CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 2 of 12
ITEM NO. 1 – SPECIFICATION SECTION 00 21 13, INSTRUCTIONS TO BIDDERS
A. On page 00 21 13-3, under Article 3 - QUALIFICATIONS OF BIDDERS, ADD the
following paragraph:
“3.05 Contractors qualified for inclusion in the Bid Form as Reservoir Contractor are:
1. Ward-Henshaw Construction Company, Inc.
2. Skaar Construction, Inc.
3. Marion Construction Company.”
B. On page 00 21 13-3, under Article 3 - QUALIFICATIONS OF BIDDERS, ADD the
following paragraph:
“3.06 Contractors qualified for inclusion in the Bid Form as Reservoir Prestressor are:
1. DN Tanks, Inc.”
C. On page 00 21 13-3, under Article 3 - QUALIFICATIONS OF BIDDERS, ADD the
following paragraph:
“3.07 Contractors qualified for inclusion in the Bid Form as Utility Main Contractor are:
1. Emery & Sons Construction Group.
2. K&E Excavating, Inc.
3. Kerr Contractors Oregon, Inc.
4. James W. Fowler Company.
5. Landis & Landis Construction.
6. Moore Excavation, Inc.
7. Rotschy, Inc.
8. Tapani, Inc.”
D. On page 00 21 13-3, under Article 3 - QUALIFICATIONS OF BIDDERS, ADD the
following paragraph:
“3.08 Contractors qualified for inclusion in the Bid Form as Earthwork Contractor are:
1. Emery & Sons Construction Group.
2. K&E Excavating, Inc.
3. Kerr Contractors Oregon, Inc.
4. Landis & Landis Construction.
5. Moore Excavation, Inc.
6. Rotschy, Inc.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 3 of 12
ITEM NO. 2 – PROCUREMENT REQUIREMENTS, SECTION 00 41 43, BID FORM
A. REPLACE page 00 41 43-13 of the Bid Form with the attached page 00 41 43-13.
ITEM NO. 3 – SPECIFICATION SECTION 03 30 00, CAST-IN-PLACE CONCRETE
A. On page 03 30 00-10, for Subsection 2.9, PROPORTIONING NORMAL CONCRETE,
DELETE the third paragraph, which begins with “At the Contractor’s option…”, in its
entirety.
ITEM NO. 4 – SPECIFICATION SECTION 04 05 17, MASONRY MORTAR AND
GROUT
A. On page 04 05 17- 2, Subsubsection 1.3.E, Construction procedures for Cold Weather
Construction and/or Hot Weather Construction, DELETE Paragraph 1 in its entirety
which begins “Adhere to the procedures and general practices…”.
B. On page 04 05 17-2, Subsection 1.4, Quality Assurance, DELETE Subsubsection A
which begins “Special Inspections: The Owner will engage…” in its entirety and
REPLACE with the following:
“A. Special Inspections: The Owner will engage an independent testing laboratory to
perform material evaluation tests and to perform required inspections.”
C. On page 04 05 17-3, Subsubsection 1.4.D, International Building Code (IBC), DELETE
Paragraph 1 which begins “Masonry construction shall be inspected…” in its entirety and
REPLACE with the following:
“1. Masonry construction shall be inspected and evaluated in accordance with the
requirements of Chapter 17 of the International Building Code (IBC) as amended by
the State of Oregon as well as the TMS 402-11/ACI 530-11/ASCE 5-11 (and
accompanying specifications) and shall be considered subject to Level C Quality
Assurance requirements (ACI 530-11 Table 1.19.1, Table 1.19.2, & Table 1.19.3),
unless otherwise indicated.”
D. On page 04 05 17-3, Subsubsection 1.4.D, International Building Code (IBC), DELETE
Paragraph 3 which begins “If the Contract Drawings do not…” in its entirety and
REPLACE with the following:
“3. If the Contract Drawings do not specify the level of required inspection, provide
Level C Quality Assurance or obtain written direction from the Engineer to the
required level of inspection.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 4 of 12
E. On page 04 05 17-7, Subsubsection 3.3.B, DELETE Paragraph 1 which begins “Provide
#4 verticals…” in its entirety and REPLACE with the following:
“1. Provide #5 verticals at four (4) feet maximum on center.”
