    Presented by

    Rafidah Binti Mohd SharkawiElectrical & Instrumentation Section

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    2/52

    2nd JulyGreeting to TMP, Si Dept. Revie Safety Education, Rule Explanation of TMP Staffroom,Greeting to SaiBouKyou, Training on the Site, Meeting to adjust the schedule, SeparateMeeting and Making the Daily Journal.

    3rd July to 12th July

    Morning Gathering, Training on the Site and Making the Daily Journal

    13th July

    Morning Gathering, Training on the Site, Making the Daily Journal and Meeting, Greeting

    to SaiBouKyou, Cleaning the Staffroom and Greeting to TMP.

    7th July

    Sight-seeing at Hiroshima

    8th July

    Free time (Tanabata Festival)

    Brief Summarized of the Japan SDM TrainingSchedule

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    3/52

    SE 1

    SE 8

    SE 3

    SE 6

    SE 7

    SE 9

    Tokuyama Corporation

    Fumed Silica

    Polysilicon

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    4/52

    SE 9

    DCS Toshiba Ciemac Electrical room

    Annubar flowmeter

    RTD calibrator (Resistance Temperature Detector)

    Bubbler level transmitter

    Metal touch ball valve

    C section drum pressure control

    Thermocouple

    Fire water

    Training on the Site

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    5/52

    Safety check

    Low voltage

    VVVF (variable voltage variable frequency)

    UPS (uninterrupted power supply C 1400)VESDA (very early smoke detector apparatus)

    Haloon gas

    SE 9 : Electrical Room

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    6/52

    Similar to a pitot tube used to measure the flow of gas or liquid ina pipe.

    measures the difference between the static pressure and theflowing pressure of the media in the pipe.

    The volumetric flow is calculated from that differenceusing Bernoullis principle and taking into account the pipe insidediameter.

    The biggest difference between an annubar and a pitot tube is thatan annubar takes multiple samples across a section of a pipe. Inthis way, the annubar averages the differential pressuresencountered accounting for variations in flow across the section.

    Annubar

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    7/52

    Sensors that are used to measure temperature bycorrelating the resistance of the RTD element withtemperature.

    The element is usually quite fragile, so it is oftenplaced inside a sheathed probe to protect it.

    Resistance thermometers use electrical resistance andrequire a power source to operate

    RTD (Resistance Temperatures Detector)

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    8/52

    Bubbler Level Transmitter

    Air supply Regulator Flow Indicator Bubbler LIT

    Operates by supplying compressed air into a bubbler tube at aconstant rate with its opening placed near the bottom of the liquid.

    Measures the pressure required to force air through the tube andgenerates a 4-20 mA signal which is proportional to the depth of theliquid.

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    9/52

    A type of flow meter that measures the velocity of a liquidor gas (fluid) by using the principle of ultrasound.

    Using ultrasonic transducer, the flow meter can measurethe average velocity along the path of an emitted beam of

    ultrasound, by averaging the difference in measuredtransit time between the pulses of ultrasound propagatinginto and against the direction of the flow.

    Ultrasonic flow meters are affected by the temperature,density and viscosity of the flowing medium.

    Ultrasonic Meter

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    10/52

    Metal Touch Ball Valve

    Air will be supplied to line A where it will push theinstrument close. A signal will be send to DCS to informthat the valve is open. Air will be supplied out throughline B. This is to release the pressure on the other side of

    the chamber. When there is a power break down, the air will besupplied to line B, where it will push the instrumentopen. Again, a signal will be send to DCS to inform thatthe valve is close.

    Maintenance is done every year

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    11/52

    Fire Water

    SE 9 Section A9 and B9 Fire water testing via control room

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    12/52

    Marshaling cabinet room

    CS5 HCL waste pit 5E-2440 plat exchanger Silica plant dryer

    SE 8

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    13/52

    Marshaling Cabinet Room

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    14/52

    Floor and metal frame are all in anti-acid coating.

    For the bubbler, teflon tube is used as sheath.

    CS5 HCL waste pit maintenance

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    15/52

    Open the coil to prevent the instrument fromdamage during mechanically maintenance.

    Silica Plant Dryer

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    16/52

    DCS room Toshiba Ciemac cleaning of event

    recorder

    FCS and marshaling room using old version ofVESDA

    A7

    D7

    BJ7

    Etching room

    SE 7

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    17/52

    Replacing Teflon membrane

    A7

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    18/52

    Removal of filter

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    19/52

    D7

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    20/52

    It has excellent high temperature mechanical

    properties.

    Also has chemical corrosion resisting.High temperature oxidation resisting, wear-proof

    capability and less specific weight.

    Ceramic Ball Valve

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    21/52

    A magnetic field is applied to the metering tube,

    which results in a potential difference proportional

    to the flow velocity perpendicular to the flux lines. The physical principle at work is electromagnetic

    induction.

    Disadvantage : -can only measure conductive liquid.

