2nd JulyGreeting to TMP, Si Dept. Revie Safety Education, Rule Explanation of TMP Staffroom,Greeting to SaiBouKyou, Training on the Site, Meeting to adjust the schedule, SeparateMeeting and Making the Daily Journal.
3rd July to 12th July
Morning Gathering, Training on the Site and Making the Daily Journal
13th July
Morning Gathering, Training on the Site, Making the Daily Journal and Meeting, Greeting
to SaiBouKyou, Cleaning the Staffroom and Greeting to TMP.
7th July
Sight-seeing at Hiroshima
8th July
Free time (Tanabata Festival)
Brief Summarized of the Japan SDM TrainingSchedule
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
3/52
SE 1
SE 8
SE 3
SE 6
SE 7
SE 9
Tokuyama Corporation
Fumed Silica
Polysilicon
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
4/52
SE 9
DCS Toshiba Ciemac Electrical room
Annubar flowmeter
RTD calibrator (Resistance Temperature Detector)
Bubbler level transmitter
Metal touch ball valve
C section drum pressure control
Thermocouple
Fire water
Training on the Site
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
5/52
Safety check
Low voltage
VVVF (variable voltage variable frequency)
UPS (uninterrupted power supply C 1400)VESDA (very early smoke detector apparatus)
Haloon gas
SE 9 : Electrical Room
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
6/52
Similar to a pitot tube used to measure the flow of gas or liquid ina pipe.
measures the difference between the static pressure and theflowing pressure of the media in the pipe.
The volumetric flow is calculated from that differenceusing Bernoullis principle and taking into account the pipe insidediameter.
The biggest difference between an annubar and a pitot tube is thatan annubar takes multiple samples across a section of a pipe. Inthis way, the annubar averages the differential pressuresencountered accounting for variations in flow across the section.
Annubar
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
7/52
Sensors that are used to measure temperature bycorrelating the resistance of the RTD element withtemperature.
The element is usually quite fragile, so it is oftenplaced inside a sheathed probe to protect it.
Resistance thermometers use electrical resistance andrequire a power source to operate
RTD (Resistance Temperatures Detector)
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
8/52
Bubbler Level Transmitter
Air supply Regulator Flow Indicator Bubbler LIT
Operates by supplying compressed air into a bubbler tube at aconstant rate with its opening placed near the bottom of the liquid.
Measures the pressure required to force air through the tube andgenerates a 4-20 mA signal which is proportional to the depth of theliquid.
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
9/52
A type of flow meter that measures the velocity of a liquidor gas (fluid) by using the principle of ultrasound.
Using ultrasonic transducer, the flow meter can measurethe average velocity along the path of an emitted beam of
ultrasound, by averaging the difference in measuredtransit time between the pulses of ultrasound propagatinginto and against the direction of the flow.
Ultrasonic flow meters are affected by the temperature,density and viscosity of the flowing medium.
Ultrasonic Meter
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
10/52
Metal Touch Ball Valve
Air will be supplied to line A where it will push theinstrument close. A signal will be send to DCS to informthat the valve is open. Air will be supplied out throughline B. This is to release the pressure on the other side of
the chamber. When there is a power break down, the air will besupplied to line B, where it will push the instrumentopen. Again, a signal will be send to DCS to inform thatthe valve is close.
Maintenance is done every year
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
11/52
Fire Water
SE 9 Section A9 and B9 Fire water testing via control room
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
12/52
Marshaling cabinet room
CS5 HCL waste pit 5E-2440 plat exchanger Silica plant dryer
SE 8
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
13/52
Marshaling Cabinet Room
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
14/52
Floor and metal frame are all in anti-acid coating.
For the bubbler, teflon tube is used as sheath.
CS5 HCL waste pit maintenance
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
15/52
Open the coil to prevent the instrument fromdamage during mechanically maintenance.
Silica Plant Dryer
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
16/52
DCS room Toshiba Ciemac cleaning of event
recorder
FCS and marshaling room using old version ofVESDA
A7
D7
BJ7
Etching room
SE 7
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
17/52
Replacing Teflon membrane
A7
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
18/52
Removal of filter
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
19/52
D7
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
20/52
It has excellent high temperature mechanical
properties.
Also has chemical corrosion resisting.High temperature oxidation resisting, wear-proof
capability and less specific weight.
Ceramic Ball Valve
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
21/52
A magnetic field is applied to the metering tube,
which results in a potential difference proportional
to the flow velocity perpendicular to the flux lines. The physical principle at work is electromagnetic
induction.
Disadvantage : -can only measure conductive liquid.
