itr sukhbir singh 2015-16.xls

47
REVIEW NOTES Date Pages recording Measurements subjected to test-check Value of Measurement checked Result of the check exercised Initials and designation of the checking officer

Upload: kanwardeep-singh

Post on 18-Feb-2016

226 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: ITR Sukhbir Singh 2015-16.xls

REVIEW NOTES

Date Pages recording Measurements

subjected to test-check

Value of Measurement

checked

Result of the check exercised

Initials and designation of the checking officer

Page 2: ITR Sukhbir Singh 2015-16.xls
Page 3: ITR Sukhbir Singh 2015-16.xls

9th Running BillMB No. 9

Type-I,II,III,IV & V ITBP Campus at Baddowal (Ludhiana)

Agency: M/s Sarup Chand & Sons

Agreement No.: 09/EE/LCD/2010-11

Date of start: 14.09.2010

Stipulated date of completion: 13.06.2011

Stipulated date of completion: Work in progress.

Certified that this MB contains pages from 01 to and all are machine numbered.

Name of work: Upgradation and Renovation of Residentail Quarters

Page 4: ITR Sukhbir Singh 2015-16.xls

9th RUNNING ACCOUNT BILL

Agency : M/s Sarup Chand & SonsAgmt. No. :09/EE/LCD/2010-11. Date of Start : 14.09.2010Stipulated date of completion: 13.06.2011Actual date of completion: Work in progress.Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-13-08-2012 8.5

T-II qtrs. 6 Nos. i.e. qtr. No. 50 to 55 6 1 6.00

C/O TMB/P- Total 6.00 Nos.

Date of Measurement :-13-08-2012 E.I.1

Measurements for T-II/Qtr No. 501 0.39 0.39 cum

5 0.39 1.95 cum

Total 2.34 cumMeasurements for T-II/Qtr No. 50 AW.C 1 0.84 1.17 0.04 0.04Less for WC Seat 1 0.58 0.44 0.04 -0.01

Total 0.03

5 0.03 0.15

Total 0.18 cumB

C/O TMB/P- TOTAL ( A + B ) 2.52 cum

Date of Measurement :-13-08-2012 8.6

A Measurements for T-II qtr. No. 5014.59 sqm

5 14.59 72.95

C/O TMB/P- Total 87.54 sqm

Name of Work: Upgradation and Renovation of Residentail Quarters Type-I,II,III,IV & V at ITBP Campus, Baddowal (Ludhiana)

Dismantling of flushing cistern of any size including stacking of usseful materials near the site and disposal of unserviceable materials within 50 metres lead:

Demolishing cement concrete manually/by cechanical means including disposal of material within 50 mtr, lead as per direction of Engineer-in-Charge. 1:3:6 or richer mix.

Similar qty. B/F vide Page-10/M.B. No. 6 (Qty 0.39 cum) of qtr No. 23/ T-II

Add similar qty. for 5 more qtrs. i.e from block No. 51 to 55 except small room

Add similar qty. for 15 more qtrs. i.e. from qtr no.51, 52,53, 54 &55

Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

Similar Qty. B/F vide Page-13/M.B. No. 6 (qty. 14.59 sqm)Add similar qty. for 5 more qtrs. i.e. From Block No. 51 to 55

Page 5: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-14-08-2012 8.1

8.1.1 1:4:8 or leaner mixMeasurements for qtr. No. 51/T-II 1 1.17 0.84 0.44 0.43 cum

3 0.43 1.30

C/O TMB/P- Total 1.73 cum

Date of Measurement : 14.08.2012E.I/25

15mm to 40mm nominal bore

Qty. for qtr. No. Q.No.55/ T-IIFor W.C. 1 1 0.15 0.15

1 1 0.80 0.801 1 0.45 0.45

For Bath to wash basin 1 1 0.10 0.101 1 0.90 0.901 1 1.20 1.20

to shower 1 1 0.73 0.731 1 0.84 0.84

Total 5.175.00 5.17 25.85

C/o TMB/P- Total 31.02 mtr

Demolishing cement concrete manually/ by mechanical means includinlg disposal of material within 50 metres lead as per direction of Engineer in charge.

Add similar qty. for 3 more qtrs. i.e. from qtr no. ,52,54& 55

Dismantling G.I. pipes (concealed work) including excavation after taking out the pipes, manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of Engineer in charge.

Add similar qty. for 5 more Quarter i.e.Q.No.50 to 54

Page 6: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 16-08-2012 E.I.6

Above plinth level

Measurements for qtr. No. 51/T-IIWC 1 1.17 0.84 0.05 0.05 cum

3 0.05 0.15 cum

C/O TMB/P- Total 0.20 cum

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.

1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size)

Add similar qty. for 3 more qtrs. i.e. from qtr no. 52,54& 55

Page 7: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-19-08-2012 E.I.7 15mm cement plaster of mix :

1;4 (1 cement : 4 coarse sand)Measurement for qtr. No. 51/T-II 1 1 1.17 0.84 0.98W C Wall 1 2 1.17 0.39 0.91 SqmW C Wall 1 2 0.84 0.39 0.66 Sqm

Total 2.553 2.55 7.65

C/o TMB/P- Total 10.20 sqmA

Date of Measurement :-19-08-2012 10.1

Measurement for qtr. No. 51, 52,54& 55/T-II 10.20 sqm

C/o TMB/P- Total 10.20 sqm

Add similar qty. for 3 more qtrs. i.e. from qtr no. 52,54& 55

Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :

a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment a

Qty. similar to E.I./7 i.e. Qty. B/F videThis Page mark 'A' above /TMB

Page 8: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement : 24.08.20121.1

Measurement for qtr. No. 51/T-II WC 1 1.14 0.81 0.39 0.36 cum

3 0.36 1.08 cum

C/o TMB/P- Total 1.44 cum

Date of Measurement : 24.08.2012E.I.8

Measurement for qtr. No. 51/T-II 1.44

Total 1.44 cumC/o TMB/P-

Date of Measurement :-24-08-2012 8.5

9 1 9.00

C/O TMB/P- Total 9.00 Nos.

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.

1:5:10 (1 cement :5 fine sand : 10 graded stone aggregate 40mm nominal size)

Add similar qty. for more qtrs. i.e. from qtr no. 52,54& 55

Extra for concrete work in superstructure above plinth level upto floor V level.

Qty. similar to to Agmt. Item No. 1.1 i.e. Qty. B/F vide page-……../TMB

Dismantling of flushing cistern of any size including stacking of usseful materials near the site and disposal of unserviceable materials within 50 metres lead:

T-II qtrs. 9 Nos. i.e. qtr. No. 56 to 61, 69, 72 & 73

Page 9: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-24-08-2012 E.I.1

Measurements for T-II/Qtr No. 561 0.39 0.39 cum

8 0.39 3.12 cum

Total 3.51 cumMeasurements for T-II/Qtr No. 56 AW.C 1 0.84 1.17 0.04 0.04Less for WC Seat 1 0.58 0.44 0.04 -0.01

Total 0.03

8 0.03 0.23

Total 0.26 cumB

C/O TMB/P- TOTAL ( A + B ) 3.77 cum

Date of Measurement :-24-08-2012 8.6

A Measurements for T-II qtr. No. 5614.59 sqm

9 14.59 131.31 sqm

C/O TMB/P- Total 145.90 sqm

Demolishing cement concrete manually/by cechanical means including disposal of material within 50 mtr, lead as per direction of Engineer-in-Charge. 1:3:6 or richer mix.