    Advantages : - as the liquid could go directlythrough, there is no pressure drop.

    - sensor is not contact with liquid.

    Magnetic Flowmeter

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    22/52

    Magnetic flowmeter after washing with HCL.

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    23/52

    Polishing of Belljar.

    Cleaning machine part mitsubishi.

    Dryer temperature yearly inspection

    Cutting pure water washing dryer cooler checkinspection packing

    Optical fiber sensor if there is nothing within therange of the sensor, the level value is high.

    BJ 7 and Etching Room

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    24/52

    Finishing process

    Ph calibration every month

    SE 6

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    25/52

    Pure water chemical washing pure water washing heater/dryer cooler

    Cleaning is done monthly.

    Finishing Process

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    26/52

    HCL is used to clean and pure water is used to wash.

    Early value is taken before calibration.

    Buffer solution pH 7 is for zero adjustment.

    Buffer solution pH 9 is for span adjustment.

    Acidic side calibration range is 4 - 9.Alkali side calibration range is 7 9.

    pH Calibration

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    27/52

    PH Calibration

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    28/52

    Electrical room

    Ph calibration every month

    SE 3

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    29/52

    Power supply of BJ 3.

    One supply for two belljars different from TMSB.

    Observed filament seeding and belljar cleaning.

    Electrical Room

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    30/52

    Ph meter YokogawaYanaco COD (chemical O2 Demand)

    Shimadzu TNPC (total nitrogen/phosphorous analyzer)

    Ph calibration

    Pump cleaning

    WWT

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    31/52

    HCL is used to clean and pure water is used to wash.

    Early value is taken before calibration.

    Buffer solution pH 7 is for zero adjustment.

    Buffer solution pH 9 is for span adjustment.

    Acidic side calibration range is 4 - 9.Alkali side calibration range is 7 9.MLSS (mixed liquid suspended solids) to measure

    the clearness of the water.

    pH Calibration

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    32/52

    HCL is used to remove the scale.

    The pump hose is stepped to remove the scale from

    inside the hose.

    Pump Cleaning

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    33/52

    Control valve maintenance

    Assembling

    Disassembling

    Steam cleaning

    Nitrogen dryer

    Testing

    Motoyama

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    34/52

    Observed the assembling, cleaning and checking

    process for eccentric rotary valves (ceramic rotary

    valves).Valve packing : yarn packing and v-packing (teflon)

    Lapping compound to smoothen the seat.

    Seat & Plug Touch check

    Gasket lubrication is using demnum grease.

    Seat leak test

    Body test

    Motoyama Workshop

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    35/52

    The stem will be sprayed and will be put inside the

    seat.

    If the color at the plug is smooth, then the seat isalright.

    If not smooth, lapping compound is still needed.

    Seat & Plug Touch check

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    36/52

    Is done to check whether the seat is smooth and even

    that it can fit the plug.

    Test value is calculated using :Air 2.434 *cv*(P1+1.0033)*1.01

    P1=4kg/cm2G

    Water 0.1428*cv*P1*leakage class

    Seat leak test

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    37/52

    Body test is done to check whether the connection

    between the bonnet flange and body flange is

    correct.

    Body test

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    38/52

    Lapping compound

    Assembling process

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    39/52

    Body test check is in progress

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    40/52

    Field instrumentation YamaichiValve disassembling from actuator and valve body.

    UV tube Pointer remover

    Pressure gauge daily maintenance

    PG calibration

    Differential pressure calibrationVariable area flowmeter (rotameter)

    Pyolan tape

    Instrumentation Workshop

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    41/52

    Instrumentation Workshops Storage

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    42/52

    Pressure gauge calibration

    Disassembling of control

    valve

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    43/52

    Pressure gauge maintenance

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    44/52

    Pressure gauge lapping tool

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    45/52

    Variable area flowmeter

    Use to remover float

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    46/52

    Pyolan tape

    UV tube

    Pressure GaugePointer remover

    Numbe

    r Colors

    Width

    [mm,(in)]

    Length

    [m,(yd)]

    Thickness

    [mm]

    Adhesive

    Strength

    [N/25mm]Holding

    Power

    [mm,40 ]Tensile

    Strength

    [N/50mm]Elongatio

    n

    [%]K-10

    srs.

    CL, WH,

    BE,

    YE, GR,

    BL,

    RE

    25,50

    (1",2")50

    (55yd) 0.16 10 0.1 300 8

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    47/52

    Study about variety type of gaskets 6503A

    6500A

    6503

    8596V

    7596V

    N7030

    Glass fiber gasket

    7010

    7020

    Special gasket

    Rubber gasket

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    48/52

    Lif i J ( T k )

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    49/52

    Sightseeing in Hiroshima

    Life in Japan ( Two weeks)

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    50/52

    Food

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    51/52

    Food

  • 7/29/2019 Japan Shut Down Maintenance Training-Pidah

    52/52

    Thank you

    END