Issues/Concerns/ Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Upload: kathlyn-carpenter

Post on 31-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Issues/Concerns/SuccessesGeorgia Environmental

Protection Division

June 20, 2007

Amy Potter Unit Coordinator

DoD Remediation Unit

Page 2: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Marine Corps Logistics Base

Dobbins Air Reserve BaseLockheed Martin Air Force Plant No. 6

Fort Gillem & Fort McPherson Fort Gordon

Moody Air Force Base

Fort Benning

Robins Air Force Base

Naval Submarine Base - Kings Bay

Fort Stewart

Hunter Army Airfield

www.gaepd.orgwww.gaepd.org

Military Presence Military Presence in thein the

State of GeorgiaState of Georgia

Page 3: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Issue #1:

BRAC 2005

Page 4: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Marine Corps Logistics Base

Dobbins Air Reserve Base

Moody Air Force Base

Fort Benning

Robins Air Force Base

Naval Submarine Base - Kings Bay

Savannah International Airport Air Guard Station

Gaining InstallationsGaining InstallationsBRAC 2005BRAC 2005

Page 5: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Fort GillemFort McPhersonNaval Air StationPeachtree Leases

U.S. Army Reserve Center Columbus

Closing Closing InstallationsInstallationsBRAC 2005BRAC 2005

Marine CorpsInspector/Instructor Naval Supply Corps

School Athens

Page 6: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

• Of the seven closing installations, no substantive environmental restoration oversight is anticipated at five: Marine Corps Inspector/Instructor, Naval Supply Corps School Athens, Naval Air Station, Peachtree Leases and

U.S. Army Reserve Center Columbus.

What is the Impact of BRAC 2005 on Georgia’s

DSMOA Program?

Page 7: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

• Of the seven closing installations, only two require substantive environmental

restoration oversight by Georgia:Fort Gillem and Fort McPherson.

What is the Impact of BRAC 2005 on Georgia’s

DSMOA Program?

Page 8: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Fort Gillem• Reviewed

Environmental Condition of Property

• Land Reuse Plan has been approved

•Completing Delineation in Several Areas

•Working with Army to get Acceptable Background

•Finding and closing out old USTs

Page 9: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Fort McPherson • Completing delineation especially at pesticide mixing areas & ranges

• Finding and closing out old USTs

                                                 

•Completing remediation of old USTs

•Land reuse plan has not yet been approved

•ECP has been completed and reviewed

Page 10: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Issue/Concern #2: MNAConcern that MNA is being applied as a sole

remedy where is not effective or appropriate because:

• Timeframe to clean up is too long; or • Concentrations of contaminants are too high;

or• Microbes that destroy contaminants are not

present; or• No sampling has begun to provide lines of

evidence.

Page 11: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

MNA (continued)• MNA is being applied without considering more

active remedial strategies that will clean the site up faster or cost less money.Example: AF project: resulted in cost savings of millions that could be applied to more contaminated areas.

• Several installations have determined that MNA is ineffective, & are accelerating the process by adding nutrients or microbes to speed up the process. Example: Army project: UST site where actual reductions were less than anticipated. Added ORC to groundwater to reduce clean up time.

Page 12: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Issue/Concern #3: FUDS

• 228 FUDS identified in GA; Approximately 5 per year are investigated

• It all comes down to $$

• Priority – Have no idea what actual dangers/contaminants are present until site is investigated.

• Limited sampling conducted.

Page 13: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit

Success Story @ Camp Wheeler

338 60mm mortar rounds and 10 grenade fuses found and destroyed

. . . But there is still work to do.