Similar qty. B/F vide Page-10/M.B. No. 6 (Qty 0.39 cum) of qtr No. 23/ T-II

T-II qtrs. 6 Nos. i.e. qtr. No. 57 to 61, 69, 72 & 73

T-II qtrs. 6 Nos. i.e. qtr. No. 57 to 61, 68, 72 & 73

Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

Similar Qty. B/F vide Page-13/M.B. No. 6 (qty. 14.59 sqm)Add similar qty. for 5 more qtrs. i.e. From Block No. 57 to 61,69, 72 & 73

Page 10: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-25-08-2012 8.1

8.1.1 1:4:8 or leaner mixMeasurements for qtr. No. 57/T-II

1 1.17 0.84 0.44 0.43 cum

6 0.43 2.58

C/O TMB/P- Total 3.01 cum

Date of Measurement : 25.08.2012E.I/25

15mm to 40mm nominal boreQty. for qtr. No. Q.No.56/ T-IIFor W.C. 1 1.00 0.15 0.15

1 1.00 0.80 0.801 1.00 0.45 0.45

For Bath to wash basin 1 1.00 0.10 0.101 1.00 0.90 0.901 1.00 1.20 1.20

to shower 1 1.00 0.73 0.731 1.00 0.84 0.84

Total 5.178 5.17 41.36

C/o TMB/P- Total 46.53 mtr

Demolishing cement concrete manually/ by mechanical means includinlg disposal of material within 50 metres lead as per direction of Engineer in charge.

Similar qty. B/F vide page-14/M.B. No. 6 (qty. 0.45 cum) i.e for w.c onlyAdd similar qty. for 6 more qtrs. i.e. from qtr no. 58, 60 & 61,69,72 & 73

Dismantling G.I. pipes (concealed work) including excavation after taking out the pipes, manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of Engineer in charge.

Add similar qty. for 8 more Quarter i.e.Q.No.57 to 61, 69, 72 & 73

Page 11: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 28.08-2012 E.I.6

Above plinth level

Measurements for qtr. No. 57/T-IIWC 1 1.17 0.84 0.05 0.05 cum

6 0.05 0.29 cum

C/O TMB/P- Total 0.34 cum

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.

1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size)

Add similar qty. for 6 more qtrs. i.e. from qtr no. 58, 60 & 61,69,72 & 73

Page 12: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-29-08-2012 E.I.7 15mm cement plaster of mix :

1;4 (1 cement : 4 coarse sand)Measurements for qtr. No. 57/T-II 1 1 1.17 0.84 0.98W C Wall 1 2 1.17 0.39 0.91 SqmW C Wall 1 2 0.84 0.39 0.66 Sqm

Total 2.556 2.55 15.30

C/o TMB/P- Total 17.85 sqm

Date of Measurement :-29-08-2012 10.1

17.85 sqm

C/o TMB/P- 17.85 sqm

Add similar qty. for 6 more qtrs. i.e. from qtr no. 58, 60 & 61,69,72 & 73

Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :

a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment a

Measurements for qtr. No. 57, 58, 60 & 61, 69, 72 & 73 /T-II

Qty. similar to E.I./7 i.e. Qty. B/F vide page- ./TMB

Page 13: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-31.08.20121.1

Measurements for qtr. No. 57/T-IIWC 1 1.14 0.81 0.39 0.36 cum

6 0.36 2.16 cum

C/o TMB/P- Total 2.52 cum

Date of Measurement :-31.08.2012E.I.8

2.52

C/o TMB/P- Total 2.52 cum

Date of Measurement : 31.08.2012E.I. 26

15 mm dia nominal boreQtr No.50 to 61,69, 72 & 73/ T- II

31.02 mtr

46.53

C/o TMB/P- Total 77.55 mtr

Date of Measurement : 31.08.20127.2

Measurements for qtr. No. 50/T-II152.13 sqm

14 152.13 2129.82 sqm

C/o TMB/P- Total 2281.95 sqm

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.

1:5:10 (1 cement :5 fine sand : 10 graded stone aggregate 40mm nominal size)

Add similar qty. for 6 more qtrs. i.e. from qtr no. 58, 60 & 61,69,72 & 73

Extra for concrete work in superstructure above plinth level upto floor V level.Qty. similar to to Agmt. Item No. 1.1 i.e. Qty. B/F vide page-……../TMB

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc.

Concealed pipe including painting with anti corrosive bitumastic paint, cutting chases and making good the wall

Qty. similar to E.I./25 i.e. Qty. B/F vide page-……../TMBQty. similar to E.I./25 i.e. Qty. B/F vide page-……../TMB

Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.

Similar qty. B/F vide page-16/M.B. No. 6 (qty 152.13 sqm) Add similar quantity for Qtr No.51 to 61,69, 72 & 73/ T- II

Page 14: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 7-09-20126.1

Qtr No.50 to 61,69, 72 & 73/ T- II2281.95

sqmC/o TMB/P- Total 2281.95 sqm

Date of Measurement :- 7-09-2012 8.5

T-II qtrs. 6 Nos. i.e. qtr. No.62 to 67 6 1 6.00

C/O TMB/P- Total 6.00 Nos.

Date of Measurement :- 7-09-2012 E.I.1

Measurements for T-II/Qtr No. 621 0.39 0.39 cum

5 0.39 1.95 cum

Total 2.34 cumMeasurements for T-II/Qtr No. 62 AW.C 1 0.84 1.17 0.04 0.04Less for WC Seat 1 0.58 0.44 0.04 -0.01

Total 0.03

5 0.03 0.15

Total 0.18 cumB

C/O TMB/P- TOTAL ( A + B ) 2.52 cum

Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepar the surface even and smooth complete.

Qty. similar to Agg. Item No. 7.2 i.e. Qty. B/F vide page-……../TMB

Dismantling of flushing cistern of any size including stacking of usseful materials near the site and disposal of unserviceable materials within 50 metres lead:

Demolishing cement concrete manually/by cechanical means including disposal of material within 50 mtr, lead as per direction of Engineer-in-Charge. 1:3:6 or richer mix.

Similar qty. B/F vide Page-10/M.B. No. 6 (Qty. 0.67 cum) of qtr No. 23/ T-II

Add similar qty. for5 moreT-II qtrs. i.e. qtr. No.63 to 67

Add similar qty. for5 moreT-II qtrs. i.e. qtr. No.63 to 67

Page 15: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 7.09-2012 8.6

A Measurements for T-II qtr. No.6214.59 sqm

5 14.59 72.95

C/O TMB/P- Total 87.54 sqm

Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

Similar Qty. B/F vide Page-13/M.B. No. 6 (qty. 14.59 sqm)Add similar qty. for5 more qtrs. i.e. From Qtr. No.63 to 67,

Page 16: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 9-09-20128.1

8.1.1 1:4:8 or leaner mixMeasurements for qtr. No. 63/T-II

1 1.17 0.84 0.44 0.43 cum

3 0.43 1.30

C/O TMB/P- Total 1.73 cum

Demolishing cement concrete manually/ by mechanical means includinlg disposal of material within 50 metres lead as per direction of Engineer in charge.

Similar qty. B/F vide page-14/M.B. No. 6 (qty. 0.45 cum) i.e for w.c onlyAdd similar qty. for 3 more qtrs. i.e. from qtr no.64,66,67

Page 17: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 10-09-2012 E.I/25

15mm to 40mm nominal bore

Qty. for qtr. No. Q.No.62/ T-IIFor W.C. 1 1.00 0.15 0.15 mtr

1 1.00 0.80 0.80 mtr1 1.00 0.45 0.45 mtr

For Bath to wash basin 1 1.00 0.10 0.10 mtr1 1.00 0.90 0.90 mtr1 1.00 1.20 1.20 mtr

to shower 1 1.00 0.73 0.73 mtr1 1.00 0.84 0.84 mtr

Kitchen 1 1 0.45 0.45 mtr1 1 0.50 0.50 mtr

Qty. for one qtr Total 6.12 mtrAdd similar qty for 5 more qtrs i.e from 5 6.12 30.60 mtr63 to 67, C/O TMB/P- Total 36.72 mtr.

