James River TMDL Redevelopment Kickoff Public Meeting. Region 2000 Local Government Council 828 Main Street, 12th Floor Lynchburg, VA March 4, 2014 6:30 – 8:30 p.m. Why are we here?. T otal M aximum D aily L oad. We are here. Study. What Happens When a Stream is Impaired?. - PowerPoint PPT PresentationTRANSCRIPT
James River TMDL Redevelopment Kickoff Public Meeting
Region 2000 Local Government Council828 Main Street, 12th Floor
Lynchburg, VA
March 4, 2014
6:30 – 8:30 p.m.
Why are we here? Implement
Control Measures
Water Quality Monitoring
Assessments 303 (d) Impaired
Waters List
305 (b) WQA Report
Stream Monitoring
Biomonitoring
Lake Monitoring
Water Quality Standards
Watershed Plans
TMDLStudies
Identify Pollutant Sources Stakeholder
Participation
Best Management Practices
Sewage Treatment Plant upgrades
\
What Happens When a Stream is Impaired?
Water quality standards not met
Water quality standards met
Study
Implementation Plan
Polluted• Identifies sources of pollution• Calculates amounts from each source• Estimates necessary pollutant reductions
• Identifies permit controls or best management practices needed to make necessary pollutant reductions
Implementation
Clean
• The State begins a formal process to clean up that water body (a TMDL)
Monitoring
We are here
TotalMaximum
Daily
Load
Agenda Meeting Description & TMDL Process.......................……….. Paula Nash,
DEQ
Stakeholder Introductions……………...................Kelly Hitchcock, Region 2000
TMDL Redevelopment Process Description ..........................Craig Lott, DEQ
Project Catalyst, Lynchburg City Long Term Control Plan ……....... Jim Talian, Lynchburg City
Transition to pending TMDL Study ................................................. Craig Lott
TMDL Source Assessment & Hydrologic Modeling Calibration …... Jim Kern, MapTech
Discussion Facilitation ............................................................Kelly Hitchcock
Wrap Up and confirmation of future scheduling ...........................Craig, Lott
Meeting Introductions
Kelly Hitchcock, Region 2000
James River Lynchburg Bacteria TMDL BackgroundOriginal TMDL, completed August, 2007
and approved by both EPA (12-4-2007) and State Water Control Board (7-31-2008).
Modification #1 completed December 3, 2009and approved by EPA December 3, 2009.
Draft Modification #2 (and Draft Beaver Creek TMDL addition) completed May 2010.
Bacteria TMDL Redevelopment Process DescriptionFormerly completed TMDLs may be reopened
for various reasons such as, to consider the effects of additional Waste Load Allocations or significant land use changes.
When changes to the TMDL are initiated by a permittee, such as the City of Lynchburg, the costs of remodeling may be passed along to the permittee.
Bacteria TMDL Redevelopment Process DescriptionWho’s responsible?
How many changes should be made?
Do TMDL Goals change?
Bacteria TMDL Redevelopment Process DescriptionWho’s responsible? The delegated regulatory authority to
develop, review, edit, provide public participation, and submit a TMDL to EPA and the SWCB remains the responsibility of the Department of Environmental Quality.
How many changes should be made? During the ‘redevelopment’ process, updates to other aspects of the original modeling, equations, and report may be made as appropriate to reflect changes, such as the bacteria water quality standards and assessments, mapping, nonpoint source load allocations, waste load allocations, hydrologic features, and land use.
Do TMDL Goals change? The process although initiated by a slightly different path, has the same state and federal regulatory expectations to achieve Water Quality Standards and receive EPA and State Water Control Board approval as any other TMDL.
LTCP Changes ConsideredTMDL Modification #2 included a simple
modeling scenario that considered whether bacteria Water Quality Standards might still be met if some limited discharge of mixed stormwater and sewage in combined sewer overflow events were to remain in the James River.
Combined Sewer Overflow Long Term Control Plan proposal, a Catalyst for TMDL Redevelopment
Jim Talian, Lynchburg City
TMDL Considerations for Changes in CSO Plan
Jim Kern, MapTech
TMDL Redevelopment ScheduleTMDL Hydrologic Modeling CompletionTAC Meeting #1Public Meeting #1
Tuesday, March 4TAC Meeting #2
Draft TMDLPublic Meeting #2
Draft TMDL 30 day Public Comment Period
SWCB SubmissionEPA Submission + Review
Questions?SEND/E-MAIL/FAX your comments to:Paula Nash, TMDL CoordinatorDEQ, Blue Ridge Regional Office7705 Timberlake RoadLynchburg, VA 24502 Phone: 434-582-6216 Fax: 434-845-3493Paula.Nash@ deq.virginia.gov
http://www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/TMDL/TMDLDevelopment/DocumentationforSelectTMDLs.aspx