islands marshall · 2020. 3. 17. · 1 i w rm p a c i f i c gef pacific iwrm demonstration project...

57
I W R M P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water Lens Final Report Majuro, Republic of the Marshall Islands June 2014 Marshall Islands An Initiative of the Global Environment Facility Supported Project: “Implementing Sustainable Water Resources and Wastewater Management in Pacific Island Countries” GEF Pacific IWRM Project

Upload: others

Post on 22-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

1

 

IW

R M

PACIFIC

GEF Pacific IWRM Demonstration Project

Integrated Water and Land Management for the Sustainable Use

of the Laura Water Lens

Final ReportMajuro, Republic of the Marshall Islands

June 2014

Marshall

Islands

An Initiative of the Global Environment Facility Supported Project:“Implementing Sustainable Water Resources and Wastewater Management in Pacific Island Countries”

GEF Pacific IWRM Project

Page 2: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

2

Contents

Preface 3

1. Water and Sanitation iSSueS in the develoPment of the rmi Gef Pacific iWrm national demonStration Project

4

2. manaGement of the Gef Pacific iWrm national demonStration Project in rmi

6

3. eStabliShment of a coordinatinG body for the oPeration of the Gef Pacific iWrm demonStration Project in rmi

8

4. PlanninG Stakeholder ParticiPation in the execution of the rmi Gef Pacific iWrm demonStration Project

10

5. reSultS oriented PlanninG and imPlementation of the Gef Pacific iWrm demonStration Project in rmi

12

5.1 logframe development

5.2 Priority areas of Work and results

5.3 catalytic impacts 16

5.4 Participatory Planning, monitoring and evaluation

6. StrenGtheninG national coordination and iWrm Policy and PlanninG in rmi

17

6.1 linkages of demonstration activities with iWrm Planning

6.2 national iWrm Planning

7. caPturinG leSSonS learned for rePlication and ScalinG-uP of iWrm beSt Practice in rmi

18

7.1 lessons learned

7.2 replication and Scaling up

8. PlanninG the tranSition from iWrm to the reGional ridGe to reef initiative

19

8.1 Scaling-up to broader integrated land, Water and coastal management

annexeS 20

Page 3: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

3

PrefaCe

the phrase “water is life” is an understatement in the republic of the marshall islands (rmi), where there is a chronic shortage of water and the population is at high risk of disease due to poor sanitation. the strong connections between water and sanitation and the health and quality life, combined with the risks associated with climate change, make effective water resource management one of the highest priorities in rmi. all of rmi’s 26 coral atolls and 5 islands are low lying, with extremely limited freshwater resources, difficult sanitation challenges, and vulnerability to extreme weather events and natural disasters. at least 74% of the population now lives in the two urban centers of majuro and ebeye, and this brings with it additional challenges.

improved water supply coverage is high, at least 97%, yet limited water availability, contamination, and drought all present high risks to the people of the marshall islands. the primary source of freshwater is rain, which is mostly harvested via rainwater catchments, and which also acts to recharge several groundwater lenses which are found in some favorable locations. on majuro atoll, the water system is more than 75% rainwater collection with the remainder coming from the laura groundwater lens. on ebeye, the water supply system is based solely on desalinization through expensive reverse osmosis filters. Water quality testing conducted by the rmi ePa show that the majority of household catchments, in both urban and rural settings, are contaminated.

at least seven severe droughts were recorded in the last half century, with majuro receiving less than 35 inches of rainfall over 7 months during these droughts. it is anticipated that should current climate predictions play out, gradual sea level rise and more frequent and severe droughts will exacerbate the high natural variability in freshwater availability in rmi. Progressively more urban households are installing private rainwater catchments, with more than 64% on majuro and 37% on ebeye. it is estimated that 49% of all households in the rmi have less than 4 days of freshwater storage.

Sanitation severely lags behind water with only 70% improved coverage, 82% in urban areas and 53% in rural areas. despite a law mandating the use of toilets many households are still without improved toilets, with 35% of the population in rural areas and 3.6% in urban still defecating in the open. additionally both urban sewer systems on majuro and ebeye dispose raw sewage directly into open water adjacent to populated areas severely impacting the environment and health. this trend is especially concerning in dense urban areas and in areas above freshwater groundwater lenses where there is contamination of critical resources and high potential for disease outbreaks.

on 22 and 23 march 2011, a national Water Summit convened in majuro highlighted the key sector issues and confirmed the urgency of water and sanitation improvements. in particular it was agreed that while there are a number of official policies, laws, regulations, plans and agreements that articulate rmi’s intentions and standards with respect water and sanitation, they have been developed over several decades in a relatively uncoordinated fashion. in march of 2014 a national Water and Sanitation Policy was endorsed that brings together and addresses these concerns.

the national and Water and Sanitation Policy articulates the rmi’s overarching vision for water and sanitation which is: “to provide all marshallese citizens access to clean and adequate water supplies and a level of hygiene and sanitation comparable to world standards”.

mr. jorelik tibon

chairman of the laura integrated Water and land management advisory Group

Page 4: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

4

1. Water and sanitation Issues in the Development of the rMI Gef Pacific IWrM national Demonstration Project

in 2007 the rmi completed a diagnostic iWrm analysis. the diagnosis provided a detailed assessment of important water and sanitation issues in the country and aimed to: help the rmi develop a sustainable integrated water resource management system; help ensure that water resources used effectively for wellbeing and development; and help safeguard water resources for future generations.

the ten key findings of the diagnosis are as follows:

1. overall, water resource management in the rmi is more non-integrated than it is integrated;

2. While there is some cooperation among water related agencies, overall collective management remains weak;

3. all organisations with direct and indirect responsibilities for water and sanitation management and the network that connects them need capacity development and strengthening;

4. the absence of a formally established and authorized national water apex body and lack of a clear and credible water and sanitation policy result in a relatively unclear future for the water and sanitation sector;

5. majuro, ebeye and the outer islands face both water quantity and quality challenges;

6. the two main water utilities continue to face severe financial and operational challenges which affect the effectiveness and quality of their services;

7. conservation and demand management remain weak;

8. Water resources assessment and monitoring remains limited, although this is improving;

9. the rmi faces increasing vulnerability from floods and other natural and man-made disasters and yet its disaster preparedness capacity remains fundamentally weak;

10. iWrm is common sense, but it is not commonly practiced in the rmi and there is much room for improvement across the board.

as part of the 2007 diagnosis, the rmi also conducted a hot Spot analysis (hSa) exercise to identify and evaluate areas of national, regional or global significance and where conditions adversely affect human health, threaten ecosystem functioning, reduce biodiversity and/or compromise resources and amenities of economic importance in a manner that would appear to warrant priority management attention. in addition to hot spots, a number of sensitive areas were also identified and evaluated. these sensitive areas are areas of national regional and/or global significance which, although not degraded at present, are threatened with future degradation.

Page 5: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

5

the hSa considered nine hot spots and sensitive areas. these were of different types: thematic, geographic, institutional, and policy/legislation. after conducting its evaluation and rating of each of these, using the prescribed hSa methodology, laura village’s fresh water lens was selected as the most suitable hot spot for a Global environment facility supported national iWrm demonstration Project. located on the western tip of majuro atoll, laura village is the third largest population center in the rmi the groundwater lens at laura is increasingly relied upon by the greater population of majuro and yet it faces mounting threats, and it offers an ideal microcosm and laboratory for an iWrm demonstration project in that it integrates a number of water and wastewater issues, socio-economic factors, and other considerations. laura was also selected based on the fact that success in this endeavour is directly applicable for replication in other areas in the rmi. a case study on the laura area and factors influencing the management of the laura water lens has been prepared and is available in hard copy and electronic format at the office of rmiePa.

the laura water lens is a critical resource in that it supplies a significant portion of fresh water for the majuro population, and yet it faces multiple threats and has not been managed very effectively or sustainably over the years. it is therefore imperative and critical that steps be taken to introduce more sustainable use of water lens – this is the main objective of rmi’s Gef supported iWrm national demonstration Project.

the project is entitled “integrated Water and land management for the Sustainable use of the laura Water lens” and is commonly referred to nationally as the “laura lens Project”. in summary, the key demonstration

project components of are:

1: Strengthened coordination for integrated land and Water management at laura

2: identification of key threats and management issues for the Water lens

3: development of a laura integrated Water and land resources management Plan

4: targeted Stress reduction demonstrations for the Water lens, including:

4.1: reducing Stress from overloaded and leaking Septic Systems

4.2: reducing Stress from domestic Solid Waste leachate Pollution

4.3: building capacity of Pig farmers to reduce Stress on the Water lens

5: enhancing awareness and understanding of the Water lens, including:

5.1: Public awareness

5.2: training and education

6: iWrm Policy and Plan development

Page 6: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

6

Overview of the Lead Agency, IWRM Focal Point, and Project Management Unit

the rmi environmental Protection authority (rmiePa) is the lead agency for both the Pacific iWrm Program in the marshall islands. the authority’s executive function is headed by the General manager, mr. lowell alik who provides overall leadership in administering the affairs of the authority. the General manager facilitates cooperative efforts with other ministries/agencies and supplies the board with policy advice and assistance with cabinet-level concerns. the General manager is assisted by a deputy General manager in directing the areas of Policy and Planning, in order to improve the delivery of services nationally and within communities. the authority strives to be innovative in strengthening its capacity to provide more effective leadership. the organizational chart is provided below in figure 1, and illustrates how the Pacific iWrm project has been embedded in the core work of rmiePa.

ePa’s strategic direction is guided by the 3-year rolling Strategic Plan which serves as the foundation for the development of the annual Portfolio budget Statement. the ePa Strategic Plan follows the direction as detailed in the environment Protection authority act.

Alignment with the National Vision 2018

in working into the future, the authority takes into account the national Goals and objectives as stated in the vision 2018 Strategic development Plan framework, 2003-2018 with a firm commitment to ensuring that the preservation of the culture and heritage of the rmi is aligned with these overall national goals.

the specific functions and duties of the ePa, are mandated under the following acts and legislation:

○ an act to provide for the establishment of a national environmental Protection authority for the protection and management of the environment national environment Protection act 1984 [P.l. 1984-31][P.l. 1987-2]

○ the ePa is responsible for the administration, control, custody and management of the coastal Zone, and for the implementation of the provisions of the coastal conservation act (1988), with respect to the obligations and mandates described above in the environment Protection act (1984)[P.l. 1988-13].

○ Public health, Safety and Welfare act, chapter 1 Public health and Sanitation, ePa and the ministry of health work together to perform food inspections to improve safety of foods sold by grocery stores, restaurants and cooked food, and continues to do public awareness on the importance of having sanitary toilet facilities and septic systems.

○ ePa is also mandated to administer and enforce the following regulations: ozone layer Protection regulations (2004) and the Pesticides and Persistent organic; Pollutants (PoPs) regulations (2004); Public Water Supply regulation; marine Water Quality regulations; toilet facilities and Sewage disposal regulations; rmi Sustainable development regulations; Solid Waste regulations.

2. Management of the Gef Pacific IWrM national Demonstration Project in rMI

Lead Agency rmi environmental Protection authority

Memorandum of Agreement

Signed 29th May 2009

national iWrm focal Point

mr. lowell alik

General manager, rmi environmental Protection authority

national iWrm Project manager

mr julius lucky

rmi environmental Protection authority

Page 7: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

7

Signing of the Memorandum of Agreement and Establishment of the Project Management Unit

the memorandum of agreement between rmi and the Pacific islands applied Geoscience commission (now the applied Geoscience and technology division of the Secretariat of the Pacific community) was signed on 29th may 2009 by the then General manager of rmiePa, mr. john bungitak. mr. bungitak and mr. Glann lewis attended the inception Workshop for the Gef Pacific iWrm Project convened in nadi, fiji in September 2009. Shortly thereafter, mr. bungitak’s employment with rmiePa was discontinued and he was replaced by ms. barker-manase in late 2009. at that time, ms. barker-manase formally assumed the role of rmi’s national iWrm focal Point for the regional Pacific iWrm Programme. See table 1 and 2 for summary information and contacts.

there followed the recruitment of a national Project manager for rmi’s national iWrm demonstration Project. ms. moriana Phillip was appointed national Project manager on 20th december 2009. the Project management unit (Pmu) was formally established at rmiePa in january 2010, including the appointment of mr. Glann lewis as demonstration Project assistant. both ms. barker-manase and ms. Phillip attended the

Second and third Pacific iWrm regional Steering committee meetings convened in the republic of Palau (july 2010) and the cook islands (july 2011)

as at 30 September 2011, the Pmu for the rmi Gef national iWrm demonstration Project had been operational for 21 of the 60 months initially identified as being required to successfully deliver the project. rmi worked during 2010, to strengthen the implementation of the european union supported iWrm Policy and Planning component of the Pacific iWrm Programme. this culminated in the development of a detailed national costed work plan aimed at stimulating this much needed area of work during 2011. ms. tamera heine was subsequently appointed national Water Policy Support officer and joined the Project management unit in december 2010.

the project management unit for the rmi have changed recently replacing the project manager, the focal point and appointing a new project assistant. the new Pmu consists of mr.julius lucky, the new project manager, mr.lowell alik the new ePa general manager and the new iWrm focal point, and mr.roderick kabua the new project assistant.

Page 8: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

8

a start-up committee for the iWrm demonstration Project was first established in 2009 with members limited to traditional leaders, major landowners, and council officials from the local Government. following establishment of the Project management unit in 2010, effort was made to revitalise and expand the membership of this group. initially, traditional leaders and laura residents were invited to consultations to re-introduce project goals, objectives, and to ensure all key traditional leaders were adequately represented in these discussions.

the idea of establishing a formal body for the coordination of the Gef iWrm demonstration was first raised amongst key stakeholders in march 2010, and shortly thereafter the “laura integrated Water and land management advisory committee” was formed. this is informally referred to as the “laura lens committee” or “committee in kejparok aiboj lal eo ilo laura” in marshallese. discussions with stakeholders resulted in the following suggested actions to further strengthen membership and participation within the committee:

○ revitalization of participation through face-to-face consultations with key traditional leaders of laura. these consultations resulted in an expanded membership list to include representation of community leaders not in original membership list;

○ establishment of an advisory Sub-committee to act as Working Group of the committee;

○ elaboration of committee terms of reference to guide the work of the committee.

the (1) membership list and (2) terms of reference for the laura integrated Water and land management advisory committee and the

advisory Sub-committee/Working Group are included in this report as annex 1 and annex 2, respectively.the following diagram illustrating how the committee links to national decision making bodies.

Overview of National Coordination Mechanisms and Linkages with RMI’s GEF IWRM Demonstration Project

in october 2008, a cabinet resolution established a national iWrm Water task force (nWtf) and appointed ePa as the chair of this. the resolution however, contained no clear no clear specifications for membership. and at the time of establishment of the rmi iWrm Project management unit in 2010, there was no evidence of the nWtf ever having met. as such it was identified that the Gef iWrm demonstration project would work to make the nWtf operational in order to strengthen national coordination in the water and sanitation and to work towards the development of a national Water and Sanitation Policy and iWrm Plan.

accordingly, rmi ePa assembled a national taskforce team. this taskforce is comprised of officials from Governmental, non-Governmental organizations, and executive members of the laura integrated Water and land management advisory committee. letters were dispatched to all relevant water stakeholders, both in Government and non-Governmental organizations, inviting participation in the work of the taskforce. Whilst broad representation of all stakeholders was encouraged, high level representation from each Government ministry was encouraged with the assistance of the office of the chief Secretary. the full list of nWtf members is included in this report as annex 3.

once established, a key initiative of the national iWrm task force was the organisation and conduct of a national Water Summit from 22nd-23rd

3. establishment of a Coordinating Body for the operation of the Gef Pacific IWrM Demonstration Project in rMI

Page 9: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

9

march 2011. this Summit was used inter alia to: launch the task force; identify its priority areas of work; and to agree on the steps needed to strengthen national coordination of water and sanitation initiatives (e.g. establishment of a formal Water commission) and to develop the national Water and Sanitation Policy and iWrm Plan. a Policy Sub-committee of the national task force force was formed in support of water policy development.

Development of a National Water and Sanitation Policy and the Establishment of the “RMI Water and Sanitation Commission”

the rmi Water and Sanitation Policy calls for the formal establishment of the “rmi national Water and Sanitation commission” to strengthen and formalise the functions and roles of the national iWrm task force. Since its establishment in october 2008, the task force has served a useful purpose in terms of coordinating water and sanitation policy and planning. however, the constitution, functions, and roles of the task force require further elaboration to better support the implementation of a national Water and Sanitation Policy and iWrm Plan. the body will also benefit greatly from strengthened institutional authority as a “commission”.

there is strong support among key stakeholders in the rmi on the need to establish this more formal, fully-functional and authoritative institution to serve as the rmi’s WatSan needs. the concept of a new Water and Sanitation commission has received support by the members of the task force, through consultations with policy makers, and during the march 2011 national Water Summit. the adoption of the new policy and the establishment of the commission are two key components in the larger effort to institutionalize and strengthen iWrm in the rmi. the draft national Water and Sanitation Policy can be obtained by contacting ms. barker-manase at rmi ePa.

Basic Functions and Roles of the Commission

the primary purpose of the commission will be to govern overall water and sanitation policy, planning, decision making and resource allocation in the rmi.

it has been identified that the commission shall:

○ be established at the highest level of authority and through well-designed enabling instruments. initially this would be via a detailed resolution to be jointly adopted by the cabinet and the nitijela. later on, this institution should be formally established and authorized via a new comprehensive iWrm Plan and law (proposed for late 2012);

○ have oversight and responsibility for the effective implementation of the Water and Sanitation Policy;

○ institutionalize its internal working relations through a multi-party ‘compact’ that clearly articulates each member’s roles and responsibilities and that commits the members to active participation in the nWab and its activities and endeavors;

○ have a very clearly articulated mandate, constitution (membership), structure, functions, roles, powers, procedures and protocols;

○ be inclusive, with representation from all key stakeholder groups in the country;

○ be comprised of geographic and thematic sub-bodies or sub-committees, structured along the main priorities and action areas for iWrm in the rmi (e.g. laura committee, Sanitation and health committee, ebeye committee, utilities committee, landowners, etc.);

○ include a ‘core’ working group (which meets more frequently) and a larger working group.

○ be well organized and coordinated, primarily through the services of a Secretariat, in the form of a iWrm coordination office (also to be established in 2012);

○ be active and proactive, meeting regularly (e.g. bi-monthly) and looking ‘beyond the horizon’ to anticipate emerging challenges and opportunities;

○ focus on effective coordination, both domestically (intergovernmental, national-local-community), regionally, and internationally (e.g. with donor and development partners);

○ utilize efficient resource allocation principles, including cost-benefit analysis and other objective criteria to inform decision making; and

○ be responsible for coordinating annual national Water day activities.

an active and effective national-level water institution that follows these main principles would constitute ‘key ingredient’ for more integrated and sustainable water resources management in the rmi.

Page 10: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

10

a stakeholder analysis was undertaken in early 2010 to identify key stakeholders and brainstorm strategies for engaging these key groups and individuals. as part of the analysis an action Plan for Stakeholder engagement was developed (see annex 4). the following table summarizes the key stakeholders identified and strategies to engage them.

Some strategies have been successful to date in terms of engaging high ranking traditional leaders at the outset to encourage more community participation and support in the planning stages. other strategies will be undertaken starting end of 2011 such as the establishment of a “laura lens learning center” located in laura, to be accessible to schools and members of the general public. this center will exhibit educational materials, demonstration activities, models and other media. the table on the following page highlights key stakeholders and engagement strategies.

in the community, the traditional leaders and the landowners are the most influential; engaging them in decision making processes for the iWrm demonstration project has encouraged community ownership of the project. their participation has also been effective in encouraging interest from other community members. because community ownership of the project is essential for the sustainability of the initiative, it is crucial that these key groups are involved in the process

of the development of the key output, i.e., the laura Water and land management Plan.

Similarly, the involvement of high level government stakeholders in the national iWrm task force has been equally beneficial for the long term water and sanitation policy and planning initiatives of the project. this has stimulated high level government buy-in. the project was effective in facilitating the appointment of first lady hannah Zedkaia as rmi’s national Water and Sanitation champion in lead-up to the first national Water Summit convened on World Water day 2011. the first lady has provided high level, instrumental support to all key project initiatives which has proven very effective in terms of raising the awareness of the initiative and water and sanitation issues generally in the rmi.

to improve stakeholder participation, particularly with respect to the national Water and Sanitation Policy and iWrm Plan development, the Pmu plans to work closely and focus on the most influential stakeholders, including traditional leaders, the first lady, Politicians and active and influential community members to lobby support from groups that are against or are indifferent to the project.

4. Planning stakeholder Participation in the execution of the rMI Gef Pacific IWrM Demonstration Project

Page 11: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

11

Stakeholder Key Interests & Why Engage? Strategies for Engagement

traditional leaders (chiefs and landowners)

○ highest ranking in traditional system

○ landowner and community leader.

○ advice, especially on traditional land issues

need to be engaged during the planning stages at each stage of the project. need to be fully informed and have clear understanding of project objectives to avoid high expectations.

risk of opposition from high ranking community members is reduced if this group has clear understanding of project objectives. this will facilitate community support during implementation on the ground.

community leaders (active community members, may have some land title rights)

landowner and community leader. community advisor and participation

Policy-Planning and implementation. community leaders may range from those with traditional land title and those without. both are key to implementation. engagement through committee meetings and advice and input on decision making for project activities, assign as points of contact in the community.

local Government council members

local government representatives for majuro-specifically laura village. can assist with mobilizing resources and/or organizing community events

Provide updates and information on project progress throughout implementation. Should be involved in decision making and enforcement at local government level

high level Government officials

landowner, traditional leader, farming and business. assistance & Support from the local Government and local communities

Political representatives from majuro, President is currently Paramount chief and has much traditional influence in laura. engagement through establishment of Water and Sanitation champion – first lady. high level briefings throughout project implementation

community associations/organizations including Womens Groups

farmers association, Womens Groups-handicrafts, catering of local foods. activities impact water resources, can help promote water campaigns traditional advise, education and participation

laura water lens meeting & laura community meeting. involvement in training programs relating to water and agriculture organized by the project.

non Government organizationsSynergies with existing programs and campaigns

technical meetings/trainings, community meetings and advisory group meetings

School childrenfuture leaders and take home messages

Study tours, educational center, School visits, activities and games

Page 12: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

12

5.1 logframe development

the national Gef supported iWrm demonstration project in the rmi focuses on integrated Water and land management for the Sustainable use of the laura Water lens, majuro atoll. the overall aim of the demonstration Project is to achieve sustainable use of the majuro groundwater supply, namely the laura lens, focusing on practical demonstration of best practices to address national priority water issues and raise political will to act in the interests of iWrm. in 2010, the original scope of work was re-evaluated and the Pmu and laura lens committee worked to adjust planned activities to meet local needs, priorities, and available resources. a detailed project logical framework matrix (logframe) incorporating Smart indicators was developed during the first half of 2010 for final review and endorsement by the Second regional Steering committee for the Gef Pacific iWrm Project.

to assist with improving stakeholder awareness and understanding of the key areas of work and anticipated results of the project, the completed project logframe was translated into marshallese language for public comment. using inputs from several landowners and community representatives, the logframe was subsequently finalised in june 2010. the english and marshallese versions of the logframe are included in this report as annex 5.

5.2 Priority areas of Work and results

the following table summarises the priority objectives and activities of the iWrm project. the full project logframe is included with this report as annex 4.

5. results oriented Planning and Implementation of the Gef Pacific IWrM Demonstration Project in rMI

Project Objectives ActivityGoal:component 1: Strengthened coordination for integrated land and Water management at laura, majuro atoll

1.1 review of socio-economic and political factors influencing iWrm and Water use efficiency in the laura area of majuro atoll, including: (a) incentives; formal and informal institutions; and economic structures relating to water and land use in the laura area; (b) recommendations for national level reform of water sector1.2 establishment and operation of a national integrated Water resource management task force, to: (a) promote the effective development and management of water resources; (b) oversee development and implementation of a laura integrated Water and land resources management Plan (liWlrmP)1.3 formalise the laura integrated Water and land management advisory committee, including endorsement from the national integrated Water resource management task1.4 develop and implement a laura community Stakeholder engagement Plan, including identification of roles and responsibilities of local partners in project implementation1.5 develop and implement an iWrm and Water use efficiency capacity building Programme for the laura integrated Water and land management advisory committee1.6 develop and implement a community based Project to foster involvement of Women’s Groups in Water management and decision-making in the laura area

component 2: identification of key threats and management issues for the laura Water lens

2.1 development of a fine scale topographical map of the laura area

2.2 review of sanitation and waste management systems in laura, including: (a) identification of all septic systems and those requiring remediation; (b) solid waste disposal methods and sites; and (c) farm waste management. Summary of sanitation and waste management recommendations for laura.

Page 13: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

13

2.3 review of the status of laura water and land resources, including identification of current and projected impacts, and recommendations for land use zoning.2.4 compilation of existing data and information to produce a GiS map of land use and potential sources of pollutants in the laura area2.5 identification of the benefits and costs of integrated water and land management in the laura area with: (a) identification of water allocation issues; (b) tariffs and price mechanism; (c) possible extraction fee; and (d) possible cost sharing arrangements (e.g. polluter versus beneficiary pays).

component 3: development of a laura integrated Water and land resources management Plan

3.1 establishment and operation of a technical Working Group of the liWlmac to develop a laura integrated Water and land resources management Plan (liWlrmP)3.2 agreement between and amongst water related agencies and funding bodies (both Government and external) of priority water problems and required management interventions at laura, including benchmarking of current and planned projects and financing levels.3.3 community forum meetings to agree needs and vision for the laura community for integrated water and land management at laura, including desired management goals, objectives, and targeted management actions.3.4 draft laura integrated Water and land resources management Plan, including targeted costed action plan and financing mechanisms presented to laura community for comment and reviewed by and endorsed by liWlmac for submission to cabinet3.5 laura integrated Water and land resources management Plan and action Plan submitted for cabinet endorsement

component 4: targeted Stress reduction demonstrations for the laura Water lens

4.1.1 development of a septic monitoring, collection, and disposal program to: (a) monitor sewage levels of septic tanks at laura; and (b) initiate timely sewage collection from overloaded and leaking septic systems and subsequent disposal using majuro’s public sewer system. [activity 2.2 to provide baseline information]

Sub-component 4.1

4.1.2 composting toilet designed and operational at central laura location, including: survey of community perceptions; preferred design features; and operational considerations.

