INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC) From: John Black (Inventum) CC: Jon Williams (Riverview); John Yensan (OSC); Craig Slater (CS Law); Todd Waldrop, P.E., and James Edwards (Inventum) RE: Site Management Work Plan Scope No. 3 Riverview Innovation & Technology Campus, Inc. Brownfield Cleanup Program Site No. C915353 Town of Tonawanda, New York Inventum Engineering, P.C. (Engineering), on behalf of Riverview Innovation & Technology Campus, Inc. (Riverview), is submitting this third phase of activities (Scope No. 3) to be completed in accordance with the Site Management Work Plan (work plan). Table 4 and Figures 3-1 through 3-4 (attached) will be appended to the New York State Department of Environmental Conservation (NYSDEC) approved IRM Work Plan for the Riverview Brownfield Cleanup Program (BCP) Site (#C915353) located at 3875 River Road, Tonawanda, New York. Purpose Stage No. 3 is designed to allow container sweeping of the buildings and cleanup and materials management of the areas that lie within the South West, Central East and South Central areas of the grid. The specific activities are limited to those tasks listed on Table 4, at the locations shown on Figures 3–1 to 3-4. It should be noted that some of the activities, are no action, or simply to place or replace covers on materials. In accordance with the Site Management IRM Work Plan, no materials will be shipped without having been approved by the DEC and the DEC will be provided no less than 5 days’ notice prior to any planned offsite transportation. It should be noted that the wood from ties and pallets that cannot be reused onsite (damaged, degraded or numbers in excess of what are needed) will be disposed offsite at a regional Subtitle D Landfill after sampling, profile approval and DEC Approval. Use as a fuel source, which would have been at a permitted offsite facility, is not viable at this time. Specific Actions – Stage 3 The specific Stage 3 actions are listed in Table 4. Notably: No. 50 – This action is a supplement to Action No. 50 in Stage No. 2. The identification and unearthing of the Box Culvert that terminates at the compressor building has allowed definition

Upload: others

Post on 08-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

INVENTUM ENGINEERING, PC

481 Carlisle Drive Suite 202

Herndon, Virginia 20170

July 19, 2020

To: Benjamin McPherson (NYSDEC) From: John Black (Inventum) CC: Jon Williams (Riverview); John Yensan (OSC); Craig Slater (CS Law); Todd Waldrop, P.E., and

James Edwards (Inventum) RE: Site Management Work Plan Scope No. 3 Riverview Innovation & Technology Campus, Inc. Brownfield Cleanup Program Site No. C915353 Town of Tonawanda, New York

Inventum Engineering, P.C. (Engineering), on behalf of Riverview Innovation & Technology Campus, Inc.

(Riverview), is submitting this third phase of activities (Scope No. 3) to be completed in accordance with

the Site Management Work Plan (work plan). Table 4 and Figures 3-1 through 3-4 (attached) will be

appended to the New York State Department of Environmental Conservation (NYSDEC) approved IRM

Work Plan for the Riverview Brownfield Cleanup Program (BCP) Site (#C915353) located at 3875 River

Road, Tonawanda, New York.

Purpose Stage No. 3 is designed to allow container sweeping of the buildings and cleanup and materials

management of the areas that lie within the South West, Central East and South Central areas of the

grid. The specific activities are limited to those tasks listed on Table 4, at the locations shown on Figures

3–1 to 3-4. It should be noted that some of the activities, are no action, or simply to place or replace

covers on materials.

In accordance with the Site Management IRM Work Plan, no materials will be shipped without having

been approved by the DEC and the DEC will be provided no less than 5 days’ notice prior to any planned

offsite transportation.

It should be noted that the wood from ties and pallets that cannot be reused onsite (damaged,

degraded or numbers in excess of what are needed) will be disposed offsite at a regional Subtitle D

Landfill after sampling, profile approval and DEC Approval. Use as a fuel source, which would have been

at a permitted offsite facility, is not viable at this time.