Dismantling G.I. pipes (concealed work) including excavation after taking out the pipes, manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of Engineer in charge.

Page 18: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 12-09-2012 E.I/26

15 mm dia nominal bore

Qty. for qtr. No. Q.No.62/ T-IIFor W.C. 1 1.00 0.15 0.15 mtr

1 1.00 0.80 0.80 mtr1 1.00 0.45 0.45 mtr

For Bath to wash basin 1 1.00 0.10 0.10 mtr1 1.00 0.90 0.90 mtr1 1.00 1.20 1.20 mtr

to shower 1 1.00 0.73 0.73 mtr1 1.00 0.84 0.84 mtr

Kitchen 1 1 0.45 0.45 mtr1 1 0.50 0.50 mtr

Qty. for one qtr Total 6.12 mtrAdd similar qty for5 more qtrs i.e from 63 to 67, 5 6.12 30.60 mtr

C/O TMB/P- Total 36.72 mtr.

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Concealed pipe including painting with anti corrosive bitumastic paint, cutting chases and making good the wall

Page 19: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 20-10-2012 E.I.6

Above plinth level

Measurements for qtr. No. 63/T-IIWC 1 1.17 0.84 0.05 0.05 cum

3 0.05 0.15 cum

C/O TMB/P- Total 0.20 cum

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.

1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size)

Add similar qty. for 3 more qtrs. i.e. from qtr no.64,66,67,

Page 20: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 22-10-2012E.I.7 15mm cement plaster of mix :

1;4 (1 cement : 4 coarse sand)Measurement for qtr. No. 63/T-II 1 1 1.17 0.84 0.98W C Wall 1 2 1.17 0.39 0.91 SqmW C Wall 1 2 0.84 0.39 0.66 Sqm

Total 2.55 Sqm3 2.55 7.65 Sqm

C/o TMB/P- Total 10.20 sqm

Add similar qty. for 3 more qtrs. i.e. from qtr no.64,66,67

Page 21: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-23-10-2012 10.1

Measurement for 4 qtr. No. 63, 64,66,67 /T-II 10.20 sqm

C/o TMB/P- Total 10.20 sqm

Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :

a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment a

Qty. similar to E.I./7 i.e. Qty. B/F vide page-8./TMB

Page 22: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-24-10-2012 1.1

Measurement for qtr. No. 63/T-II WC 1 1.14 0.81 0.39 0.36 cum

3 0.36 1.08 cum

C/o TMB/P- Total 1.44 cum

Date of Measurement :-24-10-2012 E.I.8

Measurement for qtr. No. 63/T-II 1.44

Total 1.44 cumC/o TMB/P-

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.

1:5:10 (1 cement :5 fine sand : 10 graded stone aggregate 40mm nominal size)

Add similar qty. for 3 more qtrs. i.e. from qtr no.64,66,67,

Extra for concrete work in superstructure above plinth level upto floor V level.

Qty. similar to E.I./7 i.e. Qty. B/F vide page-……../TMB

Page 23: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-7-01-20138.5

T-II qtrs. 3 Nos. i.e. qtr. No. 68, 70 & 71 3 1 3.00

C/O TMB/P- Total 3.00 Nos.Date of Measurement :-07-01-2013

7.2

Measurements for qtr. No. 62/T-II152.13 sqm

8 152.13 1217.04

C/O TMB/P- Total 1369.17 sqm

Date of Measurement :-07-01-2013E.I.1

Measurements for T-II/Qtr No. 681 0.39 0.39 cum

2 0.39 0.78 cum

Total 1.17 cumMeasurements for T-II/Qtr No. 68 AW.C 1 0.84 1.17 0.04 0.04Less for WC Seat 1 0.58 0.44 0.04 -0.01

Total 0.03

2 0.03 0.06

Total 0.09 cumB

C/O TMB/P- TOTAL ( A + B ) 1.26 cum

Date of Measurement :-07-01-20138.6

A Measurements for T-II/Qtr No. 6814.59 sqm

2 14.59 29.18

C/O TMB/P- Total 43.77 sqm

Dismantling of flushing cistern of any size including stacking of usseful materials near the site and disposal of unserviceable materials within 50 metres lead:

Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.

Similar qty. B/F vide page-16/M.B. No. 6 (qty 152.13 sqm) of qtr No.19/T-IIAdd similar Qty. for 8 more qtrs. i.e. From Qtr. No.63 to 67, 68, 70 & 71

Demolishing cement concrete manually/by cechanical means including disposal of material within 50 mtr, lead as per direction of Engineer-in-Charge. 1:3:6 or richer mix.

Similar qty. B/F vide Page-10/M.B. No. 6 (Qty 0.39 cum) of qtr No. 23/ T-II

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

Similar Qty. B/F vide Page-13/M.B. No. 6 (qty. 14.59 sqm)Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Page 24: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-9-01-20138.1

8.1.1 1:4:8 or leaner mixMeasurements for T-II/Qtr No. 68 1 1.17 0.84 0.44 0.43 cum

2 0.43 0.86

C/O TMB/P- Total 1.29 cum

Date of Measurement :-9-01-2013E.I/25

15mm to 40mm nominal boreMeasurements for T-II/Qtr No. 68For W.C. 1 1 0.15 0.15

1 1 0.80 0.801 1 0.45 0.45

For Bath to wash basin 1 1 0.10 0.101 1 0.90 0.901 1 1.20 1.20

to shower 1 1 0.73 0.731 1 0.84 0.84

Total 5.172.00 5.17 10.34

C/o TMB/P- Total 15.51 mtr

Demolishing cement concrete manually/ by mechanical means includinlg disposal of material within 50 metres lead as per direction of Engineer in charge.

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Dismantling G.I. pipes (concealed work) including excavation after taking out the pipes, manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of Engineer in charge.

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Page 25: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 11-01-2013 E.I.6

Above plinth level

Measurements for T-II/Qtr No. 68WC 1 1.17 0.84 0.05 0.05 cum

2 0.05 0.10 cum

C/O TMB/P- Total 0.15 cum

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.

1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size)

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Page 26: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 12-01-2013 E.I.7 15mm cement plaster of mix :

1;4 (1 cement : 4 coarse sand)Measurements for T-II/Qtr No. 68 1 1 1.17 0.84 0.98W C Wall 1 2 1.17 0.39 0.91 SqmW C Wall 1 2 0.84 0.39 0.66 Sqm

Total 2.552 2.55 5.10

C/o TMB/P- Total 7.65 sqmA

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Page 27: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 14-01-2013 10.1

Measurement for qtr. No. 68,70 & 71/T-II 7.65 sqm

C/o TMB/P- Total 7.65 sqm

Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :

a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours.

b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment a

Qty. similar to E.I./7 i.e. Qty. B/F videThis Page mark 'A' above /TMB

Page 28: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 15-01-2013 1.1

Measurements for T-II/Qtr No. 68

WC 1 1.14 0.81 0.39 0.36 cum2 0.36 0.72 cum

C/o TMB/P- Total 1.08 cum

Date of Measurement :- 15-01-2013 E.I.8

Measurement for qtr. No. 51/T-II 1.08

Total 1.08 cumC/o TMB/P-

Date of Measurement :- 15-01-2013 6.1

A Measurements for T-II/Qtr No. 62152.13 sqm

8 152.13 1217.04

C/O TMB/P- Total 1369.17 sqm

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.

1:5:10 (1 cement :5 fine sand : 10 graded stone aggregate 40mm nominal size)

Add similar qty. for 2 more qtrs. i.e from block No.70 to 71 except small room

Extra for concrete work in superstructure above plinth level upto floor V level.

Qty. similar to to Agmt. Item No. 1.1 i.e. Qty. B/F vide page-……../TMB

Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepar the surface even and smooth complete.

