Item 29 CIWMB Meeting April 19, 2005 Consideration Of A Resolution To Work In Partnership With The Department Of Toxic Substances Control Towards The Remediation Of The BKK Landfill Storm Drain System

Upload: albina

Post on 04-Feb-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Item 29 CIWMB Meeting April 19, 2005. Consideration Of A Resolution To Work In Partnership With The Department Of Toxic Substances Control Towards The Remediation Of The BKK Landfill Storm Drain System. BKK Landfill Background. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Item 29 CIWMB Meeting April 19, 2005

Item 29 CIWMB Meeting April 19, 2005

Consideration Of A Resolution To Work In Partnership With The

Department Of Toxic Substances Control Towards The Remediation Of The BKK Landfill Storm Drain System

Page 2: Item 29 CIWMB Meeting April 19, 2005

BKK Landfill Background

Location urban: City of West Covina Owner/operator: BKK Corporation

Class I Area operated 1962-1987 (codisposal hazardous waste/MSW); closure certified 1991

Class III Area operated 1987-1996 (MSW); partial site closure plan approved 1996; full site closure/postclosure plan approved 2002.

DTSC began emergency response action on 11/18/04 to ensure essential operations.

Page 3: Item 29 CIWMB Meeting April 19, 2005

BKK Landfill Class III Closure Status

BKK contracted out in 2004 to complete remaining closure phases and integrate with City brownfields redevelopment rough grading project.

BKK insufficient funds 9/04; closure ceased 11/04; Notice & Order issued; Revised Plans to match funding approved 2/05; FA mechanism updated.

Board options if BKK fails to complete closure. Recent resolution with BKK, insurance company,

and contractor reported for intended restart 7/05.

Page 4: Item 29 CIWMB Meeting April 19, 2005

BKK Landfill Storm Drain Repair Issue

Critical section of storm drain system failed 1/04. Progressive failure has occurred during the extreme storm season of 2004/05.

Enforcement Actions- LEA, RWQCB, and DTSC. DTSC contractor proceeding with final repair

project to be completed by next wet season; preliminary cost estimate is $3,780,000.

Initial request for funding assistance from Solid Waste Cleanup Program not currently needed.

Page 5: Item 29 CIWMB Meeting April 19, 2005

BKK Landfill Class III Area

BKK Landfill Class I Area

Failed Storm Drain Pipe

City of West Covina Brownfields Project Property Boundary

Leachate/Gas Systems

Detention Basin

Amar Road

Azu

sa B

lvd

(39)

N

½ mile

Page 6: Item 29 CIWMB Meeting April 19, 2005

Detention Basin and Temporary Excavation- 2/28/05

Page 7: Item 29 CIWMB Meeting April 19, 2005

Temporary Excavation

Page 8: Item 29 CIWMB Meeting April 19, 2005

Storm Drain Pipe Failure on Class I Area

Page 9: Item 29 CIWMB Meeting April 19, 2005

Detention Basin

Page 10: Item 29 CIWMB Meeting April 19, 2005

Conclusion

Adopt resolution 2005-91 to support storm drain project; provide ongoing technical assistance; and if needed potential future consideration for qualifying funding under Solid Waste Cleanup Program.

Page 11: Item 29 CIWMB Meeting April 19, 2005

BKK Landfill Class III Area

BKK Landfill Class I Area

Failed Storm Drain Pipe

City of West Covina Brownfields Project Property Boundary

Leachate/Gas Systems

Detention Basin

Amar Road

Azu

sa B

lvd

(39)

N

½ mile