Sub-component 4.2 – reducing Stress from domestic Solid Waste leachate Pollution at laura

4.2.1 based on results of 2.2 develop community-based project for solid domestic waste management at laura4.2.2 community survey of numbers, types, and suitable locations for solid waste bins and disposal areas4.2.3 development of education materials and activities to inform the community on domestic waste management (link to component 5).

Sub-component 4.3 – building capacity of Pig farmers to reduce Stress on the laura Water lens

4.3.1 identification of priority pig farms for involvement in trial, preferably farms located in low-lying coastal lands adjacent to water lens4.3.2 identification and development of techniques for the use of coconut husk in dry litter waste management at selected piggeries, specifically to produce compost for market garden fertiliser4.3.3 establishment of communal composting site for production of pig waste fertiliser

Page 14: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

14

component 5: enhancing awareness and understanding of the laura Water lensSub-component 5.1: Public awareness 5.1.1 laura Water lens learning center in the laura area to assist with

promotion of demonstration project and dissemination of information materials5.1.2 exhibition materials for the learning center, including: learning displays (e.g. posters), interactive database/dvd-rom of information and data relating to laura water lens, and audio-visual materials (e.g. videos).5.1.3 Promotion of learning center role via local radio, local and regional television and print media, and a programme of visits by schools and other civil society groups5.1.4 network of local journalists and government communications staff to organise television and radio broadcasts and news articles about water conservation and stress reduction demonstration activities5.1.5 laura Water lens website based on open Source content management System Software (e.g. joomla) to act as a central repository of information and data relating to integrated water and land management at laura5.1.6 electronic dissemination of a quarterly demonstration project newsletter

Sub-component 5.2: training and education 5.2.1 training needs assessment and preparation of a training programme targeting government officers and local communities, including, identification of needs for specific training in areas such as sanitation, composting toilets etc.5.2.2 implementation of the training programme at the community level. i tis envisaged that training needs may include but not be limited to: principles and practice of water resource management; sanitation and sustainable solid waste disposal methods; septic maintenance and remediation techniques; water quality monitoring; and resource use zoning.5.2.3 implementation of the targeted training programme for government agencies and personnel. it is envisaged that training needs may include but not be limited to: economic valuation and cost sharing principles; interpretation of socio-economic and scientific data and its use in planning and zoning land use; and iWrm policy and planning5.2.4 identification of needs and opportunities for a group study tour (including rmiePa management staff and selected nGo community group members from laura) to selected Gef iWrm demonstration projects in the Pacific region.5.2.5 Preparation and distribution of posters, brochures and booklets on topics of relevance to iWrm and Water use efficiency as identified in the training needs assessment.

component 6: management and coordination of the laura demonstration Project

6.1 Successful management, coordination, and implementation of: the project to achieve the demonstration objectives and to meet the strategic needs of the republic of marshall island’s environmental Protection authority.6.2 effective planning and control of the endorsed6.3 establishment and effective operation of a demonstration Project management unit (Pmu) to: (a) manage the interface between the lead agency and the regional Project coordinating unit, user groups, and other stakeholders and government agencies; and to (b) manage the consultation process to ensure comprehensive input from user groups and other stakeholders into the development and implementation of the project6.4 consistency between the various project components and related activities provided or funded by other donor organisations, including realisation of co-financing where possible6.5 Participation of project representatives in meetings of the regional Project Steering committee meetings, and associated regional training and capacity building sessions

Page 15: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

15

5.2.1 co-financing

the following tables highlights the co-financing that was realised and the additional funding that was leveraged from success of the project activities.

ISSUE KEY RESULT

institutional management of pressing water resource issues

establishment and operation of the national iWrm task force as rmi’s aPex body for coordination and Planning of Water and Sanitation investments and actions

Public awareness of water resource issues

Strengthened community engagement with national Government on Water and Sanitation issues via establishment and operation of the laura lens committee

contamination of the criticial laura lens from domestic and animal wastes

reduced stress on the laura Water lens by development and operation of septic remediation programme, pilot ecoSan, and conversion of piggeries from wash down waste disposal systems to dry litter systems

the following table provides a summary of key results linked to the projects goal and objectives. a comprehensive review of national results notes linked to performance indications can be found in annex 6.

Page 16: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

16

5.2.4 key awareness materials

the rmi Gef Pacific iWrm demonstration project has adopted a storyline approach to documenting project progress and its impact on the social and natural environment. the marshall islands journal (mij) is the rmi’s regular newspaper and features weekly cartoons known by all marshallese. the demonstration project has established a partnership with the mij to regularly update the community on project progress and activities via cartoon sketches.

5.3 catalytic impacts

the dry-litter piggery systems were identified as the most effective methods of reducing the amount of pig waste issues. through piloting dry-litter systems, it has been brought into considerations by community members including local government council members to be the right solution in dealing with the pig waste management issues on laura. currently the only form of governance for pig waste management is the local government ordinance on pig waste management stating all pig farms are required to use septic systems for pig farming. With the good outcomes of the pilot project, suggestions have been made to revise the current ordinance to using dry-litter systems for pig waste management.

5.4 Participatory Planning, monitoring, and evaluation

during the inception period, the project focused on engaging traditional leaders in the planning stages to ensure overall agreement on and understanding of the project objectives. to date, the project has expanded its stakeholder focus to include high level officials in Government. table 3 above provides a summary overview of which stakeholders where particularly important and influential during the planning, monitoring, and reporting aspects of the project. the following summarises how different stakeholders are engaged in iWrm demonstration project planning, monitoring, and reporting. the Participatory Planning, monitoring, and reporting Plan is provided in annex 6.

the laura integrated Water and land management advisory committee’s (or laura lens committee) main role is to provide direction and strategic guidance to the Pmu and the environment Protection authority as the lead agency regarding the design and implementation of the national demonstration project. these include, but are not limited to: review and endorsement of quarterly work plans; evaluation of project progress; and assessment and oversight of stakeholder participation in the project.

in 2010 the Project management unit reviewed the status of the laura integrated Water and land management advisory committee’s (or laura lens committee) with a view to further elaborating the role of the committee in both the demonstration Site as well as in national planning processes relating to water and sanitation issues. consultations were undertaken in early 2010 with members of the committee to identify ways to improve participation at the community level. as a result of the consultations the following suggested actions were undertaken:

○ representation of traditional leaders, landowners, church groups, women’s groups, and residents of demonstration site expanded to include leaders not in original membership list

○ tor updated

○ advisory Group established to act as working group of the committee Pmu meets quarterly with the main committee (laura lens Protection committee) to provide updates on overall project progress.

the Pmu organises the meetings of the laura integrated Water and land management advisory committee to provide updates on overall project progress and ensure full participation in the planning of project activities, expenditures, and communications.

the advisory Sub-committee meets more frequently than the committee and acts as a small working group of the committee to: monitor progress of planned activities; work closely with the Pmu in facilitating communications between the Pmu and the community in laura; draft quarterly work plans and reports for review and endorsement by the full advisory committee. copies of Quarterly Work plans and budgets are provided to the advisory committee to inform members on upcoming project activities and get feedback and approval of quarterly plans.

regular meetings of the advisory Sub-committee also allow discussion on lessons learned from the perspective of the community and other stakeholders. members were selected by the main committee to allow more frequent input into planning, decision making and implementation. during these consultations, the Pmu provides updates on activities and results achieved. lessons learnt are then shared with the group and feedback and suggestions for alternative approaches are agreed on.

the detailed plan guiding the Participatory Planning, monitoring and reporting of the project is included in this report as annex 6.

Page 17: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

17

6. strengthening national Coordination and IWrM Policy and Planning in rMI

6.1 linkages of demonstration activities with iWrm Planning

the iWrm demonstration project has demonstrated effective stress reduction pilot projects that have been part of the process for developing the water and sanitation policy. from the demonstration activities, the laura community recognizes the need for scaling up these demonstration pilot projects and the need to develop something that will help sustain the projects. through series of consultations and meetings, the iWrm national task force and the laura lens committee recognized that there was develop a formal national Water and Sanitation Policy.

the development process included a national water summit that convened on march 2011 capturing the community needs in terms of water and sanitation. these needs were then developed into the key elements of the policy document. this national Water and Sanitation Policy was endorsed by government in march 2014.

6.2 national iWrm Planning

the rmi national Water task force, established by cabinet in 2008 (see cabinet resolution in annex 2), currently serves as the tentative nWab for the rmi and has adopted a five-step approach for institutionalizing

iWrm in the rmi over the next two years.

in summary, the major steps to institutionalizing iWrm are as follows (with target dates indicated):

1. develop and adopt a new comprehensive, iWrm-based national Water and Sanitation Policy

2. formally establish and authorize a permanent and fully-functional rmi Water and Sanitation commission to serve as the overarching nWab and governance body for iWrm (target date: early 2012)

3. formally establish a permanent national iWrm coordination office to serve as the primary coordinating unit for water and sanitation policy and to serve as the Secretariat for the commission (target date: early 2012)

4. develop and adopt an iWrm medium-term action and investment Plan (target date: late 2011)

5. develop and enact a new iWrm law to further solidify rmi’s commitment to integrated and sustainable management in the water and sanitation sector (target date: late 2012)

Page 18: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

18

7. Capturing Lessons Learned for replication and scaling-up of IWrM Best Practice in rMI

7.1 lessons learned

Committee Involvement in Planning and Decision Making

one of the lessons documented by the project involved postponement of a particular capacity building activity. the activity had been prescheduled prior to final agreement from all members of the committee. as a result the committee members suggested that alternative activities be prioritized. this issue may have been avoided if members were involved earlier in the planning of quarterly activities. it is very important that the committee adds insight can help improve the project; however, it is also very important to be careful as to be able to manage the inputs of the group as to not hinder progress.

Transparency and Honesty

a key lesson learned to date from the demonstration project is the importance of transparency when dealing with community groups, it is important to be clear that your efforts are dedicated to assisting them and that their ideas and time are valuable too. you do this carefully by allowing everyone (landowners or not) space to think, time to contribute, by doing this you give them a sense of ownership and responsibility to their decisions (for example, by agreeing on where the laura lens learning center should be, they are likely to make sure that it is safe all the time)

High Level Support

the iWrm Gef Pmu was heavily involved in the pre-planning and conducting the national Water and Sanitation Summit held in march

2010. one of the successes of this event was the very high level of participation even though the summit was a 2 day event. nominating a national Water and Sanitation champion – the first lady, was key to turning the event into a very high level and participatory event. this same approach has been recently used for the area of climate change.

Community

key lesson learned during the implementation of the project was the appointment of the former first lady hannah Zedkeia to be the national water champion for the rmi with the role of incorporating more women and local community members into the iWrm policy and planning. her role demonstrated to be effective by leading the national water summit heavily involving major community land owners, women’s groups, and other potential members that contributed inputs that lead to the development of the key elements of the water and sanitation policy.

7.2 replication and Scaling-up

the draft replication and scaling up plan for the demonstration project is included in this report as annex 7. it is envisaged that this replication and scaling up plan will be further elaborated as the project moves into activities to pilot water and land use management practices aimed at reducing stress on the laura lens. the capture of lessons learned from the activitieshave been used to inform the drafting of the rmi Water and Sanitation Policy that was endorsed in 2014, iWrm investment Plan, and iWrm law.

Page 19: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

19

8. Planning the transition from IWrM to the regional ridge to reef Initiative

8.1 Scaling-up to broader integrated land, Water and coastal management

to be completed

Page 20: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

20

annexes

annex 1: list of committee members and Photograph 21

annex 2: committee terms of reference 22

annex 3: updated Stakeholder analysis and engagement action Plan 25

annex 4: updated Project logframe including timing of deliverables 28

annex 5: national iWrm results note 36

annex 6: copies of awareness materials developed and media coverage 47

annex 7: Participatory monitoring and evaluation Plan 48

annex 8: replication and Scaling-up Plan 53

annex 9: iW pilot project logframe 54

Page 21: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

21

annex 1: Laura Lens CommitteeList of Members of the Laura Integrated Water and Land Management

Advisory Committee (Laura Lens Committee), 2013 Jorelik Tibon

Chairman

Assistant Chief Secretary,

Chief Secretary’s Office

Ruth Harris

Advisor

Joubon Kabua

Council Woman, Iolap,

Laura Village

Shirolynn Kawakami

Council Woman, Iolap,

Laura Village

Jina David

CMI Land Grant Officer,

Arrak, Laura CMI Campus

Sepe Joash Maria Joash

Paul Rilang Anta Elbon

Silash Malachi Ain Kabua

Anthonio Rear Royal Ceasar

Aki Samuel Rondio Jormuly

Zebty Zebty Jnr.

ANNEX 1

List of Members of the Laura Integrated Water and Land Management Advisory Committee

(Commonly referred to as the Laura Lens Committee)

Ms. Ruth Harris Advisor Laura IWRM Advisor to the Laura Committee

Joubon Kabua Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Shirolynn Kawakami Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Mr. Jorelik Tibon Assistant Chief Secretary Chief Secretary’s Office and Chairman of Laura Integrated Water and Land Management Advisory Committee Laura, Village P.O. Box 15 Majuro, MH 96960 (692) 455-9713 [email protected]

Mr. Julius Lucky Laura IWRM Secretary to Laura Integrated Water and Land Management Advisory Committee P.O. Box 419 Majuro, MH 96960 (692) 455-9712 [email protected]

39

ANNEX 1

List of Members of the Laura Integrated Water and Land Management Advisory Committee

(Commonly referred to as the Laura Lens Committee)

Ms. Ruth Harris Advisor Laura IWRM Advisor to the Laura Committee

Joubon Kabua Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Shirolynn Kawakami Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Mr. Jorelik Tibon Assistant Chief Secretary Chief Secretary’s Office and Chairman of Laura Integrated Water and Land Management Advisory Committee Laura, Village P.O. Box 15 Majuro, MH 96960 (692) 455-9713 [email protected]

Mr. Julius Lucky Laura IWRM Secretary to Laura Integrated Water and Land Management Advisory Committee P.O. Box 419 Majuro, MH 96960 (692) 455-9712 [email protected]

39

ANNEX 1

List of Members of the Laura Integrated Water and Land Management Advisory Committee

(Commonly referred to as the Laura Lens Committee)

Ms. Ruth Harris Advisor Laura IWRM Advisor to the Laura Committee

Joubon Kabua Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Shirolynn Kawakami Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Mr. Jorelik Tibon Assistant Chief Secretary Chief Secretary’s Office and Chairman of Laura Integrated Water and Land Management Advisory Committee Laura, Village P.O. Box 15 Majuro, MH 96960 (692) 455-9713 [email protected]

Mr. Julius Lucky Laura IWRM Secretary to Laura Integrated Water and Land Management Advisory Committee P.O. Box 419 Majuro, MH 96960 (692) 455-9712 [email protected]

39

ANNEX 1

List of Members of the Laura Integrated Water and Land Management Advisory Committee

(Commonly referred to as the Laura Lens Committee)

Ms. Ruth Harris Advisor Laura IWRM Advisor to the Laura Committee

Joubon Kabua Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Shirolynn Kawakami Council Woman Iolap, Laura Village Majuro, MH 96960 (692) 528-8492

Mr. Jorelik Tibon Assistant Chief Secretary Chief Secretary’s Office and Chairman of Laura Integrated Water and Land Management Advisory Committee Laura, Village P.O. Box 15 Majuro, MH 96960 (692) 455-9713 [email protected]

Mr. Julius Lucky Laura IWRM Secretary to Laura Integrated Water and Land Management Advisory Committee P.O. Box 419 Majuro, MH 96960 (692) 455-9712 [email protected]

39

40

Mr. Jina David CMI Land Grant Officer Arrak, Laura CMI Campus P.O Box Majuro, MH 96960 (692) 528-6631

Mr. Roderick Kabua Laura IWRM – Vice Chairman of the Laura Integrated Water and Land Management Advisory Committee Laura Village (692) 456-1530 [email protected]

Ms. Moriana Phillip IWRM Project Manager Environmental Protection Authority P.O. Box 1322 Majuro, MH 96960 (692) 625-3035 [email protected]

Mrs. Deborah Barker-Manase General Manager/National IWRM Focal Point Environmental Protection Authority P.O. Box 1322 Majuro, MH 96960 (692)625-3035 [email protected]

Ms. Tamera Heine Water Policy Support Officer Environmental Protection Authority P.O. Box 1322 Majuro, MH 96960 (692) 625-3035 [email protected]

Ms. Renee Cabral Project Coordinator Majuro Atoll Waste Company Majuro, MH 96960 (692) 247-2700

Page 22: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

22

annex 2: Laura Lens Committee torANNEX 2

Terms of Reference for the Laura Integrated Water and Land Management Advisory Committee

(Commonly referred to as the Laura Lens Committee)

RationaleThe Laura groundwater lens and associated infiltration galleries and treatment facility is over 30 km west of the DUD area. Water is drawn from 7 infiltration galleries, all constructed around 1990. There is already a real risk of significant contamination of the water lens and if Laura is to be retained as a viable water resource for the greater Majuro population, action is urgently required.

RoleThe Committee’s main role is to facilitate safeguarding the Laura Lens from unsustainable use and over pollution from land-based activities

Responsibilities

Goals and Objectives

1. To provide direction and strategic guidance to the PMU and Lead Agency regarding the design and implementation of the national demonstration project

Receive, review and approve reports from the Project Management Unit regarding the outputs and outcomes of project activities

Review stakeholder involvement in project activities and take action where necessary to ensure appropriate levels of government, NGO, community, and private sector engagement

Review and evaluate, at the national level, progress in implementation of the project, and provide guidance for improvement to the PMU and Lead Agency (EPA) when necessary

2. To build community capacity in the implementation of the Groundwater Protection Plan

To establish a Working Committee of the Laura Lens (Groundwater) Protection Plan Periodically consult/inform the community of the status/condition of the lens. Identify potential sources of pollutants/contaminants to the Laura lens. Produce awareness and educational materials for the community-schools, residences, and

churches. Involve participation of Laura communities to assist in the campaign of the groundwater

protection plan.

3. Periodic meetings (monthly, quarterly or annually):

To consult/share new/update information-regarding implementation of the GEF Demonstration Project

Make/propose (action or strategic) plans, Develop/review policies, guidelines or standards for the development of the Laura

Groundwater Protection Plan. Review and revise TOR and role of Committee and members on an annual basis to ensure

adequate representation by key stakeholders.

4. Annually assess the plan, policies, guidelines or standards for the Groundwater Protection Plan

41

Page 23: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

23

5. Membership & Roles

Chairman – Chairing of regular Integrated Water and Land Management Advisory Committee Meetings, Review of Agenda Items-facilitate discussions. Also to sit on National IWRM Task Force and update members of issues affecting water and sanitation in Laura, and input into national level advice to government regarding water and sanitation.

Traditional Leaders & Landowners (Iroij and Alabs)There shall be adequate representation from Iroij and Alaps in the Committee. This membership shall be reviewed on an annual basis to ensure traditional leaders are informed of activities relating to water and sanitation in Laura.

Traditional leaders and landowners are one of the most influential decision makers in Laura and will need to be informed of results of studies on Laura Groundwater Lens in order to provide support in the implementation of plans, policies, guidelines and standards for Laura in relation to water and sanitation.

Local Government Representation

Councilmen/womenThere are (4) seats in the Majuro Atoll Local Government (MALGOV) council allocated to Laura Village. There shall be adequate representation of councilmen/women in the Committee to ensure close coordination with MALGOV.

Each councilman/woman represented in the Committee is responsible for coordinating with the Advisory Group in informing their constituents of any plan, policy, guidelines or standard that may be developed relating to water and sanitation in Laura. Council members are also responsible for informing Communities in Laura of any ordinances relating to water and sanitation and to assist the Committee in enforcing violations.

The Committee shall inform MALGOV Executive Council and Mayor on any recommendations affecting local ordinances for water and sanitation in Laura. As needed the Mayor and any other Executive Council Member may be invited to Committee meetings.

Laura Farm Association

There shall be (1) representative from the Laura Farm Association on the Committee.

The Laura Farm Association will be responsible for providing information on use of fertilizers (chemical and non chemical), water usage, waste disposal methods relating to agricultural activities in Laura. The representative of the Laura Farm Association shall also be responsible for informing the members of the association of any recommendations, activities, plans, standards or guidelines developed and agreed on by the Committee.

Government and Technical Representation The following offices shall be represented on the Committee and shall provide information and technical advice and recommendations to the Committee on matters relating to water and sanitation

Environmental Protection Authority- The RMI EPA as PMU for the IWRM GEF Demonstration Project shall provide to the Advisory Group and Committee quarterly reports on progress of the IWRM GEF Demonstration Project and may also provide quarterly updates on water quality-Total and Fecal Coliform (E.coli), Conductivity Total Dissolved Solids (TDS) Salinity Chloride Nitrates, Heavy Metals, Pesticides, and other parameters as required to develop adequate guidelines for protecting the groundwater lens.

Majuro Water and Sewer Company - The MWSC shall provide to the Committee at its quarterly meetings, updates on extraction and pumping rates per quarter. Updates on septic suction operations for Laura residents requiring pumping of septic systems shall be provided listing schedule for residential pumping.

42

Page 24: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

2443

National Weather Services-The National Weather Services shall be responsible for providing on a quarterly reporting on rainfall data, and forecasts, including data on rainfall collected at the demonstration site.

NON-Government/Community Based Organization Representation-There shall be at least one active NGO or CBO in the Laura community represented in the Committee. Each group shall coordinate with initiatives of the Committee to ensure activities are coordinated and complimentary.

ROC Taiwan Farm Technical Assistance to RMI-As needed a representative from the ROC Taiwan Farm Technical Assistance Program located in Laura shall be invited to quarterly or special meetings of the Committee. The Technical Mission shall provide information on all agriculture and animal husbandry activities that may impact on the laura groundwater lens. In addition the ROC Taiwan Farm shall be required to comply with any plan, guidelines, standards, policies developed and endorsed by the Committee.

Project Management Unit (Demo Project) - Administrative functions The PMU will consult with members of the Laura Committee and Advisory Group in work planning and will be responsible for providing quarterly updates to the Laura Lens Protection Committee on GEF Demo project activities

Meetings The Committee will meet regularly on a quarterly basis, and may call special meetings as required. The PMU will act as Secretariat for Committee meetings initially. The Chairman in coordination with the PMU shall organize and call quarterly and/or special meetings of the Committee.

Laura Integrated Water and Land Management Advisory Committee

IWRM Task Force

Office of the Chief Secretary

Office of the President & Cabinet

Nitijela (Parliament)

Page 25: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

25

annex 3: stakeholder analysis and engagement action PlanG

EF-P

acif

ic IW

RM P

roje

ct

Coun

try

Stak

ehol

der

Enga

gem

ent

Ana

lysi

s an

d Pl

an

Coun

try:

Rep

ublic

of

Mar

shal

l Isl

ands

___

_

Stak

ehol

der

Ana

lysi

s RM

I-A

ctio

n pl

an f

or s

take

hold

er e

ngag

emen

t

Dem

onst

rati

on P

roje

ct C

ompo

nent

1

/

2 /

3

/

4 /

5

/

6 /

7

[For

incl

usio

n in

ann

ual w

orkp

lan

(and

bud

get)

if a

ppro

pria

te]

Co

mpo

nent

foc

us…

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

……

…..

1 St

akeh

olde

r (O

rgan

isat

ion/

post

/ na

me/

cont

act)

2

Key

inte

rest

s,

conc

erns

3

How

doe

s th

e pr

ojec

t af

fect

the

m?

4 H

ow s

uppo

rt-

ive

will

the

y be

? ++

; +

; =

; -

; -

-

How

muc

h in

flue

nce

Very

5 –

0

6 Pr

iori

ty

to e

ngag

e To

p 5

- 0

7 W

hat

do w

e ne

ed

/wan

t th

em t

o do

?

8 W

hat

(& h

ow)

do w

e do

to

enga

ge t

hem

? (t

o ge

t w

hat

we

need

) 9

Whe

n do

we

enga

ge t

hem

? 10

Who

lead

s?

1.

Wit

ten

Phill

ipo

Priv

ate

Lega

l At

torn

ey

Land

owne

r an

d Co

mm

unit

y Le

ader

Gre

ater

aw

aren

ess

of

the

proj

ect

&

appr

ecia

tion

for

nee

ds

to p

rote

ct L

aura

w

ater

lens

sou

rces

++

5 5

Prov

ide

lega

l adv

ice,

es

peci

ally

on

trad

itio

nal l

and

issu

es

Polic

y-Pl

anni

ng a

nd

impl

emen

tati

on

IWRM

Nat

iona

l st

akeh

olde

r m

eeti

ng

Laur

a W

ater

le

ns s

elec

ted

com

mit

tee

wit

h IW

RM’s

su

ppor

t

2.

Jore

lik T

ibon

D

eput

y Ch

ief

Secr

etar

y (R

MI)

Land

owne

r an

d Co

mm

unit

y Le

ader

Acce

ss t

o im

prov

e w

ater

qua

lity

and

quan

tity

++

5 5

Com

mun

ity

advi

sor

and

part

icip

atio

n

Polic

y-Pl

anni

ng a

nd

impl

emen

tati

on

IWRM

Nat

iona

l st

akeh

olde

r m

eeti

ng

Laur

a W

ater

le

ns s

elec

ted

com

mit

tee

wit

h IW

RM’s

su

ppor

t

3.

Joub

on K

abua

Co

unci

l Wom

an

Land

owne

r,

trad

itio

nal l

eade

r,

Farm

ing

and

Busi

ness

Prom

ote

publ

ic

rela

tion

, ac

cess

to

impr

ove

wat

er q

ualit

y an

d qu

anti

ty &

be

nefi

t of

the

pro

ject

at

tain

men

ts

++

5 5

Assi

stan

ce &

Sup

port

fr

om t

he L

ocal

G

over

nmen

t an

d lo

cal

com

mun

itie

s

Dec

isio

n m

akin

g &

Im

plem

enta

tion

Maj

uro

Loca

l G

over

nmen

t m

eeti

ng,

IWRM

Nat

iona

l st

akeh

olde

rs

mee

ting

, &

La

ura

wat

er

lens

co

mm

itte

e m

eeti

ng

Laur

a W

ater

le

ns s

elec

ted

com

mit

tee

wit

h IW

RM’s

su

ppor

t

4.