Similar qty. B/F vide page-16/M.B. No. 6 (qty 152.13 sqm) of qtr No.19/T-IIAdd similar qty. for 2 more qtrs. i.e from block No.63 to 67,68,70 & 71

Page 29: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-15-01-2013 7.4

7.4.1 One more coats on old work.A T-II Qtr no. 85

66.89

23 66.89 1538.47

C/o TMB/P- 1605.36 A

Date of Measurement :-15-01-2013 E.I.2

Qty. B/F vide page-9/MB-4 item No. 8.4 10.37Qty. B/F vide page-34/MB-5 item No. 8.1 30.24

C/o TMB/P- Total 30.24 cum

Date of Measurement :-15-01-2013 Item No.

T-II Block no. 56 to 61Entrance risers 1 3 1.19 0.16 0.57 sqm1st flight 1 10 1.06 0.16 1.70 sqm2nd flight 1 6 0.98 0.16 0.94 sqm3rd flight 1 8 1.04 0.15 1.25 sqm4th flight 1 8 1.03 0.16 1.32 sqm5th flight 1 8 1.03 0.16 1.32 sqm6th flight 1 9 1.01 0.16 1.45 sqm

8.554 8.55 34.19

C/O TMB/P- 42.74

Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :

Similar qty. B/F vide page-28/M.B. No. 6 (Qty. 66.89 sqm)Add similar qty. For 23 more qtrs. i.e. from block No. 51 to 73

Carriage of material by mechanical transport including loading, unloading and stacking

Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing

Add similar qty for 3 more blocks i.e block no. 50 to 55, 62 to 67 & 68 to 73

Page 30: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-15-01-2013 S.I. 3

T-II Block no. 56 to 61starting from mumty 1 1 2.42 0.10 0.24 sqm

1 1 0.22 0.10 0.02 sqm1 1 1.1 0.10 0.11 sqm1 1 0.32 0.10 0.03 sqm1 1 0.56 0.10 0.06 sqm2 1 0.14 0.10 0.03 sqm

VI th flight 7 2 0.1 0.17 0.24 sqm7 2 0.26 0.10 0.36 sqm1 1 0.11 0.10 0.01 sqm1 1 0.25 0.10 0.03 sqm1 1 0.19 0.10 0.02 sqm

VI th flight 1 1 0.96 0.10 0.10 sqm1 1 2.16 0.10 0.22 sqm1 1 1.48 0.10 0.15 sqm1 1 0.47 0.10 0.05 sqm2 1 0.18 0.10 0.04 sqm7 2 0.26 0.10 0.36 sqm7 2 0.10 0.17 0.24 sqm

V th flight 1 1 2.11 0.10 0.21 sqm1 1 0.67 0.10 0.07 sqm1 1 0.43 0.10 0.04 sqm2 1 0.12 0.10 0.02 sqm2 7 0.26 0.10 0.36 sqm2 7 0.10 0.17 0.24 sqm

IV th flight 1 1 0.96 0.10 0.10 sqm1 1 2.12 0.10 0.21 sqm1 1 1.47 0.10 0.15 sqm1 1 0.48 0.10 0.05 sqm2 1 0.10 0.17 0.03 sqm2 7 0.26 0.10 0.36 sqm2 7 0.10 0.17 0.24 sqm

III rd flight 1 1 2.11 0.10 0.21 sqm1 1 1.11 0.10 0.11 sqm1 1 0.93 0.10 0.09 sqm2 1 0.10 0.17 0.03 sqm2 5 0.26 0.10 0.26 sqm2 5 0.10 0.17 0.17 sqm

II nd flight 1 1 1.11 0.10 0.11 sqm1 1 2.11 0.10 0.21 sqm1 1 1.18 0.10 0.12 sqm1 1 0.22 0.10 0.02 sqm2 1 0.10 0.17 0.03 sqm2 9 0.26 0.10 0.47 sqm2 9 0.10 0.17 0.31 sqm2 1 0.12 0.10 0.02 sqm

I st flight 1 1 2.11 0.10 0.21 sqm1 1 0.51 0.10 0.05 sqm1 1 0.55 0.10 0.06 sqm1 1 0.35 0.10 0.03 sqm

Porch 1 1 2.49 0.10 0.25 sqm1 1 1.00 0.10 0.10 sqm1 1 2.91 0.10 0.29 sqm1 1 1.2 0.10 0.12 sqm

Qty. for one block Total 7.66 sqmAdd similar qty for 3 more blocks i.e 3 7.66 22.99 sqmblock no. 50 to 55, 62 to 67 & 68 to 73

Total 30.65 sqm (A)

Kota stone slabs 15 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing

Page 31: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

T-II Block no. 74to 79starting from mumty 1 1 2.42 0.10 0.24 sqm

1 1 0.22 0.10 0.02 sqm1 1 1.1 0.10 0.11 sqm1 1 0.32 0.10 0.03 sqm1 1 0.56 0.10 0.06 sqm2 1 0.14 0.10 0.03 sqm

VI th flight 7 2 0.1 0.17 0.24 sqm7 2 0.26 0.10 0.36 sqm1 1 0.11 0.10 0.01 sqm1 1 0.25 0.10 0.03 sqm1 1 0.19 0.10 0.02 sqm

VI th flight 1 1 0.96 0.10 0.10 sqm1 1 2.16 0.10 0.22 sqm1 1 1.48 0.10 0.15 sqm1 1 0.47 0.10 0.05 sqm2 1 0.18 0.10 0.04 sqm7 2 0.26 0.10 0.36 sqm7 2 0.10 0.17 0.24 sqm

V th flight 1 1 2.11 0.10 0.21 sqm1 1 0.67 0.10 0.07 sqm1 1 0.43 0.10 0.04 sqm2 1 0.12 0.10 0.02 sqm2 7 0.26 0.10 0.36 sqm2 7 0.10 0.17 0.24 sqm

IV th flight 1 1 0.96 0.10 0.10 sqm1 1 2.12 0.10 0.21 sqm1 1 1.47 0.10 0.15 sqm1 1 0.48 0.10 0.05 sqm2 1 0.10 0.17 0.03 sqm2 7 0.26 0.10 0.36 sqm2 7 0.10 0.17 0.24 sqm

III rd flight 1 1 2.11 0.10 0.21 sqm1 1 1.11 0.10 0.11 sqm1 1 0.93 0.10 0.09 sqm2 1 0.10 0.17 0.03 sqm2 5 0.26 0.10 0.26 sqm2 5 0.10 0.17 0.17 sqm

II nd flight 1 1 1.11 0.10 0.11 sqm1 1 2.11 0.10 0.21 sqm1 1 1.18 0.10 0.12 sqm1 1 0.22 0.10 0.02 sqm2 1 0.10 0.17 0.03 sqm2 9 0.26 0.10 0.47 sqm2 9 0.10 0.17 0.31 sqm2 1 0.12 0.10 0.02 sqm

I st flight 1 1 2.11 0.10 0.21 sqm1 1 0.51 0.10 0.05 sqm1 1 0.55 0.10 0.06 sqm1 1 0.35 0.10 0.03 sqm

Porch 1 1 2.49 0.10 0.25 sqm1 1 1.00 0.10 0.10 sqm1 1 2.91 0.10 0.29 sqm1 1 1.2 0.10 0.12 sqm

Qty. for one block Total 7.66 sqmsqm

Add similar qty for 1 more block i.e 80 1 7.66 7.66 sqmto 85

15.32 B

Type-I 86 to 91 starting from mumty 1 1 2.52 0.10 0.25 sqm1 1 0.18 0.10 0.02 sqm1 1 0.28 0.10 0.03 sqm1 1 1.2 0.10 0.12 sqm