Specific Actions – Stage 3 The specific Stage 3 actions are listed in Table 4. Notably:

• No. 50 – This action is a supplement to Action No. 50 in Stage No. 2. The identification and

unearthing of the Box Culvert that terminates at the compressor building has allowed definition

Page 2: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

JULY 19, 2020

P A G E | 2

of the watershed for the Box Culvert. The iron oxide pile is potentially in the watershed. The

revised action No. 50 will allow consolidation of the iron oxide pile and covering with

polyethylene sheeting to prevent contact with precipitation.

• No. 71 – A flooded shaft that was likely associated with the coal conveyor and a former car

shaker was identified at this location. Caution must be taken in the area and after removal of

the debris, the opening should be surrounded with caution tape or other warning materials.

• No. 74 – The pile of material at this location contains tar, the pile should be covered with

polyethylene sheeting.

• No. 75 – Rail car RC-04 has rusted through. If confirmed to be empty, cut for scrap. If not

empty, flag for sampling.

• Nos. 79N and 79S – Two piles of mixed coal and coke that are not suitable for offsite use. Pile

79N has visible tar seeps and will be covered in place for future decision on management. Pile

79S has no visible tar like materials on the surface and will be used as fill in a coal yard

excavation. If tar like materials are encountered in Pile 79S, the excavation and use as fill will

stop and the remaining materials will be covered in place.

• No. 80 – The surface materials in the area have a blue tint. After the mixing pad is dewatered,

the surface materials outside the mixing pad entrance will be consolidated in a pile, covered,

and identified with a sign. The access to the mixing pad will be covered with a geotextile and

crushed stone to provide access. Sampling of the stockpiled material removed from the

entrance area will be completed during the remedial investigation.

• No. 82 - A flooded shaft that was likely associated with the coal conveyor was identified at this

location. Caution must be taken in the area and after removal of the debris, the opening should

be surrounded with caution tape or other warning materials. The catch basin CB-08 is

immediately west of the shaft, protect and clear of any soil or debris.

• No. 84 – The contents, if any, of the three abandoned rail cars (RC01, RC02, and RC03) on the

south rail tracks are unknown. Gauge the depth to the materials, if any, in the rail cars. If

there are contents, the contents will be sampled and characterized. It is reported that the

USEPA identified, but did not test, tar like materials in one or more of these rail cars. If the tank

cars are empty, the cars will be cut and prepared for scrap.

Page 3: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

JULY 19, 2020

P A G E | 3

Table

Page 4: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

Table 4Site ManagementWork Scope 3NorthSouth Waste, South Central, and Central West Sections of PropertyRiverview Innovation Technology Campus, In.Tonawanda, New York

MapDesignation

Description Action

50 AF7 to AQ8Iron Oxide Pile, possible source ofiron in surface water within the boxculvert.

Push materials that have eroded ontoperimeter back onto pile/insideformer purifier boxes. Cover withpolyethylene sheeting. Anchorperimeter to reduce contact withsurface water.

71 AC17 to AC18

Debris pile and tunnel shaft(Foundations were former car shakerto unload rail cars onto coalconveyor)

Caution - open pit. Install warningbarrier around shaft, remove andmanage materials as C&D, possiblelow point to dewater tunnel.

73 AR21 to AT19Old belting and debris on former tankfoundations.

Remove and manage materials asC&D, cut a path through the coke toallow access for RI.

74 AM20 to AN20 Pile of mixed coal, coke and tar.Do not disturb, cover withpolyethylene sheeting.

75 AP22 to AP22Rail Car RC04. Note bottom rustedthrough.

Confirm tank is empty. Cut for scrap.

If tar is visible below tank on ground,try not to disturb, notify Keith.

76 AW16 to AX17 Piles of railroad ties.Sort ties in accordance with practice,usable and unusable. Disposeunusable/excess offsite.

77 AZ15 to BB17Old wooden trestle materials in arandom pile.

Sort as usable v unusable wood.Dispose unusable/excess offsite.