Ruth

Har

ris

Seni

or L

and

Ow

ner

Com

pens

atio

n, s

itti

ng

fee

& f

inan

cial

rew

ard

Extr

a so

urce

of

inco

me,

par

tici

pate

in

deci

sion

mak

ing

&

bene

fit

of t

he

proj

ects

att

ainm

ents

++

5 5

Trad

itio

nal

advi

se &

pa

rtic

ipat

ions

Trad

itio

nal &

dec

isio

n m

akin

g &

im

plem

enta

tion

Laur

a w

ater

le

ns m

eeti

ng,

Laur

a co

mm

unit

y m

eeti

ng

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

5.

Ain

Kabu

a Se

nior

Lan

dow

ner

Com

mun

ity

Lead

er &

Bu

sine

ss

Publ

ic r

elat

ion,

acc

ess

to im

prov

e w

ater

qu

alit

y an

d qu

anti

ty &

be

nefi

t of

the

pro

ject

at

tain

men

ts

++

5 5

Trad

itio

nal a

dvis

e &

pa

rtic

ipat

ion

Trad

itio

nal &

Ele

ctio

n m

akin

g &

Im

plem

enta

tion

s

Laur

a w

ater

le

ns m

eeti

ngs

& L

aura

co

mm

unit

y m

eeti

ngs

Laur

a W

ater

le

ns s

elec

ted

com

mit

tee

wit

h IW

RM’s

su

ppor

t

6.

Jasp

er L

anki

Tr

adit

iona

l lea

der

& S

enio

r em

ploy

ee

of t

he M

ajur

o At

oll

Loca

l Gov

erne

men

t

Land

owne

r &

Co

mm

unit

y Le

ader

Publ

ic r

elat

ion

&

serv

e pe

ople

as

trad

itio

nal l

eade

r

++

5 5

Trad

itio

nal A

dvis

e,

educ

atio

n &

pa

rtic

ipat

ion

Trad

itio

nal &

Dec

isio

n m

akin

g &

im

plem

enta

tion

Laur

a w

ater

le

ns m

eeti

ngs

& L

aura

co

mm

unit

y m

eeti

ngs

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

7.

Ronn

y Bo

kmej

Ch

air

pers

on f

or

the

Laur

a Fa

rmer

s As

soci

atio

n

Farm

ing

&

Com

mer

cial

de

velo

pmen

t

Publ

ic r

elat

ion

&

serv

e pe

ople

as

trad

itio

nal l

eade

r

++

5 5

Trad

itio

nal a

dvis

e,

educ

atio

n an

d pa

rtic

ipat

ion

Trad

itio

nal &

Dec

isio

n m

akin

g &

im

plem

enta

tion

s

Laur

a w

ater

le

ns m

eeti

ng

& L

aura

co

mm

unit

y

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

Page 26: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

26

GEF

-Pac

ific

IWRM

Pro

ject

Co

untr

y St

akeh

olde

r En

gage

men

t A

naly

sis

and

Plan

Co

untr

y: R

epub

lic o

f M

arsh

all I

slan

ds _

___

mee

ting

of

fice

& M

WSC

8.

Tom

my

Laib

wij

Co

unci

lman

&

Busi

ness

Com

mun

ity

lead

er &

co

mm

erci

al

deve

lopm

ent

Acce

ss t

o w

ater

qu

alit

y an

d qu

anti

ty,

impr

ove

capa

city

bu

ildin

g of

far

min

g &

be

nefi

t fr

om

proj

ects

’att

ainm

ent

++

5 5

Assi

stan

ce &

Sup

port

fr

om t

he M

ajur

o At

oll

Loca

l Gov

ernm

ent

&

Part

icip

atio

n

Trad

itio

nal &

Dec

isio

n m

akin

g &

im

plem

enta

tion

Laur

a w

ater

le

ns m

eeti

ng

& L

aura

co

mm

unit

y m

eeti

ng

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

9.

Anto

nio

Rear

Co

unci

lman

&

Trad

itio

nal l

eade

r

Com

mun

ity

lead

er &

bu

sine

ss d

evel

opm

ent

Publ

ic r

elat

ion,

acc

ess

to im

prov

e w

ater

qu

alit

y an

d qu

anti

ty &

be

nefi

t fr

om p

roje

cts

atta

inm

ents

++

5 5

Assi

stan

ce &

Sup

port

fr

om t

he M

ajur

o At

oll

Loca

l Gov

erne

men

t

Dec

isio

n m

akin

g an

d Im

plem

enta

tion

Maj

uro

atol

l lo

cal

gove

rnm

ent

mee

ting

, La

ura

com

mit

tee

mee

ting

Laur

a Le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

10.

Titu

s La

ngri

ne

May

or,

Maj

uro

Atol

l Lo

cal G

over

nmen

t

Land

owne

r,

com

mun

ity

lead

er

Prom

ote

polit

ical

ac

hiev

emen

t an

d pu

blic

rel

atio

n,

infl

uenc

e co

mm

unit

y ac

tion

++

5 5

Assi

stan

ce &

sup

port

fr

om M

ajur

o At

oll

Loca

l Gov

ernm

ent

&

Part

icip

atio

n

Dec

isio

n m

akin

g an

d im

plem

enta

tion

Maj

uro

Atol

l lo

cal

Gov

ernm

ent

&

Laur

a co

mm

unit

y m

eeti

ng

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

11.

Isai

ah A

lee

Coun

cil &

Ex

ecut

ive

mem

ber

of M

ajur

o At

oll

Loca

l Gov

ernm

ent

adm

inis

trat

ion

and

trad

itio

nal l

eade

r

Land

owne

r &

Co

mm

unit

y le

ader

Publ

ic r

elat

ion,

ser

ve

peop

le a

s tr

adit

iona

l le

ader

, gr

eate

r aw

aren

ess

and

appr

ecia

tion

of

bene

fici

al p

urpo

se o

f th

e pr

ojec

t

++

5 5

Assi

stan

ce &

sup

port

fr

om M

ajur

o At

oll

Loca

l Gov

ernm

ent

&

Part

icip

atio

n

Dec

isio

n m

akin

g an

d im

plem

enta

tion

Maj

uro

Atol

l lo

cal

Gov

ernm

ent

&

Laur

a co

mm

unit

y m

eeti

ng

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

12.

Shro

line

Kaw

akam

i O

ffic

ial s

taff

of

the

Maj

uro

loca

l go

vern

men

t

Land

owne

r,

com

mun

ity

lead

er &

ac

tive

mem

ber

for

the

wom

ens’

s N

GO

s gr

oups

Incr

ease

app

reci

atio

n an

d un

ders

tand

ing

of

the

proj

ect’

s go

al &

ob

ject

ive,

acc

ess

to

impr

ove

wat

er q

ualit

y &

qua

ntit

y &

ben

efit

fr

om t

he p

roje

cts’

at

tain

men

t

++

5 5

Assi

stan

ce &

sup

port

fr

om M

ajur

o At

oll

Loca

l Gov

ernm

ent

&

Part

icip

atio

n

Dec

isio

n m

akin

g an

d im

plem

enta

tion

Maj

uro

Atol

l lo

cal

Gov

ernm

ent

&

Laur

a co

mm

unit

y m

eeti

ng

Laur

a w

ater

le

ns

com

mit

tee,

IW

RM s

uppo

rt

offi

ce &

MW

SC

GEF

-Pac

ific

IWRM

Pro

ject

Co

untr

y St

akeh

olde

r En

gage

men

t A

naly

sis

and

Plan

Co

untr

y: R

epub

lic o

f M

arsh

all I

slan

ds _

___

St

akeh

olde

r A

naly

sis

Gui

danc

e N

otes

Purp

ose

Thro

ugh

stak

ehol

der

situ

atio

n an

alys

is,

iden

tify

eff

ecti

ve a

ctio

ns t

hat

will

cap

ture

the

pot

enti

al p

osit

ive

impa

ct

of s

uppo

rter

s an

d m

inim

ise

the

pote

ntia

l neg

ativ

e im

pact

of

oppo

sers

, in

ord

er t

o ac

hiev

e pl

anne

d pr

ojec

t IW

RM o

utco

mes

. Be

fore

you

st

art

Dec

ide

how

to

do t

his

stak

ehol

der

anal

ysis

.

Eith

er d

o it

glo

bally

for

the

who

le d

emo

proj

ect.

Or

do it

pro

ject

com

pone

nt b

y pr

ojec

t co

mpo

nent

.

Doi

ng it

glo

bally

may

be

quic

ker.

D

oing

it b

y co

mpo

nent

may

hel

p fo

cus

the

anal

ysis

and

the

eng

agem

ent

acti

on p

lan

mor

e pr

ecis

ely

on

stak

ehol

der

inte

rest

s, is

sues

and

con

trib

utio

n ne

eded

; a

nd h

elp

to li

nk t

he t

imin

g of

the

eng

agem

ent

acti

on

plan

wit

h th

e im

plem

enta

tion

of

the

com

pone

nt’s

act

ivit

ies.

St

art

each

com

pone

nt o

n a

new

she

et.

Are

ther

e an

y Ac

tion

Pla

n ac

tion

s th

at w

ill n

eed

to b

e re

flec

ted

in t

he 1

2-m

onth

wor

kpla

n, 1

2-m

onth

bud

get

and

the

log-

fram

e?

Mos

t co

untr

ies

have

a s

take

hold

er d

iagr

am t

hat

was

pre

pare

d du

ring

the

Niu

e W

orks

hop

in J

uly

2008

. T

his

coul

d be

a s

tart

ing

poin

t to

be

deve

lope

d.

But

keep

it s

impl

e an

d us

eful

.

Stak

ehol

der

anal

ysis

1 St

akeh

olde

r Id

enti

fy t

he m

ain

stak

ehol

ders

(or

gani

sati

on;

sect

ion;

pos

t; n

ame;

con

tact

) w

ho w

ill c

ontr

ibut

e to

, be

aff

ecte

d by

, be

sup

port

ive

of o

r op

posi

ng t

he d

emo

proj

ect

(com

pone

nt).

Fo

cus

on in

-cou

ntry

sta

keho

lder

s.

2 Ke

y in

tere

sts,

co

ncer

ns

Iden

tify

wha

t ar

e th

e m

ain

reas

ons

why

the

sta

keho

lder

s ar

e /w

ould

be

inte

rest

ed in

or

conc

erne

d ab

out

the

proj

ect

(com

pone

nt).

The

y w

ant

an a

dequ

ate

and

relia

ble

supp

ly o

f cl

ean

wat

er?

The

y w

ant

a fr

ee s

uppl

y of

w

ater

? T

hey

wan

t to

min

imiz

e fl

ood

dam

age?

The

y do

not

wan

t to

cha

nge

thei

r la

nd m

anag

emen

t or

pig

ef

flue

nt m

anag

emen

t pr

acti

ces?

The

y w

ant

to b

e ab

le t

o bu

ild o

n w

aste

land

plo

ts in

the

flo

od-p

lain

? T

hey

do

not

wan

t to

han

dle

thei

r ow

n sa

nita

tion

pro

duct

s?

3 H

ow d

oes

proj

ect

affe

ct

them

Iden

tify

the

way

s in

whi

ch t

he p

roje

ct (

com

pone

nt)

(act

ivit

ies

and

outp

uts)

will

aff

ect

the

stak

ehol

der?

W

ill it

af

fect

(le

ad t

o ch

ange

s in

, in

crea

se o

r de

crea

se)

and

if s

o ho

w w

ill it

aff

ect:

the

ir a

utho

rity

? t

heir

pow

er?

th

eir

auto

nom

y?

thei

r ai

ms?

the

ir p

rope

rty?

the

ir w

ork?

th

eir

budg

et?

the

ir li

velih

oods

& p

ract

ices

? t

heir

st

atus

? et

c

4 H

ow s

uppo

rt-

ive

will

the

y be

++

+

= -

--

Cons

ider

ing

the

abov

e, w

ill t

he s

take

hold

er b

e su

ppor

tive

of

the

proj

ect

(com

pone

nt)

or o

ppos

ing

or b

lock

ing

the

proj

ect

(com

pone

nt).

W

ill t

he s

take

hold

er b

e ve

ry s

uppo

rtiv

e (+

+),

sup

port

ive

(+);

ne

utra

l (=)

; o

ppos

ing

(-)

or s

tron

gly

oppo

sing

(--

) th

e pr

ojec

t (c

ompo

nent

)?

5 H

ow m

uch

infl

uenc

e Ve

ry 5

– 0

Your

ass

essm

ent

of h

ow m

uch

the

stak

ehol

der

will

be

able

to

infl

uenc

e th

e im

plem

enta

tion

and

ach

ieve

men

t of

th

e pr

ojec

t (c

ompo

nent

) –

by d

irec

t su

ppor

t or

blo

ckin

g; o

r in

dire

ctly

by

infl

uenc

ing

othe

rs t

o su

ppor

t or

blo

ck.

Ex

trem

ely

infl

uent

ial

5;

Ve

ry in

flue

ntia

l 4;

Q

uite

infl

uent

ial

3;

Som

e in

flue

nce

2;

Ve

ry li

mit

ed in

flue

nce

1;

N

o in

flue

nce

0;

6 Pr

iori

ty t

o en

gage

To

p pr

iori

ty 5

do

wn

4,3

,2,1

to

0 le

ast

Cons

ider

ing

the

abov

e, a

sses

s ho

w im

port

ant

it is

to

enga

ge t

he s

take

hold

er in

ord

er t

o ac

hiev

e th

e pr

ojec

t (c

ompo

nent

) ou

tcom

e. F

or e

xam

ple,

a s

take

hold

er w

ith

limit

ed in

flue

nce

and

alre

ady

supp

orti

ve o

f th

e pr

ojec

t m

ay b

e le

ss im

port

ant

to a

chie

ving

the

pro

ject

(co

mpo

nent

) ou

tcom

es t

han

a ve

ry in

flue

ntia

l st

akeh

olde

r w

ho is

str

ongl

y op

posi

ng t

he p

roje

ct.

Mor

e ef

fort

wou

ld b

e di

rect

ed t

o en

gagi

ng (

or e

ffec

tive

ly

side

linin

g) t

he in

flue

ntia

l and

neg

ativ

e st

akeh

olde

r

Stak

ehol

der

enga

gem

ent

acti

on p

lan

7 W

hat

do w

e ne

ed /

wan

t th

em t

o do

Dec

ide

whi

ch p

rior

ity

grou

ps t

o fo

cus

on f

or t

he e

ngag

emen

t ac

tion

pla

ns,

cons

ider

ing

reso

urce

s av

aila

ble.

Pr

iori

ty 3

upw

ards

(3-

5)?

Pri

orit

y 2

upw

ards

(2-

5)?

Or

all?

An

alys

e w

hat

it is

tha

t is

nee

ded

from

eac

h st

akeh

olde

r in

ord

er t

o ac

hiev

e th

e pr

ojec

t (c

ompo

nent

) ou

tcom

es:

Sa

ncti

on a

nd e

ndor

sem

ent?

Fi

nanc

ial o

r hu

man

res

ourc

es?

Hig

h pr

ofile

pub

lic s

uppo

rt?

Col

labo

rati

on a

nd

inco

rpor

atio

n of

act

ivit

ies

into

the

ir w

ork

plan

s?

Expe

rtis

e?

8 W

hat

do w

e do

to

enga

ge

them

&/o

r ho

w

(in

orde

r to

ac

hiev

e w

hat

we

need

)

Base

d on

the

pre

cedi

ng a

naly

sis,

wha

t w

ill w

e ne

ed t

o do

to

enga

ge t

he s

take

hold

ers,

in o

rder

to

max

imis

e th

e po

siti

ve in

flue

nce

of s

uppo

rter

s; w

in o

ver

stak

ehol

ders

who

are

neg

ativ

e; a

nd/o

r m

inim

ise

the

nega

tive

in

flue

nce

of t

hose

who

rem

ain

oppo

sed?

U

se in

flue

ntia

l sup

port

ers

as f

igur

e he

ads?

One

-to-

one

mee

ting

s?

Join

t pl

anni

ng d

iscu

ssio

ns?

Har

mon

isin

g w

orkp

lans

? S

ite

visi

ts?

Joi

nt im

plem

enta

tion

? J

oint

M&

E an

d re

view

? R

egul

ar b

rief

ings

– e

lect

roni

c, h

ard

copi

es?

Tar

gete

d co

mm

unic

atio

n/in

form

atio

n ca

mpa

ign?

An

adv

ocac

y ca

mpa

ign?

Lo

bbyi

ng s

enio

r de

cisi

on

mak

ers?

Fu

ndin

g?

Prov

ide

alte

rnat

ive

sour

ces

of li

velih

ood,

land

, w

ater

, st

atus

, au

thor

ity

etc

9 W

hen

do w

e en

gage

the

m

Whe

n do

the

eng

agem

ent

acti

viti

es n

eed

to s

tart

in o

rder

to

impl

emen

t th

e pr

ojec

t ac

tivi

ties

on

tim

e.

Whe

n do

seq

uent

ial a

nd f

ollo

w-u

p en

gage

men

t ac

tivi

ties

nee

d to

be

done

to

mat

ch t

he s

take

hold

er’s

pla

nnin

g an

d im

plem

enta

tion

cyc

le?

10 W

ho le

ads

Who

wit

hin

the

lead

age

ncy,

the

PM

U,

or o

ther

sta

keho

lder

s, w

ill b

e re

spon

sibl

e to

init

iate

, de

velo

p an

d fo

llow

th

roug

h w

ith

the

acti

on p

lan

step

?

Rem

embe

r to

o Th

e co

mm

unit

y ar

e al

so s

take

hold

ers!

In

clud

e th

em in

the

sta

keho

lder

ana

lysi

s .

The

com

mun

ity

is m

ade

up o

f di

ffer

ent

sub-

grou

ps:

lead

ers,

men

, w

omen

, yo

uth,

eld

ers,

mor

e in

flue

ntia

l, le

ss

infl

uent

ial,

bet

ter

reso

urce

d, le

ss w

ell r

esou

rced

all

of w

hom

may

hav

e di

ffer

ent

conc

erns

, in

tere

sts

and

infl

uenc

e.

Page 27: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

27

GEF

-Pac

ific

IWRM

Pro

ject

Co

untr

y St

akeh

olde

r En

gage

men

t A

naly

sis

and

Plan

Co

untr

y: R

epub

lic o

f M

arsh

all I

slan

ds _

___

St

akeh

olde

r A

naly

sis

Gui

danc

e N

otes

Purp

ose

Thro

ugh

stak

ehol

der

situ

atio

n an

alys

is,

iden

tify

eff

ecti

ve a

ctio

ns t

hat

will

cap

ture

the

pot

enti

al p

osit

ive

impa

ct

of s

uppo

rter

s an

d m

inim

ise

the

pote

ntia

l neg

ativ

e im

pact

of

oppo

sers

, in

ord

er t

o ac

hiev

e pl

anne

d pr

ojec

t IW

RM o

utco

mes

. Be

fore

you

st

art

Dec

ide

how

to

do t

his

stak

ehol

der

anal

ysis

.

Eith

er d

o it

glo

bally

for

the

who

le d

emo

proj

ect.

Or

do it

pro

ject

com

pone

nt b

y pr

ojec

t co

mpo

nent

.

Doi

ng it

glo

bally

may

be

quic

ker.

D

oing

it b

y co

mpo

nent

may

hel

p fo

cus

the

anal

ysis

and

the

eng

agem

ent

acti

on p

lan

mor

e pr

ecis

ely

on

stak

ehol

der

inte

rest

s, is

sues

and

con

trib

utio

n ne

eded

; a

nd h

elp

to li

nk t

he t

imin

g of

the

eng

agem

ent

acti

on

plan

wit

h th

e im

plem

enta

tion

of

the

com

pone

nt’s

act

ivit

ies.

St

art

each

com

pone

nt o

n a

new

she

et.

Are

ther

e an

y Ac

tion

Pla

n ac

tion

s th

at w

ill n

eed

to b

e re

flec

ted

in t

he 1

2-m

onth

wor

kpla

n, 1

2-m

onth

bud

get

and

the

log-

fram

e?

Mos

t co

untr

ies

have

a s

take

hold

er d

iagr

am t

hat

was

pre

pare

d du

ring

the

Niu

e W

orks

hop

in J

uly

2008

. T

his

coul

d be

a s

tart

ing

poin

t to

be

deve

lope

d.

But

keep

it s

impl

e an

d us

eful

.

Stak

ehol

der

anal

ysis

1 St

akeh

olde

r Id

enti

fy t

he m

ain

stak

ehol

ders

(or

gani

sati

on;

sect

ion;

pos

t; n

ame;

con

tact

) w

ho w

ill c

ontr

ibut

e to

, be

aff

ecte

d by

, be

sup

port

ive

of o

r op

posi

ng t

he d

emo

proj

ect

(com

pone

nt).

Fo

cus

on in

-cou

ntry

sta

keho

lder

s.

2 Ke

y in

tere

sts,

co

ncer

ns

Iden

tify

wha

t ar

e th

e m

ain

reas

ons

why

the

sta

keho

lder

s ar

e /w

ould

be

inte

rest

ed in

or

conc

erne

d ab

out

the

proj

ect

(com

pone

nt).

The

y w

ant

an a

dequ

ate

and

relia

ble

supp

ly o

f cl

ean

wat

er?

The

y w

ant

a fr

ee s

uppl

y of

w

ater

? T

hey

wan

t to

min

imiz

e fl

ood

dam

age?

The

y do

not

wan

t to

cha

nge

thei

r la

nd m

anag

emen

t or

pig

ef

flue

nt m

anag

emen

t pr

acti

ces?

The

y w

ant

to b

e ab

le t

o bu

ild o

n w

aste

land

plo

ts in

the

flo

od-p

lain

? T

hey

do

not

wan

t to

han

dle

thei

r ow

n sa

nita

tion

pro

duct

s?

3 H

ow d

oes

proj

ect

affe

ct

them

Iden

tify

the

way

s in

whi

ch t

he p

roje

ct (

com

pone

nt)

(act

ivit

ies

and

outp

uts)

will

aff

ect

the

stak

ehol

der?

W

ill it

af

fect

(le

ad t

o ch

ange

s in

, in

crea

se o

r de

crea

se)

and

if s

o ho

w w

ill it

aff

ect:

the

ir a

utho

rity

? t

heir

pow

er?

th

eir

auto

nom

y?

thei

r ai

ms?

the

ir p

rope

rty?

the

ir w

ork?

th

eir

budg

et?

the

ir li

velih

oods

& p

ract

ices

? t

heir

st

atus

? et

c

4 H

ow s

uppo

rt-

ive

will

the

y be

++

+

= -

--

Cons

ider

ing

the

abov

e, w

ill t

he s

take

hold

er b

e su

ppor

tive

of

the

proj

ect

(com

pone

nt)

or o

ppos

ing

or b

lock

ing

the

proj

ect

(com

pone

nt).

W

ill t

he s

take

hold

er b

e ve

ry s

uppo

rtiv

e (+

+),

sup

port

ive

(+);

ne

utra

l (=)

; o

ppos

ing

(-)

or s

tron

gly

oppo

sing

(--

) th

e pr

ojec

t (c

ompo

nent

)?

5 H

ow m

uch

infl

uenc

e Ve

ry 5

– 0

Your

ass

essm

ent

of h

ow m

uch

the

stak

ehol

der

will

be

able

to

infl

uenc

e th

e im

plem

enta

tion

and

ach

ieve

men

t of

th

e pr

ojec

t (c

ompo

nent

) –

by d

irec

t su

ppor

t or

blo

ckin

g; o

r in

dire

ctly

by

infl

uenc

ing

othe

rs t

o su

ppor

t or

blo

ck.

Ex

trem

ely

infl

uent

ial

5;

Ve

ry in

flue

ntia

l 4;

Q

uite

infl

uent

ial

3;

Som

e in

flue

nce

2;

Ve

ry li

mit

ed in

flue

nce

1;

N

o in

flue

nce

0;

6 Pr

iori

ty t

o en

gage

To

p pr

iori

ty 5

do

wn

4,3

,2,1

to

0 le

ast

Cons

ider

ing

the

abov

e, a

sses

s ho

w im

port

ant

it is

to

enga

ge t

he s

take

hold

er in

ord

er t

o ac

hiev

e th

e pr

ojec

t (c

ompo

nent

) ou

tcom

e. F

or e

xam

ple,

a s

take

hold

er w

ith

limit

ed in

flue

nce

and

alre

ady

supp

orti

ve o

f th

e pr

ojec

t m

ay b

e le

ss im

port

ant

to a

chie

ving

the

pro

ject

(co

mpo

nent

) ou

tcom

es t

han

a ve

ry in

flue

ntia

l st

akeh

olde

r w

ho is

str

ongl

y op

posi

ng t

he p

roje

ct.

Mor

e ef

fort

wou

ld b

e di

rect

ed t

o en

gagi

ng (

or e

ffec

tive

ly

side

linin

g) t

he in

flue

ntia

l and

neg

ativ

e st

akeh

olde

r

Stak

ehol

der

enga

gem

ent

acti

on p

lan

7 W

hat

do w

e ne

ed /

wan

t th

em t

o do

Dec

ide

whi

ch p

rior

ity

grou

ps t

o fo

cus

on f

or t

he e

ngag

emen

t ac

tion

pla

ns,

cons

ider

ing

reso

urce

s av

aila

ble.

Pr

iori

ty 3

upw

ards

(3-

5)?

Pri

orit

y 2

upw

ards

(2-

5)?

Or

all?

An

alys

e w

hat

it is

tha

t is

nee

ded

from

eac

h st

akeh

olde

r in

ord

er t

o ac

hiev

e th

e pr

ojec

t (c

ompo

nent

) ou

tcom

es:

Sa

ncti

on a

nd e

ndor

sem

ent?

Fi

nanc

ial o

r hu

man

res

ourc

es?

Hig

h pr

ofile

pub

lic s

uppo

rt?

Col

labo

rati

on a

nd

inco

rpor

atio

n of

act

ivit

ies

into

the

ir w

ork

plan

s?

Expe

rtis

e?