Page 32: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

1 1 0.54 0.10 0.05 sqm1 1 0.83 0.10 0.08 sqm2 0.09 0.10 0.00 sqm2 7 0.25 0.10 0.35 sqm2 7 0.1 0.17 0.24 sqm

VI th flight 1 1 0.79 0.10 0.08 sqm2 1 0.19 0.10 0.04 sqm1 1 1.76 0.10 0.18 sqm1 1 0.85 0.10 0.09 sqm1 1 0.1 0.17 0.02 sqm2 6 0.25 0.10 0.30 sqm2 6 0.1 0.17 0.20 sqm1 1 2.19 0.10 0.22 sqm1 1 1.76 0.10 0.18 sqm1 1 0.85 0.10 0.09 sqm2 1 0.17 0.10 0.03 sqm2 6 0.25 0.10 0.30 sqm2 6 0.17 0.10 0.20 sqm1 1 2.12 0.10 0.21 sqm

V th flight 1 1 2.19 0.10 0.22 sqm1 1 0.55 0.10 0.06 sqm1 1 0.12 0.10 0.01 sqm1 1 0.58 0.10 0.06 sqm2 1 0.1 0.13 0.03 sqm2 6 0.1 0.17 0.20 sqm1 1 0.25 0.10 0.03 sqm1 1 0.12 0.10 0.01 sqm1 1 0.17 0.10 0.02 sqm

IV th flight 1 1 0.85 0.10 0.09 sqm1 1 2.18 0.10 0.22 sqm1 1 1.59 0.10 0.16 sqm1 1 0.24 0.10 0.02 sqm1 1 0.62 0.10 0.06 sqm2 1 0.1 0.17 0.03 sqm2 6 0.25 0.10 0.30 sqm2 6 0.1 0.17 0.20 sqm2 1 0.13 0.10 0.03 sqm

III rd flight 1 1 2.16 0.10 0.22 sqm1 1 0.1 0.10 0.01 sqm1 1 1.19 0.10 0.12 sqm1 1 1.22 0.10 0.12 sqm2 1 0.1 0.17 0.03 sqm2 6 0.25 0.10 0.30 sqm2 6 0.1 0.17 0.20 sqm

II nd flight 1 1 0.77 0.10 0.08 sqm1 1 2.16 0.10 0.22 sqm1 1 1.19 0.10 0.12 sqm1 1 0.32 0.10 0.03 sqm2 1 0.1 0.17 0.03 sqm2 8 0.25 0.10 0.40 sqm2 8 0.1 0.17 0.27 sqm2 1 0.1 0.13 0.03 sqm

I st flight 1 1 2.16 0.10 0.22 sqm1 1 0.32 0.10 0.03 sqm1 1 0.34 0.10 0.03 sqm1 1 0.27 0.10 0.03 sqm

Porch 1 1 2.96 0.10 0.30 sqm1 1 0.27 0.10 0.03 sqm1 1 0.97 0.10 0.10 sqm1 1 2.42 0.10 0.24 sqm1 1 1.1 0.10 0.11 sqm1 1 0.84 0.10 0.08 sqm

Qty. for one block Total 8.36 sqmAdd similar qty for 5 more blocks i.e block no. 44 to 49, & 92 to 115 5 8.36 41.80 sqm

Page 33: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

(B)50.16 C

C/O TMB/P- (A+B+C) Total 96.13 sqm

Page 34: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-16-01-2013 E.I/28 12mm cement plaster of mix :

1:6 (1 cement:6 fine sand)Block no. 80 to 85 Back side boundary wall 1 1 4.55 1.2 5.46 sqm

1 1 7.47 1.2 8.96 sqmBlock no. 68 to 73 Back side boundary wall 1 1 0.4 1.29 0.52 sqm

1 1 0.51 1.29 0.66 sqm1 1 2.2 1.32 2.90 sqm1 1 5.61 1.24 6.96 sqm1 1 4.2 0.4 1.68 sqm1 1 1.4 1 1.40 sqm

C/O TMB/P- Total 28.54 sqm

Date of Measurement :-16-01-2013 E.I/27 15mm cement plaster of mix :

1:4 (1 cement:6 fine sand)Block no. 68 to 73 Back side boundary wall 1 1 0.12 1.29 0.15 sqm

1 1 1.23 1.25 1.54 sqmQtr no 20 to 25 Boundary wall 1 1 0.48 1.15 0.55 sqm

1 1 0.12 1.15 0.14 sqm1 1 1.76 1.17 2.06 sqm2 1 0.12 1.17 0.28 sqm1 1 1.52 1.17 1.78 sqm1 2 0.12 1.17 0.28 sqm1 1 0.25 1.17 0.29 sqm1 1 1.48 1.17 1.73 sqm1 1 0.27 1.17 0.32 sqm2 1 0.12 1.17 0.28 sqm1 1 0.12 1.17 0.14 sqm1 1 0.06 1.17 0.07 sqm1 1 1.56 1.17 1.83 sqm2 1 0.06 1.17 0.14 sqm1 1 0.24 1.17 0.28 sqm1 1 1.49 1.17 1.74 sqm2 1 0.06 1.17 0.14 sqm1 1 0.24 1.17 0.28 sqm1 1 1.30 1.17 1.52 sqm1 1 0.06 1.17 0.07 sqm1 1 0.23 1.17 0.27 sqm

C/O TMB/P- Total 15.88 sqm

Page 35: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 17-01-2013 E.I/25

15mm to 40mm nominal bore

Qty. for qtr. No. Q.No.68/ T-IIFor W.C. 1 1.00 0.15 0.15 mtr

1 1.00 0.80 0.80 mtr1 1.00 0.45 0.45 mtr

For Bath to wash basin 1 1.00 0.10 0.10 mtr1 1.00 0.90 0.90 mtr1 1.00 1.20 1.20 mtr

to shower 1 1.00 0.73 0.73 mtr1 1.00 0.84 0.84 mtr

Kitchen 1 1 0.45 0.45 mtr1 1 0.50 0.50 mtr

Qty. for one qtr Total 6.12 mtrAdd similar qty for 2 more qtrs i.e from 2 6.12 12.24 mtr72 & 73C/O TMB/P- Total 18.36 mtr.

Date of Measurement :- 17-01-2013 6.2

6.2.1

B Measurements for qtr. No. 50/T-II 152.13

23 152.13 3498.99

C/o TMB/P- TOTAL 3651.12 sqm

Dismantling G.I. pipes (concealed work) including excavation after taking out the pipes, manually by mechanical means including stacking of pipes within 50 mtrs lead as per direction of Engineer in charge.

Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade.New work (Two or more coats) over and including priming coat with cement primer.

Qty. similar to aggrement item No. 6.1 i.e. Qty. B/F vide page-……../TMBAdd similar qty. For 23 more qtrs. i.e. from Qtr. No. 51 to 73

Page 36: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 31-1-2013 E.I/26

15 mm dia nominal bore

Qty. for qtr. No. Q.No.68/ T-IIFor W.C. 1 1.00 0.15 0.15 mtr

1 1.00 0.80 0.80 mtr1 1.00 0.45 0.45 mtr

For Bath to wash basin 1 1.00 0.10 0.10 mtr1 1.00 0.90 0.90 mtr1 1.00 1.20 1.20 mtr

to shower 1 1.00 0.73 0.73 mtr1 1.00 0.84 0.84 mtr

Kitchen 1 1 0.45 0.45 mtr1 1 0.50 0.50 mtr

Qty. for one qtr Total 6.12 mtrAdd similar qty for 2 more qtrs i.e from 2 6.12 12.24 mtr 70 & 71C/O TMB/P- Total 18.36 mtr.

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc.

Concealed pipe including painting with anti corrosive bitumastic paint, cutting chases and making good the wall

Page 37: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 2-02-2013 Item No.