78 AH24 to AH25 Old railroad track, some rail and ties.

Recover loose metal and materials,leave below grade materials.Recover any ties and rail componentsduring coal and coke recovery.Remainder of subgrade materials willbe addressed by the AA/RA or anIRM.

79N AG23 to AH24Mixed coal and coke piles. Notmarketable as coal or coke. Visibletar like materials.

Cover and Label "Mixed Coal andCoke, Some Tar Like Materials".

79S AG24 to AH25Mixed coal and coke piles. Notmarketable as coal or coke.

Use as fill in coal yard as long as novisible tar like materials.

Remove and manage materials asC&D.

Cell Range

72 AO20 to AO20 Debris pile.

G:\My Drive\Inventum\Project Files\Tonawanda\Work Plans and Site Management Plans\BCP Task WPs\Surface MaterialsManagement\Scope 3\Table 4 Work Scope Number 3 _ MASTERStage 3 Coke Tracks, SW, SC, CE Page 1 to 2 7/31/2020

Page 5: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

Table 4Site ManagementWork Scope 3NorthSouth Waste, South Central, and Central West Sections of PropertyRiverview Innovation Technology Campus, In.Tonawanda, New York

MapDesignation

Description ActionCell Range

80 AH24 to AH24Blue tinged soil east of mixing padentrance.

Stockpile near the mixing pad out ofthe treatment and traffic areas.Cover with polyethylene sheeting andplace sign "Entrance Materials, DoNot Disturb".

81 AE25 to AH25 Debris south of mixing pad.Remove and manage materials asC&D.

82 AJ25 to AI26 Debris at South end of coal conveyor.

Caution - open pit. Install warningbarrier around opening, remove andmanage materials as C&D, possibleaccess point to test for ACM intunnel.

Catch Basin (CB-08) is immediatelywest of the tunnel opening, protectthe catch basin and clean out any soilor debris in drop inlet.

83 AK27 to T35 South RailRemove and recycle rail, plates andspikes. Sort rail road ties as other -usable v not usable.

84 X34 to Y33 Rail Cars RC01, RC02, and RC03.

Caution - contents unknown. One ormore reportedly had contentsaccording to the USEPA, no datacollected.Open and check for contents. Ifcontents, gauge depth/quantity andcollect sample for hazardous wastecharacteristics. If empty, cut up forscrap.

85 J27 to J27Blue poly drums in storm waterdetention basin.

Remove and place in containerstorage area. Add to inventory.

86 I26 to I26 Former spray head pumps Scrap

87 H31 to I31

Scrap pipe, tank and hoses. Tank isthe green tank leaning against thebrick structure. Not one of theinstalled numbered tanks.

Remove and manage as scrap andC&D. Verify small green tank isempty. Characterize contents if notempty.

88 G29 to G29Wooden deck for sediment gaugeaccess (Check all ponds)

Not stable, remove and dispose asC&D. If no other access to sedimentgauges, discuss replacement withInventum.

G:\My Drive\Inventum\Project Files\Tonawanda\Work Plans and Site Management Plans\BCP Task WPs\Surface MaterialsManagement\Scope 3\Table 4 Work Scope Number 3 _ MASTERStage 3 Coke Tracks, SW, SC, CE Page 2 to 2 7/31/2020

Page 6: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

JULY 19, 2020

P A G E | 4

Figures

Page 7: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX AY AZ BA BB BC BD BE BF BG BH BI BJ BK BL

AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX AY AZ BA BB BC BE BF BG BH BI BJ BK BLBD

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

2

1

DRAWING NUMBER

D

(NE

W S

ET

) IN

VE

NT

UM

EN

GIN

EE

RIN

G481 C

AR

LIS

LE

D

RIV

E

SU

IT

E 202

HE

RN

DO

N, V

IR

GIN

IA

20170

(703) 722-6049

ww

w.Inventum

Eng.com

DR

AW

IN

G B

Y

CH

EC

KE

D

AP

PR

OV

ED P

RO

PE

RT

Y O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G

IMPORTANT: T

HIS

D

RA

WIN

G P

RIN

T IS

LO

AN

ED

F

OR

M

UT

UA

L

AS

SIS

TA

NC

E A

ND

A

S S

UC

H IS

S

UB

JE

CT

T

O R

EC

ALL A

T A

NY

T

IM

E.