F. On page 04 05 17-7, Subsubsection 3.3.B, DELETE Paragraph 2 which begins “Locate
two #4 at each…” in its entirety and REPLACE with the following:
“2. Locate two #5 at each jamb of door, window, louver, and other openings and end of
walls; run full height of wall. Reinforcement adjacent to openings need not be
provided for openings smaller than 16-inches in either the horizontal or vertical
direction, unless the spacing of distributed reinforcing is interrupted by such
openings.”
G. On page 04 05 17-7, Subsubsection 3.3.B, DELETE Paragraph 3 which begins “Position
one #4…” in its entirety and REPLACE with the following:
“3. Position one #5 vertical at each wall corner and each wall intersection; run full height
of wall.”
H. On page 04 05 17-7, Subsubsection 3.3.B, DELETE Paragraph 4 which begins “Dowel
verticals to foundation…” in its entirety and REPLACE with the following:
“4. Dowel verticals to foundation with one #5 dowel four (4) feet long minimum per
vertical; embed dowel two (2) feet in foundation unless otherwise shown on
Drawings.”
ITEM NO. 5 – SPECIFICATION SECTION 04 22 00, CONCRETE MASONRY
UNITS
A. On page 04 22 00-2, Subsubsection 1.3.E, International Building Code (IBC), DELETE
Paragraph 1 which begins “Masonry construction shall be inspected…” in its entirety and
REPLACE with the following:
“1. Masonry construction shall be inspected and evaluated in accordance with the
requirements of Chapter 17 of the International Building Code (IBC) as amended by
the State of Oregon as well as the TMS 402-11/ACI 530-11/ASCE 5-11 (and
accompanying specifications) and shall be considered subject to Level C Quality
Assurance requirements (ACI 530-11 Table 1.19.1, Table 1.19.2, & Table 1.19.3),
unless otherwise indicated.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 5 of 12
ITEM NO. 6 – SPECIFICATION SECTION 05 50 00, METAL FABRICATIONS
A. On page 05 50 00-12, Subsubsection 2.12.E, Reservoir Roof Access Hatches, DELETE
Paragraph 2 in its entirety and REPLACE with the following:
“2. Frame opening length x width:
a. 2 at 4’-0” x 8’-0”.
b. 1 at 2’-0” x 2’-0”. ”
B. On page 05 50 00-13, Subsubsection 2.12.E, Reservoir Roof Access Hatches, ADD the
following paragraph:
“15. Manufacturer/Model: U.S.F. Fabrication, Inc., Model FPS.”
ITEM NO. 7 – SPECIFICATION SECTION 25 32 13, INTEGRATED OPERATION
ACTUATORS AND OPERATORS
A. On page 25 32 13-6, Subsubsection 2.3.F, Motor, DELETE Paragraph 3 which reads
“Single-phase 120/240V AC power supply.” and REPLACE with the following:
“3. Single-phase 240V AC power supply.”
B. On page 25 32 13-9, Subsubsection 2.3.M, Electrical Controls Enclosure, DELETE
Paragraph 1 which begins “Terminal facilities for connection…” and REPLACE with
the following:
“1. Terminal facilities for connection to motor leads, limit switches and torque switches
shall be housed in compartment(s) integral to the actuator.”
C. On page 25 32 13-9, Subsubsection 2.3.M, Electrical Controls Enclosure, DELETE
Paragraph 2 which reads “Rated NEMA 4, 4X, and 6” and REPLACE with the
following:
“2. Rated NEMA 4.”
D. On page 25 32 13-12, Paragraph 2.3.N(5), Power Interruption Switch, DELETE
Subparagraph c which begins “The disconnect switch shall…” and REPLACE with the
following:
“c. The disconnect switch shall be enclosed in its own NEMA 4 housing separate from all
other actuator components.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 6 of 12
E. REPLACE Section 25 32 13, Supplement 1 in its entirety with the attached
Section 25 32 13, Supplement 1.
