istanbul metrobus brt - world banksiteresources.worldbank.org/azerbaijanextn/resources/301913... ·...

33
Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s Sibel Koyluoglu and Dario Hidalgo

Upload: vuliem

Post on 01-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Istanbul METROBUS BRT

Adapted from Presentations by World Resources Institute/EMBARQ’s

Sibel Koyluoglu and Dario Hidalgo

Page 2: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Historic Istanbul

Page 3: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

ModernIstanbul

Page 4: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Istanbul

Among World’s most historic and rapidly growing cities ◦ 12.6 million population

◦ Financial, cultural and commercial capital of Turkey, nation >70 million

Significant water constaints

Congestion cited by citizens as #1 issue ◦ Peak hour hwy. speeds 8-10 km/hour

◦ 23% of Istanbul commuters spend > 3 hours in traffic.

◦ 22% of Istanbul commuters spend 2-3 hours

Page 5: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s
Page 6: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

The First BRT Corridor Istanbul has developed along two narrow east-west penninsulas, Europe, Asia

The D-100 national highway forms the main European axis for Istanbul

Page 7: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Four Phases

Page 8: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Before METROBUS: Long, Slow Bus and Minibus Routes Stuck in Traffic

Page 9: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Summary Statistics

4 Phases ◦ About 50 Km transitways, terminal to terminal◦ 42 stations◦ Station spacing, 360-3300 meters, average 1.2 Km◦ 350 vehicles

Open by March 2009)◦ 40.5 kilometers◦ 31 stops◦ Terminals◦ total implementation cost, $366 million

Page 10: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Running Ways

Freeway Median

Fully Grade-Separated and Dedicated

No Passing Lanes

Page 11: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

SERVICE, OPERATIONS

Average revenue speeds, 30-40 Km/Hr.

Maximum frequency, >120/Hr.

Single, all-stops local route alignment but with turnbacks

Page 12: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Operations

Page 13: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

STATIONS

Page 14: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Stations Most platforms sized for two buses (three at some)

Center platforms, requiring counterflow operation for regular buses

Page 15: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Stations 8 stations are currently accessible to physically challenged passengers

Modernizaton of other stations continues

Page 16: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

VEHICLES

Page 17: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Length 26.035 mmWidth 2.540 mmMaximum Height 2.949 mmİnside Height 2.250 mmEntrance Height 340 mm

PHILEAS (Advanced Public Transport System, Holland)

Seated 52

Standing 178Total 230

Page 18: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

PHILEAS: Hybrid

20% to 30% fuel savings.

Decreased emissions.

More acceleration.

Page 19: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Length 19.5 mInside Height 2.3 mDoor Width 1.2 m

MERCEDES CAPACITY

Manual ramp at the 2 doorLow floor: 320mm vehicle height

Kneeling4 double doors

Euro V

43 seated150 standing 193 Total Capacity

Page 20: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Performance to Date

Page 21: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

21

Phase One•Opening date: 17.09.2007

•Length: 18.3 km

•Number of stations: 14•1246 Minibuses removed from corridor•Revenue Operating Speed: ~40Km/Hr.

•Ridership: ~300.000 trips/day

Page 22: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Mini-Buses Removed from Traffic

Page 23: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

23

Phase Two•Opening date: 08.09.2008

•Length: 29 km

•Number of stations: 25

•Revenue Operating Speed: ~ 30Km/Hr.

•1 hour/direction time savings

•Ridership: ~550,000 trrips/day

Page 24: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Comparison to Mass Rail Transit: Metro, LRT, Suburban Rail

>100Km of Mass Rail Transit operating◦ Ridership about 900,000 trips/day

METROBUS: ~47 Km operating◦ Ridership about 850,000 trips/day

◦ Maximum load point, peak hour, peak direction volume >19,000 passengers/Hr.

Page 25: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Passenger satisfaction

0

100

200

300

400

500

600

700

Glad 67% Absulutely

Glad 26%

Absulutely

unsatisfied

2%

Unsatisfied

2%

No comment

3%

Series1

93% satisfaction

Page 26: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Evaluation

Pedestrian Access X

Handicapped Accessibility X

Bus Stop Design and Capacity X

Bus Stop Comfort X

Bus Stop Location X

Bus Stop Information X

Operations (Efficiency needs further study) X

Trip generators X

Transfer Characteristics: Physical transfer X

Electronic ticketing X

Passenger Characteristics X

Page 27: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Public Opinion

“Metrobüs is not built to end congestion. It is built to solve the problem of access. Even if traffic is bad, if people have access to a system that provides speedy access and that means the problem of access has been addressed. Metrobus has solved my problem of access and if the system is expanded, Istanbul’s access problem will be solved soon.”

“I definitely don’t think metrobus solves the problem.

They are narrowing lanes to build metrobus. Most of

us still use our cars to go to work and we can no longer

drive comfortably.

Page 28: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

3rd corridor crosses bridge to Asia, ending at

Söğütlüçeşme, intercity train station with

significant parking

Page 29: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Phase Three

11,2 km line Opened March 4, 2009

Page 30: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Upon completion of phase 4, the 50 km line will have 42 stations and

350 vehicles that will serve an estimated 865.000 passengers/day.

BEYLİKDÜZÜ - SÖĞÜTLÜÇEŞME

Page 31: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

PLANNED CORRIDORS

Page 32: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Planned Corridors

EDİRNEKAPI-VEZNECİLER

BOSTANCI-SÖĞÜTLÜÇEŞME

AKSARAY-MİLLİYET SİTESİ

9 corridors are planned. 3 corridors are high priority :

Page 33: Istanbul METROBUS BRT - World Banksiteresources.worldbank.org/AZERBAIJANEXTN/Resources/301913... · Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ’s

Expressway Median Pedestrian

Access: Trade-off

Pro:• No appropriation

• Little opposition to use of land

– Con:

• Very difficult to access stations

– Lesson learned:

• Use of overpasses and subways (at points with

alignment on embankment) works well!

• Still need to address issue of access for

disabled