introductory to well head

Upload: ahmad-reza-atef

Post on 04-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Introductory to well head

    1/20

    Subsea Wellhead SystemsFor deepwater and shallow-water applications

    SUBSEA SYSTEMSSUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    2/20

    4

    CAMERON TECHNOLOGY LEADERSHIP LEADS TOWELLHEAD ADVANCEMENTS

    Cameron has a long history of product innovation, andthe evolution of the subsea wellhead product line is a

    prime example of the continuation of this heritage.

    Camerons experience in pressure control can be traced

    back to 1922 and the introduction of the first BOP.

    Other Cameron innovations through the years include

    the first subsea wellhead completion, introduction of the

    legendary U BOP, the first hydraulic production control

    system, the first guidelineless drilling system and the first

    free-standing drilling riser.

    In the late 1980s, Cameron introduced two new wellhead

    system designs the STC-10and the STM-15. Since

    then, nearly 1000 STC-10 and STM-15 subsea wellhead

    systems have been installed successfully throughout

    the world.

    More advances are on the horizon. As the industry moves

    forward, Cameron is here with the latest technology.

    Table of Contents

    STM-15 Type DW5 Deepwater High-CapacSubsea Wellhead System

    STM-15 Type XL5 Deepwater Large-BoreSubsea Wellhead System

    STM-15 Type XL7 High-CapacityUltra-Deepwater Subsea Wellhead System

    Wellhead Connection Profiles

    STC-10 Compact Subsea Wellhead System

    Casing Hanger Seal Assembly RunningTools for STM Subsea Wellhead Systems

    High-Capacity Running Tools for STM-15Subsea Wellhead Systems

    STM Parallel Bore Metal-to-Metal (PBM) Se

    Optional Trip-Saving Running Tools

    Supplemental Hanger Systems for STM-1and STC-10 Subsea Wellhead Systems

    STM Large Diameter Shoulder-TypeSupplemental Hangers

    Innovation and Quality

    4

    6

    8

    8

    10

    12

    14

    16

    16

    17

    17

    18

    2

  • 8/14/2019 Introductory to well head

    3/20

    3

    5

    STC-10 Subsea WellheadWS2 Subsea WellheadWS1 Subsea Wellhead STM-15 Subsea Wellhead

    To 1980 1980 - 1988 1989 - Present 1992 - Present

    CAMERONS WELLHEAD HISTORY

    The offshore Equatorial Guinea development is located in water

    depths to 2400 ft (732 m). The initial development included more

    than fifteen STM-15 subsea wellheads, and expansion of the field

    is ongoing with six additional installations scheduled for 2011.

    The South China Sea development is located in approximately

    2700-ft (823 m) water depths. The initial development include

    five STM-15 subsea wellhead systems with subsequent addition

    of two STM-15 subsea wellheads and completion systems.

    South China Sea DevelopmentEquatorial Guinea Development

    Camerons wellhead systems are offered as part of our total subsea drilling and production systems. Installed in producing fie

    around the world, these systems consist of wellheads, subsea Christmas trees, flowline connection systems, production manifolds

    and production controls systems. Cameron systems have been installed at various water depths as well as in operating pressurup to and including 15,000 psi.

    FIELD EXPERIENCE

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    4/20

    STM-15 Type DW5

    Deepwater High-Capacity

    Subsea Wellhead System

    Camerons STM-15 Type DW5 15,000 psi WP Subsea Wellhead

    System delivers up to 5.25 MM ft-lb bending capacity for

    enhanced performance for drilling and completion in water

    depths up to 10,000 ft (3048 m).

    Active pre-load lockdown at 2 MM lb

    5.25 MM ft-lb bending capacity

    Standard and high-capacity 16 supplemental

    hangers and adapters are available

    Machined from F-22, 85 ksi yield forged material

    Available for H2S service

    7 MM lb end-load carrying capacity on single-

    landing shoulder for deep wells with complex

    casing programs

    18.63 Bore17.83 Min. ID7 MM lb End-LoadCapacity LandingShoulder

    High-Pressure Housing Joint Wellhead on CNC MachineSTM-15 TYPE DW5 DEEPWATER

    HIGH-CAPACITY SUBSEA WELLHEAD SYSTEM

    Camerons deepwater STM wellheads meet the requirements

    for most subsea drilling operations with deepwater semisubmers-

    ibles and drillships, as well as production applications such as

    tension-leg platforms, deep-draft caisson vessels and all types

    of subsea trees.