8 W

hat

do w

e do

to

enga

ge

them

&/o

r h o

w

(in

orde

r to

ac

hiev

e w

hat

we

need

)

Base

d on

the

pre

cedi

ng a

naly

sis,

wha

t w

ill w

e ne

ed t

o do

to

enga

ge t

he s

take

hold

ers,

in o

rder

to

max

imis

e th

e po

siti

ve in

flue

nce

of s

uppo

rter

s; w

in o

ver

stak

ehol

ders

who

are

neg

ativ

e; a

nd/o

r m

inim

ise

the

nega

tive

in

flue

nce

of t

hose

who

rem

ain

oppo

sed?

U

se in

flue

ntia

l sup

port

ers

as f

igur

e he

ads?

One

-to-

one

mee

ting

s?

Join

t pl

anni

ng d

iscu

ssio

ns?

Har

mon

isin

g w

orkp

lans

? S

ite

visi

ts?

Joi

nt im

plem

enta

tion

? J

oint

M&

E an

d re

view

? R

egul

ar b

rief

ings

– e

lect

roni

c, h

ard

copi

es?

Tar

gete

d co

mm

unic

atio

n/in

form

atio

n ca

mpa

ign?

An

adv

ocac

y ca

mpa

ign?

Lo

bbyi

ng s

enio

r de

cisi

on

mak

ers?

Fu

ndin

g?

Prov

ide

alte

rnat

ive

sour

ces

of li

velih

ood,

land

, w

ater

, st

atus

, au

thor

ity

etc

9 W

hen

do w

e en

gage

the

m

Whe

n do

the

eng

agem

ent

acti

viti

es n

eed

to s

tart

in o

rder

to

impl

emen

t th

e pr

ojec

t ac

tivi

ties

on

tim

e.

Whe

n do

seq

uent

ial a

nd f

ollo

w-u

p en

gage

men

t ac

tivi

ties

nee

d to

be

done

to

mat

ch t

he s

take

hold

er’s

pla

nnin

g an

d im

plem

enta

tion

cyc

le?

10 W

ho le

ads

Who

wit

hin

the

lead

age

ncy,

the

PM

U,

or o

ther

sta

keho

lder

s, w

ill b

e re

spon

sibl

e to

init

iate

, de

velo

p an

d fo

llow

th

roug

h w

ith

the

acti

on p

lan

step

?

Rem

embe

r to

o Th

e co

mm

unit

y ar

e al

so s

take

hold

ers!

In

clud

e th

em in

the

sta

keho

lder

ana

lysi

s .

The

com

mun

ity

is m

ade

up o

f di

ffer

ent

sub-

grou

ps:

lead

ers,

men

, w

omen

, yo

uth,

eld

ers,

mor

e in

flue

ntia

l, le

ss

infl

uent

ial,

bet

ter

reso

urce

d, le

ss w

ell r

esou

rced

all

of w

hom

may

hav

e di

ffer

ent

conc

erns

, in

tere

sts

and

infl

uenc

e.

Page 28: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

28

annex 4: IWrM Logframe

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

Com

pone

nt 1

: Str

engt

hene

d C

oord

inat

ion

for I

nteg

rate

d La

nd a

nd W

ater

Man

agem

ent a

t Lau

ra, M

ajur

o A

toll

1.1

Rev

iew

of s

ocio

-eco

nom

ic

and

polit

ical

fact

ors

influ

enci

ng IW

RM

and

Wat

er

Use

Effi

cien

cy in

the

Laur

a Ar

ea o

f Maj

uro

Atol

l, in

clud

ing:

(a) i

ncen

tives

; fo

rmal

and

info

rmal

in

stitu

tions

; and

eco

nom

ic

stru

ctur

es re

latin

g to

wat

er

and

land

use

in th

e La

ura

area

; (b)

reco

mm

enda

tions

fo

r nat

iona

l lev

el re

form

of

wat

er s

ecto

r

Term

s of

Ref

eren

ce a

nd K

ey

Del

iver

able

s fo

r stu

dy

iden

tifie

d by

Aug

ust 2

010

Con

sulta

nt/p

erso

nnel

for

stud

y re

crui

ted

by O

ctob

er

2010

D

raft

repo

rt pr

esen

ted

to

NIW

RM

TF a

nd L

IWLM

AC fo

r re

view

and

com

men

t by

Janu

ary

2011

Fi

nal r

epor

t end

orse

d by

M

arch

201

1

Cal

l for

exp

ress

ions

of

inte

rest

in a

ppro

pria

te

natio

nal a

nd re

gion

al m

edia

C

onsu

ltant

or R

MIE

PA s

taff

cont

ract

Li

st o

f com

men

ts fr

om

natio

nal a

nd L

aura

co

mm

ittee

s Fi

nal e

ndor

sed

repo

rt

In-c

ount

ry c

apac

ity a

nd

acce

ss to

con

sulta

nts

able

to

addr

ess

com

plex

sci

entif

ic,

tech

nica

l, so

cio-

econ

omic

, in

stitu

tiona

l, an

d po

litic

al

fact

ors

influ

enci

ng w

ater

re

sour

ce m

anag

emen

t in

Maj

uro/

Laur

a

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), c

onsu

ltant

1.2

Rev

italis

atio

n an

d O

pera

tion

of a

Nat

iona

l Int

egra

ted

Wat

er R

esou

rce

Man

agem

ent T

ask

Forc

e, to

: (a

) pro

mot

e th

e ef

fect

ive

deve

lopm

ent a

nd

man

agem

ent o

f wat

er

reso

urce

s; (b

) ove

rsee

de

velo

pmen

t and

im

plem

enta

tion

of a

Lau

ra

Inte

grat

ed W

ater

and

Lan

d R

esou

rces

Man

agem

ent

Plan

(LIW

LRM

P)

Term

s of

Ref

eren

ce;

Mem

bers

hip

List

; and

Pr

ogra

mm

e of

Wor

k,

incl

udin

g M

eetin

g Sc

hedu

le

agre

ed b

etw

een

RM

IEPA

an

d w

ater

sta

keho

lder

s by

Se

ptem

ber 2

010.

Q

uarte

rly m

eetin

gs o

f the

N

atio

nal I

nteg

rate

d W

ater

R

esou

rce

Man

agem

ent T

ask

Forc

e, c

haire

d by

RM

IEP

A

Rep

ort o

f Inc

eptio

n M

eetin

g to

laun

ch In

tegr

ated

Wat

er

Res

ourc

e M

anag

emen

t Tas

k Fo

rce,

con

tain

ing

agre

ed

Term

s of

Ref

eren

ce;

Mem

bers

hip

List

; and

Pr

ogra

mm

e of

Wor

k.

Min

utes

of q

uarte

rly

mee

tings

.

Suffi

cien

t buy

-in/s

uppo

rt fro

m

rele

vant

gov

ernm

ent

Min

istri

es a

nd a

genc

ies

for

Inte

grat

ed W

ater

Res

ourc

es

Man

agem

ent

Dem

and

from

gov

ernm

ent

offic

ials

for s

ittin

g fe

es

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), M

inis

try o

f R

esou

rces

and

D

evel

opm

ent

1.3

Form

alis

e th

e La

ura

Inte

grat

ed W

ater

and

Lan

d M

anag

emen

t Adv

isor

y C

omm

ittee

, inc

ludi

ng

endo

rsem

ent f

rom

the

Nat

iona

l Int

egra

ted

Wat

er

Res

ourc

e M

anag

emen

t Tas

k

Agre

ed T

erm

s of

Ref

eren

ce;

Mem

bers

hip

List

; and

Pr

ogra

mm

e of

Wor

k,

incl

udin

g m

eetin

g sc

hedu

le

by S

epte

mbe

r 201

0.

Qua

rterly

mee

tings

of t

he

Laur

a In

tegr

ated

Wat

er a

nd

Rep

ort o

f Mee

ting

incl

udin

g ag

reed

Ter

ms

of R

efer

ence

; fin

alis

ed M

embe

rshi

p Li

st;

and

Prog

ram

me

of W

ork

2010

-201

1 M

inut

es o

f qua

rterly

m

eetin

gs.

Suffi

cien

t buy

-in/s

uppo

rt fro

m

Laur

a la

ndow

ners

, far

m

oper

ator

s, a

nd p

rivat

e se

ctor

(in

clud

ing

Mar

shal

ls W

ater

an

d Se

wag

e C

ompa

ny)

Cos

t of s

ittin

g fe

es

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

Fo

rce

Land

Man

agem

ent A

dvis

ory

Com

mitt

ee

1.4

Dev

elop

and

Impl

emen

t a

Laur

a C

omm

unity

St

akeh

olde

r Eng

agem

ent

Plan

, inc

ludi

ng id

entif

icat

ion

of ro

les

and

resp

onsi

bilit

ies

of lo

cal p

artn

ers

in p

roje

ct

impl

emen

tatio

n

Com

mun

ity S

take

hold

er

Con

sulta

tion

Wor

ksho

p(s)

co

nven

ed b

y D

ecem

ber 2

010

Rol

es o

f loc

al p

artn

ers

in

proj

ect i

mpl

emen

tatio

n id

entif

ied

and

stak

ehol

der

enga

gem

ent p

lan

endo

rsed

by

LIW

LMAC

by

Mar

ch 2

011

Doc

umen

tatio

n of

co

nsul

tatio

n w

orks

hops

(s

umm

arie

s, n

ews

item

s,

audi

o-vi

sual

mat

eria

ls)

Endo

rsed

eng

agem

ent p

lan

Loca

l par

tner

com

mitm

ent t

o co

nsul

tativ

e pr

oces

s C

onfli

ct o

f int

eres

ts b

etw

een

and

amon

g lo

cal c

omm

unity

re

pres

enta

tives

and

loca

l pa

rtner

s (e

.g. N

GO

s)

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC

1.5

Dev

elop

and

Impl

emen

t an

IWR

M a

nd W

ater

Use

Ef

ficie

ncy

Cap

acity

Bui

ldin

g Pr

ogra

mm

e fo

r the

Lau

ra

Inte

grat

ed W

ater

and

Lan

d M

anag

emen

t Adv

isor

y C

omm

ittee

Cap

acity

nee

ds a

sses

smen

t of

LIW

LMAC

con

duct

ed b

y Se

ptem

ber 2

010

Cap

acity

bui

ldin

g pr

ogra

mm

e de

velo

ped

by D

ecem

ber

2010

W

orks

hops

con

duct

ed in

co

njun

ctio

n w

ith q

uarte

rly

mee

tings

of t

he L

IWLM

AC

Cap

acity

nee

ds a

sses

smen

t re

port,

incl

udin

g su

rvey

re

sults

R

epor

t sum

mar

isin

g ca

paci

ty

build

ing

prog

ram

me

Wor

ksho

p do

cum

enta

tion,

au

dio-

visu

al m

ater

ials

, e.g

., (P

ower

Poin

t slid

es)

Avai

labi

lity

of e

ngag

ing

and

inte

ract

ive

train

ing

mat

eria

ls

and

activ

ities

W

illing

ness

of c

omm

ittee

m

embe

rs to

par

ticip

ate

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

1.6

Dev

elop

and

Impl

emen

t a

Com

mun

ity B

ased

Pro

ject

to

Fost

er In

volv

emen

t of

Wom

en’s

Gro

ups

in W

ater

M

anag

emen

t and

Dec

isio

n-M

akin

g in

the

Laur

a Ar

ea

Proj

ect c

once

pt d

evel

oped

in

conj

unct

ion

with

NG

O a

nd

Wom

en’s

Gro

ups

by

Dec

embe

r 201

0 Pr

ojec

t fun

ding

sou

rce

iden

tifie

d by

Mar

ch 2

011

Proj

ect o

pera

tiona

l and

co

mpl

eted

by

Dec

embe

r 20

12

Proj

ect c

once

pt n

ote

and

prop

osal

to fu

ndin

g ag

ency

(e

.g. G

EF S

mal

l Gra

nts

Prog

ram

me)

Pr

ojec

t app

rova

l and

fund

ing

rece

ived

Pr

ojec

t im

plem

enta

tion

revi

ews

and

repo

rts

Avai

labi

lity

of fu

nds

for

com

mun

ity p

roje

cts

on w

ater

in

the

Paci

fic Is

land

C

ount

ries

Com

mitm

ent f

rom

NG

O’s

an

d W

omen

’s G

roup

s to

de

velo

p an

d ex

ecut

e pr

ojec

t

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), N

GO

s, a

nd

Wom

en’s

Gro

ups

C

ompo

nent

2: I

dent

ifica

tion

of K

ey T

hrea

ts a

nd M

anag

emen

t Iss

ues

for t

he L

aura

Wat

er L

ens

2.

1 D

evel

opm

ent o

f a fi

ne s

cale

to

pogr

aphi

cal m

ap o

f the

La

ura

Area

Term

s of

Ref

eren

ce fo

r su

rvey

agr

eed

by L

IWLM

AC

by J

uly

2010

C

onsu

ltant

/per

sonn

el fo

r st

udy

recr

uite

d by

Sep

tem

ber

2010

Agre

ed T

erm

s of

Ref

eren

ce

Con

sulta

nt/p

erso

nnel

co

ntra

cts

Topo

grap

hica

l map

Avai

labi

lity

of s

urve

yors

R

MIE

PA,

GEF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI),

con

sulta

nts

Page 29: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

29

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

Fo

rce

Land

Man

agem

ent A

dvis

ory

Com

mitt

ee

1.4

Dev

elop

and

Impl

emen

t a

Laur

a C

omm

unity

St

akeh

olde

r Eng

agem

ent

Plan

, inc

ludi

ng id

entif

icat

ion

of ro

les

and

resp

onsi

bilit

ies

of lo

cal p

artn

ers

in p

roje

ct

impl

emen

tatio

n

Com

mun

ity S

take

hold

er

Con

sulta

tion

Wor

ksho

p(s)

co

nven

ed b

y D

ecem

ber 2

010

Rol

es o

f loc

al p

artn

ers

in

proj

ect i

mpl

emen

tatio

n id

entif

ied

and

stak

ehol

der

enga

gem

ent p

lan

endo

rsed

by

LIW

LMAC

by

Mar

ch 2

011

Doc

umen

tatio

n of

co

nsul

tatio

n w

orks

hops

(s

umm

arie

s, n

ews

item

s,

audi

o-vi

sual

mat

eria

ls)

Endo

rsed

eng

agem

ent p

lan

Loca

l par

tner

com

mitm

ent t

o co

nsul

tativ

e pr

oces

s C

onfli

ct o

f int

eres

ts b

etw

een

and

amon

g lo

cal c

omm

unity

re

pres

enta

tives

and

loca

l pa

rtner

s (e

.g. N

GO

s)

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC

1.5

Dev

elop

and

Impl

emen

t an

IWR

M a

nd W

ater

Use

Ef

ficie

ncy

Cap

acity

Bui

ldin

g Pr

ogra

mm

e fo

r the

Lau

ra

Inte

grat

ed W

ater

and

Lan

d M

anag

emen

t Adv

isor

y C

omm

ittee

Cap

acity

nee

ds a

sses

smen

t of

LIW

LMAC

con

duct

ed b

y Se

ptem

ber 2

010

Cap

acity

bui

ldin

g pr

ogra

mm

e de

velo

ped

by D

ecem

ber

2010

W

orks

hops

con

duct

ed in

co

njun

ctio

n w

ith q

uarte

rly

mee

tings

of t

he L

IWLM

AC

Cap

acity

nee

ds a

sses

smen

t re

port,

incl

udin

g su

rvey

re

sults

R

epor

t sum

mar

isin

g ca

paci

ty

build

ing

prog

ram

me

Wor

ksho

p do

cum

enta

tion,

au

dio-

visu

al m

ater

ials

, e.g

., (P

ower

Poin

t slid

es)

Avai

labi

lity

of e

ngag

ing

and

inte

ract

ive

train

ing

mat

eria

ls

and

activ

ities

W

illing

ness

of c

omm

ittee

m

embe

rs to

par

ticip

ate

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

1.6

Dev

elop

and

Impl

emen

t a

Com

mun

ity B

ased

Pro

ject

to

Fost

er In

volv

emen

t of

Wom

en’s

Gro

ups

in W

ater

M

anag

emen

t and

Dec

isio

n-M

akin

g in

the

Laur

a Ar

ea

Proj

ect c

once

pt d

evel

oped

in

conj

unct

ion

with

NG

O a

nd

Wom

en’s

Gro

ups

by

Dec

embe

r 201

0 Pr

ojec

t fun

ding

sou

rce

iden

tifie

d by

Mar

ch 2

011

Proj

ect o

pera

tiona

l and

co

mpl

eted

by

Dec

embe

r 20

12

Proj

ect c

once

pt n

ote

and

prop

osal

to fu

ndin

g ag

ency

(e

.g. G

EF S

mal

l Gra

nts

Prog

ram

me)

Pr

ojec

t app

rova

l and

fund

ing

rece

ived

Pr

ojec

t im

plem

enta

tion

revi

ews

and

repo

rts

Avai

labi

lity

of fu

nds

for

com

mun

ity p

roje

cts

on w

ater

in

the

Paci

fic Is

land

C

ount

ries

Com

mitm

ent f

rom

NG

O’s

an

d W

omen

’s G

roup

s to

de

velo

p an

d ex

ecut

e pr

ojec

t

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), N

GO

s, a

nd

Wom

en’s

Gro

ups

C

ompo

nent

2: I

dent

ifica

tion

of K

ey T

hrea

ts a

nd M

anag

emen

t Iss

ues

for t

he L

aura

Wat

er L

ens

2.

1 D

evel

opm

ent o

f a fi

ne s

cale

to

pogr

aphi

cal m

ap o

f the

La

ura

Area

Term

s of

Ref

eren

ce fo

r su

rvey

agr

eed

by L

IWLM

AC

by J

uly

2010

C

onsu

ltant

/per

sonn

el fo

r st

udy

recr

uite

d by

Sep

tem

ber

2010

Agre

ed T

erm

s of

Ref

eren

ce

Con

sulta

nt/p

erso

nnel

co

ntra

cts

Topo

grap

hica

l map

Avai

labi

lity

of s

urve

yors

R

MIE

PA,

GEF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI),

con

sulta

nts

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Par

tner

s S

urve

y co

nduc

ted

and

map

pr

oduc

ed b

y M

arch

201

1 2.

2 R

evie

w o

f san

itatio

n an

d w

aste

man

agem

ent s

yste

ms

in L

aura

, inc

ludi

ng: (

a)

iden

tific

atio

n of

all

sept

ic

syst

ems

and

thos

e re

quiri

ng

rem

edia

tion;

(b) s

olid

was

te

disp

osal

met

hods

and

site

s;

and

(c) f

arm

was

te

man

agem

ent.

Sum

mar

y of

sa

nita

tion

and

was

te

man

agem

ent

reco

mm

enda

tions

for L

aura

.

Ter

ms

of R

efer

ence

for

surv

ey a

gree

d by

LIW

LMA

C

by S

epte

mbe

r 201

0 C

onsu

ltant

/per

sonn

el fo

r st

udy

recr

uite

d by

Dec

embe

r 20

10

Rev

iew

com

plet

ed a

nd re

port

incl

udin

g re

com

men

datio

ns

prod

uced

by

Mar

ch 2

011

Agr

eed

Ter

ms

of R

efer

ence

C

onsu

ltant

/per

sonn

el

cont

ract

s R

evie

w r

epor

t end

orse

d by

LI

WLM

AC

Ava

ilabi

lity

of s

uita

ble

sani

tatio

n an

d w

aste

m

anag

emen

t exp

ertis

e P

artic

ipat

ion

of la

ndow

ners

an

d

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

cons

ulta

nt(s

)

2.3

Rev

iew

of t

he s

tatu

s of

Lau

ra

wat

er a

nd la

nd re

sour

ces,

in

clud

ing

iden

tific

atio

n of

cu

rren

t and

pro

ject

ed

impa

cts,

and

re

com

men

datio

ns fo

r lan

d us

e zo

ning

.

Ter

ms

of R

efer

ence

for

surv

ey a

gree

d by

LIW

LMA

C

by D

ecem

ber

2010

C

onsu

ltant

/per

sonn

el fo

r st

udy

recr

uite

d by

Feb

ruar

y 20

111

Rev

iew

com

plet

ed a

nd re

port

prod

uced

by

June

201

1

Agr

eed

Ter

ms

of R

efer

ence

C

onsu

ltant

/per

sonn

el

cont

ract

s R

evie

w r

epor

t

Ava

ilabi

lity

of s

peci

alis

t with

ca

paci

ty to

reco

ncile

sc

ient

ific,

tech

nica

l, an

d po

litic

al is

sues

rela

ting

to th

e La

ura

area

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

cons

ulta

nt(s

)

2.4

Com

pila

tion

of e

xist

ing

data

an

d in

form

atio

n to

pro

duce

a

GIS

map

of l

and

use

and

pote

ntia

l sou

rces

of

pollu

tant

s in

the

Laur

a ar

ea

Land

use

, pol

luta

nt s

ourc

es,

grou

ndw

ater

wel

ls, a

nd w

ater

qu

ality

(DO

, pH

, Sal

inity

, co

lifor

m) f

or th

e La

ura

Wat

er

Lens

map

ped

to e

stab

lish

base

lines

by

June

201

1

Rep

ort i

nclu

ding

map

s of

la

nd u

se, p

ollu

tant

sou

rces

, rip

aria

n zo

nes,

gro

undw

ater

w

ells

, and

wat

er q

ualit

y of

th

e La

ura

Wat

er L

ens

revi

ewed

and

end

orse

d by

th

e LI

WLM

AC

Cap

acity

and

acc

ess

to

info

rmat

ion

and

data

E

xist

ing

info

rmat

ion

prov

ides

da

ta re

pres

enta

tive

of

base

line

cond

ition

s fo

r the

La

ura

Wat

er L

ens

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

2.5

Iden

tific

atio

n of

the

bene

fits

and

cost

s of

inte

grat

ed w

ater

an

d la

nd m

anag

emen

t in

the

Laur

a ar

ea w

ith: (

a)

iden

tific

atio

n of

wat

er

allo

catio

n is

sues

; (b)

tarif

fs

and

pric

e m

echa

nism

; (c)

Ter

ms

of R

efer

ence

de

velo

ped

by M

arch

201

0 In

itial

sur

vey

of s

take

hold

ers

and

info

rmat

ion

gath

erin

g by

Ju

ne 2

010

Dra

ft re

port

prod

uced

for

revi

ew b

y LI

WLM

AC

by

Stu

dy d

esig

n do

cum

ent

Con

sulta

nt/e

cono

mis

t re

crui

ted

Com

mitt

ee c

omm

ents

Fi

nal e

ndor

sed

repo

rt,

outli

ning

cos

ts a

nd b

enef

its

of w

ater

use

and

Cap

acity

and

acc

ess

to

info

rmat

ion

and

data

B

ias,

inco

nsis

tenc

ies,

and

S

econ

dary

dat

a so

urce

s

Prim

ary

data

sou

rces

pro

vide

re

pres

enta

tive

info

rmat

ion

with

out b

ias

and

abou

t wat

er

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), S

OP

AC

E

cono

mic

s A

dvis

er

Page 30: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

30

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

po

ssib

le e

xtra

ctio

n fe

e; a

nd

(d) p

ossi

ble

cost

sha

ring

arra

ngem

ents

(e.g

. pol

lute

r ve

rsus

ben

efic

iary

pay

s).

Sept

embe

r 201

0 Fi

nal r

epor

t pub

lishe

d an

d en

dors

ed b

y LI

WLM

AC b

y D

ecem

ber 2

010

man

agem

ent,

and

reco

mm

enda

tions

for p

ricin

g m

echa

nism

s an

d co

st

shar

ing

use

syst

em

Assu

mpt

ions

use

d in

ec

onom

ic a

naly

sis

are

clos

ely

alig

ned

to re

aliti

es o

f w

ater

use

and

man

agem

ent

syst

ems

in M

ajur

o

Com

pone

nt 3

: Dev

elop

men

t of a

Lau

ra In

tegr

ated

Wat

er a

nd L

and

Res

ourc

es M

anag

emen

t Pla

n 3.

1 Es

tabl

ishm

ent a

nd O

pera

tion

of a

Tec

hnic

al W

orki

ng

Gro

up o

f the

LIW

LMAC

to

deve

lop

a La

ura

Inte

grat

ed

Wat

er a

nd L

and

Res

ourc

es

Man

agem

ent P

lan

(LIW

LRM

P)

Term

s of

Ref

eren

ce a

nd

wor

k pr

ogra

mm

e de

velo

ped

by M

arch

201

1 W

orki

ng g

roup

mem

bers

id

entif

ied

with

agr

eed

mem

bers

hip

list b

y Ju

ne

2011

Term

s of

Ref

eren

ce

Wor

k pr

ogra

mm

e an

d tim

etab

le

Mem

bers

hip

list

Sum

mar

y re

port

of

LIW

LMAC

mee

ting

with

en

dors

emen

t of m

embe

rs

Min

utes

of

Avai

labl

e ex

perti

se in

the

LIW

LMAC

for i

nteg

rate

d m

anag

emen

t pla

n de

velo

pmen

t W

illing

ness

and

com

mitm

ent

of L

IWLM

AC m

embe

rs to

co

mm

it to

pla

n de

velo

pmen

t

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

3.2

Agre

emen

t bet

wee

n an

d am

ongs

t wat

er re

late

d ag

enci

es a

nd fu

ndin

g bo

dies

(b

oth

Gov

ernm

ent a

nd

exte

rnal

) of p

riorit

y w

ater

pr

oble

ms

and

requ

ired

man

agem

ent i

nter

vent

ions

at

Laur

a, in

clud

ing

benc

hmar

king

of c

urre

nt a

nd

plan

ned

proj

ects

and

fin

anci

ng le

vels

.

Rou

nd-T

able

mee

ting

of

amon

gst w

ater

rela

ted

agen

cies

and

fund

ing

bodi

es

conv

ened

by

Sep

tem

ber

2011

Pr

iorit

y w

ater

pro

blem

s at

La

ura

iden

tifie

d Pr

iorit

y m

anag

emen

t in

terv

entio

ns a

gree

d by

D

ecem

ber 2

011,

incl

udin

g co

mm

itmen

ts to

sup

port

man

agem

ent p

lan

appr

oach

Rep

ort o

f Rou

nd-T

able

m

eetin

g Ag

reed

list

of p

riorit

y w

ater

pr

oble

ms

at L

aura

C

once

pt n

otes

on

prio

rity

man

agem

ent i

nter

vent

ions

re

quire

d fo

r int

egra

ted

wat

er

and

land

man

agem

ent a

t La

ura

Rep

rese

ntat

ives

of

gove

rnm

ent a

genc

ies

and

dono

rs fa

milia

r with

Lau

ra

wat

er is

sues

In

abilit

y of

age

ncie

s an

d fu

ndin

g bo

dies

to a

gree

on

prio

rity

actio

ns d

ue to

lim

ited

scie

ntifi

c an

d te

chni

cal

info

rmat

ion

avai

labl

e fo

r the

ar

ea

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

3.3

Com

mun

ity fo

rum

mee

tings

to

agr

ee n

eeds

and

vis

ion

for

the

Laur

a co

mm

unity

for

inte

grat

ed w

ater

and

land

m

anag

emen

t at L

aura

, in

clud

ing

desi

red

man

agem

ent g

oals

, ob

ject

ives

, and

targ

eted

m

anag

emen

t act

ions

.