Old work (one or more coats)Qtr NO. 68 T-II Bathroom Ceiling 1 1 1.44 1.05 1.51 sqmGF walls 2 1 1.44 0.51 1.47 sqm

2 1 1.05 0.51 1.07 sqmWC ceiling 1 1 1.17 0.89 1.04 sqm

2 1 1.17 1.47 3.44 sqm2 1 0.89 1.47 2.62 sqm

Kitchen ceiling 1 1 2.33 1.60 3.73 sqmWalls 2 1 2.33 2.76 12.86 sqm

2 1 1.60 2.76 8.83 sqmTiles -0.5 1 0.83 2.03 -0.84 sqm

-1 1 2.33 1.75 -4.08 sqm-1 1 1.60 0.75 -1.20 sqm-1 1 0.60 0.75 -0.45 sqm

-0.5 1 0.60 0.42 -0.13 sqmshelves 2 2 2.33 0.31 2.89 sqm

qty. for one qtr. 32.76 sqmAdd similar qty.for 31 more qtrs i.e From Blockno. 14 to 25 and 50 to 85 exceptqtr. No 16,19,22,25,52,55,58,61,64,67,70,73 31 32.76 1015.56 sqm76,79,82 and 85 1048.32 A

Old work (one or more coats)Qtr NO. 19 T-II Bathroom Ceiling 1 1 1.44 1.05 1.51 sqmGF walls 2 1 1.44 0.75 2.16 sqm

2 1 1.05 0.75 1.58 sqmWC ceiling 1 1 1.17 0.89 1.04 sqm

2 1 1.17 1.94 4.54 sqm2 1 0.89 1.94 3.45 sqm

Kitchen ceiling 1 1 2.33 1.60 3.73 sqmWalls 2 1 2.33 2.25 10.49 sqm

2 1 1.60 2.25 7.20 sqmTiles -0.5 1 0.83 2.03 -0.84 sqm

-1 1 2.33 1.75 -4.08 sqm-1 1 1.60 0.75 -1.20 sqm-1 1 0.60 0.75 -0.45 sqm

-0.5 1 0.60 0.42 -0.13 sqmshelves 2 2 2.33 0.31 2.89 sqm

qty. for one qtr. 31.89 sqmAdd similar qty.for 15 more qtrs i.e qtr. No 16,19,22,25,52,55,58,61,64,67,70,73 15 32.76 491.40 sqm76,79,82 and 85 523.29 B

Type-I Qtr No. 87 ceiling 1 1 1.44 1.18 1.70 sqmBathroom walls 2 1 1.44 0.49 1.41 sqm

2 1 1.18 0.49 1.16 sqmWC 1 1 1.17 0.89 1.04 sqm

2 1 1.17 1.40 3.28 sqm2 1 0.89 1.40 2.49 sqm

Kitchen 1 1 2.26 1.65 3.73 sqm2 1 2.26 2.75 12.43 sqm2 1 1.65 2.75 9.08 sqm-1 1 2.26 0.75 -1.69 sqm-1 1 1.65 0.75 -1.24 sqm-1 1 0.60 0.75 -0.45 sqm

-0.5 1 0.83 2.03 -0.84 sqm-0.5 1 1.20 0.42 -0.25 sqm

White washing with lime to give an even shade :

Page 38: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

shelves 2 2 2.26 0.31 2.80 sqmqty. for one qtr. 34.64 sqmAdd similar qty.for 47 more qtrs i.e From Blockno. 26 t0 49 and 86 to 121 exceptqtr. No 28,31,34,37,40,43,46,49,88,91, 31 34.64 1073.84 sqm94,97,100,103,16,109,112,115,118 &121 1108.48 C

Type-I Qtr No. 121 ceiling 1 1 1.44 1.18 1.70 sqmBathroom walls 2 1 1.44 0.75 2.16 sqm

2 1 1.18 0.75 1.77 sqmWC 1 1 1.17 0.89 1.04 sqm

2 1 1.17 1.94 4.54 sqm2 1 0.89 1.94 3.45 sqm

Kitchen 1 1 2.26 1.65 3.73 sqm2 1 2.26 2.25 10.17 sqm2 1 1.65 2.25 7.43 sqm-1 1 2.26 0.75 -1.69 sqm-1 1 1.65 0.75 -1.24 sqm-1 1 0.60 0.75 -0.45 sqm

-0.5 1 0.83 2.03 -0.84 sqm-0.5 1 1.20 0.42 -0.25 sqm

shelves 2 2 2.26 0.31 2.80 sqmqty. for one qtr. 34.31 sqmAdd similar qty.for 15 more qtrs qtr. No 28,31,34,37,40,43,46,49,88,91, 15 34.64 519.60 sqm94,97,100,103,16,109,112,115,118 &121 553.91 D

Type-III Bathroom ceiling 1 1 1.29 1.11 1.43 sqmwalls 2 1 1.29 0.49 1.26 sqmwalls 2 1 1.11 0.49 1.09 sqmWC ceiling 1 1 1.21 0.82 0.99 sqmwall 2 1 1.21 1.47 3.56 sqm

2 1 0.82 1.47 2.41 sqmKitchen ceiling 1 1 2.26 1.6 3.62 sqmwalls 2 1 2.26 2.75 12.43 sqm

2 1 1.6 2.75 8.80 sqm-2 1 2.26 0.75 -3.39 sqm-1 1 1.65 0.75 -1.24 sqm-1 1 0.6 0.75 -0.45 sqm

-0.5 1 0.83 2.03 -0.84 sqm-0.5 1 1.2 0.42 -0.25 sqm

Shelves 2 2 2.26 0.31 2.80 sqmqty. for one qtr. 32.22 sqmAdd similar qty.for qtr. No 11,12 &13 qtr. No 28,31,34,37,40,43,46,49,88,91, 3 32.22 96.66 sqm94,97,100,103,16,109,112,115,118 &121 128.88 E

Type-II 56 to 61 starting from mumty ceiling 1 1 2.17 1.25 2.71 sqm1 1 2.17 2.20 4.77 sqm2 1 1.25 2.20 5.50 sqm-1 0.5 0.90 2.00 -0.90 sqm1 1 1.10 0.70 0.77 sqm

ceiling 1 1 2.75 2.17 5.97 sqm2.2+2.25)/2 1 1 2.75 2.23 6.13 sqmRCC wall 2.08+2.35)/2 1 1 2.22 0.49 1.09 sqm

1 1 0.38 0.57 0.22 sqmVIth landing ceiling 1 1 0.83 2.17 1.80 sqmwall 2 1 0.85 2.25 3.82 sqm2.75+2.5)/2, (2.25+5.25)/2 1 1 2.63 3.75 9.84 sqmRCC wall 1 1 1.00 1.27 1.27 sqm

1 1 2.00 0.99 1.98 sqm1 1 2.58 0.55 1.42 sqm

Vth landing ceiling 1 1 2.15 1.25 2.69 sqm

Page 39: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

walls 1 1 2.15 2.84 6.11 sqm2 1 1.25 2.84 7.10 sqm-2 0.5 0.97 2.00 -1.94 sqm

ceiling waist slab 1 1 2.45 1.10 2.70 sqmwall 2.69+2.65)2 1 1 2.45 2.67 6.54 sqmRCC wall 1 1 2.30 0.49 1.13 sqmIvth flight landing 1 1 0.12 1.10 0.13 sqm

1 1 1.20 2.17 2.60 sqm2 1 1.20 2.65 6.36 sqm1 1 2.17 0.98 2.13 sqm

waist slab ceiling 1 1 2.45 1.09 2.67 sqmRCC wall 1 1 1.36 1.06 1.44 sqmwall 2.65+2.44)2 1 1 2.45 2.55 6.24 sqmRCC wall 1 1 2.45 0.49 1.20 sqmceiling 1 1 2.16 1.27 2.74 sqm3rd landing 1 1 2.16 2.84 6.13 sqm

