job_141_cv

Upload: shah-khalid

Post on 08-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 job_141_cv

    1/5

    Ahmed Ali AlShehri

    Mobile 00966-508-217284

    E-Mail: [email protected]: P.O.BOX 70132 ZIPCODE :31952

    Riyadh Street , Al-Khobar, Saudi Arabia

    SUMMARY

    y Profile: Male, 29 , Single

    y Nationality: Saudi Arabia

    y Current Location: Saudi Arabia

    y Current position: QA/QC Engineer/ inspector & construction

    superintendent (AA)y Company: WORLEY PARSONS CONSORTIUM

    Reporting to: project / production QualityManager

    y Preferred Locations: All GCC Countries

    y Salary expectation: Not Specified/ Negotiable

    PROFESSIONAL EXPERIENC E

    Feb 2006 - Present Worley Parsons consortium Australian

    Company

    TANAJIB (MPP, SUBSEAPIPE LINES, WELL

    HOOK -UPSGROUP) , KSA

    Discipline Engineer II (Project Inspector)

    working as project inspector (OPD ) offshore project Inspector to supervise the contractors toperform the construction as Per provision of the contract with Saudi Aramco and reviewed all theDesign packages with related international standards and Saudi aramco and implement all theSaudi Aramco Checklists which will provide the total compliances with higher performance in theconstruction and I have been assigned in Fabrication yard to monitor all the checklists of Saudi

    Aramco for well Hook-up and structural for all the platforms at DPC-811 delivery point codeDirectly responsible to the QC Supervisor of the Offshore Projects Division, based in Al Khobarand employed through Worley Parsons as part of the Project Management Team (PMT) for theScada Integration and Maintain Potential Program for construction, installation and pre-commissioning of offshore structures in the Eastern Province of Saudi Arabia.

    Duties include: Carry out all QC Inspection duties related to welding activities on behalf of theOffshore Projects Division (OPD) capital project Time Unit Rate (TUR) and Work Unit Rate(WUR) activities to ensure that all work performed by the TUR Contractors meets the specifiedSaudi Aramco requirements. Implement the approved QCS for offshore TUR contract work, co-ordinate with the Constructions Superintendent to plan and forecast QC Inspection requirementsto support construction schedules. Attendance of Hold, Witness and Surveillance inspectionand test of fabrication facilities and construction sites to ensure compliance with Saudi Aramcorequirements and project specifications, inform and coordinate with the NAPIS QC Inspectors onQC issues. Verify inspection and testing to ensure that these are carried out safely and meetsthe acceptance criteria. Carry out inspection of material and equipment to ensure compliancewith Saudi Aramco requirements and verification of the proper handling, storage and protection atSaudi Aramco facilit ies and/or construction sites. Establish uniform Quality Controldocumentation generation and control. Co-ordinate NDT services to support constructionactivities.

  • 8/6/2019 job_141_cv

    2/5

    to supervise all the welding and hydro-testing of valves and spools and coating for all ongoingfabrication of spools , mechanical andstructural works as required WPSs and NDT percentage to assure the total compliance with allrequirements of all these projects like

    ZULUF GOSP-1SR , MARJAN-TP4, QATIF 71, RT BERTH 19/20-S1, ZULUF 294/301,

    MAHARAH -30/35 , ECN SAFANYIA G4 , RT SEA ISLAND, SFNY626/636H/UP , SAFANIYA

    GOSP-4 SR, SFNY636/645,MARJAN 176/185,ZULUF GOSP-1 ,ZULUF 258/263

    SEA ISLAND BERTH 1,2,3,4,LHAHWAH 15/20

    CONSTRUCTION SUPERINTENDENT (AA)

    Responsible for all the operation in fabrication yards like initiating the requests of additional list ofmaterials ,scarab and waste material management , shortage of materials , monitoring thereceiving material forms and backlists , vessels manifest ,monitoring the consumable status ,Drawings and the progress of the multi-projects ,responsible for theStaging and structural and piping spool for all on-going projects as inventory control , breakdown

    reporting of manpower to lead project engineer and senior project engineer in Saudi Aramco.

    Jun 2005 - sep 2005 UNICOIL BHP Australian company JUBAIL , KSA

    MechanicalEngineer

    UNICOIL Universal Metal coating Company as Quality Engineer and customer services from 18June 2005 until 18 September 2005 in industrial Jubail city

    working for unicoil side for construction supervision of all contractor , supervising the contractorsfor any deviations and initiating queries for the project specifications and guide the contractor forany rectifications on the construction site within the project .