Advantages : - as the liquid could go directlythrough, there is no pressure drop.
- sensor is not contact with liquid.
Magnetic Flowmeter
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
22/52
Magnetic flowmeter after washing with HCL.
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
23/52
Polishing of Belljar.
Cleaning machine part mitsubishi.
Dryer temperature yearly inspection
Cutting pure water washing dryer cooler checkinspection packing
Optical fiber sensor if there is nothing within therange of the sensor, the level value is high.
BJ 7 and Etching Room
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
24/52
Finishing process
Ph calibration every month
SE 6
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
25/52
Pure water chemical washing pure water washing heater/dryer cooler
Cleaning is done monthly.
Finishing Process
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
26/52
HCL is used to clean and pure water is used to wash.
Early value is taken before calibration.
Buffer solution pH 7 is for zero adjustment.
Buffer solution pH 9 is for span adjustment.
Acidic side calibration range is 4 - 9.Alkali side calibration range is 7 9.
pH Calibration
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
27/52
PH Calibration
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
28/52
Electrical room
Ph calibration every month
SE 3
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
29/52
Power supply of BJ 3.
One supply for two belljars different from TMSB.
Observed filament seeding and belljar cleaning.
Electrical Room
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
30/52
Ph meter YokogawaYanaco COD (chemical O2 Demand)
Shimadzu TNPC (total nitrogen/phosphorous analyzer)
Ph calibration
Pump cleaning
WWT
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
31/52
HCL is used to clean and pure water is used to wash.
Early value is taken before calibration.
Buffer solution pH 7 is for zero adjustment.
Buffer solution pH 9 is for span adjustment.
Acidic side calibration range is 4 - 9.Alkali side calibration range is 7 9.MLSS (mixed liquid suspended solids) to measure
the clearness of the water.
pH Calibration
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
32/52
HCL is used to remove the scale.
The pump hose is stepped to remove the scale from
inside the hose.
Pump Cleaning
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
33/52
Control valve maintenance
Assembling
Disassembling
Steam cleaning
Nitrogen dryer
Testing
Motoyama
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
34/52
Observed the assembling, cleaning and checking
process for eccentric rotary valves (ceramic rotary
valves).Valve packing : yarn packing and v-packing (teflon)
Lapping compound to smoothen the seat.
Seat & Plug Touch check
Gasket lubrication is using demnum grease.
Seat leak test
Body test
Motoyama Workshop
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
35/52
The stem will be sprayed and will be put inside the
seat.
If the color at the plug is smooth, then the seat isalright.
If not smooth, lapping compound is still needed.
Seat & Plug Touch check
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
36/52
Is done to check whether the seat is smooth and even
that it can fit the plug.
Test value is calculated using :Air 2.434 *cv*(P1+1.0033)*1.01
P1=4kg/cm2G
Water 0.1428*cv*P1*leakage class
Seat leak test
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
37/52
Body test is done to check whether the connection
between the bonnet flange and body flange is
correct.
Body test
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
38/52
Lapping compound
Assembling process
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
39/52
Body test check is in progress
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
40/52
Field instrumentation YamaichiValve disassembling from actuator and valve body.
UV tube Pointer remover
Pressure gauge daily maintenance
PG calibration
Differential pressure calibrationVariable area flowmeter (rotameter)
Pyolan tape
Instrumentation Workshop
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
41/52
Instrumentation Workshops Storage
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
42/52
Pressure gauge calibration
Disassembling of control
valve
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
43/52
Pressure gauge maintenance
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
44/52
Pressure gauge lapping tool
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
45/52
Variable area flowmeter
Use to remover float
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
46/52
Pyolan tape
UV tube
Pressure GaugePointer remover
Numbe
r Colors
Width
[mm,(in)]
Length
[m,(yd)]
Thickness
[mm]
Adhesive
Strength
[N/25mm]Holding
Power
[mm,40 ]Tensile
Strength
[N/50mm]Elongatio
n
[%]K-10
srs.
CL, WH,
BE,
YE, GR,
BL,
RE
25,50
(1",2")50
(55yd) 0.16 10 0.1 300 8
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
47/52
Study about variety type of gaskets 6503A
6500A
6503
8596V
7596V
N7030
Glass fiber gasket
7010
7020
Special gasket
Rubber gasket
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
48/52
Lif i J ( T k )
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
49/52
Sightseeing in Hiroshima
Life in Japan ( Two weeks)
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
50/52
Food
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
51/52
Food
-
7/29/2019 Japan Shut Down Maintenance Training-Pidah
52/52
Thank you
END