Com

mun

ity fo

rum

mee

tings

co

nven

ed to

Jun

e 20

13

Com

mun

ity n

eeds

and

vis

ion

agre

ed b

y co

mm

unity

re

pres

enta

tives

by

Augu

st

2011

C

omm

unity

asp

ects

of

man

agem

ent p

lan

deve

lope

d fo

r pre

sent

atio

n at

Rou

nd-

Sum

mar

y re

ports

of

com

mun

ity fo

rum

mee

tings

C

omm

unity

sta

tem

ent o

n ne

ed, v

isio

n, m

anag

emen

t go

als,

obj

ectiv

es, a

nd p

riorit

y m

anag

emen

t act

ions

Li

st o

f key

con

side

ratio

ns fo

r co

mm

unity

ele

men

ts o

f m

anag

emen

t pla

n

Cap

acity

of p

artic

ipan

ts in

co

mm

unity

foru

m to

co

ncep

tual

ise

broa

d ra

nge

of

issu

es in

pla

nnin

g in

tegr

ated

w

ater

and

land

man

agem

ent

at L

aura

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC,

and

com

mun

ity

mem

bers

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

Ta

ble

(see

3.2

) 3.

4 D

raft

Laur

a In

tegr

ated

Wat

er

and

Land

Res

ourc

es

Man

agem

ent P

lan,

incl

udin

g ta

rget

ed c

oste

d ac

tion

plan

an

d fin

anci

ng m

echa

nism

s pr

esen

ted

to L

aura

co

mm

unity

for c

omm

ent a

nd

revi

ewed

by

and

endo

rsed

by

LIW

LMAC

for s

ubm

issi

on

to c

abin

et

Firs

t dra

ft m

anag

emen

t pla

n de

velo

ped

for c

omm

ent f

rom

go

vern

men

t, pr

ivat

e se

ctor

, co

mm

unity

, NG

O a

nd o

ther

ci

vil s

ocie

ty g

roup

s by

D

ecem

ber 2

012

Laur

a st

akeh

olde

r w

orks

hop(

s) to

pre

sent

and

di

scus

s m

anag

emen

t pla

n an

d ta

rget

ed c

oste

d ac

tion

plan

(Jan

uary

-Mar

ch 2

012)

M

anag

emen

t pla

n su

bmitt

ed

to c

abin

et b

y Ju

ne 2

013

Firs

t dra

ft m

anag

emen

t pla

n St

akeh

olde

r com

men

ts

Sum

mar

y re

ports

of

stak

ehol

der w

orks

hops

in

clud

ing

parti

cipa

nt li

sts

Fina

l man

agem

ent p

lan

subm

itted

to C

abin

et

Willi

ngne

ss a

nd c

omm

itmen

t of

sta

keho

lder

s to

con

tribu

te

to

Abili

ty to

reac

h ag

reem

ent

betw

een

gove

rnm

ent,

land

owne

rs, a

nd o

ther

st

akeh

olde

rs o

n th

e fin

anci

ng

of m

anag

emen

t pla

n im

plem

enta

tion

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

3.5

Laur

a In

tegr

ated

Wat

er a

nd

Land

Res

ourc

es

Man

agem

ent P

lan

and

Actio

n P

lan

subm

itted

for

Cab

inet

end

orse

men

t

Firs

t dra

ft ac

tion

plan

for

com

mun

ity c

onsu

ltatio

n by

M

arch

201

3 Ac

tion

plan

agr

eed

and

endo

rsed

by

LIW

LMAC

and

su

bmitt

ed to

cab

inet

by

June

20

13

Firs

t dra

ft m

anag

emen

t pla

n St

akeh

olde

r com

men

ts

Sum

mar

y re

ports

of

stak

ehol

der w

orks

hops

in

clud

ing

parti

cipa

nt li

sts

Fina

l man

agem

ent p

lan

subm

itted

to C

abin

et

Willi

ngne

ss a

nd c

omm

itmen

t of

sta

keho

lder

s to

con

tribu

te

to

Abili

ty to

reac

h ag

reem

ent

betw

een

gove

rnm

ent,

land

owne

rs, a

nd o

ther

st

akeh

olde

rs o

n th

e fin

anci

ng

of m

anag

emen

t pla

n im

plem

enta

tion

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

C

ompo

nent

4: T

arge

ted

Stre

ss R

educ

tion

Dem

onst

ratio

ns fo

r the

Lau

ra W

ater

Len

s

Sub-

Com

pone

nt 4

.1 –

Red

ucin

g St

ress

from

Ove

rload

ed a

nd L

eaki

ng S

eptic

Sys

tem

s at

Lau

ra

4.1.

1 D

evel

opm

ent o

f a s

eptic

m

onito

ring,

col

lect

ion,

and

di

spos

al p

rogr

am to

: (a)

m

onito

r sew

age

leve

ls o

f se

ptic

tank

s at

Lau

ra; a

nd (b

) in

itiat

e tim

ely

sew

age

colle

ctio

n fro

m o

verlo

aded

an

d le

akin

g se

ptic

sys

tem

s an

d su

bseq

uent

dis

posa

l us

ing

Maj

uro’

s pu

blic

sew

er

syst

em. [

Activ

ity 2

.2 to

Land

owne

r agr

eem

ent o

n sy

stem

for m

onito

ring

sept

ic

stat

us b

y D

ecem

ber 2

011

Rem

edia

tion

actio

ns

incl

udin

g pu

mpi

ng o

f ov

erlo

aded

and

leak

ing

sept

ics

unde

rway

by

June

20

12

All o

verlo

aded

and

leak

ing

sept

ics

clea

n an

d op

erat

iona

l by

Jun

e 20

13

Tech

nica

l rep

ort a

nd

educ

atio

n m

ater

ials

on

sept

ic

mon

itorin

g, c

olle

ctio

n, a

nd

disp

osal

sys

tem

N

umbe

r of c

lean

sep

tic

syst

ems

Volu

me

of s

eptic

was

te

colle

cted

and

saf

ely

disp

osed

Willi

ngne

ss a

nd a

gree

men

t of

land

owne

rs to

par

ticip

ate

in s

eptic

mon

itorin

g Av

aila

bilit

y of

sep

tic p

ump

truck

Ab

ility

of M

ajur

o to

wn

sew

age

syst

em to

cop

e w

ith

sept

ic w

aste

dis

posa

l Av

aila

ble

hum

an re

sour

ces

for s

eptic

rem

edia

tion

wor

ks

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC,

Maj

uro

Wat

er a

nd

Sew

age

Com

pany

(N

WSC

)

Page 31: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

31

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

Ta

ble

(see

3.2

) 3.

4 D

raft

Laur

a In

tegr

ated

Wat

er

and

Land

Res

ourc

es

Man

agem

ent P

lan,

incl

udin

g ta

rget

ed c

oste

d ac

tion

plan

an

d fin

anci

ng m

echa

nism

s pr

esen

ted

to L

aura

co

mm

unity

for c

omm

ent a

nd

revi

ewed

by

and

endo

rsed

by

LIW

LMAC

for s

ubm

issi

on

to c

abin

et

Firs

t dra

ft m

anag

emen

t pla

n de

velo

ped

for c

omm

ent f

rom

go

vern

men

t, pr

ivat

e se

ctor

, co

mm

unity

, NG

O a

nd o

ther

ci

vil s

ocie

ty g

roup

s by

D

ecem

ber 2

012

Laur

a st

akeh

olde

r w

orks

hop(

s) to

pre

sent

and

di

scus

s m

anag

emen

t pla

n an

d ta

rget

ed c

oste

d ac

tion

plan

(Jan

uary

-Mar

ch 2

012)

M

anag

emen

t pla

n su

bmitt

ed

to c

abin

et b

y Ju

ne 2

013

Firs

t dra

ft m

anag

emen

t pla

n St

akeh

olde

r com

men

ts

Sum

mar

y re

ports

of

stak

ehol

der w

orks

hops

in

clud

ing

parti

cipa

nt li

sts

Fina

l man

agem

ent p

lan

subm

itted

to C

abin

et

Willi

ngne

ss a

nd c

omm

itmen

t of

sta

keho

lder

s to

con

tribu

te

to

Abili

ty to

reac

h ag

reem

ent

betw

een

gove

rnm

ent,

land

owne

rs, a

nd o

ther

st

akeh

olde

rs o

n th

e fin

anci

ng

of m

anag

emen

t pla

n im

plem

enta

tion

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

3.5

Laur

a In

tegr

ated

Wat

er a

nd

Land

Res

ourc

es

Man

agem

ent P

lan

and

Actio

n P

lan

subm

itted

for

Cab

inet

end

orse

men

t

Firs

t dra

ft ac

tion

plan

for

com

mun

ity c

onsu

ltatio

n by

M

arch

201

3 Ac

tion

plan

agr

eed

and

endo

rsed

by

LIW

LMAC

and

su

bmitt

ed to

cab

inet

by

June

20

13

Firs

t dra

ft m

anag

emen

t pla

n St

akeh

olde

r com

men

ts

Sum

mar

y re

ports

of

stak

ehol

der w

orks

hops

in

clud

ing

parti

cipa

nt li

sts

Fina

l man

agem

ent p

lan

subm

itted

to C

abin

et

Willi

ngne

ss a

nd c

omm

itmen

t of

sta

keho

lder

s to

con

tribu

te

to

Abili

ty to

reac

h ag

reem

ent

betw

een

gove

rnm

ent,

land

owne

rs, a

nd o

ther

st

akeh

olde

rs o

n th

e fin

anci

ng

of m

anag

emen

t pla

n im

plem

enta

tion

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

C

ompo

nent

4: T

arge

ted

Stre

ss R

educ

tion

Dem

onst

ratio

ns fo

r the

Lau

ra W

ater

Len

s

Sub-

Com

pone

nt 4

.1 –

Red

ucin

g St

ress

from

Ove

rload

ed a

nd L

eaki

ng S

eptic

Sys

tem

s at

Lau

ra

4.1.

1 D

evel

opm

ent o

f a s

eptic

m

onito

ring,

col

lect

ion,

and

di

spos

al p

rogr

am to

: (a)

m

onito

r sew

age

leve

ls o

f se

ptic

tank

s at

Lau

ra; a

nd (b

) in

itiat

e tim

ely

sew

age

colle

ctio

n fro

m o

verlo

aded

an

d le

akin

g se

ptic

sys

tem

s an

d su

bseq

uent

dis

posa

l us

ing

Maj

uro’

s pu

blic

sew

er

syst

em. [

Activ

ity 2

.2 to

Land

owne

r agr

eem

ent o

n sy

stem

for m

onito

ring

sept

ic

stat

us b

y D

ecem

ber 2

011

Rem

edia

tion

actio

ns

incl

udin

g pu

mpi

ng o

f ov

erlo

aded

and

leak

ing

sept

ics

unde

rway

by

June

20

12

All o

verlo

aded

and

leak

ing

sept

ics

clea

n an

d op

erat

iona

l by

Jun

e 20

13

Tech

nica

l rep

ort a

nd

educ

atio

n m

ater

ials

on

sept

ic

mon

itorin

g, c

olle

ctio

n, a

nd

disp

osal

sys

tem

N

umbe

r of c

lean

sep

tic

syst

ems

Volu

me

of s

eptic

was

te

colle

cted

and

saf

ely

disp

osed

Willi

ngne

ss a

nd a

gree

men

t of

land

owne

rs to

par

ticip

ate

in s

eptic

mon

itorin

g Av

aila

bilit

y of

sep

tic p

ump

truck

Ab

ility

of M

ajur

o to

wn

sew

age

syst

em to

cop

e w

ith

sept

ic w

aste

dis

posa

l Av

aila

ble

hum

an re

sour

ces

for s

eptic

rem

edia

tion

wor

ks

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC,

Maj

uro

Wat

er a

nd

Sew

age

Com

pany

(N

WSC

)

Out

put

No.

O

utpu

t/O

utco

me

Key

Ind

icat

ors

Mea

ns o

f V

erifi

catio

n

Ass

umpt

ion

s/R

isks

R

espo

nsib

le

Par

tner

s pr

ovid

e ba

selin

e in

form

atio

n]

Rel

iabl

e co

st e

stim

ate

of

sept

ic m

aint

enan

ce a

nd

annu

al c

olle

ctio

n vo

lum

es

agre

ed b

y LI

WLM

AC

by

Mar

ch 2

013

4.1.

2 C

ompo

stin

g to

ilet d

esig

ned

and

oper

atio

nal a

t cen

tral

La

ura

loca

tion,

incl

udin

g:

surv

ey o

f com

mun

ity

perc

eptio

ns; p

refe

rred

des

ign

feat

ures

; and

ope

ratio

nal

cons

ider

atio

ns.

Rep

ort o

f com

mun

ity

perc

eptio

ns a

nd d

esire

d de

sign

feat

ure

surv

ey b

y D

ecem

ber

2011

S

elec

tion

and

inst

alla

tion

of

one

dem

onst

ratio

n co

mpo

stin

g to

ilet b

y M

arch

20

12

Com

mun

ity d

emon

stra

tion

of

com

post

ing

toile

t and

use

of

com

post

by

June

201

3

Tec

hnic

al r

epor

t of s

urve

y re

sults

T

echn

ical

not

e on

com

mun

ity

pref

erre

d de

sign

(s)

for

com

post

ing

toile

t C

ompo

stin

g to

ilet o

pera

tiona

l by

Jun

e 20

13

Will

ingn

ess

of c

omm

unity

m

embe

rs to

par

ticip

ate

in

surv

ey

Sur

vey

resu

lts p

rovi

de

repr

esen

tativ

e in

form

atio

n an

d da

ta fo

r se

tting

rea

listic

ba

selin

es

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, and

LI

WLM

AC

S

ub-C

ompo

nent

4.2

– R

educ

ing

Str

ess

from

Dom

esti

c S

olid

Was

te L

each

ate

Pol

lutio

n at

Lau

ra

4.2.

1 B

ased

on

resu

lts o

f 2.2

de

velo

p co

mm

unity

-bas

ed

proj

ect f

or s

olid

dom

estic

w

aste

man

agem

ent a

t Lau

ra

Com

mun

ity a

gree

men

t on

proj

ect c

once

pt fo

r do

mes

tic

solid

was

te d

emon

stra

tion

by

Dec

embe

r 20

11

Com

mun

ity b

ased

pro

ject

ex

ecut

ed b

y D

ecem

ber

2012

Rep

ort o

f com

mun

ity

mee

tings

and

pro

ject

con

cept

do

cum

ent

Pro

ject

pro

posa

l and

ev

alua

tions

Will

ingn

ess

and

com

mitm

ent

of la

ndow

ners

and

co

mm

unity

mem

bers

to

sust

aina

ble

was

te

man

agem

ent

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, and

LI

WLM

AC

4.2.

2 C

omm

unity

sur

vey

of

num

bers

, typ

es, a

nd s

uita

ble

loca

tions

for

solid

was

te b

ins

and

disp

osal

are

as

Tec

hnic

al r

epor

t of s

urve

y by

Ju

ne 2

011

Tec

hnic

al r

epor

t M

ap o

f sui

tabl

e lo

catio

ns fo

r bi

ns a

nd d

ispo

sal a

reas

Sur

vey

resp

onse

s re

flect

co

mm

unity

nee

ds

RM

IEP

A a

nd G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

4.

2.3

Dev

elop

men

t of e

duca

tion

mat

eria

ls a

nd a

ctiv

ities

to

info

rm th

e co

mm

unity

on

dom

estic

was

te m

anag

emen

t (li

nk to

com

pone

nt 5

).

Edu

catio

n m

ater

ials

pr

oduc

ed b

y M

arch

201

2 M

ater

ials

dis

trib

uted

to a

ll La

ura

land

owne

rs a

nd

disp

laye

d at

pro

min

ent

loca

tions

in L

aura

(A

pril

2012

Dec

embe

r 20

13)

Pos

ters

, bro

chur

es, v

ideo

s et

c pr

oduc

ed

Num

ber

of e

duca

tion

pack

ages

pro

duce

d an

d di

strib

uted

Ava

ilabl

e ex

pert

ise

for

prod

uctio

n of

com

mun

ity

educ

atio

n an

d aw

aren

ess

mat

eria

ls

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, Mar

shal

l Is

land

s C

onse

rvat

ion

Soc

iety

(M

ICS

)

Sub

-Com

pone

nt 4

.3 –

Bui

ldin

g C

apac

ity o

f P

ig F

arm

ers

to R

educ

e S

tres

s on

the

Lau

ra W

ater

Len

s 4.

3.1

Iden

tific

atio

n of

prio

rity

pig

Pig

farm

site

s id

entif

ied

by

Map

dep

ictin

g pi

gger

y si

tes

Site

s se

lect

ed a

re

RM

IEP

A, G

EF

Page 32: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

32

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

fa

rms

for i

nvol

vem

ent i

n tri

al,

pref

erab

ly fa

rms

loca

ted

in

low

-lyin

g co

asta

l lan

ds

adja

cent

to w

ater

lens

Dec

embe

r 201

1 Ag

reem

ent o

f lan

dow

ners

/ fa

rmer

s to

par

ticip

ate

in p

ilot

activ

ity

to b

e us

ed in

tria

l act

ivity

M

inut

es o

f mee

tings

with

la

ndow

ners

rega

rdin

g th

eir

parti

cipa

tion

in tr

ial

repr

esen

tativ

e of

prio

rity

area

s fo

r act

ion

Pig

farm

er w

illin

g to

be

invo

lved

in p

ilot a

ctiv

ity

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

land

owne

rs

4.3.

2 Id

entif

icat

ion

and

deve

lopm

ent o

f tec

hniq

ues

for t

he u

se o

f coc

onut

hus

k in

dry

litte

r was

te

man

agem

ent a

t sel

ecte

d pi

gger

ies,

spe

cific

ally

to

prod

uce

com

post

for m

arke

t ga

rden

ferti

liser

Com

mun

ity tr

aini

ng

wor

ksho

p co

nven

ed b

y Ju

ne

2012

Pi

g fa

rmer

usi

ng w

aste

and

sh

redd

ed c

ocon

ut h

usk

to

prod

uce

com

post

by

Sept

embe

r 201

2 M

etho

d as

sess

ed fo

r re

plic

atio

n/up

take

by

othe

r pi

gger

ies

by M

arch

201

3 C

oope

ratio

n w

ith o

ther

pr

ojec

ts a

s ap

prop

riate

R

elia

ble

cost

est

imat

es o

f co

mpo

st p

rodu

ctio

n by

M

arch

201

3

Com

mun

ity tr

aini

ng m

ater

ials

Su

mm

ary

repo

rt of

co

mm

unity

trai

ning

w

orks

hop,

incl

udin

g au

dio-

visu

al p

rese

ntat

ions

N

umbe

r of p

ig fa

rmer

s tri

allin

g co

conu

t hus

k as

dry

lit

ter f

or c

ompo

st p

rodu

ctio

n Te

chni

cal r

epor

t det

ailin

g as

sess

men

t of t

he m

etho

d an

d re

liabl

e co

st e

stim

ates

Willi

ngne

ss o

f lan

dow

ners

to

trial

new

pig

was

te

man

agem

ent t

echn

ique

s an

d pa

rtici

pate

in tr

aini

ng e

vent

s Av

aila

bilit

y of

coc

onut

hus

k

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

land

owne

rs

4.3.

3 Es

tabl

ishm

ent o

f com

mun

al

com

post

ing

site

for

prod

uctio

n of

pig

was

te

ferti

liser

Com

mun

al c

ompo

stin

g si

te

esta

blis

hed

and

in o

pera

tion,

an

d fo

llow

ing

best

pra

ctic

es

for w

aste

han

dlin

g by

D

ecem

ber 2

012

Com

post

ing

site

ope

ratin

g Vo

lum

e of

was

te p

roce

ssed

an

d co

mpo

st p

rodu

ced

Avai

labi

lity

of la

nd

Best

was

te m

anag

emen

t pr

actic

es e

nsur

e co

mpo

st

prod

uctio

n do

es n

ot im

pact

on

Lau

ra le

ns w

ater

qua

lity

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

land

owne

rs

C

ompo

nent

5: E

nhan

cing

Aw

aren

ess

and

Und

erst

andi

ng o

f the

Lau

ra W

ater

Len

s

Sub-

Com

pone

nt 5

.1: P

ublic

Aw

aren

ess

5.1.

1 La

ura

Wat

er L

ens

Lear

ning

C

ente

r in

the

Laur

a Ar

ea to

as

sist

with

pro

mot

ion

of

dem

onst

ratio

n pr

ojec

t and

di

ssem

inat

ion

of in

form

atio

n m

ater

ials

Com

mun

ity s

uppo

rt fo

r es

tabl

ishm

ent o

f Cen

ter

Lear

ning

Cen

ter l

ocat

ion

agre

ed, l

aunc

hed,

and

op

erat

iona

l by

June

201

1

Min

utes

of L

IWLM

AC

mee

tings

agr

eein

g to

loca

tion

Lear

ning

Cen

ter o

pera

tiona

l N

umbe

r of d

ays

open

and

st

affe

d N

umbe

r of v

isito

rs

Agr

eem

ent a

nd s

uppo

rt of

LI

WLM

AC fo

r Lea

rnin

g C

ente

r Av

aila

bilit

y an

d co

st o

f pr

emis

es

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

5.1.

2 Ex

hibi

tion

mat

eria

ls fo

r the

Le

arni

ng C

ente

r, in

clud

ing:

le

arni

ng d

ispl

ays

(e.g

. po

ster

s), i

nter

activ

e

Lear

ning

Cen

ter c

onta

inin

g ex

hibi

tion

mat

eria

ls (o

ngoi

ng

June

201

1-D

ecem

ber 2

013)

Le

arni

ng d

ispl

ays

depi

ctin

g

Num

ber o

f Lau

ra W

ater

Len

s m

anag

emen

t iss

ues

addr

esse

d by

lear

ning

di

spla

ys

Avai

labl

e ex

perti

se to

pr

oduc

e en

gagi

ng a

nd

info

rmat

ive

exhi

bitio

n m

ater

ials

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), L

IWLM

AC,

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

da

taba

se/D

VD-R

OM

of

info

rmat

ion

and

data

rela

ting

to L

aura

wat

er le

ns, a

nd

audi

o-vi

sual

mat

eria

ls (e

.g.

vide

os).

prog

ress

and

resu

lts o

f st

ress

redu

ctio

n de

mo

activ

ities

on

disp

lay

from

Ju

ne 2

011

and

upda

ted

regu

larly

In

tera

ctiv

e D

VD

-RO

M o

f La

ura

Wat

er L

ens

info

rmat

ion

prod

uced

by

June

201

2

Freq

uenc

y at

whi

ch

info

rmat

ion

from

stre

ss

redu

ctio

n de

mon

stra

tions

are

di

spla

yed

Num

ber o

f req

uest

s fo

r co

pies

of l

earn

ing

mat

eria

ls,

DVD

-RO

M, a

udio

-vis

ual

prod

ucts

Cos

ts o

f exh

ibiti

on m

ater

ial

prod

uctio

n an

d re

quire

d te

chno

logy

(prin

ting

etc)

on

Maj

uro

Ato

ll St

ress

redu

ctio

n de

mo

activ

ities

pro

vide

tang

ible

ex

ampl

es o

f goo

d pr

actic

es

in in

tegr

ated

wat

er a

nd la

nd

man

agem

ent

MIC

S, a

nd

stud

ent v

olun

teer

s

5.1.

3 Pr

omot

ion

of L

earn

ing

Cen

ter r

ole

via

loca

l rad

io,

loca

l and

regi

onal

tele

visi

on

and

prin

t med

ia, a

nd a

pr

ogra

mm

e of

vis

its b

y sc

hool

s an

d ot

her c

ivil

soci

ety

grou

ps

Rad

io, t

elev

isio

n, a

nd

new

spap

er n

ews

item

s on

C

ente

r (on

goin

g 20

11-2

013)

Pr

ogra

mm

e of

vis

its b

y sc

hool

s an

d ot

her g

roup

s un

derw

ay b

y M

arch

201

2

Num

ber o

f rad

io, t

elev

isio

n,

and

new

spap

er n

ews

item

s N

umbe

r of g

roup

s vi

sits

and

to

tal n

umbe

r of v

isito

rs

Num

ber o

f req

uest

s to

vis

it C

ente

r or f

or in

form

atio

n

Lear

ning

Cen

ter e

xhib

ition

s an

d ac

tiviti

es c

onsi

dere

d ne

wsw

orth

y by

loca

l new

s In

tere

st o

f sch

ools

and

oth

er

grou

ps in

Lau

ra w

ater

lens

is

sues

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

5.1.

4 N

etw

ork

of lo

cal j

ourn

alis

ts

and

gove

rnm

ent

com

mun

icat

ions

sta

ff to

or

gani

se te

levi

sion

and

radi

o br

oadc

asts

and

new

s ar

ticle

s ab

out w

ater

con

serv

atio

n an

d st

ress

redu

ctio

n de

mon

stra

tion

activ

ities

Mee

ting(

s) o

f loc

al jo

urna

lists

an

d go

vern

men

t co

mm

unic

atio

ns s

taff

conv

ened

by

Dec

embe

r 201

1 In

form

atio

n an

d pr

ess

rele

ases

on

dem

onst

ratio

n pr

ojec

t act

iviti

es d

istri

bute

d to

net

wor

k of

jour

nalis

ts o

n a

quar

terly

bas

is

Min

utes

of m

eetin

g(s)

with

lo

cal j

ourn

alis

ts a

nd

com

mun

icat

ions

sta

ff N

umbe

r of i

nfor

mat

ion

pack

ages

and

pre

ss re

leas

es

issu

ed to

net

wor

k N

umbe

r of n

ews

item

s fro

m

pres

s re

leas

es

Inte

rest

and

sup

port

amon

gst

loca

l jou

rnal

ists

for w

ater

re

sour

ce m

anag

emen

t and

sa

nita

tion

issu

es o

n M

ajur

o Av

aila

bilit

y of

jour

nalis

ts to

m

eet a

nd p

lan

wat

er a

nd

sani

tatio

n co

mm

unic

atio

ns

actio

ns

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

5.1.