    4

    Camerons unique PBM metal-to-metal seal isstandard in all 15,000 psi WP systems and hasdelivered superior performance in nearly 20 yearsof installation history.

  • 8/14/2019 Introductory to well head

    5/20

    18-3/4 15,000 psi WPHigh-Pressure Wellhead

    w/Active Pre-Load Lockdown,

    Gasket Seal and Hydrate Seal

    36 Conductor Housing

    w/Eight 3 Flow-By Holes

    18-3/4 Wellhead Housing

    20 x 0.812 Wall Extension

    13-3/8 Casing

    9-5/8 Casing

    Seal Assembly (Typical)

    Hydrate Deflectorw/Bullseye

    16 Seal

    Assembly

    16

    Receptacle

    16 CasingHanger

    20 x 0.812 WT Wellhead Housing Joint

    36 x 2.0 WT Conductor Housing Joint

    STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System36 x 20 x 16 x 13-3/8 x 9-5/8 x 7

    3 Ball Valvew/Pipe Extension(Typical Installation)

    7 Casing

    5

    16 Casing Hanger System

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    6/20

    STM-15 Type XL5

    Deepwater Large Bore

    Subsea Wellhead System

    Camerons STM-15 Type XL5 Deepwater Large Bore Subsea

    Wellhead System is rated at a full 15,000 psi WP for drilling

    and completion operations in water depths up to 10,000 ft

    (3048 m). This system is used when it is necessary to run 18

    casing in addition to 16. The wellhead has an 18-1/2 mini-

    mum ID bore in the bottom to pass 18 casing. As with the 16

    casing hanger, the 18casing hanger has a landing adapter

    that is welded into the 22 (instead of 20) casing below the

    high-pressure housing and the 16 adapter, allowing installa-

    tion through the riser and BOP stack. This wellhead system is

    an ideal solution for shallow-water flows and to accommodatesmall bore-pressure/fracture gradient differentials.

    Active pre-load lockdown at 2 MM lb

    5.25 MM ft-lb bending capacity

    3 MM lb tensile capacity

    Machined from F-22, 85 ksi yield forged material

    Available for H2S service

    Multiple-landing shoulder with 7 MM lb end-loadcarrying capacity

    18.63 Bore

    18.510 Min. ID7 MM lb End-Load

    Capacity LandingShoulder

    STM-15 Type XL5Wellhead Housing

    STM-15 TYPE XL5 DEEPWATER LARGE BORESUBSEA WELLHEAD SYSTEM

    6

    Camerons unique PBM metal-to-metal seal isstandard in all 15,000 psi WP systems and hasdelivered superior performance in nearly 20 yearsof installation history.

    The STM-15 Type XL5 Deepwater Large Bore Subsea Wellhead

    System is used with the STM-15 trip-reducing, high-capacity

    running tools and is available with the three most common

    wellhead connection profiles. A standard 4130 extension joint isadded to the bottom of the high-pressure housing for

    increased weld compatibility with various casing grades, and

    other materials for the extension can be

    supplied when required. Guide bases and

    mud mats with hydrate seals and flow rings

    are available upon request.

  • 8/14/2019 Introductory to well head

    7/20

    18-3/4 Wellhead HousingSTM-15 Large Bore

    Wellhead HousingRunning Tool

    Active Lockdown

    Assembly - Unlocked

    16 Landing Sub

    22 OD x 18.38 ID

    16 PBMSeal Assembly

    16 Casing Hanger

    16 Casing Flush or

    Near Flush CasingConnections

    18 Landing Sub22 OD x 18.25 ID

    18 Casing Hanger18.43 OD x 16.60 ID

    18 Casing Flush

    Casing Connections

    18 Seal Assembly

    18-3/4 Seal Assembly

    9-5/8 Casing Hanger

    Active LockdownAssembly - Locked

    18-3/4 Typical Seal Assembly

    36 Conductor Housing

    13-3/8 Casing Hanger

    36 Conductor Pipe

    22 Extension Pipe

    13-3/8 Casing

    10-3/4 Casing

    28 Receptacle

    w/Vertical Flow-By

    28 SupplementalCasing Hanger

    28 Supplemental Casing

    12 x 12 Mud Mat

    w/Split Lock Ring Lipand Hydrate Seal

    STM-15 Type XL5 Deepwater Large Bore Subsea Wellhead System36 x 28 x 22 x 18 x 16 x 13-3/8 x 9-5/8