ITEM NO. 8 – SPECIFICATION SECTION 26 32 13.16, EMERGENCY GASEOUS
ENGINE GENERATORS
A. On page 26 32 13.16-5, Subsubsection 2.2.G, Environmental Conditions, DELETE
Paragraph 2 which reads “Altitude: Sea level to 1,000 feet” and REPLACE with the
following:
“2. Altitude: 500 feet.”
ITEM NO. 9 – SPECIFICATION SECTION 33 11 10, WATER UTILITY
DISTRIBUTION & TRANSMISSION PIPING
A. On page 33 11 10-17, Subsubsection 2.7.A, DELETE Item 5(a)(1) which begins
“Provide force balanced flexible expansion joints…” in its entirety.
ITEM NO. 10 – SPECIFICATION SECTION 40 05 23.18, BUTTERFLY VALVES
A. On page 40 05 23.18-4, Subsubsection 2.2.A, DELETE in its entirety Paragraph 7, which
reads “Style: Wafer”.
B. On page 40 05 23.18-4, Subsubsection 2.2.A, DELETE in its entirety Paragraph 9, which
begins “Seats: Mounted on…” and REPLACE with the following:
“9. Seats: Rubber seats applied to either the body or the disc shall be constructed from
new natural or synthetic rubber secured to the valve body or disc and designed to
provide tight shut-off and facilitate removal and replacement at the site. Provide field
replaceable seats (mechanically retained in a machined groove) for valves larger than
24 inches in diameter.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 7 of 12
ITEM NO. 11 – SPECIFICATION SECTION 40 90 00, INSTRUMENTATION AND
CONTROL
A. On page 40 90 00-1, Subsubsection 1.1.E, Responsibility for Complete System, ADD the
following paragraph:
“2. The Owner shall be responsible for integrating the control panel into Owner’s existing
SCADA system. The Owner shall participate in the testing of the System (including
PLC, Radio Communicator, SCADA, and Operator Interface systems) and all
associated field devices at start-up.”
B. On page 40 90 00-9, Subsubsection 2.4.E, Enclosure, DELETE Paragraph 1 which reads
“NEMA 4X rated. Industrial hardened case.” and REPLACE with the following:
“1. Place radio communicator in the same enclosure as the PLC.”
ITEM NO. 12 – DRAWINGS, SHEET G-5, GENERAL NOTES - 1
A. Under GENERAL NOTES, DELETE Note 4 which reads “NOT USED” and
REPLACE with the following:
“4. COORDINATE TEMPORARY WATER SUPPLY, AS MAY BE NEEDED FOR
SOIL AND AGGREGATE MOISTURE CONDITIONING, PIPELINE PRESSURE
TESTING AND OTHER CONSTRUCTION USES, WITH CRW PER THE
REQUIREMENTS OF CLACKAMAS RIVER WATER TECHNICAL
SPECIFICATIONS, SECTION 01500, CONSTRUCTION FACILITIES AND
UTILITIES. CONTACTOR WILL NOT BE CHARGED FOR CONSTRUCTION
WATER FOR THIS PROJECT.”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 8 of 12
ITEM NO. 13 – DRAWINGS, SHEET ESC-2, EROSION & SEDIMENT CONTROL
OFF-SITE PLAN
A. DELETE the callout which reads:
“FURNISH AND INSTALL:
TYPE 3 INLET PROTECTION
(TYP), SEE WES DET 4-18,
SHT ESC-5”
and REPLACE with:
“FURNISH AND INSTALL:
TYPE 5 INLET PROTECTION
(TYP OF 17), SEE WES DET 4-19,
SHT ESC-5”
B. ADD a callout pointing to the north side of SE Morning Way and west and east sides of
SE 152nd Ave which reads:
“INSTALL WATTLES AS REQUIRED FOR APPROX 1600 LF OF ROADSIDE
DITCHES, SEE WES DET 4-27, SHT ESC-5”
ITEM NO. 14 – DRAWINGS, SHEET ESC-4, EROSION AND SEDIMENT
CONTROL PLAN
A. DELETE the callout which reads:
“FURNISH AND INSTALL:
TYPE 4 INLET PROTECTION
SEE WES DET 4-18, SHT ESC-5”
and REPLACE with:
“FURNISH AND INSTALL:
TYPE 5 INLET PROTECTION
SEE WES DET 4-19, SHT ESC-5”
ITEM NO. 15 – DRAWINGS, SHEET ESC-5, EROSION AND SEDIMENT
CONTROL DETAILS
A. DELETE Detail 4-18, INLET PROTECTION TYPE 4, and REPLACE with the
attached Detail 4-19, INLET PROTECTION TYPE 5.
