james river treatment plant - hrsd · 2019. 5. 31. · james river treatment plant newpor news city...
TRANSCRIPT
James River Treatment Plant
Newport News City Center at Oyster Point is a business district thatfeatures retail shops, restaurants and offices as well as residential spacecentered around the fountain in the heart of the development.
York County Yorktown is most remembered as the site where BritishGeneral Lord Cornwallis surrendered to American and French forcesunder the command of General George Washington, bringing an end
to the last major battle of the American Revolutionary War. But evenbefore the struggle for independence, the town was a bustling andprosperous 18th century seaport, having been established by the1691 Act of Ports. Yorktown also witnessed major Civil War activity.Its fortifications held off a Union army attack during the PeninsulaCampaign of 1862.
0 4,900 9,800 14,700 19,6002,450Feet
3Q±JR013200
JR011730
JR011300
JR012100
JR013000
James River
JR010600
ÜCIP Location
Service Area
Legend
Treatment Plant Projects
James River Treatment Plant Service AreaCIP Projects
GN016343GN016360GN016361JR013400
James RiverTreatment Plant3Q±
_ CIP PumpStation Point
±
± CIP Interceptor LineCIP Abandonment
CIP Interceptor Point_̂
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
Treatment Plant Service Area
JR010600
JR013200
LUCAS CREEK
LUCAS CREEK RD
OLD LU
CAS C
REEK
RD
LUCAS CREEK RD
SELK
IRK
DR
MACNEIL
DR
ANCHORAGE DR
JR010600Lucas Creek Pump Station Upgrade
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR010600
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Lucas Creek Pump Station Upgrade PR_JR010600
System: James RiverType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Status: Design DelayRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$6,436 $88 $133 $303 $5,912 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will upgrade all equipment at Lucas Creek Pump Station, to include but not limited to: pumps, motors, controls, and electrical service. Lucas Creek must be able to pump independently as a lift station and as a pressure reducing station in multiple flow directions. Work should also include the rehabilitation of the wet well.Scope of work to include the replacement of all yard piping, and an addition of two flow meters and vaults. Approximately 132 feet of 30 and 36-inch pipe is also to be replaced.
PROJECT JUSTIFICATION
This project is required in order to provide expanded operational flexibility in the North Shore system. The new Kiln Creek Interceptor Force Main (IFM) and Route 171IFM in conjunction with upgrades to Lucas Creek will reduce system pressures during wet weather events.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Eddie AbisaabContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 01/01/2014PER 01/01/2015Design Delay 05/01/2015Design 03/01/2020Bid Delay 04/01/2021PreConstruction 04/01/2021Construction 08/01/2021Closeout 10/01/2021
Cost Estimate Class: Class 4 PrePlanning $0PER $88,377Design $430,700PreConstruction $6,430Construction $5,900,000Closeout $10,000 Est. Program Cost $6,435,507Contingency Budget $389,267
Est. Project Costs $6,824,774
JR011300
JR011730
PATRICK HENRY
I-64
JEFFERSON AVE
255B
JEFFERSON AVE
G AVE
BRICK KILN BLVD
HABE
RSHA
M D
R
SHUMATE LN
WAL
MAR
T W
AY
BOYKIN LN
JR011300Patrick Henry Pump StationInterconnection Force Main
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR011300
/0 300 600 900 1,200150
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Patrick Henry Pump Station Interconnection Force Main PR_JR011300
System: James RiverType: Pipelines
Driver Category: Capacity ImprovementsProject Status: PERRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$1,585 $318 $903 $365 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project involves the installation of approximately 2,000 linear feet of 30-inch force main (FM) from the Colony Area Interceptor Force Main (IFM) and the Oyster Point IFM to Patrick Henry Pump Station.