IN

FO

RM

AT

IO

N C

ON

TA

IN

ED

H

ER

EIN

IS

N

OT

T

O B

E D

IS

CLO

SE

D O

R

RE

PR

OD

UC

ED

IN

A

NY

F

OR

M F

OR

T

HE

B

EN

EF

IT

O

F P

AR

TIE

S O

TH

ER

TH

AN

N

EC

ES

SA

RY

P

AR

TN

ER

S, F

IN

AN

CIA

L IN

ST

IT

UT

IO

NS

,

SU

BC

ON

TR

AC

TO

RS

A

ND

S

UP

PLIE

RS

W

IT

HO

UT

T

HE

W

RIT

TE

N

CO

NS

EN

T O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G.

NOTICE: T

HIS

D

RA

WIN

G H

AS

B

EE

N P

RE

PA

RE

D U

ND

ER

T

HE

DIR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R. IT

IS

A

VIO

LA

TIO

N O

F S

TA

TE

LA

W F

OR

A

NY

P

ER

SO

NS

, U

NLE

SS

A

CT

IN

G

UN

DE

R T

HE

D

IR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L

EN

GIN

EE

R, T

O A

LT

ER

T

HIS

D

OC

UM

EN

T IN

A

NY

W

AY

.

FIGURE 3-1

107A

NORT

H EA

ST S

ECTI

ON O

F PR

OPER

TYTA

NKS

AND

RAIL

CAR

S

1 INCH = 50 FEET (22X34)

050 25 50 100 200

GAS "BALL"HOLDER GH 1

RC 10 RC 11

RC 07

RC 08

NE-3

N

RC 09

Keith Adderley
Typewriter
45
Keith Adderley
Typewriter
50
Keith Adderley
Typewriter
50
Keith Adderley
Typewriter
47
Keith Adderley
Typewriter
48
Keith Adderley
Typewriter
48
Keith Adderley
Typewriter
49
Keith Adderley
Typewriter
60
Keith Adderley
Typewriter
62
Page 8: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

A B DC E F G H I J K L M N O P Q R S T U V W X Y Z

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

DRAWING NUMBER

D

INV

EN

TU

M E

NG

INE

ER

ING

481 C

AR

LIS

LE

D

RIV

E

SU

IT

E 202

HE

RN

DO

N, V

IR

GIN

IA

20170

(703) 722-6049

ww

w.Inventum

Eng.com

DR

AW

IN

G B

Y

CH

EC

KE

D

AP

PR

OV

ED P

RO

PE

RT

Y O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G

IMPORTANT: T

HIS

D

RA

WIN

G P

RIN

T IS

LO

AN

ED

F

OR

M

UT

UA

L

AS

SIS

TA

NC

E A

ND

A

S S

UC

H IS

S

UB

JE

CT

T

O R

EC

ALL A

T A

NY

T

IM

E.

IN

FO

RM

AT

IO

N C

ON

TA

IN

ED

H

ER

EIN

IS

N

OT

T

O B

E D

IS

CLO

SE

D O

R

RE

PR

OD

UC

ED

IN

A

NY

F

OR

M F

OR

T

HE

B

EN

EF

IT

O

F P

AR

TIE

S O

TH

ER

TH

AN

N

EC

ES

SA

RY

P

AR

TN

ER

S, F

IN

AN

CIA

L IN

ST

IT

UT

IO

NS

,

SU

BC

ON

TR

AC

TO

RS

A

ND

S

UP

PLIE

RS

W

IT

HO

UT

T

HE

W

RIT

TE

N

CO

NS

EN

T O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G.