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 9 of 12
ITEM NO. 16 – DRAWINGS, SHEET C-10, RESERVOIR DRAINAGE AND SITE
STORMWATER PLAN
A. On the DRAIN/STORMWATER SCHEDULE, DELETE Callout No. 20 in its entirety
and REPLACE Callout No. 20 with:
“FURNISH & INSTALL:
1-48” MH (MH-6) W/24” SUMP
RIM=283.3
IE 24” IN(SE)=270.6
IE 8” IN(NW)=273.0
IE 24” OUT(N)=270.5”
B. On the DRAIN/STORMWATER SCHEDULE, DELETE Callout No. 21 in its entirety
and REPLACE Callout No. 21 with:
“FURNISH & INSTALL:
1-48” MH (MH-7) W/24” SUMP
RIM=282.2
IE 12” IN(SE)=267.4
IE 12” IN(NW)=270.0
IE 24” OUT(N)=267.3”
ITEM NO. 17 – DRAWINGS, SHEET C-28, DRAINAGE DETAIL-1
A. On Detail 4, DETENTION FACILITY OUTLET STRUCTURE (MH-4), under the
DETAIL 4 - ADDITIONAL NOTES, DELETE Note 1 in its entirety and REPLACE
Note 1 with:
“1. RIM=282.2
IE (IN) 24” PVC(NW)=267.1
IE (OUT)24” PVC(SW)=267.0
BOT EL=264.0”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 10 of 12
B. On Detail 4, DETENTION FACILITY OUTLET STRUCTURE (MH-4), under the
DETAIL 4 - ADDITIONAL NOTES, in Note 2, DELETE the line which reads:
“-BOTTOM RESTRICTOR PLATE 2” ORIFICE EL=264.5”
and REPLACE with:
“-BOTTOM RESTRICTOR PLATE 3” ORIFICE EL=265.0”
ITEM NO. 18 – DRAWINGS, SHEET SV-1, FLOW CONTROL VAULT
A. Under CONCRETE MASONRY (CMU), DELETE Note 2 which begins “MORTAR
SHALL BE TYPE…” in its entirety and REPLACE with the following:
“2. MORTAR SHALL BE TYPE M OR S WITH A MINIMUM COMPRESSIVE
STRENGTH EQUAL TO 1,800 PSI.”
B. Under CONCRETE MASONRY (CMU), ADD the following note:
“5. UNIT STRENGTH METHOD SHALL BE USED TO VERIFY MINIMUM
COMPRESSIVE STRENGTH OF MASONRY F’M=1,900 PSI.”
ITEM NO. 19 – DRAWINGS, SHEET SV-10, ELECTRICAL/CONTROLS BUILDING
DETAILS
A. Under CMU NOTES at the bottom left corner of the sheet, ADD the following note:
“5. ALL HORIZONTAL BARS AT WALL ENDS AND JAMBS SHALL TERMINATE
IN 180-DEGREE HOOKS AROUND VERTICAL BARS.”