    Maintain the records of the production schedules to perform some statistics calculation forstandard deviations and how uniformity of mils of coated sheet for primer coat , back finish coat,and top coat and performing analysis' for any deviations that might be encountered of affectingfactors as per ASTM924 and ASTM A 653 and suggested corrective actions for productionDepartment

    Feb 2004 - Nov 2005 ALHOTY Establishment ALKHOBAR , KSA

    Inspection Engineer III (Mechanical)

    Saudi Aramco contractor (Al-Hoty establishment) as an Inspection Engineer III (Mechanical) from24 February 2004 until 18 November 2005 Quality Assurance with Project Inspection Division(PID) under Inspection Department Scope of work in Project Inspection Division:

    QATIF PROJECTS ISF, MAINTIAN POTENTIALS (MPP), PIPELINES, GOSP-II & GOSP-I

    (February 2004 to November 2004)Quality assurance activities:Hydro-testing activities, Reinstatement activities, punch listing activities. Witnessing manywelding activities to make sure its compliance with Saudi Aramco standards and internationalstandards. To monitor Welder performance and conduct visual inspections of welds and repairs

    of welds in accordance with Company procedures and international codes of practice.To check, inspect and test incoming welding and construction materials to ensure they meetproject specification requirementsTo monitor the construction process from all aspects to ensure performance meets job qualityand design requirements in accordance with Company procedures and international standardsTo coordinate with clients to undertake Procedure Qualification Tests (PQT) and inspections ofprepared test specimens and witness destructive testsTo identify and prepare Welding Procedure Specification (WPS) & PQR for jobs as per projectspecifications and verify Welders meet PQR requirementsTo collate all relevant documentation for the job and apply the data to the creation of a Test Packto undertake pre-hydro test inspection activityTo undertake verification of welding machines to ensure equipment meets job requirementsspecification and provide verification of electrode baking and holding temperature includingcontrol and issueTo conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide

  • 8/6/2019 job_141_cv

    3/5

    technical guidance for welding sequence and distortion controlTo survey erection, construction and equipment for alignment and plumbness in accordance withdrawings and specificationsTo prepare all equipment punch lists and verify all items are in place and act as an agent for theCompany during punch list activity.

    2- QURAYAH-AINDAR NORTH AND CENTER

    Sea water conversion project (pipelines portion)(November 2004 to February 2005)

    Quality assurance activities:Welding activities, coating, internal and external holiday testing, video tape witnessing for internalcoating for single joints and double joints FBE processes Proposal design reviews, hydro-testingpackage review

    3- Shudgem Gas Plant:

    (February 2005 till Nov 2005)Quality assurance activities:Witnessing certification of valves and seat testing in fabrication shop according to API 598 , API520 for hydro-testing relief valves , installation according to standards and updated drawings andwitnessing many construction activities to make sure theirCompliance with standards, conducting many focused assessments to evaluate the constructioncompany (contractor quality monitoring) for certain inspection points

    4-Haradh Oil increment III for shudgem-hawiyah pipeline 60"

    Quality assurance activities:

    Conducting the inspection activities on SRB contractor for welding ,coating and lowering thepipelines and total ROW right of ways inspection and backfilling operations and bermingoperation as per QCPs and ITP for SRB and SAUDI ARAMCO standards

    Aug 2003 - Feb 2004 Saudi Consolidated EngineeringCompany (SCEC)

    ALKHOBAR , KSA

    Design Engineer IV(PIPING)

    Saudi Consolidated Engineering Company as Mechanical Designer (IV): Piping Engineer (IV)(27th October 2003 until 27th January 2004) (Khatib & Alami)

    Design piping systems and selection materials of pipe with its components valves, Elbows andfittings by using (P & ID) by using design codes and procedures like ANSI B31.3, ANSI B31.4and ANSI B31.8 and as per international standards and some stress analysis calculations Forcertain projects for Saudi Aramco and Working for Stowage Treatment Plant ABQIAQ andirrigation system and performed design calculation .

    Jun 2001 - Aug 2002 ISPF DAMMAM SECOND INDUSTRIAL , KSA

    Production EngineerTraineeasQC personnel

    AlTuwairqi Group Summer training and part time job (22 June2001 to 26 August 2002) in (I.S.P.F) Itefaq Steel Plant Factory as Production Engineer trainee For manufacturing reinforcedbars for construction and I worked in Rolling Mill for two production lines in second industrial,Dammam .

    Collecting the samples in interval basis and send them to lab to conduct UTS tensile testing forfracture in instrom machine and perform calculations on the samples by spread sheet andproviding the total comparative qualitative exams to the required characteristics that encounteredin each schedules of production to maintain the uniformity of the products of rebar's as requiredby ASTMS and study the mechanical properties of the material by applying certain limes in thelab , performing U test to measure the ductility of the rebar and other feature by International

    code and standards .