5 La

ura

Wat

er L

ens

web

site

ba

sed

on O

pen

Sour

ce

Con

tent

Man

agem

ent

Sys

tem

Sof

twar

e (e

.g.

Joom

la) t

o ac

t as

a ce

ntra

l re

posi

tory

of i

nfor

mat

ion

and

data

rela

ting

to in

tegr

ated

w

ater

and

land

man

agem

ent

at L

aura

Laur

a W

ater

Len

s w

ebsi

te

oper

atio

nal b

y M

arch

201

1 W

ebsi

te c

onta

inin

g al

l pro

ject

re

late

d do

cum

ents

, in

form

atio

n, d

ata,

and

aud

io-

visu

al o

utpu

ts (o

ngoi

ng)

Web

site

acc

essi

ble

at

http

://w

ww

.laur

awat

er.o

rg

Num

ber o

f pro

ject

rela

ted

docu

men

ts, n

ews

stor

ies,

ph

otog

raph

s, a

nd o

ther

ou

tput

s ac

cess

ible

onl

ine

Num

ber o

f web

site

s w

ith

links

to L

aura

pro

ject

site

G

oogl

e ra

nk fo

r sea

rch

on

“Lau

ra W

ater

Len

s”

Acce

ssib

ility

to e

xper

tise

for

onlin

e C

onte

nt M

anag

emen

t S

yste

m s

etup

and

m

anag

emen

t Lo

cal I

nter

net c

onne

ctio

n sp

eed

and

relia

bilit

y en

able

s ef

ficie

nt u

ploa

ding

of p

roje

ct

info

rmat

ion

and

outp

uts

GEF

IWR

M

Proj

ect

Man

agem

ent U

nit

(RM

I)

5.1.

6 El

ectro

nic

diss

emin

atio

n of

a

Proj

ect E

-New

slet

ter s

ent

Cop

ies

of e

-new

slet

ter

Qua

rterly

e-n

ewsl

ette

r is

Proj

ect

Page 33: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

33

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

da

taba

se/D

VD-R

OM

of

info

rmat

ion

and

data

rela

ting

to L

aura

wat

er le

ns, a

nd

audi

o-vi

sual

mat

eria

ls (e

.g.

vide

os).

prog

ress

and

resu

lts o

f st

ress

redu

ctio

n de

mo

activ

ities

on

disp

lay

from

Ju

ne 2

011

and

upda

ted

regu

larly

In

tera

ctiv

e D

VD

-RO

M o

f La

ura

Wat

er L

ens

info

rmat

ion

prod

uced

by

June

201

2

Freq

uenc

y at

whi

ch

info

rmat

ion

from

stre

ss

redu

ctio

n de

mon

stra

tions

are

di

spla

yed

Num

ber o

f req

uest

s fo

r co

pies

of l

earn

ing

mat

eria

ls,

DVD

-RO

M, a

udio

-vis

ual

prod

ucts

Cos

ts o

f exh

ibiti

on m

ater

ial

prod

uctio

n an

d re

quire

d te

chno

logy

(prin

ting

etc)

on

Maj

uro

Ato

ll St

ress

redu

ctio

n de

mo

activ

ities

pro

vide

tang

ible

ex

ampl

es o

f goo

d pr

actic

es

in in

tegr

ated

wat

er a

nd la

nd

man

agem

ent

MIC

S, a

nd

stud

ent v

olun

teer

s

5.1.

3 Pr

omot

ion

of L

earn

ing

Cen

ter r

ole

via

loca

l rad

io,

loca

l and

regi

onal

tele

visi

on

and

prin

t med

ia, a

nd a

pr

ogra

mm

e of

vis

its b

y sc

hool

s an

d ot

her c

ivil

soci

ety

grou

ps

Rad

io, t

elev

isio

n, a

nd

new

spap

er n

ews

item

s on

C

ente

r (on

goin

g 20

11-2

013)

Pr

ogra

mm

e of

vis

its b

y sc

hool

s an

d ot

her g

roup

s un

derw

ay b

y M

arch

201

2

Num

ber o

f rad

io, t

elev

isio

n,

and

new

spap

er n

ews

item

s N

umbe

r of g

roup

s vi

sits

and

to

tal n

umbe

r of v

isito

rs

Num

ber o

f req

uest

s to

vis

it C

ente

r or f

or in

form

atio

n

Lear

ning

Cen

ter e

xhib

ition

s an

d ac

tiviti

es c

onsi

dere

d ne

wsw

orth

y by

loca

l new

s In

tere

st o

f sch

ools

and

oth

er

grou

ps in

Lau

ra w

ater

lens

is

sues

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

5.1.

4 N

etw

ork

of lo

cal j

ourn

alis

ts

and

gove

rnm

ent

com

mun

icat

ions

sta

ff to

or

gani

se te

levi

sion

and

radi

o br

oadc

asts

and

new

s ar

ticle

s ab

out w

ater

con

serv

atio

n an

d st

ress

redu

ctio

n de

mon

stra

tion

activ

ities

Mee

ting(

s) o

f loc

al jo

urna

lists

an

d go

vern

men

t co

mm

unic

atio

ns s

taff

conv

ened

by

Dec

embe

r 201

1 In

form

atio

n an

d pr

ess

rele

ases

on

dem

onst

ratio

n pr

ojec

t act

iviti

es d

istri

bute

d to

net

wor

k of

jour

nalis

ts o

n a

quar

terly

bas

is

Min

utes

of m

eetin

g(s)

with

lo

cal j

ourn

alis

ts a

nd

com

mun

icat

ions

sta

ff N

umbe

r of i

nfor

mat

ion

pack

ages

and

pre

ss re

leas

es

issu

ed to

net

wor

k N

umbe

r of n

ews

item

s fro

m

pres

s re

leas

es

Inte

rest

and

sup

port

amon

gst

loca

l jou

rnal

ists

for w

ater

re

sour

ce m

anag

emen

t and

sa

nita

tion

issu

es o

n M

ajur

o Av

aila

bilit

y of

jour

nalis

ts to

m

eet a

nd p

lan

wat

er a

nd

sani

tatio

n co

mm

unic

atio

ns

actio

ns

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

5.1.

5 La

ura

Wat

er L

ens

web

site

ba

sed

on O

pen

Sour

ce

Con

tent

Man

agem

ent

Sys

tem

Sof

twar

e (e

.g.

Joom

la) t

o ac

t as

a ce

ntra

l re

posi

tory

of i

nfor

mat

ion

and

data

rela

ting

to in

tegr

ated

w

ater

and

land

man

agem

ent

at L

aura

Laur

a W

ater

Len

s w

ebsi

te

oper

atio

nal b

y M

arch

201

1 W

ebsi

te c

onta

inin

g al

l pro

ject

re

late

d do

cum

ents

, in

form

atio

n, d

ata,

and

aud

io-

visu

al o

utpu

ts (o

ngoi

ng)

Web

site

acc

essi

ble

at

http

://w

ww

.laur

awat

er.o

rg

Num

ber o

f pro

ject

rela

ted

docu

men

ts, n

ews

stor

ies,

ph

otog

raph

s, a

nd o

ther

ou

tput

s ac

cess

ible

onl

ine

Num

ber o

f web

site

s w

ith

links

to L

aura

pro

ject

site

G

oogl

e ra

nk fo

r sea

rch

on

“Lau

ra W

ater

Len

s”

Acce

ssib

ility

to e

xper

tise

for

onlin

e C

onte

nt M

anag

emen

t S

yste

m s

etup

and

m

anag

emen

t Lo

cal I

nter

net c

onne

ctio

n sp

eed

and

relia

bilit

y en

able

s ef

ficie

nt u

ploa

ding

of p

roje

ct

info

rmat

ion

and

outp

uts

GEF

IWR

M

Proj

ect

Man

agem

ent U

nit

(RM

I)

5.1.

6 El

ectro

nic

diss

emin

atio

n of

a

Proj

ect E

-New

slet

ter s

ent

Cop

ies

of e

-new

slet

ter

Qua

rterly

e-n

ewsl

ette

r is

Proj

ect

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n

Ass

umpt

ions

/Ris

ks

Res

pons

ible

P

artn

ers

quar

terly

dem

onst

ratio

n pr

ojec

t new

slet

ter

quar

terly

to p

roje

ct

stak

ehol

ders

Li

st o

f ind

ivid

uals

the

e-ne

wsl

ette

r is

sen

t to

suffi

cien

tly r

egul

ar

Man

agem

ent U

nit

S

ub-C

ompo

nent

5.2

: Tra

inin

g an

d E

duca

tion

5.2.

1 T

rain

ing

need

s as

sess

men

t an

d pr

epar

atio

n of

a tr

aini

ng

prog

ram

me

targ

etin

g go

vern

men

t offi

cers

and

lo

cal c

omm

uniti

es, i

nclu

ding

, id

entif

icat

ion

of n

eeds

for

spec

ific

trai

ning

in a

reas

su

ch a

s sa

nita

tion,

co

mpo

stin

g to

ilets

etc

.

Res

ults

of t

rain

ing

need

s as

sess

men

t gen

erat

ed b

y D

ecem

ber

2010

T

rain

ing

prog

ram

me

targ

et

audi

ence

, top

ics,

del

iver

y m

ode,

and

tim

etab

le a

gree

d by

LIW

LMA

C b

y M

arch

201

1

Rep

ort o

f tra

inin

g ne

eds

asse

ssm

ent

Tra

inin

g pr

ogra

mm

e re

port

, in

clud

ing

list o

f ind

ivid

uals

to

part

icip

ate,

topi

cs, d

eliv

ery

mod

e an

d tim

etab

le

Ava

ilabi

lity

of tr

aini

ng n

eeds

as

sess

men

t and

cap

acity

bu

ildin

g ex

pert

ise

Ava

ilabi

lity

of g

over

nmen

t of

ficer

s an

d co

mm

unity

m

embe

rs to

par

ticip

ate

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, and

LI

WLM

AC

5.2.

2 Im

plem

enta

tion

of th

e tr

aini

ng p

rogr

amm

e at

the

com

mun

ity

leve

l. It

is e

nvis

aged

that

trai

ning

ne

eds

may

incl

ude

but n

ot

be li

mite

d to

: prin

cipl

es a

nd

prac

tice

of w

ater

res

ourc

e m

anag

emen

t; sa

nita

tion

and

sust

aina

ble

solid

was

te

disp

osal

met

hods

; sep

tic

mai

nten

ance

and

re

med

iatio

n te

chni

ques

; w

ater

qua

lity

mon

itorin

g; a

nd

reso

urce

use

zon

ing.

Tra

inin

g co

nduc

ted

as

plan

ned

at 5

.2.1

dur

ing

perio

d A

pril

2011

Dec

embe

r 20

12

Tra

inin

g m

ater

ials

and

su

mm

arie

s lo

aded

to L

aura

pr

ojec

t web

site

with

in 2

w

eeks

of t

rain

ing

activ

ity

com

plet

ion

Sum

mar

ies

of a

ll tr

aini

ng

even

ts in

clud

ed in

qua

rter

ly

elec

tron

ic n

ewsl

ette

rs

Sur

vey

to m

easu

re s

kill

deve

lopm

ent (

ongo

ing

Apr

il 20

11 -

Mar

ch 2

013)

Num

ber

of tr

aini

ng e

vent

s N

umbe

r of

com

mun

ity

mem

bers

invo

lved

N

umbe

r of

trai

ning

mat

eria

ls

prod

uced

and

acc

essi

ble

on

the

proj

ect w

ebsi

te

Num

ber

of tr

aini

ng e

vent

su

mm

ary

repo

rts

and

thei

r in

clus

ion

in th

e qu

arte

rly e

-ne

wsl

ette

r R

esul

ts o

f ski

ll de

velo

pmen

t su

rvey

Ava

ilabi

lity

and

inte

rest

of

com

mun

ity m

embe

rs to

pa

rtic

ipat

e in

trai

ning

ac

tiviti

es

Ava

ilabl

e ex

pert

ise

to

deve

lop

and

deliv

er tr

aini

ng

mat

eria

ls to

add

ress

prio

rity

need

s fo

r co

mm

unity

m

embe

rs

Ski

ll de

velo

pmen

t sur

vey

prov

ides

rea

listic

bas

elin

es

and

mea

sure

s of

im

prov

emen

t

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, and

LI

WLM

AC

5.2.

3 Im

plem

enta

tion

of th

e ta

rget

ed tr

aini

ng p

rogr

amm

e fo

r go

vern

men

t age

ncie

s an

d pe

rson

nel.

It is

en

visa

ged

that

trai

ning

ne

eds

may

incl

ude

but n

ot

be li

mite

d to

: eco

nom

ic

valu

atio

n an

d co

st s

harin

g pr

inci

ples

; int

erpr

etat

ion

of

Tra

inin

g co

nduc

ted

as

plan

ned

at 5

.2.1

dur

ing

perio

d A

pril

2011

Dec

embe

r 20

12

Tra

inin

g m

ater

ials

and

su

mm

arie

s lo

aded

to L

aura

pr

ojec

t web

site

with

in 2

w

eeks

of t

rain

ing

activ

ity

com

plet

ion

Num

ber

of tr

aini

ng e

vent

s N

umbe

r of

gov

ernm

ent

invo

lved

N

umbe

r of

trai

ning

mat

eria

ls

prod

uced

and

acc

essi

ble

on

the

proj

ect w

ebsi

te

Num

ber

of tr

aini

ng e

vent

su

mm

ary

repo

rts

and

thei

r in

clus

ion

in th

e qu

arte

rly e

-

Ava

ilabi

lity

and

inte

rest

of

com

mun

ity m

embe

rs to

pa

rtic

ipat

e in

trai

ning

ac

tiviti

es

Ava

ilabl

e ex

pert

ise

to

deve

lop

and

deliv

er tr

aini

ng

mat

eria

ls to

add

ress

prio

rity

need

s fo

r co

mm

unity

m

embe

rs

RM

IEP

A, G

EF

IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

, and

LI

WLM

AC

Page 34: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

34

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

so

cio-

econ

omic

and

sci

entif

ic

data

and

its

use

in p

lann

ing

and

zoni

ng la

nd u

se; a

nd

IWR

M p

olic

y an

d pl

anni

ng.

Sum

mar

ies

of a

ll tra

inin

g ev

ents

incl

uded

in q

uarte

rly

elec

troni

c ne

wsl

ette

rs

Surv

ey to

mea

sure

ski

ll de

velo

pmen

t (on

goin

g A

pril

2011

- M

arch

201

3)

new

slet

ter

Res

ults

of s

kill

deve

lopm

ent

surv

ey

Skill

deve

lopm

ent s

urve

y pr

ovid

es re

alis

tic b

asel

ines

an

d m

easu

res

of

impr

ovem

ent

5.2.

4 Id

entif

icat

ion

of n

eeds

and

op

portu

nitie

s fo

r a g

roup

st

udy

tour

(inc

ludi

ng

RM

IEP

A m

anag

emen

t sta

ff an

d se

lect

ed N

GO

and

co

mm

unity

gro

up m

embe

rs

from

Lau

ra) t

o se

lect

ed G

EF

IWR

M d

emon

stra

tion

proj

ects

in th

e Pa

cific

regi

on.

Lear

ning

and

exc

hang

e ne

eds

and

oppo

rtuni

ties

with

ot

her G

EF d

emon

stra

tion

proj

ects

iden

tifie

d at

ann

ual

Reg

iona

l Ste

erin

g C

omm

ittee

M

eetin

gs

Stud

y to

ur c

onve

ned

by

Dec

embe

r 201

3

Rep

ublic

of M

arsh

all I

slan

ds’

lear

ning

and

exc

hang

e ne

eds

and

oppo

rtuni

ties

note

d in

ann

ual R

SC m

eetin

g re

port

Num

ber o

r par

ticip

ants

and

du

ratio

n of

lear

ning

ex

chan

ge s

tudy

tour

Avai

labi

lity

of re

gion

al fu

nds

or n

atio

nal d

emo

proj

ect

fund

s to

sup

port

lear

ning

ex

chan

ge

Suita

bilit

y of

oth

er G

EF

IWR

M d

emon

stra

tions

to

lear

ning

nee

ds o

f the

R

epub

lic o

f Mar

shal

l Isl

ands

RM

IEP

A, G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I), a

nd

LIW

LMAC

5.2.

5 Pr

epar

atio

n an

d di

strib

utio

n of

pos

ters

, bro

chur

es a

nd

book

lets

on

topi

cs o

f re

leva

nce

to IW

RM

and

W

ater

Use

Effi

cien

cy a

s id

entif

ied

in th

e tra

inin

g ne

eds

asse

ssm

ent.

Lear

ning

mat

eria

ls p

rodu

ced

and

dist

ribut

ed (o

ngoi

ng A

pril

2011

- M

arch

201

3)

Num

ber o

f boo

ks, b

roch

ures

, bo

okle

ts in

clud

ing

date

s of

co

mpl

etio

n D

istri

butio

n lis

ts (i

.e. w

ho

rece

ived

them

and

how

m

any)

Avai

labl

e ex

perti

se to

de

velo

p m

ater

ials

G

EF IW

RM

Pr

ojec

t M

anag

emen

t Uni

t (R

MI)

C

ompo

nent

6: M

anag

emen

t and

Coo

rdin

atio

n of

the

Laur

a D

emon

stra

tion

Proj

ect

6.1

Succ

essf

ul m

anag

emen

t, co

ordi

natio

n, a

nd

impl

emen

tatio

n of

: the

pr

ojec

t to

achi

eve

the

Dem

onst

ratio

n ob

ject

ives

an

d to

mee

t the

stra

tegi

c ne

eds

of th

e R

epub

lic o

f M

arsh

all I

slan

d’s

Envi

ronm

enta

l Pro

tect

ion

Auth

ority

.

Com

plet

ion

of p

lann

ed

activ

ities

agr

eed

with

R

MIE

PA,

LIW

LMAC

, the

R

egio

nal P

roje

ct M

anag

er,

and

the

Reg

iona

l Pro

ject

St

eerin

g C

omm

ittee

Pr

oduc

tion

of s

peci

fied

Dem

onst

ratio

n de

liver

able

s w

ithin

the

agre

ed p

erio

d an

d co

st

Qua

rterly

pro

gres

s re

ports

An

nual

Dem

onst

ratio

n Pr

ojec

t Im

plem

enta

tion

Rev

iew

Rep

orts

M

id-T

erm

Eva

luat

ion

Term

inal

Eva

luat

ion

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

C

onsi

sten

t env

ironm

enta

l co

nditi

ons,

e.g

., no

sev

ere,

le

ngth

y dr

ough

ts o

r oth

er

disa

ster

s w

hich

cou

ld re

quire

re

dire

ctio

n of

RM

IEPA

and

pr

ojec

t sta

ff tim

e Ad

equa

te p

artic

ipat

ion

of

stak

ehol

ders

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

6.2

Effe

ctiv

e pl

anni

ng a

nd

cont

rol o

f the

end

orse

d Bu

dget

sho

ws

diss

ecte

d es

timat

es o

f the

cos

t of k

ey

Annu

al b

udge

ts a

nd w

ork

plan

s C

onsi

sten

cy o

f sta

ffing

ar

rang

emen

ts a

t RM

IEP

A

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

de

mon

stra

tion

proj

ect

budg

et, i

nclu

ding

de

velo

pmen

t of c

ash

flow

pr

edic

tions

con

sist

ent w

ith

the

appr

oved

pro

ject

wor

k pl

an a

nd b

udge

t for

the

dura

tion

of th

e pr

ojec

t

dem

onst

ratio

n ac

tiviti

es b

y U

ND

P C

ost C

odes

Es

timat

es o

f cos

t for

a g

iven

ye

ar, f

utur

e ye

ars

and

the

dem

onst

ratio

n as

a w

hole

en

dors

ed b

y th

e R

egio

nal

Proj

ect S

teer

ing

Com

mitt

ee

Cas

h flo

w p

redi

ctio

ns

cons

iste

nt w

ith w

ork

plan

and

up

date

d on

a q

uarte

rly b

asis

Qua

rterly

bud

gets

and

wor

k pl

ans

Endo

rsem

ent o

f bud

get b

y LI

WLM

AC a

nd s

ubse

quen

t ap

prov

al b

y R

egio

nal

Stee

ring

Com

mitt

ee

mee

tings

Fina

ncia

l pla

nnin

g an

d m

anag

emen

t exp

ertis

e in

Pr

ojec

t Uni

t Man

agem

ent

Uni

t

Man

agem

ent U

nit

(RM

I)

6.3

Esta

blis

hmen

t and

effe

ctiv

e op

erat

ion

of a

Dem

onst

ratio

n Pr

ojec

t Man

agem

ent U

nit

(PM

U) t

o: (a

) man

age

the

inte

rface

bet

wee

n th

e le

ad

agen

cy a

nd th

e re

gion

al

Proj

ect C

oord

inat

ing

unit,

us

er g

roup

s, a

nd o

ther

st

akeh

olde

rs a

nd

gove

rnm

ent a

genc

ies;

and

to

(b) m

anag

e th

e co

nsul

tatio

n pr

oces

s to

ens

ure

com

preh

ensi

ve in

put f

rom

us

er g

roup

s an

d ot

her

stak

ehol

ders

into

the

deve

lopm

ent a

nd

impl

emen

tatio

n of

the

proj

ect

Proj

ect M

anag

er a

nd

Assi

stan

t con

tract

s O

ffice

est

ablis

hed

with

ne

cess

ary

com

mun

icat

ion

tech

nolo

gy

Proj

ect i

ssue

s de

alt w

ith a

s th

ey a

rise,

incl

udin

g id

entif

icat

ion

of o

ptio

ns fo

r th

eir r

esol

utio

n Pr

ojec

t coo

rdin

atio

n m

eetin

gs c

onve

ned

regu

larly

an

d ac

cord

ing

to w

ork

plan

Pr

ojec

t pro

gres

s an

d fin

anci

al re

ports

sub

mitt

ed

quar

terly

to re

gion

al P

CU

M

aint

enan

ce o

f acc

urat

e re

cord

s of

mee

tings

, rep

orts

, fin

anci

al m

onito

ring

data

, sp

ecifi

catio

ns, a

nd b

riefs

re

late

d to

the

impl

emen

tatio

n of

the

proj

ect

Qua

rterly

pro

gres

s re

ports

An

nual

Dem

onst

ratio

n Pr

ojec

t Im

plem

enta

tion

Rev

iew

Rep

orts

M

id-T

erm

Eva

luat

ion

Term

inal

Eva

luat

ion

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

C

onsi

sten

t env

ironm

enta

l co

nditi

ons,

e.g

., no

sev

ere,

le

ngth

y dr

ough

ts o

r oth

er

disa

ster

s w

hich

cou

ld re

quire

re

dire

ctio

n of

RM

IEPA

and

pr

ojec

t sta

ff tim

e Ad

equa

te p

artic

ipat

ion

of

stak

ehol

ders

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

6.4

Con

sist

ency

bet

wee

n th

e va

rious

pro

ject

com

pone

nts

and

rela

ted

activ

ities

pr

ovid

ed o

r fun

ded

by o

ther

do

nor o

rgan

isat

ions

, in

clud

ing

real

isat

ion

of c

o-

Des

ign

of n

ew w

ater

and

la

nd p

roje

cts

and

prog

ram

mes

at L

aura

, bot

h go

vern

men

t and

ext

erna

lly

fund

ed, c

onsi

sten

t with

de

mon

stra

tion

proj

ect

Qua

rterly

pro

gres

s re

ports

An

nual

Dem

onst

ratio

n Pr

ojec

t Im

plem

enta

tion

Rev

iew

Rep

orts

M

id-T

erm

Eva

luat

ion

Term

inal

Eva

luat

ion

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

W

illing

ness

of o

ther

pro

ject

s an

d do

nors

to c

olla

bora

te

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

Page 35: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

35

Out

put

No.

