ITER welcomes EPICS WD Klotz ITER int. Organiztion. That’s me. ITER – a Global Challenge. „The stakes are considerable, not to say vital for our planet.“ Manuel Barroso, Former President of the European Commission. - PowerPoint PPT PresentationTRANSCRIPT
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010 Page 1
ITER welcomes EPICS
WD KlotzITER int. Organiztion
That’s me
Page 2EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
ITER – a Global Challenge
• „The stakes are considerable, not to say vital for our planet.“ Manuel Barroso, Former President of the European Commission
Page 3EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Fusion powers the sun and the starsFusion powers the sun and the stars“…Prometheus steals fire from the heaven”“…Prometheus steals fire from the heaven”
• Essentially limitless fuel, available all over the world
• No greenhouse gases
• Intrinsic safety
• No long-lived radioactive waste
• Large-scale energy production
On Earth,
fusion could provide:
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010 Page 4
The Fusion Reaction on Earth“... is not the same as in the Sun“
CH4 + 2O2 --> CO2 + 2H2O + 5.5 eV (chemical)41H + 2e --> 4He + 2 + 6 + 26.7 MeV (solar process)
+ 3.5 MeV
+ 14.1 MeV
Page 5EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Why D-T: Cross section
Page 6EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Fusion FuelRaw fuel of a fusion reactor is water and lithium*
Lithium in one laptop battery + half a bath-full of ordinary water (-> one egg cup full of heavy water) 200,000 kW-hours = (current UK electricity production)/(population of the UK) for 30 years
* Deuterium/hydrogen = 1/6700+ tritium from: neutron (from fusion) + lithium tritium + helium
Page 7EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Basic Principle of Stable Motion of Ions in Magnetically confined Plasma
Page 8EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Reactor conditions
ITER
Progress in fusion performance
Page 9EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Major technical elements of ITER
Nb3Sn-SC
Nb3Sn-SC
NbTi-SC
Be- S/Steel
S/Steel
CFC-W-S/Steel
film
Page 10
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
ITER Tokamak – Mass Comparison
ITER Machine mass: ~23000 t
28 m diameter x 29 m tall
Charles de Gaulle mass: ~38000 t (empty)
856 ft (261 m) long(Commissioned 2001)
Page 11
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Vacuum Vessel Mass Comparison
VV & In-vessel components mass: ~8000 t19.4 m outside diameter x 11.3 m tall
Eiffel Tower mass: ~7300 t324 m tall(Completed 1889)
Page 12
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
TF Coil – Mass ComparisonTF Coil – Mass Comparison
Mass of (1) TF Coil: ~360 t16 m Tall x 9 m Wide
D8 Caterpillar Bulldozer~35 t
Page 13
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Cryostat Size ComparisonCryostat Size Comparison
ITER Cryostat~28 m Tall x 29 m Wide Jefferson Memorial (Washington
DC)~29 m Tall (floor to top of dome)
Page 14
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
EPICS for ITER
Decision taken about 16 month ago
Consequences:– We have to convince and sell to achieve acceptance– We don’t have very much time …
Page 15
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Overview of Schedule to 2019 First Plasma
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
First Plasma
ITER Construction
TF Coils (EU)
Tokamak Assembly
Tokamak Basic Machine Assembly
Ex Vessel Assembly
In Vessel Assembly
Start Install CS Start Cryostat Closure
Pump Down & Integrated Commissioning
Start Machine Assembly
2021 2022
ITER Operations
Assembly Phase 2
Assembly Phase 3
Plasma Operations
2023
Buildings & Site
Central Solenoid (US)
Case Winding Mockups Complete TF10 TF15
VV Fabrication Contract Award VV 05 VV09 VV07
Vacuum Vessel (EU)
CS Final Design Approved CS3L CS3U CS Ready for Machine Assembly
Construction Contract Award Tokamak Bldg 11 RFE
Integrated Commissioning
Page 16
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Overview of Operation up to DT
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
ITER Construction
Assembly Phases II and III
2030 2031 2032
ITER OperationsIntegrated Commissioning
Hydrogen-Helium Operations Campaign
Deuterium Operations Campaign
Assembly Phase 2
Assembly Phase 3
First Plasma
Start Torus Pump Down
Pump Down & Integrated Commissioning
Magnet Commissioning
Commission, Cool & Vacuum
Plasma Development & H&CD Commissioning
Full H&CD, TBM & Diagnostics Commissioning
Pre-Nuclear Shutdown & Divertor Change
Q=10 Short Pulse
Planned Shutdown
Start DT
Deuterium-Tritium Operations Campaign
Deuterium-Tritium Operations
Q=10 Long Pulse Achieved
Nominal Plasma Hydrogen-Helium Complete Start Tritium Q=10 Long Pulse Achieved
Deuterium Operations
Page 17
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
EPICS for ITER
Decision taken about 16 month agoConsequences:
– We have to convince and sell to achieve acceptance– We don’t have very much time …– We have to learn from the community to use it the good way– We have to show ITER to the community– We organized the spring collaboration meeting 2010 in AIX– We are happy to have received:
• 113 registrations• 52 affiliations• 9 companies • 33 contributions
Page 18
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Collaboration
Collaborating means taking and giving• Giving
– ITER surely will contribute to the community – We could become an active contributor to CSS and an OO
service layer– Today ITER disseminates EPICS to the fusion community– … more to come
• Taking– For a fast start up we take what the community has produced– …and we thank the community for giving us this possibility
Having said that …
Page 19
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010
Enjoy the Meeting !