    EDUCATION

    Sep 1997 - Jun 2003 KFUPM Dhahran , KSA

    Bachelor of Science (BS ) of Mechanical Engineering

  • 8/6/2019 job_141_cv

    4/5

    OTHERCERTIFICATES

    1997 TOEFEL International institute , KSA

    1997 TOEFEL International institute , KSA

    IT SKILLS

    Windows & Office tools

    y MS office Advanced

    y matlab Advanced

    Non-web programming languages

    y EZ-cash Advanced

    SEMINARSATTENDED

    y Technical presentation ( amiantit Saudi Arabian amiantit Co for RTR pipe selection )

    y HAP training course in carrier

    y SAUDIARAMCO engineering and drawing meeting (Focusing on solutions to meet customers' needs).

    INSPECTIONAND PROJECT MANAGEMENT TEAMCOURSESATTENDED

    Certified welding inspector CSWIP 3.1 from TWI from UK 904/TWI/06

    (Certificate no # 25113)

    y LOSS PREVENTION WORK PERMIT RECEIVER

    y INTRODUCTION TO WELDING CODES & STANDARDS

    y INSPECTION TECHNIQUES OF WELDS

    y PRE-WELD PREPARATION PRACTICE

    y PIPELINE INSPECTION PRACTICE

    y INTRODUCTION TO PLANT PIPING

    y INSPECTION TECHNIQUES OF VALVES

    y QUALITY METHODS FUNDAMENTALS

    y QUALITY ASSESSMENTS FUNDAMENTALS

    y LOSS PREVENTION HAZARDS RECOGNITIONS

    y Magnetic Particles testing NDT level II qualificationy Ultrasonic Testing NDT level I Qualification

    y Liquid penetrations Testing NDT level II Qualification

    y NDT OVERVIEWS AND INSPECTION TECHNIQUES

    y ES-PMT 701 OVERVIEW OF PROJECT MANAGEMENTy ES-PMT 702 INITIATING A PROJECT

    y ES-PMT 703 PLANNING PROJECT SCOPE

    y ES-PMT 705 PLANNING PROJECT COSTS

    y ES-PMT 707 CONTROLLING A PROJECT

    y ES-PMT QUALITY MANAGEMENT

    STANDARDSWORK WITH

    ASME B31.3 PROCESS PIPING AND ALLOYS SPIPING

    ASME B31.4 CROSS COUNTRY PIPING & TRANSPORTATION OF LIQUID

    ASME B31.8 GAS TRANSPORTATION PIPING

    API 1104 WELDING OF PIPING FACILITIES

    API 598 INSPECTION OF VALVES AND HYDROTEST

    API 6D INSPECTION OF VALVES AND HYDROTEST

    API 570 PIPING INSPECTION MAINTENANCE AND ALTERNATION

    AWS D1.1 STRUCTURAL WELDING

    AWS A2.4 WELDING SYMBOLS IN DESIGN AND ISOMETRICS

    AWS A 3.0 WELDING TERMONOLGIES

    ASTM 92 HARDNESS TESTING

    ASTM E23 DUSTURCTIVE TESTING IN PQR FOR FILLET WELD

    API 1110 HYDROTESTING OF LIQUID TRANPORTING PIPELINES

    API 510PRESSURE VESSEL INSPECTION MAINTENANCE AND

    ALTERNATION

    API 650 STORAGE TANKS AND FARMS

    API 653 ABOVE GROUND TANKS

  • 8/6/2019 job_141_cv

    5/5

    ASTM D 5614 HOLIDAY TESTING AND EXTERNAL COATING INSPECTION

    ASME B16.5 VALVE

    ASME B16.47 FLANGES ABOVE 24''

    ASME B16.34 FLANGES LESS 24''

    API 579 COMPNENTS AND AUXILAIRES PIPING (UTILITY )

    ASME B31.1 POWER PIPING

    ASME B31.5 REFRIGANT PIPING

    ASME B16.11 WELDING OF SS JOINT

    ASME B16.9 WELDING OF BUTT WELDING JOINT

    ASME SECTION 9 WELDING PROCEDURES AND ESSENTIALS

    ASME SECTION 8 DIV 1 PRESSURE VESSELS AND TANKS

    ASME SECTION 5 NDT METHODS PT UT MT RT VT ET

    ASME SECTION 2 MATERIAL HANDLING

    ASME SECTION 1 COGENERATION WELDING AND NUCLEAR PLANTS

    API RP 2A SECTION 13 OFFSHORE WELDING REQUIRMENTS

    API 520 PART I CERTIFICATION OF RELIEF VALVES AND SAFETY VALVES

    LANGUAGES

    y ENGLISH

    y ARABIC

    FluentFluent

    References : upon the request

    OBJECTIVE

    To work in a medium to a large company as a Mechanical engineer where I can utilize myeducational background and enhance my experience.