2 1 1.25 2.84 7.10 sqm-2 0.5 0.97 2.00 -1.94 sqm

Landing ceiling 1 1 2.35 1.10 2.59 sqmRCC wall 1 1 1.25 0.98 1.23 sqm

1 1 0.66 0.68 0.45 sqm1 1 1.75 0.49 0.86 sqm

wall 1 1 0.66 0.68 0.45 sqm1 1 1.75 0.49 0.86 sqm

wall 2.58+1.92)/2 1 1 2.35 2.25 5.29 sqmlanding ceiling 1 1 2.17 1.35 2.93 sqm

2 1 1.35 2.27 6.13 sqm1 1 2.17 0.94 2.04 sqm

Waist slab ceiling 1 1 2.45 1.1 2.70 sqmRCC wall 1 1 1.31 1.04 1.36 sqm

1 1 3.1 0.49 1.52 sqmwall 2.92+2.27)/2 1 1 2.45 2.60 6.37 sqmceiling 1 1 2.17 1.27 2.76 sqm

2 1 1.25 2.84 7.10 sqmDoors -2 1 0.97 2 -3.88 sqm

1 1 2.17 2.84 6.16 sqmwaist slab ceiling 1 1 2.45 1.1 2.70 sqmRCC wall 1 1 2.37 1.07 2.54 sqm

1 1 2.45 2.49 6.10 sqm1 1 2.88 1.1 3.17 sqm

ceiling 1 1 0.5 1.1 0.55 sqmwalls 1 1 0.5 1.9 0.95 sqm

1 1 1.1 1.9 2.09 sqm0.5 1 2.41 1.9 2.29 sqm

ceiling 1 1 1.54 0.96 1.48 sqm1 1 1.54 0.90 1.39 sqm

wall 1 1 0.56 1.9 1.06 sqmqty. for one block 178.73 sqmAdd similar qty.for 7 more Blocks block no. 14 to25 ,50to55 and 62 to 85 7 178.73 1251.11 sqm

1429.84 F

Type-I starting from mumty ceiling 1 1 2.19 1.25 2.74 sqmwalls 2 1 1.25 2.24 5.60 sqmdoors -2 0.5 0.9 1.98 -1.78 sqm

1 1 2.19 2.24 4.91 sqm

Page 40: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

RCC walls 1 1 1.2 0.79 0.95 sqm1 1 0.56 0.72 0.40 sqm1 1 1.93 0.52 1.00 sqm

ceiling taper mumty 1 1 2.69 2.19 5.89 sqmwalls 2.63+2.69)2, 1.99+2.24)2 1 1 2.66 2.12 5.63 sqmceiling 1 1 2.17 1.00 2.17 sqmwalls 1 1 2.17 2.16 4.69 sqm

2 1 1.00 2.16 4.32 sqmwall 2.16+5.00)2 1 1 2.69 3.58 9.63 sqmRCC wall 1 1 1.09 1.34 1.46 sqm

1 1 1.72 1.10 1.89 sqm1 1 0.58 0.82 0.48 sqm1 1 1.87 0.57 1.07 sqm

ceiling landing 1 1 2.17 2.30 4.99 sqmwall 1 1 2.17 2.72 5.90 sqm

2 1 1.30 2.72 7.07 sqm-2 0.5 0.95 2.00 -1.90 sqm

RCC wall 1 1 0.21 0.97 0.20 sqm1 1 2.56 0.61 1.56 sqm1 1 1.27 1.16 1.47 sqm

waist slab ceiling 1 1 2.40 1.08 2.59 sqmwall 2.67+2.34)2 1 1 2.40 2.51 6.01 sqmceiling 1 1 2.14 1.6 3.42 sqmlanding wall 1 1 2.14 0.91 1.95 sqm

2 1 1.6 2.65 8.48 sqm1 1 2.55 1.58 4.03 sqm

RCC wall 1 1 1.16 1.06 1.23 sqm1 1 2.48 0.62 1.54 sqm

2.65+2.00)2 1 1 2.55 2.33 5.94 sqmceiling landing 1 1 2.16 1.24 2.68 sqm

1 1 2.16 2.7 5.83 sqm2 1 1.24 2.7 6.70 sqm-2 0.5 0.95 2 -1.90 sqm

Slab ceiling 1 1 2.52 1.12 2.82 sqmRCC wall 1 1 1.00 1.11 1.11 sqm

1 1 0.7 0.87 0.61 sqm1 1 1.8 0.58 1.04 sqm

wall 2.70+1.89)2 1 1 2.52 2.30 5.80 sqmlanding 1 1 2.14 1.53 3.27 sqmwalls 1 1 2.14 0.79 1.69 sqm

2 1 1.53 2.23 6.82 sqm1 1 2.37 1.11 2.63 sqm

RCC walls 1 1 1.25 1.06 1.33 sqm1 1 2.85 0.58 1.65 sqm

walls 2.23+2.29)2 1 1 2.37 2.26 5.36 sqmlanding ceiling 1 1 1.25 2.15 2.69 sqmwalls 2 1 1.25 2.70 6.75 sqm

-2 0.5 0.95 2.00 -1.90 sqmwalls 1 1 2.19 2.70 5.91 sqmwaist slab ceiling 1 1 1.85 1.09 2.02 sqm

1 1 0.63 1.09 0.69 sqmRCC wall 1 1 2.14 1.13 2.42 sqm

1 1 0.63 2.70 1.70 sqmwall 2.70+1.85)2 1 1 1.83 2.28 4.16 sqmceiling 1 1 1.58 1.06 1.67 sqm

1 1 1.58 1.85 2.92 sqm1 1 0.80 1.85 1.48 sqm

Below waist slab 1 1 1.12 1.85 2.07 sqm1 0.5 2.38 1.85 2.20 sqm

waist slab ceiling 1 1 2.90 1.05 3.05 sqmqty. for one block 188.07 sqmAdd similar qty.for 9 more Blocks block no. 26 to49 ,86to121 9 188.07 1692.63 sqm

1880.70 G

Page 41: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

C/O TMB/P- Total 6673.41 sqm

Page 42: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-8-02-2013 Providing and fixing 1mm thick M.S. sheet

door with frame of 40x40x6 mm angle iron and3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete,including applying a priming coat of approvedsteel primer.Using flats 30x6 mm for diagonal bracesand central cross piece.

Block no. 2 to 5 1 1 0.88 1.94 1.71 sqm1 1 0.88 1.94 1.71 sqm

Block no. 6 to 9 1 1 0.88 1.99 1.75 sqm1 1 0.90 1.94 1.75 sqm

Block no. 10 to 13 1 1 0.81 2.00 1.62 sqmBlock no. 110 to 115 1 1 0.82 1.93 1.58 sqmBlock no. 26 to 31 1 1 0.80 2.00 1.60 sqm

1 1 0.80 1.96 1.57 sqmBlock no. 86 to 91 1 1 0.80 2.00 1.60 sqmBlock no. 14 to 19 1 1 0.80 1.90 1.52 sqm

1 1 0.80 1.94 1.55 sqmBlock no. 44 to 49 1 1 0.83 1.94 1.61 sqm

1 1 0.825 1.94 1.60 sqmBlock no. 49 to 54 1 1 0.84 1.9 1.60 sqmBlock no. 38 to 43 1 1 0.835 1.935 1.62 sqm

1 1 0.83 1.92 1.59 sqmBlock no. 49 to 54 1 1 0.83 1.91 1.59 sqmBlock no. 56 to 61 1 1 0.81 1.99 1.61 sqm

1 1 0.83 2.02 1.68 sqmC/O TMB/P- Total 30.84 sqm

Date of Measurement :-8-02-2013 E.I/18

15 mm nominal bore.For showersT-II qtr.no. 50 to 73 24 1 24.00

C/o TMB/P- Total 24.00 Nos.