PROJECT JUSTIFICATION
The installation of this FM would provide much needed operational flexibility to the North Shore system in moving flows between the James River and York River systems while simultaneously reducing system pressures. A Conditional Flow Acceptance Letter was issued to the City of Newport News in September 2009 specifically referencing the proposed FM improvements. The proposed FM improvements will provide a significant reduction in system pressure for Oyster Point IFM located in Jefferson Avenue. The City of Newport News has experienced several failures of FMs that connect directly to the Oyster Point FM over the past few years. A HART Analysis of the City Center Study Area was completed in October 2010 and included the proposed force main. Several scenarios were included in the study and resulted in a recommended FM size of 30-inches. The recommended 30-inch FM sizing will provide the capacity and ability to reduce system pressures as well as provide flexibility to convey flows under various conditions.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeremiah BurfordContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2017PER 08/01/2018Design Delay 02/01/2019Design 02/01/2019Bid Delay 06/01/2019PreConstruction 06/01/2019Construction 09/01/2019Closeout 11/01/2020
Cost Estimate Class: Class 4 PrePlanning $36,706PER $53,190Design $226,500PreConstruction $5,000Construction $1,259,090Closeout $5,000 Est. Program Cost $1,585,486Contingency Budget $229,450
Est. Project Costs $1,814,936
JR011730
I-64I-64
JEFFERSON AVE
255B
255A
255
OYSTER POINT RD
OYSTER POINT RD
JEFFERSON AVE
255A
OYSTER POINT RD
HORNSBY LN
CRIS
TON
DR
HQ W
AY
HOLBROOK DR
OPERATIONS DR
FOXB
ORO
DR
G AVE
FREEDOM WAY
TODD TRL
RIVE
R BE
ND C
T
ROGER BROWN DR
CROWN POINT DR
CLAIRE LNHANCOCK DR
KRISTY CT
BELLOWS WAY
ARBORETUM WAY
JR011730Jefferson Avenue Interceptor ForceMain Replacement Phase III
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR011730
/0 590 1,180 1,770 2,360295
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Jefferson Avenue Interceptor Force Main Replacement Phase III
PR_JR011730
System: James RiverType: Pipelines
Driver Category: Capacity ImprovementsProject Status: PERRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$12,174 $1,040 $3,235 $6,762 $1,137 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will replace approximately 9,000 LF of 12-inch, 14-inch and 16-inch HRSD force main (FM) (NF-020 and NF-021) from the intersection of Route 171 (Oyster Point Road) and Jefferson Avenue to the proposed Patrick Henry jumper. The proposed force main sizing (30-inch) was performed during the City Center HART Analysis.
PROJECT JUSTIFICATION
Preliminary hydraulic and capacity analysis show that pressures in the HRSD FM are hindering the City of Newport News' pump stations from entering the HRSD system during high flow conditions. Future development is planned for the service area, which will exacerbate the current problem. This FM segment will also provide additional capacity and system flexibility when combined with other proposed improvements.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeremiah BurfordContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 02/01/2018PER 09/01/2018Design Delay 02/01/2019Design 02/01/2019Bid Delay 01/01/2020PreConstruction 01/01/2020Construction 03/01/2020Closeout 09/01/2021
Cost Estimate Class: Class 4 PrePlanning $53,808PER $187,424Design $1,756,880PreConstruction $23,100Construction $10,142,572Closeout $10,000 Est. Program Cost $12,173,784Contingency Budget $1,848,304
Est. Project Costs $14,022,088
JR012100JR012100
WARWICK BLVD
NETT
LES
DR
HUXLEY PL
CITY CENTER BLVD
TURL
INGT
ON RD
MELLON ST
WHITES LN
WINTERHAVEN DR
PATTON DR
PARKER AVE
SPRI
NG R
D
DEEP CREEK RD
MARRO
W DR
CARNEGIE DR
CENT
ER S
T
WHITTIER AVE
CULPEPPER AVE
MOLINE DR
SUMMER DR
NAT TURNER BLVD
HERMAN MELVILLE AVE
MAYM
ONT
DR
QUIL
LEN
TER
MONICA DR
LEO
CT
SUITE LIFE CIR
SAYB
ROOK
E CT
SARA
H CT
COLUMBUS WAY
CITY CENTER BLVD
JR012100Huxley to Middle Ground Force MainExtension
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR012100
/0 450 900 1,350 1,800225
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Huxley Place to Middle Ground Boulevard Force Main Extension
PR_JR012100
System: James RiverType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Status: DesignRegulatory: Rehab Plan Phase One
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$4,227 $700 $3,252 $276 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will involve the installation of approximately 2,250 LF of new 36-inch force main (FM) from the intersection of Alpine Street and Huxley Place to the MiddleGround-City Center Interconnect FM west of the CSX railroad tracks. This extension will allow for abandonment of the 36-inch reinforced concrete pipe (RCP) from theintersection of Maxwell Lane and Route 60 to the intersection of Huxley Place and Carnegie Drive (approx. 5,500 LF abandoned).
