal Of Architecture and Urban Development, 2.

Itsmeizic. (2011). Housing for all; An Obvious Delusion. [Online].Available at: itsmeizic.blogspot.com/

[Accessed March 25, 2018].

Ismail S, 2014 Critical success factors of public private partnership (PPP) implementation in Malaysia.

Asia-Pacific Journal of Business Administration Vol. 5 No. 1, 2013 pp. 6-19

Jeffrey Boon Hui Yap and Xin Hua Ng, 2017. Housing affordability in Malaysia: perception, price range,

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4864

Page 19: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

influencing factors and policies. International Journal of Housing Markets and Analysis Vol. 11 No. 3, 2018

pp. 476-497.

Jiboye, A. D. (2011). Urbanization Challenges and Housing Delivery in Nigeria: The need for an effective

policy framework for sustainable development. International Review of Social Sciences and Humanities,

Vol. 2(1), 176-185.

Kumar, R.A. 2005. Research Methodology: A Step-by-Step Guide for Beginners, French forest, Australia:

Pearson Education Australia.

Lagos State Government (2008) Lagos State Government PPP initiatives, PPP Brochure (Ikeja: Ministry

of Finance). Available at http://www.lagostate.gov.ng (accessed 14 October 2018).

Mba, H. C. (1993). The Dilemmas of housing programmes in Nigeria. In H. C. Mba, J. U. Ogbazi, & K. O.

Efobi (Eds.), Principles and practice of urban and regional planning in Nigeria (pp. 52–62). Awka: Mekslink

Publishers Nigeria.

Megginson, W. & Netter, J„ 2001. From state to market: A survey of empirical studies on privatization.

Journal of Economic Literature, (40a), PP321-389.

Milligan, V. 2009. Housing Moves: Transforming Australian Housing Policy.

Miraftab, F. (2004) Public–private partnerships: Trojan horse of neoliberal development? Journal of

planning Education and Research, (24), pp. 89–101.

Muhammad & Johar (2018) Critical success factors of public–private partnership projects: a comparative

analysis of the housing sector between Malaysia and Nigeria, International Journal of Construction

Management.

Muhammad Z. and Johar F. (2018). Coping with Challenges of Public for Housing Delivery in Nigeria.

International Journal of Engineering & Technology. 7 (2.29) 1097, 1101

Neema Kavishe, 2018. An analysis of the delivery challenges influencing public-private partnership in

housing projects The case of Tanzania. Engineering, Construction and Architectural Management Vol. 25

No. 2, 2018 pp. 202-240.

Odia, S. 2010. Vision 20: 2020 Housing requirements in Finmark Trust: Overview of the Housing Finance

Sector in Nigeria ThisDay, August 3 2010.

Okonjo-Iweala, N. 2014. Unleashing the Housing Sector in Nigeria and in Africa. 6th Global Housing

Finance Conference. World Bank Headquarters, Washington, DC.

Okpala D.C.I. 1985 Housing Tenure in Nigeria Housing Policy, of need for Rethinking of current emphasis,

Publication of Nigerian Association of Housing Corporation Vol. 2 No.1

Olayiwola, L. M., Adeleye, O., and Ogunshakin, L. (2005). Public Housing Delivery in Nigeria: Problems

and challenges. Paper presented at World Congress on Housing in Pretoria, South Africa Available online

athttp://repository.up.ac.za/bitstream/handle/2263/10438/Public%20Housing%20Delivery%20In%20Nige

ria%20Pr..?Sequence=1 20 March, 2018.

Olotuah, A. O. and Aiyeta, O. S. (2015) “Housing Poverty, Slum Formation and Deviant Behaviour”

[Online] Available at: www.york.ac.uk/inst/chp/hsa/autumn05/papers/OLOTUAH1. Doc [Accessed 07

July 2018

Onibokun, A. G. (1985) Issues in Nigerian Housing, Ibadan, NISER.

Oruwari, Y. (2006). Lest we forget: The poor people need housing in the urban areas in Nigeria too—A

reflection of low-income housing provision. In A. I. Okewole, et al. (Eds.), The built environment:

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020

Issn No : 1006-7930

Page No: 4865

Page 20: Journal of Xi'an University of Architecture & Technology ...xajzkjdx.cn/gallery/453-mar2020.pdf4**Department of Estate Management & Valuation, Federal Polytechnic, Nasarawa, Nasarawa,

innovation policy and sustainable development (pp. 2–9). Ota-Nigeria: Department of Architecture,

Covenant University.

Osei-Kyei R, Chan AP. 2015. Review of studies on the critical success factors for public_private partnership

(PPP) projects from 1990 to 2013. Int J Proj Manag. 33:1335_1346.

Owei, O. (2007) Distortions of the urban land markets in Nigerian cities and the implications for urban

growth patterns; the case of Abuja and Port Harcourt. Paper presented at the Fourth Urban Research

Symposium. Available at: http://www.Worldbank.org (accessed 22 June 2018).

Ozo, A. O. (1990) The private rented housing sector and public policies in developing countries: the

example of nigeria. Third World Planning Review, 12 (3): 32-43.

Public Sector Accounting and Finance (PSAF) (2018). Introduction to public sector Accounting and

Finanace http://www.icanig.org/documents/PSAF.pdf access on 21 July 2018.

Quan Gana and Robert J. Hill, 2008. Measuring Housing Affordability: Looking Beyond the Median.

School of Economics Australian School of Business UNSW Sydney NSW 2052 Australia. ISSN 1323-

8949.

Roumboutsos, A. & macario, R.M.R., (2013). Public private partnerships in transport: theory and practice.

Built environment project and asset management, 3, pp. 160-164.

Shelter Afrique (2008) Mortgage financing for increased access to housing inAfrica, Symposium organized

jointly by Shelter Afrique and the Ministry of Housing, Republic of Togo, Lome, 10 June. Available

at: http://www.shelterafrique.org (accessed 15 November 2018).

Sykes M., Gani F., Vally Z., (2016). Statistical terms Part 1: The meaning of the MEAN, and other statistical

terms commonly used in medical research.

http://www.scielo.org.za/scielo.php?script=sci_arttext&pid=S0011-85162016000600009. Access

on 31/07/2019.

Talba, I. (2004) Implementation of the monetisation policy in the federal civil service of Nigeria.

Wellington, New Zealand.

Unchs (1993) National trends in housing-production practices volume 4: Nigeria. (hs/313/93 e) Nairobi:

UNCHS.

UN-HABITAT (2006) National Trends in Housing – Production Practices Volume 4: Nigeria (Nairobi:

United Nations Centre for Human Settlements).

Walley, S. 2014. Housing the world: leveraging private sector resources for the public good. Private Sector

Development, Proparco's Magazine.

Waziri, A.G. and Roosli, R. (2013). Housing Policies and Programmes in Nigeria: A Review of the concept

and Implementation. Society for Business and Management Dynamics. 3(2): 60–68.

Wibowo, A. & aifen, H.W., (2015). Government-led critical success factors in ppp

infrastructuredDevelopment. Built environment project and asset management, 5(1), pp. 121-134.

Woetzel, J., Ram, S., Mischke, J., Garemo, N. & Sankhe, S. (2014). A blueprint for addressing the global

Affordable housing challenge. McKinsey Global Institute.

World Bank (1993). Housing: Enabling markets to work. A World Bank policy paper. Washington DC. The

World Bank.

Journal of Xi'an University of Architecture & Technology

Volume XII, Issue III, 2020