Item No.4.1

Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931.

Page 43: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :-8-02-2013 E.I.29

For frame of mumty doorsAngle 50x5mmBlock no. 44 to 49 1 2 1.96 3.92 mtr

1 1 1.09 1.09 mtr1 2 2.01 4.02 mtr1 1 1.07 1.07 mtr

Block no. 49 to 54 1 2 1.93 3.86 mtr1 1 1.08 1.08 mtr1 2 2.00 4.00 mtr1 1 1.03 1.03 mtr

Block no. 38 to 43 1 2 2.02 4.04 mtr1 1 1.04 1.04 mtr1 2 2.00 4.00 mtr1 1 1.04 1.04 mtr

Block no. 56 to 61 1 2 2.06 4.12 mtr1 1 1.02 1.02 mtr1 2 2.10 4.20 mtr1 1 1.07 1.07 mtr

40.60 mtr

40.60 @ 3.75 152.25 KgKg/m

C/O TMB/P- Total 152.25 Kg

Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.

In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

Page 44: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 11-03-20135.5

A T-II Qtr no. 50 14.59

23 14.59 335.57

C/o TMB/P- Total 350.16 A

Date of Measurement :- 11-03-201310.2

a)

b)

c)

d)

e)

10.2.1

T-II measurement for block no. 50 to 55 1 1 3.13 2.24 7.01 sqmAdd similar qty for three more blocks56 to 73 3 7.01 21.03 sqm

C/o TMB/P- 28.04 E

Providing and fixing first quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be speified by the manufacture) of approved make in all colour, shade except burgundy, bottle green, black of and size as dados over 12mm thick bed of ceme

Similar qty. B/F vide page-27/M.B. No. 6 (Qty. 14.59)Add similar qty. For 23 more qtrs. i.e. from block No. 51 to 73

Providing and laying intergral cement based of surface as required for treatment of roofs, balconies, terraces etc. consisting of following operations:

Applying a slurry coat of neat cemnt using 2.75kg/sqm. Of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer in charge over the RCC slab including adjoining walls upto 300mm height including cleaning the surface be

Laying brick bats with mortar using broken brick/brick bats 25mm to 115mm size with 50%of cement mortar 1:5(1 cement :5 coarse sand) admixed with water proofing compund conforming to IS:2645 and approved by Engineer in charge over 20mm thick layer of ceme

After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm. Of cement admixed with water proofing compound conforming to IS: 2645 and approaved by Enginer in charge.

Finishing the surface with 20mm thick jointless cement mortar of mix 1:4 (1cement :4 coarse sand) admixed with water proofing compound conforming to IS:2645 and approved by Engineer in charge including laying glass fibra cloth of approved quality in to la

The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as direction and specified by the Engineer in Charge.

With average thickness of 120mm and minimum thickness at khurra as 65mm.

Page 45: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 11-03-20139.1 Providing and fixing stainless steel…9.1.2 Kitchen sikn without drain board9.1.2.1 610x510mm bowl depth 200mm

T-II qtrs 12 Nos. i.e. from 74 to 85 18 1 18.00C/o TMB/P- Total 18.00 Nos.

Date of Measurement :- 11-03-2013 E.I/11

40 mm wide and 4 mm thick.A T-II Qtr no.50

18.77

23 18.77 431.71

C/o TMB/P- Total 450.48 B

Date of Measurement :- 11-03-2013 5.1

5.1.1 Ordinary cement without any pigment.A T-II Qtr no. 50

9.88 sqm

0.93 sqm

Total 10.81 sqm

23 10.81 248.63 sqm

C/o TMB/P- Total 259.44 sqm

Date of Measurement :- 11-03-2013 5.2

5.2.1

B T-II Qtr no. 50 1.10

23 1.10 25.30

C/o TMB/P- TOTAL 26.40 sqm

Providing and fixing glass strips in joints of terrazo/ cement concrete floors.

Similar qty. B/F vide page-29/M.B. No. 8 (Qty. 18.77 mtr) of Qtr No.85Add similar qty. For 23 more qtrs. i.e. from block No. 51 to 73

40mm thick marble marble chips flooring, rubbed and polished to granolithic finish, under layer 31mm thick cement concrete 1;2;4 ( 1 cement :2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) and tp layer 9mm thick with white, black, chocolate,

Similar qty. B/F vide page-25/M.B. No. 6 (Qty. 9.88 sqm) i.e qty for big room of Qtr No. 23 /T-II

Similar qty. B/F vide page-26/M.B. No. 6 (Qty 0.93 sqm) i.e qty for w.c

Add similar qty. For 23 more qtrs. i.e. from block No. 51 to 73

Marble chips skirting (upro 30 cm height) rubbed and polished to granolithic finish top layer 6mm thick with white, black, chocolate, grey, yellow or green marble chips of sizes from smallest to 4 mm nominal size laid I cement marbel powder mix 3:1( 3 cem

18mm thick under layer 12mm thick I cement plaster 1;3 ( 1 cement :3 coarse)

Similar qty. B/F vide page-26/M.B. No. 6 (Qty. 1.10 mtr) i.e for big room of Qrtr. 23/ T-II

Add similar qty. For 23 more qtrs. i.e. from block No. 51 to 73

Page 46: ITR Sukhbir Singh 2015-16.xls

Item No. Description of Item No. Length Width Depth Quantity Unit

Date of Measurement :- 11-03-2013 9.2

9.2.1 Orissa pattern W.C. pan of size 580x440mmT-II/ 50 to 73 24 1 24.00 Nos.

C/o TMB/P- 24.00 Nos.

Date of Measurement :- 11-03-2013 9.3

9.3.1 10 ltr capacity - white.T-II/Qtrs. 50 to 73 24 1 24.00

C/o TMB/P- Total 24.00 Nos.

Providing and fixing white vitreous china water closet squatting pan (Indian type)

Providing and fixing PVC low level flushing cistren manually controlled device (handle lever) conforming to IS:7231 with all fitting and fixtures completes.

Page 47: ITR Sukhbir Singh 2015-16.xls

RELIEF CLAIM FOR INCOME TAX ON A/C OF ARREAR BY ER. SUKHBIR SINGH ASSISTANT ENGINEER (Civil).

For Financial Year 2011-12 For Financial Year 2012-13 For Financial Year 2013-14 For Financial Year 2014-15 Arrear

Gross Income 686506 686506 894864 894864 837312 837312 878617 609419

Arrear year wise break up 29968 85210 120030 33990 269198

716474 980074 957342 643409

Less Fixed Conveyance Allowance -9600 -9600 -9600 -9600 -9600 -9600 -9600 -9600

Net Income 676906 706874 885264 970474 827712 947742 869017 633809

Standard Deduction -100000 -100000 -100000 -100000 -100000 -100000 -150000 -150000

Net Income after Standard rebate 576906 606874 785264 870474 727712 847742 719017 483809

Tax Payable

On first Rs. 2,00,000/-(male) Nil Nil Nil Nil Nil Nil Nil Nil

On next Rs. 3,00,000/- @ 10% 30000 30000 30000 30000 30000 30000 20000 18381

On next Rs. 5,00,000/- @ 20% 15381 21375 57053 74095 45542 62477 43803 0

Tax Payable 47381 51375 87053 104095 75542 92477 63803 18381

Add education cess @ 3 % 1421 1541 2612 3123 2266 2774 1914 551

48802 52916 89665 107218 77808 95251 65717 18932

Less already Paid -48802 -48802 -89665 -89665 -77808 -77808 -41200 -41200

Now to be paid 4114 0 17553 0 17443 24517 -22268 16842