NOTICE: T

HIS

D

RA

WIN

G H

AS

B

EE

N P

RE

PA

RE

D U

ND

ER

T

HE

DIR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R. IT

IS

A

VIO

LA

TIO

N O

F S

TA

TE

LA

W F

OR

A

NY

P

ER

SO

NS

, U

NLE

SS

A

CT

IN

G

UN

DE

R T

HE

D

IR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L

EN

GIN

EE

R, T

O A

LT

ER

T

HIS

D

OC

UM

EN

T IN

A

NY

W

AY

.

FIGURE 3-2

107A

SOUT

H W

EST

SECT

ION

OF P

ROPE

RTY

TANK

S AN

D RA

IL C

ARS

COAL YARD

COAL YARD

SEDIMENTATION POND #1

SOUTH DITCH

ST 24

RC 01

ST 23ST 22ST 21

ST 20 OUTFALL #002

STORM WATERDETENTION BASIN

1 INCH = 50 FEET (22X34)

050 25 50 100 200

RC 02RC 03

SW-7

N

OUTFALL #001

Keith Adderley
Typewriter
67
Keith Adderley
Typewriter
68
Keith Adderley
Typewriter
69
Keith Adderley
Typewriter
87
Keith Adderley
Typewriter
88
Keith Adderley
Typewriter
85
Keith Adderley
Typewriter
86
Page 9: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX AY AZ BA BB BC BE BF BG BH BI BJ BKBD

DRAWING NUMBER

D

(NE

W S

ET

) IN

VE

NT

UM

EN

GIN

EE

RIN

G481 C

AR

LIS

LE

D

RIV

E

SU

IT

E 202

HE

RN

DO

N, V

IR

GIN

IA

20170

(703) 722-6049

ww

w.Inventum

Eng.com

DR

AW

IN

G B

Y

CH

EC

KE

D

AP

PR

OV

ED P

RO

PE

RT

Y O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G

IMPORTANT: T

HIS

D

RA

WIN

G P

RIN

T IS

LO

AN

ED

F

OR

M

UT

UA

L

AS

SIS

TA

NC

E A

ND

A

S S

UC

H IS

S

UB

JE

CT

T

O R

EC

ALL A

T A

NY

T

IM

E.

IN

FO

RM

AT

IO

N C

ON

TA

IN

ED

H

ER

EIN

IS

N

OT

T

O B

E D

IS

CLO

SE

D O

R

RE

PR

OD

UC

ED

IN

A

NY

F

OR

M F

OR

T

HE

B

EN

EF

IT

O

F P

AR

TIE

S O

TH

ER

TH

AN

N

EC

ES

SA

RY

P

AR

TN

ER

S, F

IN

AN

CIA

L IN

ST

IT

UT

IO

NS

,

SU

BC

ON

TR

AC

TO

RS

A

ND

S

UP

PLIE

RS

W

IT

HO

UT

T

HE

W

RIT

TE

N

CO

NS

EN

T O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G.

NOTICE: T

HIS

D

RA

WIN

G H

AS

B

EE

N P

RE

PA

RE

D U

ND

ER

T

HE

DIR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R. IT

IS

A

VIO

LA

TIO

N O

F S

TA

TE

LA

W F

OR

A

NY

P

ER

SO

NS

, U

NLE

SS

A

CT

IN

G

UN

DE

R T

HE

D

IR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L

EN

GIN

EE

R, T

O A

LT

ER

T

HIS

D

OC

UM

EN

T IN

A

NY

W

AY

.