PROJECT JUSTIFICATION
This FM extension will connect to the Middle Ground Boulevard FM that will allow for the abandonment described above. An evaluation of the existing record drawings indicated the presence of 6 unvented high points in the section to be abandoned. Based on this finding, it is likely that the interior of this pipe is suffering from severe crown corrosion. Considering the age of this pipe (> 40 years), the length of the projected bubbles, the location of adjacent city pump stations, and available repair techniques (particularly on the flat bottom RCP) the solution for the conditional issues here is complete abandonment.
FUNDING TYPE CONTACTS
Funding Type: Clean Water/Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Ann CopelandContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 10/01/2015PER 01/01/2016Design Delay 03/01/2018Design 03/01/2018Bid Delay 04/01/2019PreConstruction 04/01/2019Construction 06/01/2019Closeout 08/01/2020
Cost Estimate Class: Class 2 PrePlanning $686PER $59,960Design $361,700PreConstruction $5,000Construction $3,794,900Closeout $5,000 Est. Program Cost $4,227,245Contingency Budget $328,600
Est. Project Costs $4,555,845
JR013000
MORRISON
HARPERSVILLE RD
GATEWOOD RD
BELINDA DR
JR013000Morrison Pump Station DischargeForce Main Replacement & CapacityEnhancements
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR013000
/0 130 260 390 52065
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Morrison Pump Station Discharge Force Main Replacement and Capacity Enhancements
PR_JR013000
System: James RiverType: Pipelines
Driver Category: Capacity ImprovementsProject Status: PERRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$1,273 $86 $91 $457 $638 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project involves replacing and rerouting approximately 850 LF of 12-inch Asbestos Cement (AC) Pipe with 16-inch pipe from Morrison Pump Station (PS) to the connection point at the main trunk across the CSX railroad.
PROJECT JUSTIFICATION
The 12-inch Asbestos Cement interconnect force main is designed to divert flows from the 12-inch Cast Iron force main to the 20-inch Asbestos Cement force main. Existing debris build up completely prevents flow through the pipe segment. There were several unsuccessful attempts to flush the pipe segment. The option to send flow from the Morrison PS to the James River Treatment Plant through the 20-inch AC pipe is critical in case of a break on the 12-inch Cast Iron pipe installed in 1967. The Morrison PS also has significant capacity issues. This replacement will improve capacity at this location.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Matt PoeContacts-Managing Dept: Operations-Interceptors
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2018PER 12/01/2018Design Delay 04/01/2019Design 04/01/2019Bid Delay 02/01/2020PreConstruction 12/01/2020Construction 02/01/2021Closeout 02/01/2022
Cost Estimate Class: Class 4 PrePlanning $0PER $47,300Design $130,000PreConstruction $5,258Construction $1,085,000Closeout $5,416 Est. Program Cost $1,272,974Contingency Budget $273,000
Est. Project Costs $1,545,974
JR013200
LUCAS CREEK
WARWICK BLVD
DENBIGH BLVDOL
D LU
CAS
CREE
K RD
US-60
WARW
ICK BLVD
CATALINA DR
GARR
OW R
D
WELLS RD
DENBIGH BLVD
BEECHMONT DR
COLLEEN DRDARDEN DR
CASCADE DR
PAULETTE DR
PICARD DR
VENTNOR DR
DE LAURA DR
STONY DR
TELFORD DR
TULIP DR
VISTA DR
THALIA DR
SADD
LER D
R
MANOR RD
HUGHES DR
LORAINE DR
KINGSMAN DR OLD
COUR
THOU
SE W
AY
DEBBIE LN
OWENS RD
CREMONA DR
HELENA DR
PEAR RIDGE CIR
RUBRUM RD
HELEN DR
BAILIFF CT
ASHLEY PL
ADA
TER
BELLE CIR
JR013200Lucas Creek-WoodhavenInterceptor Force MainReplacement Phase II
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR013200
/0 740 1,480 2,220 2,960370
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Lucas Creek-Woodhaven Interceptor Force Main Replacement Phase II
PR_JR013200
System: James RiverType: Pipelines
Driver Category: Aging Infrastructure/RehabilitationProject Status: ProposedRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$2,085 $60 $820 $1,205 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project involves the replacement of approximately 1,500 linear feet of Ductile Iron (DI) pipe between Denbigh High School and Epes Elementary School. This section of pipe will be replaced with a 30" Horizontal Directional Drilled Polyethylene pipe underneath Stony Run.