ITEM NO. 20 – DRAWINGS, SHEET M-2, RESERVOIR PIPING ENTRANCE/EXIT
PLAN AND SECTIONS
A. On Section A, RESERVOIR INLET/OUTLET PIPE SECTION, DELETE callout which
begins “24” FLEX EXP JT…” and REPLACE with the following:
“24” FLEX EXP JT, FLG X MJ, 16” EXP, W/ ISOLATION JT, SEE DET 1, SHT C-21”
B. On Section B, RESERVOIR OUTLET PIPE SECTION, DELETE callout which begins
“24” FLEX EXP JT…” and REPLACE with the following:
“24” FLEX EXP JT, FLG X MJ, 16” EXP, W/ ISOLATION JT, SEE DET 1, SHT C-21”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 11 of 12
C. On Section C, RESERVOIR DRAIN PIPE SECTION, DELETE callout which begins
“18” FLEX EXP JT…” and REPLACE with the following:
“18” FLEX EXP JT, FLG X MJ, 16” EXP, W/ ISOLATION JT, SEE DET 1, SHT C-21”
ITEM NO. 21 – DRAWINGS, SHEET E-2, ELECTRICAL CONTROLS BUILDING
LAYOUTS AND IO LIST
A. REPLACE Detail 1, I/O CONTROL SCHEDULE, with the attached Detail 1, I/O
CONTROL SCHEDULE.
ITEM NO. 22 – DRAWINGS, SHEET E-3, PARTIAL ELECTRICAL GROUNDING
PLAN, ONELINE POWER RISER DIAGRAM, PANEL SCHEDULE, WIRE
SCHEDULE AND LOAD SUMMARY
A. For Detail 2, ONELINE POWER RISER DIAGRAM, DELETE the callout which reads
“THREE POLE AUTOMATIC TRANSFER SWITCH (A.T.S)”
and REPLACE with the following:
“TWO POLE, SOLID NEUTRAL, AUTOMATIC TRANSFER SWITCH (A.T.S)”
B. For Detail 4, PANEL SCHEDULE, for Circuit Number (Ckt No.) 1 and 3, Motorized
Valve BV 101, REVISE circuit breaker size (CBA) from 50 Ampere to 20 Ampere.
C. For Detail 4, PANEL SCHEDULE, for Circuit Number (Ckt No.) 2 and 4, Motorized
Valve BV 102, REVISE circuit breaker size (CBA) from 50 Ampere to 20 Ampere.
D. For Detail 5, POWER WIRE SCHEDULE, for Circuit Number (Ckt No.) 1 and 3,
Motorized Valve BV 101, REVISE conductor and conduit sizes (Cable & Conduit) from
“2-#6, 1-#10 GND, 1” C”
to the following:
“2-#10, 1-#10 GND, 3/4” C”
CRW Project No. 15-5188 Addendum No. 1
MS-OR 5/09 // 16-1902.0800 Page 12 of 12
E. For Detail 5, POWER WIRE SCHEDULE, for Circuit Number (Ckt No.) 2 and 4,
Motorized Valve BV 102, REVISE conductor and conduit sizes (Cable & Conduit) from
“2-#6, 1-#10 GND, 1” C”
to the following:
“2-#10, 1-#10 GND, 3/4” C”
NOVEMBER 2017 00 41 43-13/13 CRW Project No. 15-5188
ADDENDUM NO. 2 Bid Form
9.01 Bidder Identification and Signatures
Name of Firm: _________________________________________________________________________
Federal Tax ID No: __________________________________________________________________
State of Incorporation and Oregon CCB License No: ________________________________________
Bidder IS / IS NOT a “Resident Bidder” as defined by ORS 279A.120.
Signature and Printed Name(s): (If Bidder is a partnership or joint venture, all parties must sign below)
___________________________________________ ________________________________________
___________________________________________ ________________________________________
___________________________________________ ________________________________________
Title: ________________________________________________________________________________
Date: ________________________________________________________________________________
(END OF SECTION)
CRW Project No. 15-5188 Integrated Operation Actuators and Operators
16-1902.0701 ADDENDUM NO. 2 25 32 13 Supplement - 1
Actuator Schedule for Butterfly Valves
Valve
Tag No.
Location
Valve
Dia.
(inches)
Max Delta
Operational
Pressure
(PSI)
Max
Operational
Flow
(gpm)
Functionality
BV101 Flow Control Vault, Alignment “A”,
Reservoir Inlet/Outlet Line 24 30 18,000
Open / Intermediate Closed /
Closed
BV102 Flow Control Vault, Alignment “B”,
Reservoir Outlet Line 24 50 18,000
Open / Intermediate Closed /
Closed