FIGURE 3-3

107A

CENT

RAL

EAST

SEC

TION

OF

PROP

ERTY

TANK

S AN

D RA

IL C

ARS

RC 07

RC 08

RC 06

RC 05

RC 04

1 INCH = 50 FEET (22X34)

050 25 50 100 200

CE-6

N

RC 09

Keith Adderley
Typewriter
Keith Adderley
Typewriter
63
Keith Adderley
Typewriter
Keith Adderley
Typewriter
61
Keith Adderley
Typewriter
Keith Adderley
Typewriter
Keith Adderley
Typewriter
61
Keith Adderley
Typewriter
61
Keith Adderley
Typewriter
61
Keith Adderley
Typewriter
61
Keith Adderley
Typewriter
Keith Adderley
Typewriter
62
Keith Adderley
Typewriter
73
Keith Adderley
Typewriter
Keith Adderley
Typewriter
60
Keith Adderley
Typewriter
76
Keith Adderley
Typewriter
Keith Adderley
Typewriter
Keith Adderley
Typewriter
78
Keith Adderley
Typewriter
Keith Adderley
Typewriter
77
Keith Adderley
Typewriter
Keith Adderley
Typewriter
Keith Adderley
Typewriter
75
Keith Adderley
Typewriter
Keith Adderley
Typewriter
72
Keith Adderley
Typewriter
74
Keith Adderley
Typewriter
Keith Adderley
Typewriter
79N
Keith Adderley
Typewriter
79S
Keith Adderley
Typewriter
80
Keith Adderley
Typewriter
81
Keith Adderley
Typewriter
82
Keith Adderley
Typewriter
83
Page 10: INVENTUM ENGINEERING PC Plan.BCP.C915… · 31/07/2020  · INVENTUM ENGINEERING, PC 481 Carlisle Drive Suite 202 Herndon, Virginia 20170 July 19, 2020 To: Benjamin McPherson (NYSDEC)

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT

DRAWING NUMBER

D

(NE

W S

ET

) IN

VE

NT

UM

EN

GIN

EE

RIN

G481 C

AR

LIS

LE

D

RIV

E

SU

IT

E 202

HE

RN

DO

N, V

IR

GIN

IA

20170

(703) 722-6049

ww

w.Inventum

Eng.com

DR

AW

IN

G B

Y

CH

EC

KE

D

AP

PR

OV

ED P

RO

PE

RT

Y O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G

IMPORTANT: T

HIS

D

RA

WIN

G P

RIN

T IS

LO

AN

ED

F

OR

M

UT

UA

L

AS

SIS

TA

NC

E A

ND

A

S S

UC

H IS

S

UB

JE

CT

T

O R

EC

ALL A

T A

NY

T

IM

E.

IN

FO

RM

AT

IO

N C

ON

TA

IN

ED

H

ER

EIN

IS

N

OT

T

O B

E D

IS

CLO

SE

D O

R

RE

PR

OD

UC

ED

IN

A

NY

F

OR

M F

OR

T

HE

B

EN

EF

IT

O

F P

AR

TIE

S O

TH

ER

TH

AN

N

EC

ES

SA

RY

P

AR

TN

ER

S, F

IN

AN

CIA

L IN

ST

IT

UT

IO

NS

,

SU

BC

ON

TR

AC

TO

RS

A

ND

S

UP

PLIE

RS

W

IT

HO

UT

T

HE

W

RIT

TE

N

CO

NS

EN

T O

F IN

VE

NT

UM

E

NG

IN

EE

RIN

G.

NOTICE: T

HIS

D

RA

WIN

G H

AS

B

EE

N P

RE

PA

RE

D U

ND

ER

T

HE

DIR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R. IT

IS

A

VIO

LA

TIO

N O

F S

TA

TE

LA

W F

OR

A

NY

P

ER

SO

NS

, U

NLE

SS

A

CT

IN

G

UN

DE

R T

HE

D

IR

EC

TIO

N O

F A

LIC

EN

SE

D P

RO

FE

SS

IO

NA

L

EN

GIN

EE

R, T

O A

LT

ER

T

HIS

D

OC

UM

EN

T IN

A

NY

W

AY

.

FIGURE 3-4

107A

SOUT

H CE

NTRA

L SE

CTIO

N OF

PRO

PERT

YTA

NKS

AND

RAIL

CAR

S

SOUTH DITCH

RC 03RC 02

RC 01

1 INCH = 50 FEET (22X34)

050 25 50 100 200

MIXING PAD

COAL YARDACCUMULATIONAREA

SC-8

N

Keith Adderley
Typewriter
84
Keith Adderley
Typewriter
83