PROJECT JUSTIFICATION
In 2014, two failures occurred on the Lucas Creek-Woodhaven Interceptor Force Main (NF-015) just south of Woodhaven Road within a 6 month period. These failures shared the same characteristics as the previous failures on the Prestressed Concrete Cylinder Pipe (PCCP) force main in 2007 that required the replacement of approximately 2 miles of HRSD force main. After the first failure (April 2014), several Broadband Electromagnetic (BEM) scans and Ultrasonic Thickness (UST) tests were performed along the force main from Woodhaven Road to Lucas Creek Road along Warwick Boulevard. The BEM and UST testing confirmed a loss of wallthickness along the bottom third of the pipe. pH sampling along NF-008 and NF-015 resulted in values ranging from 4.4-6.1.Due to the condition of the pipe immediately downstream of the repairs, a Prompt Repair Work Order has been issued for the replacement of approximately 1,200 LF of pipe from the intersection of Woodhaven Road and Warwick Boulevard to just north of the intersection of Thorncliff Drive and Warwick Boulevard. While no condition assessment has been performed along this section of force main from Warwick Boulevard and Lucas Creek Road to the Lucas Creek PS, it is anticipated that a loss of wall thickness has occurred along the bottom of the pipe. Additional condition assessment activities may be performed based on actual pipe condition obtained from the Prompt Repair work and the work to complete Phase I.This 1,500L.F. of pipe to be replaced represents the most difficult section of forcemain to access and repair from the Lucas Creek Phase I CIP to Lucas Creek Pump Station. This portion of 1970 D.I. pipe lies between Denbigh High School and Epes Elementary School. This pipeline is installed under a salt marsh, which based on past experiences, is also at risk of severe external corrosion.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Sam McAdooContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 04/01/2019PER 05/01/2019Design Delay 08/01/2019Design 08/01/2019Bid Delay 02/01/2020PreConstruction 02/01/2020Construction 04/01/2020Closeout 01/01/2021
Cost Estimate Class: Class 5 PrePlanning $0PER $90,000Design $180,000PreConstruction $10,000Construction $1,800,000Closeout $5,000 Est. Program Cost $2,085,000Contingency Budget $360,000
Est. Project Costs $2,445,000
JR013400
JR013400James River Treatment PlantAdvanced Nutrient ReductionImprovements
CIP Location
Newport News
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
JR013400
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
JRTP Advanced Nutrient Reduction Improvements PR_JR013400
System: James RiverType: Nutrient Reduction
Driver Category: Performance UpgradesProject Status: ProposedRegulatory: Integrated Plan-SWIFT
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29
$120,750 $0 $237 $2,550 $31,242 $32,520 $32,520 $21,681 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is for the design and construction of improvements to the secondary treatment process at the James River Treatment Plant. The scope includes equalization of primary effluent, modifications to the Integrated Fixed Film Activated Sludge (IFAS) system, increased IFAS media fill, demolition of existing secondary clarifiers (1, 2, and 3), replacement with new rectangular secondary clarifiers, conversion of clarifier 5 to a post denitrification moving bed bio-reactor (MBBR), chemical storage and feed systems, and all pumping, piping, instrumentation, and site work required. Current estimate does not include any upgrades to the treatmentplant electrical system backbone.
PROJECT JUSTIFICATION
Advanced secondary treatment improvements, including nutrient reduction measures, will be required to provide stable source water quality that meets the influent requirements of the full scale SWIFT facility at James River Treatment Plant.
FUNDING TYPE CONTACTS
Funding Type: WIFIA Contacts-Requesting Dept: Operations-TreatmentContacts-Dept Contacts: Lauren ZuravnskyContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2019PER 02/01/2020Design Delay 07/01/2020Design 06/01/2021Bid Delay 06/01/2021PreConstruction 07/01/2020Construction 03/01/2022Closeout 03/01/2025
Cost Estimate Class: Class 5 PrePlanning $0PER $237,000Design $114,763,000PreConstruction $0Construction $5,750,000Closeout $0 Est. Program Cost $120,750,000Contingency Budget $0
Est. Project Costs $120,750,000