O

utpu

t/Out

com

e K

ey In

dica

tors

M

eans

of V

erifi

catio

n A

ssum

ptio

ns/R

isks

R

espo

nsib

le

Part

ners

de

mon

stra

tion

proj

ect

budg

et, i

nclu

ding

de

velo

pmen

t of c

ash

flow

pr

edic

tions

con

sist

ent w

ith

the

appr

oved

pro

ject

wor

k pl

an a

nd b

udge

t for

the

dura

tion

of th

e pr

ojec

t

dem

onst

ratio

n ac

tiviti

es b

y U

ND

P C

ost C

odes

Es

timat

es o

f cos

t for

a g

iven

ye

ar, f

utur

e ye

ars

and

the

dem

onst

ratio

n as

a w

hole

en

dors

ed b

y th

e R

egio

nal

Proj

ect S

teer

ing

Com

mitt

ee

Cas

h flo

w p

redi

ctio

ns

cons

iste

nt w

ith w

ork

plan

and

up

date

d on

a q

uarte

rly b

asis

Qua

rterly

bud

gets

and

wor

k pl

ans

Endo

rsem

ent o

f bud

get b

y LI

WLM

AC a

nd s

ubse

quen

t ap

prov

al b

y R

egio

nal

Stee

ring

Com

mitt

ee

mee

tings

Fina

ncia

l pla

nnin

g an

d m

anag

emen

t exp

ertis

e in

Pr

ojec

t Uni

t Man

agem

ent

Uni

t

Man

agem

ent U

nit

(RM

I)

6.3

Esta

blis

hmen

t and

effe

ctiv

e op

erat

ion

of a

Dem

onst

ratio

n Pr

ojec

t Man

agem

ent U

nit

(PM

U) t

o: (a

) man

age

the

inte

rface

bet

wee

n th

e le

ad

agen

cy a

nd th

e re

gion

al

Proj

ect C

oord

inat

ing

unit,

us

er g

roup

s, a

nd o

ther

st

akeh

olde

rs a

nd

gove

rnm

ent a

genc

ies;

and

to

(b) m

anag

e th

e co

nsul

tatio

n pr

oces

s to

ens

ure

com

preh

ensi

ve in

put f

rom

us

er g

roup

s an

d ot

her

stak

ehol

ders

into

the

deve

lopm

ent a

nd

impl

emen

tatio

n of

the

proj

ect

Proj

ect M

anag

er a

nd

Assi

stan

t con

tract

s O

ffice

est

ablis

hed

with

ne

cess

ary

com

mun

icat

ion

tech

nolo

gy

Proj

ect i

ssue

s de

alt w

ith a

s th

ey a

rise,

incl

udin

g id

entif

icat

ion

of o

ptio

ns fo

r th

eir r

esol

utio

n Pr

ojec

t coo

rdin

atio

n m

eetin

gs c

onve

ned

regu

larly

an

d ac

cord

ing

to w

ork

plan

Pr

ojec

t pro

gres

s an

d fin

anci

al re

ports

sub

mitt

ed

quar

terly

to re

gion

al P

CU

M

aint

enan

ce o

f acc

urat

e re

cord

s of

mee

tings

, rep

orts

, fin

anci

al m

onito

ring

data

, sp

ecifi

catio

ns, a

nd b

riefs

re

late

d to

the

impl

emen

tatio

n of

the

proj

ect

Qua

rterly

pro

gres

s re

ports

An

nual

Dem

onst

ratio

n Pr

ojec

t Im

plem

enta

tion

Rev

iew

Rep

orts

M

id-T

erm

Eva

luat

ion

Term

inal

Eva

luat

ion

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

C

onsi

sten

t env

ironm

enta

l co

nditi

ons,

e.g

., no

sev

ere,

le

ngth

y dr

ough

ts o

r oth

er

disa

ster

s w

hich

cou

ld re

quire

re

dire

ctio

n of

RM

IEPA

and

pr

ojec

t sta

ff tim

e Ad

equa

te p

artic

ipat

ion

of

stak

ehol

ders

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I)

6.4

Con

sist

ency

bet

wee

n th

e va

rious

pro

ject

com

pone

nts

and

rela

ted

activ

ities

pr

ovid

ed o

r fun

ded

by o

ther

do

nor o

rgan

isat

ions

, in

clud

ing

real

isat

ion

of c

o-

Des

ign

of n

ew w

ater

and

la

nd p

roje

cts

and

prog

ram

mes

at L

aura

, bot

h go

vern

men

t and

ext

erna

lly

fund

ed, c

onsi

sten

t with

de

mon

stra

tion

proj

ect

Qua

rterly

pro

gres

s re

ports

An

nual

Dem

onst

ratio

n Pr

ojec

t Im

plem

enta

tion

Rev

iew

Rep

orts

M

id-T

erm

Eva

luat

ion

Term

inal

Eva

luat

ion

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

W

illing

ness

of o

ther

pro

ject

s an

d do

nors

to c

olla

bora

te

RM

IEP

A an

d G

EF

IWR

M P

roje

ct

Man

agem

ent U

nit

(RM

I) O

utpu

t N

o.

Out

put/O

utco

me

Key

Indi

cato

rs

Mea

ns o

f Ver

ifica

tion

Ass

umpt

ions

/Ris

ks

Res

pons

ible

P

artn

ers

finan

cing

whe

re p

ossi

ble

obje

ctiv

es a

nd a

ctiv

ities

6.

5 P

artic

ipat

ion

of p

roje

ct

repr

esen

tativ

es in

mee

tings

of

the

Reg

iona

l Pro

ject

S

teer

ing

Com

mitt

ee

Mee

tings

, and

ass

ocia

ted

regi

onal

trai

ning

and

cap

acity

bu

ildin

g se

ssio

ns

IWR

M F

ocal

Poi

nt a

nd G

EF

IWR

M d

emon

stra

tion

proj

ect

man

ager

par

ticip

ate

in

annu

al R

egio

nal S

teer

ing

Com

mitt

ee m

eetin

gs

Reg

iona

l Ste

erin

g C

omm

ittee

M

eetin

g R

epor

t par

ticip

ant

list

Con

sist

ency

of s

taffi

ng

arra

ngem

ents

at R

MIE

PA

R

MIE

PA

and

GE

F IW

RM

Pro

ject

M

anag

emen

t Uni

t (R

MI)

N

ATI

ON

AL

PO

LIC

Y A

ND

LE

GA

L R

EFO

RM

S F

OR

IWR

M

P.1

N

atio

nal C

omm

ittee

(nam

ed “N

atio

nal I

nteg

rate

d W

ater

Res

ourc

e M

anag

emen

t Tas

k Fo

rce”

) est

ablis

hed

and

activ

ities

to re

vita

lise

at 1

.2

P.2

N

atio

nal W

ater

Sum

mit

to

info

rm s

take

hold

ers

of: (

a)

Nat

iona

l Int

egra

ted

Wat

er

Res

ourc

e M

anag

emen

t Tas

k Fo

rce

Man

date

and

R

espo

nsib

ilitie

s; a

nd (b

) pr

opos

ed p

roce

ss fo

r pol

icy

and

legi

slat

ive

refo

rm fo

r IW

RM

and

WU

E

Nat

iona

l Wat

er S

umm

it co

nven

ed o

n W

orld

Wat

er

Day

(22nd

Mar

ch) 2

011

Sta

keho

lder

s in

form

ed o

f pr

opos

ed p

roce

ss fo

r IW

RM

an

d W

UE

pol

icy

and

lega

l re

form

. C

omm

ents

rece

ived

by

22nd

A

pril

2011

Nat

iona

l Wat

er S

umm

it co

nven

ed

Pol

icy

pape

r out

linin

g:

mem

bers

hip;

ToR

/man

date

; an

d re

spon

sibi

litie

s of

N

atio

nal I

nteg

rate

d W

ater

R

esou

rce

Man

agem

ent T

ask

Forc

e; a

nd a

gree

d st

eps

for

unde

rtaki

ng p

olic

y an

d le

gisl

ativ

e re

form

for I

WR

M

and

WU

E in

RM

I.

Suf

ficie

nt h

igh

leve

l pol

itica

l bu

y-in

S

uffic

ient

inte

rest

am

ongs

t st

akeh

olde

rs to

com

men

t on

prop

osed

pro

cess

RM

IEP

A a

nd

IWR

M P

olic

y O

ffice

r

P.3

R

evie

w o

f exi

stin

g po

licie

s an

d la

ws

rela

ting

to w

ater

an

d sa

nita

tion,

and

id

entif

icat

ion

of n

eeds

with

re

spec

t to

natio

nal p

olic

y an

d le

gisl

ativ

e re

form

Pol

icy

Adv

iser

recr

uite

d by

Fe

brua

ry 2

011

Pol

icy

repo

rt re

view

ed a

nd

endo

rsed

by

Nat

iona

l In

tegr

ated

Wat

er R

esou

rce

Man

agem

ent T

ask

Forc

e an

d ci

rcul

ated

for p

ublic

com

men

t by

Jun

e 20

11

Fina

l rep

ort p

ublis

hed

and

com

men

ted

by J

uly

2011

Pol

icy

revi

ew re

port

A

vaila

bilit

y of

spe

cial

ist w

ith

expe

rtise

requ

ired

to

effe

ctiv

ely

reco

ncile

sc

ient

ific,

tech

nica

l, a

nd

polit

ical

issu

es re

latin

g to

IW

RM

and

WU

E in

RM

I

RM

IEP

A a

nd

IWR

M P

olic

y O

ffice

r

P.4

D

raft

natio

nal w

ater

pol

icy

and

reco

mm

ende

d le

gal

refo

rms

endo

rsed

by

Nat

iona

l Wat

er C

omm

ittee

fo

r sub

mis

sion

to C

abin

et

Pub

lic h

earin

g to

pre

sent

re

com

men

datio

ns to

st

akeh

olde

rs S

epte

mbe

r 20

11

Com

men

t rec

eive

d an

d fin

al

Pub

lic h

earin

g re

cord

s D

raft

polic

y do

cum

ent

Fina

l dra

ft su

bmitt

ed to

C

abin

et

Ade

quat

e tim

e to

ens

ure

suffi

cien

t buy

-in fr

om s

enio

r of

ficia

ls

RM

IEP

A a

nd

IWR

M P

olic

y O

ffice

r

Page 36: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

36

annex 5: results notes

1

GEF PACIFIC IWRM PROJECT RESULTS

NOTE

Integrated Water and Land Management for the Sustainable Use of

the Laura Water Lens, Majuro Atoll

Top 3 Project Results 1. Establishment and Operation of the National IWRM Task Force as RMI’s APEX Body for Coordination and Planning of Water and Sanitation Investments and Actions 2. Strengthened Community Engagement with National Government on Water and Sanitation Issues via Establishment and Operation of the Laura Lens Committee 3. Reduced stress on the Laura Water Lens by development and operation of septic remediation programme, pilot ECOSAN, and conversion of piggeries from wash down waste disposal systems to dry litter systems

Mr. Julius Lucky [email protected]

RMI Environmental Protection Authority

http://www.pacific-iwrm.org/results RSC 5 2013

Implementing Sustainable Water Resource and Wastewater Management in Pacific Island Countries

Page 37: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

37

2

============================================================================= 1. PROJECT OBJECTIVE The objective of the “Integrated Water and Land Management for the Sustainable Use of the Laura Water Lens” Project (Laura Lens Project) is to strengthen national and local coordination for water resource management with a focus on reducing stress on the Laura Water Lens and planning the longer-term sustainable use of the Laura Water Lens. ============================================================================= 2. RESULTS: PROCESS A start-up committee for the IWRM Demonstration Project was first established in 2009 with members limited to traditional leaders, major landowners, and Council officials from the Local Government. Following establishment of the Project Management Unit In 2010, effort was made to revitalise and expand the membership of this group. Initially, traditional leaders and Laura residents were invited to consultations to re-introduce project goals, objectives, and to ensure all key traditional leaders were adequately represented in these discussions. Establishment of this locally based committee has been effective in: (a) building relationships of government with traditional landowners and leaders and (b) has also been catalytic in terms of influencing decision makers at the national level to provide support for the revitalisation of the “National IWRM Task Force” to lead national IWRM policy and planning. The National IWRM Task Force then proceeded to organize a national consultative process, including a large National Water and Sanitation Summit convened in March 2011 involving ~300 participants, to agree targets and priorities for the development of national policy and an IWRM Plan. This has facilitated the development of a National Water and Sanitation Policy and draft IWRM Plan for endorsement 2013. 2(a) INDICATOR#1: BEST IWRM AND WUE APPROACHES DEFINED Prior to project inception a consultant had been engaged to identify IWRM and WUE needs for the Marshall Islands. Although these had not been considered by communities or relevant agencies of government. The target was to have the approach defined and endorsed by national APEX body. Via the operation of a national consultation process, involving communities and women’s groups, priorities for and steps towards institutionalizing IWRM approaches in the RMI have been developed and endorsed by the National IWRM Task Force.

Figure 1: Influential female members of the community, including the First Lady, Government Officials, and WUTMI

members attend the 2011 Water Summit to lend their support to IWRM initiatives in RMI

Page 38: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

383

Figure 2: Members of the National IWRM Task Force working to incorporate agreed approaches for IWRM into

the National Water and Sanitation Policy 2(b) INDICATOR#2: INCREASE IN COMMUNITY ENGAGEMENT WITH NATIONAL GOVERNMENT ON WATER ISSUES At the time of project inception, the relationship with the Laura community and national government was tenuous due to a history of dispute over water resource access and allocation. Prior to project commencement, only 2 community group representatives occasionally took part in government workshops. Regular engagement of traditional leaders, landowners, and Laura residents with government through the operation of the community-based Laura Lens Committee has assisted with developing a common understanding and trust between the community, with on average 12 community leaders meeting on a quarterly basis with government.

Figure 3: Community representatives participating in a National Water Summit in 2011 2(c) INDICATOR#3: MULTI-SECTORAL APEX BODY IN PLACE At the time of project inception, there was no APEX body for water in the RMI. The target of the project was to have such a body established and operational by July 2010. RMI’s National IWRM Task Force was established by Executive Order and includes membership off all relevant community

Page 39: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

394

and traditional leaders, national government departments, local governments, private sector and NGOs. The Task Force is actively leading coordination, policy development, and planning.

Figure 4: National IWRM Task Force making a presentation to RMI Parliament on IWRM Policy 2(d) INDICATOR#4: SECTORAL ENGAGEMENT IN FORMAL MULTILATERAL COMMUNICATION ON WATER ISSUES Prior to commencement of IWRM there was limited cross sectoral engagement or communication on water issues. The project aimed to increase engagement, with a particular emphasis on strengthening communication between national government and traditional community-based governance arrangements. The National IWRM Task Force established the forum for this and, with Secretariat support for this group provided through the IWRM, up to 30 different agencies from national and local government, representatives of NGOs, and community leaders have met on a quarterly basis to discuss national water and sanitation policy and IWRM planning, review the status of various water related investment in the Marshall Islands, and to share information on the results of various stress reduction technologies being trialed as part of the IWRM demonstration project. Minutes of the meetings of National IWRM Task Force indicate a high level of continuity of participation by senior representatives of the participating agencies in these meetings.

Figure 5: The President of the Republic of the Marshall Islands facilitating the National Water Summit in 2011

Page 40: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

40 5

2(e) INDICATOR#5: LAURA LENS INTEGRATED WATER AND LAND MANAGEMENT ADVISORY COMMITTEE At project inception there existed no mechanism for local community stakeholders, including landowners and traditional leaders to contribute to planning and management of water resource use and sanitation in the area of the Laura groundwater lens. The target of the project was to establish a local coordinating committee to enable community input to planning at both local and national levels and to establish a formal linkage between local stakeholders and the National IWRM Task Force. Terms of Reference and membership for a Laura Lens Integrated Water and Land Management Advisory Committee (or Laura Lens Committee) were developed, considered by the 2011 National Water and Sanitation Summit, and subsequently endorsed by the Chair of the National IWRM Task Force. The Committee has been in operation since 2011 and acts to guide planning of local stress reduction initiatives and provides inputs to national policy and planning.

Figure 6: Members of the Laura Lens Committee meeting with a regional expert on pig waste management to discuss and plan

the installation and maintenance of dry litter pig pens in the Laura Community 2(f) INDICATOR#6: PROPORTION OF COMMUNITY ENGAGED IN WATER RELATED ISSUES Community engagement in awareness activities and on-the-ground work for environment and natural resource management was largely limited to solid waste management prior to the commencement of the IWRM demonstration project. This project aimed to achieve a 30 percent increase in community participation in both water and sanitation related awareness and engagement activities. This has been achieved by development and operation of a targeted water resource protection awareness program which has been mainstreamed into the routine operations of RMI EPA. Supporting initiatives include the active participation of 33 households in testing dry litter pig pens and ecosanitation toilets in the Laura community.

Page 41: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

416

Figure 7: Community awareness workshop on IWRM and safeguarding the Laura lens convened as part of the IWRM

demonstration project’s outreach programme 2(g) INDICATOR#7: BEST APPROACHES TO IWRM AND WUE MAINSTREAMED INTO NATIONAL AND REGIONAL PLANNING FRAMEWORKS Prior to project commencement the RMI had no strategy or agreed approaches to water and sanitation policy. The project aimed to define targets and priority actions for IWRM aimed at strengthening national coordination and reducing stress on vulnerable water resources for mainstreaming into national and regional planning frameworks. An intensive consultative process, involving broad cross-sectoral and community participation, enabled the definition of best approaches for water and sanitation management which were subsequently incorporated in the draft National Water and Sanitation Policy and IWRM Plan. National priorities have also been used in broader regional efforts during 2012-2013 to revise the Regional Action Plan for Water and Sanitation.

Figure 8: The Republic of the Marshall Islands’ national policy and planning framework for the water and sanitation sector

Page 42: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

42

7

2(h) INDICATOR#8: LESSONS LEARNED INCORPORATED INTO OTHER PROJECT(S) AND/OR REGULATIONS The Majuro Atoll Local Government (MALGOV) ordinances human and pig waste management and the RMIEPA regulations for household toilets require the use of septic systems at each household in the Laura community. Limited resources for septic pump-out and disposal had led to overloaded septic systems contaminating the Laura water lens. The project demonstrated alternative, locally appropriate technologies for the management of pig-waste (dry-litter pig pens) and human waste (ecosanitation composting toilets) in the Laura community. The Laura lens committee for the project has initiated efforts with MALGOV and RMIEPA to amend local government ordinances and national regulations to encourage the use of dry litter pig pens and ecosanitation toilets in place of septic systems.

Figure 9: Council members discussing issues relating to use of septic systems in areas of the vulnerable Laura groundwater lens

============================================================================= 3. RESULTS: STRESS REDUCTION The Laura Lens Project aims to reduce stress on the Laura Water Lens via targeted actions addressing pollution from septic systems, piggeries, and domestic solid waste. These will be supported via introduction of a zoning scheme based on an assessment of Laura water lens vulnerability to land and water uses. Key achievements to date include conduct of a survey of solid and septic waste management practices and needs for all Laura households, and development of septic monitoring and pump-out programme; community led design and conduct of household water use and sanitation audit; construction of 3 pilot ECOSAN systems at prominent locations in Laura community; preliminary works to remediate a large broken pig waste septic at a commercial piggery and conversion of its operation to a dry litter system; and conversion of 30 household pig pens to dry litter system from typical water intensive wash down pens. 3(a) INDICATOR#1: REDUCTION IN SEWAGE POLLUTION IN LAURA COMMUNITY At the time of project inception, there was no system in place for reducing sewage pollution in Laura. Many household septic systems were overloaded and broken. The target of the project was to have 35 percent reduction in sewage pollution of the lens from households. The survey of septic waste identified 117 broken and overloaded septics requiring immediate pump-out. To date around 40% of these septics have been remediated.

Page 43: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

438

Figure 10: Example of an overloaded septic immediately above the Laura Water Lens 3(b) INDICATOR#2: REDUCTION IN POLLUTION SOURCES DISCHARGING INTO LAURA GROUNDWATER At the time of project inception, there was no action underway for reducing pollution discharges into Laura groundwater. The target of the project is to achieve 30% reduction in sources discharging into Laura groundwater. To date the number of households and pollutant sources have been identified and characterized. Pollution from pig waste has been identified as a major source. Preliminary work has been done to remediate a large broken pig waste septic at a commercial piggery and conversion of its operation to a dry litter system, and conversion of 30 household pig pens to dry litter system from typical water intensive wash down pens. An ECOSAN pilot activity is also underway in the Laura community, with 3 pilot systems constructed at prominent locations in Laura community. The national IWRM Plan for RMI is being developed and contains targeted costed actions for pig waste management and ECOSAN replication and scaling-up.

Figure 11: Commercial piggery situation above the Laura Water Lens with effluent discharge into cesspit immediately in the

lens. High levels of e coli have been recorded at wells in the vicinity.

Page 44: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

449

Figure 12: Waterless dry litter pig waste management being promoted in the Laura community at commercial pig

farms and for household pig pens (change photos above to include Bokmej and household pens

Figure 13 Current toilets being utilized at Laura providing poor sanitation and septic systems

Page 45: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

4510

Figure 14: Recently constructed eco-san toilets as part stress reduction methods and ideal replacement for current

toilets being used on Laura 3(c) INDICATOR#3: POPULATION WITH ACCESS TO IMPROVED SANITATION Prior to inception of the IWRM demonstration project there was no monitoring of the status of sanitation systems in the Laura community. Routine monitoring of well water quality and resultant e-coli data had indicated significant risk of waterborne disease. Priority targets of the project were to conduct an assessment of the state of sanitation at the project site and to initiate a monitoring programme to identify septic system remediation and sludge disposal needs. Based on the results of this assessment, the project initiated a partnership with the Majuro Water and Sewer Company for the the routine pump-out of septic systems. To date this has resulted in almost 40 percent of overloaded septic systems having been remediated. Recent surveys of well water quality indicate significant reduction of e-coli in the Laura lens groundwater. This has been augmented with efforts to promote ecosanitation approaches within the community.

Figure 15: The Majuro Water and Sewer Company septic pump-out operations 3(d) INDICATOR#4: REDUCTION IN USE OF FRESHWATER FOR SANITATION PURPOSES DUE TO COMPOSTING TOILET INSTALLATION Prior to project commencement there was limited understanding of the volumes of water used for sanitation at the household level. The project aimed to provide practical demonstrations to

Page 46: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

46

11

householders in the Laura community of how to reduce household water use by 30 percent through the use of ecosanitation composting toilets. Technical exchange with the Tuvalu IWRM project enabled the construction of 3 demonstration toilets at key locations within the Laura community. It has been estimated that these households have reduced water use by 40 percent through the use of composting toilets instead of flush systems. These reductions in water use have been augmented by the conversion of wash-down pig pens to waterless dry litter pig waste management systems at 30 households in the community.

Figure 16 Comparison of the commonly used flush toilet in Laura with the waterless composting toilet demonstrated in the Laura community 4. RESULTS: WATER RESOURCE AND ENVIRONMENTAL STATUS IWRM in the Marshall Islands aims to contribute to improved water resource status by increasing population with access to safe drinking water supply and with access to sanitation. Drinking water safety has been addressed via the development of a drinking water safety planning and IWRM planning underway for RMI incorporates the replication of this work on Ebeye. 4(a) INDICATOR#1: POPULATION WITH ACCESS TO SAFE WATER At the time of project implementation, there had been no water safety planning conducted for Majuro Atoll. The target of the project is to have the Majuro Water Safety Plan implemented. To date water safety issues have been investigated and discussed with key water providers and businesses. A Water Safety Plan has been drafted and reviewed by the IWRM Task Force and is awaiting formal adoption.

Page 47: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

47

annex 6: awareness Materials Developed and Media Coverage

Page 48: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

48

annex 7: Participatory Monitoring and evaluation PlanAnnex 6

Participatory Planning, Monitoring, and Reporting Planfor the GEF Pacific IWRM Demonstration Project in the RMI

1. INTRODUCTION

There are multiple and varied planning, monitoring and reporting requirements as part of the GEF Pacific IWRM Project. These were discussed and agreed during the project’s Inception Workshop in September 2009 and were adopted as part of the operation of the Republic of the Marshall Island’s national IWRM demonstration project entitled: “Laura Demonstration Project”.

Participation and engagement of key project stakeholders including community groups and Non-Governmental Organisations. The project coordinating committee Laura Water and Land Management Advisory Group, The Environmental Protection Authority, Cabinet, national development partners, and global donors in project planning, monitoring, and reporting was considered important in guiding the successful implementation of the project in Marshall Islands.

2. GUIDING PRINCIPLES

The key principles used in developing the project planning, monitoring, and reporting approach were that it should:

primarily act to better inform an “IWRM continuum of transition” in the relevance, effectiveness, efficiency, results, and sustainability of investment in IWRM;

facilitate good governance of demonstration project activities, including areas of project finances, coordination, planning, capture of lessons learned, and technical quality assurance;

ensure efficient and cost-effective compliance of reporting requirements of the National Government of Marshall Islands SPC/SOPAC, UNDP, UNEP, and the GEF;

ensure relevance of the information and data collected, and that data on project results can be rolled up and down, from “Community to Cabinet” and from “Country to Global Donor”; and

Draw on participatory Most Significant Change (MSC) techniques which act to monitoring and validate reported project impacts on behaviour.

3. PLANNING, MONITORING, AND REPORTING FRAMEWORK

The general planning, monitoring, and reporting framework developed for operation through the Marshall Islands national IWRM demonstration project is summarised in Table 1. The timetable of activities is summarised in Table 1.

Project Planning

Laura Integrated Water and Land Management Advisory CommitteeThe Laura Integrated Water and Land Management Advisory Committee’s main role is to provide direction and strategic guidance to the PMU and the Environment Protection Authority as the Lead Agency regarding the design and implementation of the national demonstration project including amongst other things:

Receive, review and approve reports from the Project Management Unit regarding the outputs and outcomes of project activities

Review stakeholder involvement in project activities and take action where necessary to ensure appropriate levels of government, NGO, community, and private sector engagement

Review and evaluate, at the national level, progress in implementation of the project, and provide guidance for improvement to the PMU and Lead Agency (EPA) when necessary

To establish a Working Committee of the Laura Lens (Groundwater) Protection Plan Periodically consult/inform the community of the status/condition of the lens. Identify potential sources of pollutants/contaminants to the Laura lens.

75

Page 49: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

49

Produce awareness and educational materials for the community-schools, residences, and churches.

Involve participation of Laura communities to assist in the campaign of the groundwater protection plan.

In 2010 the Project Management Unit reviewed the status of the Laura Lens Protection Committee with a view to further elaborating the role of the Committee in both the Demonstration Site as well as in national planning processes relating to water and sanitation issues. Consultations were undertaken at the end of 2009 and early 2010 with members of the Committee to identify ways to improve participation at the community level. As a result of the consultations the following suggested actions were undertaken:

Representation of traditional leaders, landowners, church groups, women’s groups, and residents of demonstration site expanded to include leaders not in original membership list

TOR elaborated Advisory Group established to act as working group of the committee PMU meets

quarterly with the main committee (Laura Lens Protection Committee) to provide updates on overall project progress.

The PMU meets quarterly with the Laura Lens Protection Committee to provide updates on overall project progress, review any revisions to the Project Logframe.

Project Monitoring

Advisory Group MeetingsThe Advisory Group meets more frequently than the Committee and acts as a small working group of the Committee to monitor progress of planned activities, work closely with the PMU and facilitate communications between the PMU and the Community in Laura, review and approve quarterly work plans and budgets. Copies of Quarterly Work plans and Budgets are provided to the Advisory Group to inform members on upcoming project activities and get feedback and approval of quarterly plans. Regularly scheduled meetings of the Advisory Group also allow discussion on lessons learned from the perspective of the community and other stakeholders. Members were selected by the main committee to allow more frequent input into planning, decision making and implementation. The group is tasked to review quarterly activities, work plans. During these consultations, PMU presents the work plans for review and endorsement. The PMU also go over previous quarter’s work plan to check off on activities that were successfully implemented as well as activities that were delayed or not undertaken. Lessons learnt are then shared with the group and feedback and suggestions for alternative approaches are agreed on.

Quarterly Work plan and Budgeting

Members of the advisory group reside in Laura and assist the PMU with communicating to community

groups and committee members on project related activities.

Coordination and communication between PMU and Community Laura Community

and Partners

Laura Lens Advisory Group

ProjectManagement

Unit

The Advisory Group has provided an opportunity for the PMU to coordinate more closely with the Laura community and other stakeholder groups when organizing and implementing demo project activities and information sharing and feedback on quarterly work plans and budgets.

76

Page 50: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

5077

Project Reporting

Community MeetingsUse of power point presentations for community meetings have become a popular means of informing communities about a range of issues. However PMU have started to use approaches that are more aligned towards traditional practice of having “conversation” in an informal setting in the community seems to encourage more dialogue with community members.

Laura Advisory CommitteeWhen the demonstration Logframe was revised in 2010 it was provided to the committee members for feedback. Members requested that the logframe be translated into the local language, and has been done and distributed to committee members for approval.

Advisory Group MeetingsCopies of Quarterly Workplans and Budgets are provided to the Advisory Group to inform members on upcoming project activities and get feedback and approval of quarterly plans. Regularly scheduled meetings of the Advisory Group also allow discussion on lessons learned not just from the perspective of the PMU but from the perspective of the community and other stakeholders as well.

Newspaper articles Newspaper article submissions are used to highlight project activities. Once outputs, such as baseline studies or survey reports are finalized news articles on results of these outputs will be submitted to local newspapers.

High Level Briefing In September the PMU in coordination with other partners organized a Luncheon for Parliament members to brief members on Climate Change Policy Framework and overview of recommendations of the National Water and Sanitation Summit held in March 2011 and the status and timeline for the development of the National Water and Sanitation Policy as well as Demo Project activities. The briefing allowed an opportunity to have an open dialogue with Parliament Members, which is not always easy to schedule with all members of parliament.

Interviews with Laura Integrated Water and Land Management Advisory Committee membersThe PMU conducted and recorded interviews with members from both the Laura Lens Protection Committee and the National Water Task Force. Their responses and pictures were published in the local newspaper. This is one of the approaches the PMU will use for monitoring and evaluation of the demonstration project through feedback on certain issues from committee members as well as other community groups and individuals.

Annual National Project Implementation Review

Each year the PMU is responsible for completing a National Project Implementation Review (PIR). The PIR is meant to incorporate a range of input from various stakeholders to determine rate of progress against agreed outputs per the project logframe. It is a useful exercise to go through internally and can highlight areas that require more stakeholder engagement. This PIR ideally should be vetted through the Demonstration Project Committees as well as the National IWRM Task Force for feedback. This year the PIR ending June 2011 was completed based on community and task force members responses to interview questions. The PMU is looking into developing a simple way of getting feedback for the PIR. Often times such documents are seen as cumbersome and not always well received, particularly at the community level.

Page 51: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

51

78

IWR

M C

ontin

uum

of T

rans

ition

in R

elev

ance

, Effe

ctiv

enes

s, E

ffici

ency

, Res

ults

, and

Sus

tain

abili

ty o

f IN

VEST

MEN

T

Cab

inet

Rev

iew

& U

se o

f Pr

ojec

t Out

puts

/Res

ults

Com

mun

ity In

puts

, Pa

rtic

ipat

ion

& F

eedb

ack

Nat

iona

l IW

RM

C

oord

inat

ing

Com

mitt

ee

Nat

iona

l Lea

d A

genc

y &

Ex

ecut

ing

Part

ners

Monitoring & Reporting by Project Management Unit

Q1

Fina

ncia

l Rep

orts

Q1

Prog

ress

Rep

ort

Q1

Less

ons

Lear

ned

Q1

Tech

nica

l QA

Rev

iew

& F

eedb

ack

Ann

ual N

atio

nal P

roje

ct

Impl

emen

tatio

n R

evie

w

Four

(4) Q

uart

erly

R

epor

ting

Pack

ages

Reg

iona

l Pro

ject

Im

plem

enta

tion

Rev

iew

G

EF P

AC

IFIC

IWR

M

Use

d by

Cou

ntrie

s to

Dra

ft P

IR

Use

d by

RP

CU

to V

alid

ate

Nat

iona

l PIR

Rat

ings

Nat

iona

l PIR

Rat

ings

an

d P

rogr

ess

Rol

led-

up

into

Reg

iona

l PIR

Subm

issi

on to

GEF

IAs

for U

se in

Glo

bal/R

egio

nal

Eval

uatio

n of

Impa

ct

Rev

iew

and

Fee

dbac

k fro

m R

egio

nal T

echn

ical

A

dvis

ers/

Task

Man

ager

s

Part

icip

ator

y Pl

anni

ng

& M

onito

ring

Coo

rdin

atio

n of

R

epor

ting

Qua

rter

ly R

epor

ting

&

Pla

nnin

gC

omm

unity

-Cab

inet

-Glo

bal

Rel

evan

ce o

f Rep

ortin

g

Rel

evan

t and

Mea

ning

ful t

o C

omm

unity

Rel

evan

t and

Mea

ning

ful t

o C

abin

et

Incr

easi

ng L

ocal

Con

text

of

Pla

nnin

g &

Mon

itorin

g

Q2

Cas

h R

eque

st

Country -Global

Part

icip

ator

y M

ost

Sign

ifica

nt

Cha

nge

Tech

niqu

es S

truct

ured

vid

eo

inte

rvie

ws

of W

atS

an

stak

ehol

ders

eng

aged

in

IWR

M a

t var

ious

leve

ls to

ga

uge

lear

ning

and

ch

ange

in p

erce

ptio

n S

tory

boar

ding

to h

elp

com

mun

ities

bet

ter

capt

ure

& c

omm

unic

ate

in

fo o

n im

pact

& c

hang

e

Use

of t

he “S

tory

line”

appr

oach

enc

oura

ges

parti

cipa

tion

and

the

use

of d

ialo

gue

and

stor

ies

to a

sses

s pr

ojec

t im

pact

Community-Based Monitoring

Figu

re 1

S

chem

atic

of t

he P

lann

ing,

Mon

itorin

g, a

nd R

epor

ting

App

roac

h A

dopt

ed fo

r the

RM

I Nat

iona

l IW

RM

Dem

onst

ratio

n P

roje

ct

PRO

JEC

T LO

GFR

AM

EE

volv

ing

Base

d on

St

akeh

olde

r R

evie

w&

Inpu

ts

Q2

Wor

k Pl

anni

ng

Page 52: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

52

79

Tabl

e 1

D

raft

Par

ticip

ator

y P

roje

ct P

lann

ing,

Mon

itorin

g, a

nd R

epor

ting

Pla

n

Year

2010

20

11

2012

20

13

Qua

rter

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Com

mun

ity G

roup

s (L

aura

Far

mer

s A

ssoc

iatio

n, W

omen

s G

roup

s)

Par

ticip

atio

n in

regu

lar r

evie

w o

f pro

ject

out

puts

X

XX

XX

XX

XX

XX

XX

XX

XIn

puts

to p

repa

ratio

n of

qua

rterly

wor

k pl

ans

and

budg

et

XX

XX

XX

XX

XX

XX

XX

XX

Ref

lect

ive

revi

ew o

f pro

ject

out

com

es –

wor

ksho

ps

XX

XX

Ann

ual r

evie

w a

nd in

puts

to le

sson

s le

arne

d X

XX

Ann

ual

revi

ew

and

plan

ning

of

us

e of

tra

ditio

nal

know

ledg

e/go

vern

ance

in p

roje

ct p

lann

ing

XX

X

Stor

yboa

rdin

g an

d st

ruct

ured

vid

eo in

terv

iew

app

roac

h to

iden

tify

Mos

t Sig

nific

ant C

hang

e at

com

mun

ity le

vel

WW

D22

/3X

WW

D22

/3X

WW

D22

/3X

Nat

iona

l Coo

rdin

atin

g C

omm

ittee

( La

ura

Wat

er a

nd L

and

Man

agem

ent A

dvis

ory

Gro

up, L

aura

Adv

isor

y Su

b-G

roup

) Q

uarte

rly

inpu

ts

to

prog

ress

, fin

anci

al,

and

less

ons

lear

ned

repo

rts p

repa

red

by P

MU

/com

mun

ity g

roup

s X

XX

XX

XX

XX

XX

XX

XX

X

Qua

rterly

revi

ew/e

ndor

sem

ent o

f wor

k pl

ans

and

budg

et

XX

XX

XX

XX

XX

XX

XX

XX

Iden

tific

atio

n of

qua

rterly

nee

ds f

or t

echn

ical

sup

ports

an

d pr

epar

atio

n of

rec

omm

enda

tions

bas

ed o

n kn

own

bene

fits

and

cost

s of

opt

ions

X

XX

XX

XX

XX

XX

XX

XX

X

Ann

ual r

evie

w o

f rep

licat

ion

and

scal

ing-

up p

lans

X

XX

Ann

ual

revi

ew o

f qu

arte

rly r

epor

ts a

nd p

repa

ratio

n of

ad

vice

/gui

danc

e fo

r com

mun

ity g

roup

s X

XX

X

Ann

ual e

ndor

sem

ent

of P

roje

ct I

mpl

emen

tatio

n R

evie

w

and

prep

arat

ion

of a

dvic

e fo

r Cab

inet

/Con

gres

s X

XX

X

Lead

Age

ncy

(Env

ironm

enta

l Pro

tect

ion

Aut

horit

y)

Ong

oing

Ove

rsig

ht o

f Pro

ject

Man

agem

ent U

nit S

taff

Ong

oing

rev

iew

of p

rocu

rem

ent a

nd r

epor

ting

to e

nsur

e co

mpl

ianc

e w

ith fi

duci

ary

stan

dard

s of

MoA

par

ties

Qua

rterly

revi

ew a

nd s

igna

ture

of p

rogr

ess

and

finan

cial

re

ports

for s

ubm

issi

on to

SP

C/S

OP

AC

RC

U

XX

XX

XX

XX

XX

XX

XX

XX

Subm

issi

on

of

annu

al

PIR

an

d an

nual

su

mm

ary

of

com

mun

ity w

orks

hop(

s) to

Cab

inet

X

XX

X

Dev

elop

men

t Par

tner

s (U

ND

P an

d U

NEP

) R

evie

w a

nd fe

edba

ck o

n an

nual

PIR

repo

rts

XX

XX

Sub

mis

sion

of a

nnua

l pro

ject

resu

lts to

glo

bal d

atab

ase

XX

XX

Pre

para

tion

of m

ater

ials

for g

loba

l sha

ring

of re

sults

X

XX

Sup

port

to p

rodu

ctio

n of

pro

ject

exp

erie

nce

note

s an

d re

ports

on

resu

lts in

glo

bal w

ater

for a

(e.g

. IW

C6&

7)

XIW

C6

XIW

C7

Page 53: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

53

annex 8: replication and scaling-up Plan

Page 54: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

54

annex 9: IW Pilot Project Logframe

Com

pone

nts

Out

com

esIn

dica

tor

Bas

elin

eTa

rget

s En

d of

Pr

ojec

tSo

urce

of

Verifi

catio

nR

isks

and

A

ssum

ptio

ns1.

Sus

tain

ed

com

mun

ity

adop

tion

of

app

ropr

iate

on

-sit

e w

aste

m

anag

emen

t sy

stem

s to

redu

ce

cont

amin

ant

impa

cts

on e

nvir

onm

enta

l an

d pu

blic

hea

lth

at

laur

a vi

llage

1.1

evid

ence

bas

ed

appl

icat

ion

of o

n-si

te

was

te m

anag

emen

t sy

stem

s th

roug

h op

tim

al

desi

gn a

nd o

pera

tion

of

sys

tem

s to

mee

t in

tern

atio

nal s

tand

ards

fo

r wat

er s

afet

y an

d us

e of

hum

an c

ompo

st in

la

ura

villa

ge

exte

nt o

f app

licat

ion

of s

cien

tific

re

com

men

dati

ons

to im

prov

e sy

stem

de

sign

s

lim

ited

und

erst

andi

ng

of p

roce

sses

of o

n-si

te

was

te m

anag

emen

t sy

stem

s an

d ef

ficac

y at

redu

cing

co

ntam

inan

t lo

ads

to

the

laur

a le

ns

loca

lly a

ppro

pria

te

desi

gn a

nd m

anag

emen

t of

on-

site

was

te

man

agem

ent

syst

ems

deve

lope

d th

roug

h ta

rget

ed s

cien

tific

re

sear

ch in

to c

ompo

stin

g m

echa

nism

s, c

onta

min

ant

redu

ctio

ns a

nd o

ptim

al

oper

atin

g co

ndit

ions

to

enha

nce

syst

em e

ffic

acy

doc

umen

ts o

f as

sess

men

ts a

nd

mon

itor

ing

resu

lts,

an

alys

is a

nd re

sear

ch

repo

rts,

com

para

tive

st

udie

s an

d co

nsul

tati

on

mee

ting

repo

rts

impr

oved

des

ign

and

cons

truc

tion

pla

ns

Publ

ishe

d sc

ient

ific

pape

r [y

r 3}

des

ign

and

oper

atio

n of

ec

o-sa

nita

tion

sys

tem

s ar

e ab

le to

be

opti

mal

ly

impr

oved

in re

mot

e is

land

set

ting

reso

urce

s ar

e su

ffic

ient

ly

avai

labl

e fo

r rel

iabl

e an

alys

is o

f eco

-san

itat

ion

syst

ems

to p

rodu

ce

robu

st s

cien

tific

resu

lts

cost

of r

efin

ed d

esig

n do

es n

ot e

xcee

d ab

ility

to

reso

urce

1.2

impr

oved

com

mun

ity

unde

rsta

ndin

g of

was

te

man

agem

ent

issu

es

and

solu

tion

s th

roug

h en

hanc

ed a

cces

s to

ef

fect

ive

and

appr

opri

ate

info

rmat

ion

volu

me

of n

ew

and

addi

tion

al

info

rmat

ion

avai

labl

e an

d ac

cess

ed t

hrou

gh

the

laur

a le

ns

lear

ning

cen

tre

lim

ited

info

rmat

ion

mat

eria

ls a

vaila

ble

thro

ugh

the

laur

a le

ns l

earn

ing

cent

re

the

laur

a le

ns l

earn

ing

cent

re p

opul

ated

wit

h ef

fect

ive

and

appr

opri

ate

educ

atio

nal r

esou

rces

educ

atio

nal f

ilms

and

docu

men

tari

es,

cons

truc

tion

tra

inin

g m

anua

ls, s

yste

m

oper

atio

nal g

uide

s,

com

post

use

gui

delin

es,

radi

o/au

dio

talk

sho

ws,

to

ilet

owne

r int

ervi

ews

and

advi

ce

effe

ctiv

enes

s of

ed

ucat

ion

mat

eria

ls to

in

crea

se c

omm

unit

y un

ders

tand

ing

of w

aste

m

anag

emen

t is

sues

reso

urce

s av

aila

ble

to d

evel

op e

duca

tion

m

ater

ials

1.3

impr

oved

don

or

supp

ort

for i

ncre

ased

ho

useh

olde

r upt

ake

of

on-s

ite

sani

tati

on s

yste

ms

num

ber o

f Gef

Sm

all G

rant

s Pr

ogra

mm

e, u

Said

an

d a

usa

id p

roje

cts

impl

emen

ted

to s

uppo

rt

hous

ehol

der u

ptak

e of

on-

site

san

itat

ion

syst

ems

low

leve

l of

com

mun

ity

acce

ss

to d

onor

fund

s fo

r im

plem

enti

ng

dom

esti

c on

-sit

e w

aste

man

agem

ent

syst

ems

Part

ners

hips

wit

h G

ef

Smal

l Gra

nts

Prog

ram

me,

u

Said

and

aus

aid

to

stre

ngth

en h

ouse

hold

er

abili

ty to

impl

emen

t do

mes

tic

on-s

ite

was

te

man

agem

ent

syst

ems

Gef

Sm

all G

rant

s Pr

ogra

mm

e, u

Said

and

a

usa

id p

roje

ct p

ropo

sals

an

d im

plem

enta

tion

re

port

s

Suit

able

com

mun

ity

base

d or

gani

sati

ons

to a

ssis

t co

mm

unit

ies

wit

h do

nor p

roje

ct

requ

irem

ents

Page 55: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

55

Com

pone

nts

Out

com

esIn

dica

tor

Bas

elin

eTa

rget

s En

d of

Pr

ojec

tSo

urce

of

Verifi

catio

nR

isks

and

A

ssum

ptio

ns2.

inte

grat

ing

targ

eted

sc

ient

ific

inve

stig

atio

n on

co

asta

l and

land

eco

syst

em

proc

esse

s, lo

cal k

now

ledg

e an

d st

rate

gic

part

ners

hips

to

stre

ngth

en k

now

ledg

e ba

se

for k

ey e

vide

nce-

base

d ic

m

plan

ning

and

inve

stm

ent

2.1

enha

nced

kno

wle

dge

of li

nkag

e be

twee

n la

nd-

use

and

coas

tal h

ealt

h an

d st

atus

of c

oast

al

habi

tats

in l

aura

are

a

Stat

us o

f dat

a co

llect

ion

prog

ram

mes

for 3

pri

orit

y si

tes

upt

ake

of s

cien

tific

re

com

men

dati

ons

in ic

m

plan

ning

litt

le d

ata

avai

labl

e on

coa

stal

hab

itat

s,

links

bet

wee

n la

nd-

base

d co

ntam

inan

ts

and

coas

tal w

ater

de

grad

atio

n an

d co

asta

l hab

itat

sta

tus

ecos

yste

m p

roce

sses

an

d co

asta

l hab

itat

dat

a co

llect

ion

prog

ram

mes

op

erat

iona

l to

iden

tify

nu

trie

nt d

ynam

ics

and

thre

ats

from

land

-bas

ed

cont

amin

ants

to c

oast

al

wat

ers,

cau

sal l

inks

to

coa

stal

eco

syst

em

degr

adat

ion

and

habi

tat

stat

us a

t 3

prio

rity

sit

es in

th

e la

ura

area

mon

itor

ing

resu

lts,

an

alys

is a

nd re

sear

ch

repo

rts,

com

para

tive

st

udie

s an

d fin

al

eval

uati

on re

port

[yr 3

]

coas

tal h

ealt

h Su

mm

ary

for P

olic

y &

Pla

nnin

g [y

r 3]

Publ

ishe

d sc

ient

ific

pape

r [y

r 3]

unt

reat

ed e

fflu

ent

disp

osal

is n

egat

ivel

y af

fect

ing

coas

tal w

ater

qu

alit

y

reso

urce

s ar

e su

ffic

ient

ly

avai

labl

e fo

r rel

iabl

e an

alys

is a

nd e

valu

atio

n of

co

ntam

inan

t dy

nam

ics

to

prod

uce

scie

ntifi

c re

sult

s

2.2

impr

oved

syn

thes

is

of in

form

atio

n re

lati

ng

to fi

sher

ies

and

wat

er

qual

ity

stat

us a

nd t

rend

s in

the

lau

ra a

rea

volu

me

of in

form

atio

n co

mpi

led

and

shar

ed o

n ha

bita

t ar

ea a

nd q

ualit

y;

tren

ds in

cat

ch s

ize

and

qual

ity;

and

tre

nds

in

coas

tal a

nd g

roun

dwat

er

qual

ity

lim

ited

sha

ring

an

d lin

king

of d

ata

rega

rdin

g st

atus

of

fishe

ries

and

wat

er

qual

ity

in l

aura

are

a

Part

ners

hips

bet

wee

n rm

iePa

and

dep

t. of

fi

sher

ies

esta

blis

hed

to

shar

e an

d lin

k da

ta re

lati

ng

to fi

sher

ies

use

and

coas

tal

and

grou

ndw

ater

wat

er

qual

ity

dat

abas

e of

sha

red

and

linke

d in

form

atio

n,

com

para

tive

ass

essm

ent

repo

rt

colla

bora

tive

agr

eem

ents

be

twee

n de

part

men

ts

can

be e

stab

lishe

d

Suit

able

repo

sito

ry

can

be e

stab

lishe

d an

d m

aint

aine

d fo

r sha

red

data

2.3

Stre

ngth

ened

in

tegr

atio

n of

tra

diti

onal

kn

owle

dge

wit

h sc

ient

ific

inve

stig

atio

ns

Stat

us o

f rep

osit

ory

and

amou

nt o

f kno

wle

dge

reco

rds

colle

cted

lack

of r

ecor

ded

trad

itio

nal

envi

ronm

enta

l kn

owle

dge

esta

blis

hmen

t an

d po

pula

tion

of l

ocal

re

posi

tory

for t

radi

tion

al

know

ledg

e on

eco

syst

em

proc

esse

s, h

isto

rica

l en

viro

nmen

tal t

rend

s,

coas

tal h

abit

ats

and

fishe

ries

onl

ine

and

hard

copy

da

taba

se o

f kno

wle

dge

reco

rds,

par

tici

pato

ry

inte

rvie

ws,

com

mun

ity

cons

ulta

tion

repo

rts

ade

quat

e in

tern

et s

ervi

ce

to a

llow

sta

ff to

upd

ate

an o

nlin

e da

taba

se

Suff

icie

nt t

radi

tion

al

know

ledg

e av

aila

ble

to

popu

late

dat

abas

e

2.2

enha

nced

acc

ess

to

info

rmat

ion

rega

rdin

g la

nd u

se, a

nd s

tatu

s of

co

asta

l hab

itat

s an

d fis

heri

es in

lau

ra v

illag

e ar

ea

Stat

us o

f the

GiS

and

nu

mbe

r of s

ites

des

crib

edla

ck o

f rel

evan

t G

iS

data

for t

he l

aura

are

ata

rget

ed G

iS o

n la

nd u

se

and

coas

tal h

ealt

h fe

atur

ing

info

rmat

ion

on la

nd u

se,

land

and

coa

stal

sit

es o

f w

aste

dis

posa

l, st

atus

and

lo

cati

on o

f cri

tica

l mar

ine

habi

tats

and

fish

erie

s, w

ater

qu

alit

y da

ta a

nd a

reas

of

publ

ic h

ealt

h co

ncer

n

repo

rt in

clud

ing

map

s of

land

use

, pol

luta

nt

sour

ces,

rip

aria

n zo

nes,

fis

heri

es, c

oast

al h

abit

ats,

gr

ound

wat

er w

ells

, and

w

ater

qua

lity

of t

he l

aura

W

ater

len

s

ade

quat

e in

tern

et s

ervi

ce

to a

llow

sta

ff to

upd

ate

an o

nlin

e da

taba

se

reso

urce

s av

aila

ble

to

unde

rtak

e an

d co

mpl

ete

GiS

map

ping

Page 56: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

56

Com

pone

nts

Out

com

esIn

dica

tor

Bas

elin

eTa

rget

s En

d of

Pr

ojec

tSo

urce

of

Verifi

catio

nR

isks

and

A

ssum

ptio

ns3.

n

atio

nal

and

loca

l m

anag

emen

t pl

anni

ng f

or

inte

grat

ed l

and,

wat

er a

nd

coas

tal

man

agem

ent

for

sust

aina

ble

livel

ihoo

ds

at

laur

a

3.1

man

agem

ent

stra

tegi

es

deve

lope

d to

su

stai

n co

asta

l liv

elih

oods

at

la

ura

thro

ugh

inte

r-ag

ency

coo

pera

tion

esta

blis

hmen

t of

a

roun

dtab

le

netw

ork

of

rele

vant

age

ncie

s

Stat

us

of

prio

rity

is

sues

id

enti

ficat

ion

and

man

agem

ent

inte

rven

tion

s ag

reed

up

on a

nd c

omm

itte

d to

litt

le

inte

r-ag

ency

co

oper

atio

n of

co

asta

l m

anag

emen

t at

la

ura

area

cons

ensu

s am

ongs

t re

leva

nt

agen

cies

an

d fu

ndin

g bo

dies

(e

.g

fish

erie

s,

hea

lth,

n

Go

’s)

rega

rdin

g pr

essi

ng c

oast

al

issu

es,

thei

r im

pact

on

su

stai

nabl

e liv

elih

oods

an

d re

quir

ed m

anag

emen

t in

terv

enti

ons

at

laur

a,

incl

udin

g be

nchm

arki

ng

of

curr

ent

and

plan

ned

proj

ects

an

d fin

anci

ng

leve

ls

roun

d-ta

ble

mee

ting

re

port

s in

clud

ing

list

of

part

icip

ants

, jo

int

man

agem

ent

deci

sion

s an

d pa

rtic

ipat

ion

lists

Publ

ishe

d m

anag

emen

t pl

ans

and

impl

emen

tati

on

repo

rts

[yr 3

]

exis

ting

tens

ions

bet

wee

n ag

enci

es

may

lim

it pa

rtic

ipat

ion

in a

rou

nd-

tabl

e ne

twor

k

unw

illin

gnes

s of

pa

rtic

ipan

ts

to

open

ly

disc

uss

caus

es

of

envi

ronm

enta

l de

grad

atio

n

3.2

cau

sal

links

bet

wee

n la

nd

use

and

coas

tal

heal

th,

and

sust

aina

ble

livel

ihoo

ds

and

publ

ic

heal

th

esta

blis

hed

and

unde

rsto

od

thro

ugh

inte

grat

ing

curr

ent

and

hist

oric

al d

ata

dat

abas

e es

tabl

ishe

d an

d po

pula

ted

wit

h in

tegr

ated

da

tase

ts fr

om c

oope

rati

ng

agen

cies

Poor

int

egra

tion

of

data

re

gard

ing

diff

eren

t as

pect

s of

env

iron

men

tal

and

publ

ic

heal

th

for

laur

a ar

ea

dat

a ga

ther

ed

thro

ugh

sub

-con

trac

t ag

reem

ents

w

ith

rele

vant

ag

enci

es

(e.g

. fi

sher

ies,

h

ealt

h)

to

conn

ect

aspe

cts

of

land

us

e an

d co

asta

l he

alth

to

liv

elih

oods

an

d pu

blic

he

alth

fe

atur

ing

info

rmat

ion

on

conn

ecti

on t

o tr

adit

iona

l lif

esty

les

and

nc

d’s

onl

ine

data

base

of

en

viro

nmen

tal a

nd p

ublic

he

alth

info

rmat

ion

unw

illin

gnes

s of

age

ncie

s to

par

tici

pate

in s

hari

ng o

f in

form

atio

n

Page 57: Islands Marshall · 2020. 3. 17. · 1 I W RM P A C I F I C GEF Pacific IWRM Demonstration Project Integrated Water and Land Management for the Sustainable Use of the Laura Water

57

 

IW

R M

PACIFIC