    7

    18 Casing Hanger System

    16 Casing Hanger System

    16 Casing Hanger System

    18 Casing Hanger System

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    8/20

  • 8/14/2019 Introductory to well head

    9/20

    STM/STC SUBSEA WELLHEAD-TO-CONDUCTOR HOUSINGLOCKDOWN OPTIONS

    The STC-10 wellhead has a similar passive lockdown mechanism which provides a 1.5 MM ft-lb bending capacity and 0.5 MM lb

    tensile capacity.

    STM-15 Type DW5 and XL5 wellheads are available with an active pre-loaded option using a mechanical lockdown tool. The two

    housings are pre-loaded together using this mechanical tool resulting in a 2 MM lb pre-load which increases the bending capacity

    to 5.25 MM ft-lb with a 3 MM lb tensile capacity.

    The STM-15 Type XL7 is an active pre-loaded wellhead design with a 30 O.D. high-pressure housing which delivers 7 MM ft-lb

    bending capacity and 5 MM lb tensile capacity.

    9

    STC-10 Passive

    Lockdown

    STM-15 Type DW5,

    STM-15 Type XL5 and XL7

    2 MM lb Mechanical Lockdown

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    10/20

    STC-10 Compact Subsea

    Wellhead System

    The STC-10 Compact Wellhead System is a popular choice for

    low-pressure wells up to 10,000 psi WP and moderate well

    depths. Simplicity and attractive pricing make the STC-10

    wellhead system a cost-effective choice.

    The STC-10 wellhead system uses Camerons metal-end cap

    (MEC) seal. This elastomeric sealing element is rated a full

    10,000 psi WP and made of proprietary CAMLAST

    elastomer which is rated for temperatures up to 250oF

    (121o C). It is resistant to H2S, CO

    2, chlorides, diesel fluid and

    oil- or water-based amine corrosion inhibitors. Stainless

    steel caps on the upper and lower surfaces of the elastomer

    reduce extrusion limit exposure of the elastomers tocorrosive well fluids and discourage roll off during

    installation. The MEC seal is highly tolerant to seal area

    damage and will often seal when other types of seals will

    not. The seal is radially energized and requires less energy

    to set than other seals.

    Available in a five-string casing program

    Also available in a six-string program utilizing a

    16 supplemental hanger system

    Jet-in/drill-ahead tools are available for evenfaster run times

    STC High-Pressure Housing Joint

    18.69 Bore17.83 Min. ID3.5 MM lb End-Load

    Carrying CapacityLanding Shoulder

    STC-10 COMPACTSUBSEA WELLHEAD SYSTEM

    10

  • 8/14/2019 Introductory to well head

    11/20

    STC-10 Compact Subsea Wellhead System30 x 20 x 16 x 13-3/8 x 10-3/4

    10-3/4 Casing Hanger

    w/Inconel625 Inlay

    16 Casing Hanger System

    13-3/8 CasingHanger w/Inconel 625 Inlay

    STC-10 SealAssembly

    13-3/8 Dummy Hanger

    STC-10 30

    Conductor Housingw/1.50 BWP Down

    STC-10 18-3/4Wellhead Housing

    w/H4 Profile,16 Receptacle and

    20 x 0.625 BWP

    Adapter w/ThreadedOutlet Ports

    (Optional)

    16 Receptacle16 Casing Hanger,16 3000 psi Seal

    Assembly

    Retrievable/Reinstallable

    Guide Base w/0-5Slope Indicator

    11

    3 Ball Valvew/Pipe Extension(Optional)

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    12/20

    Casing Hanger Seal Assembly

    Running Tools for STM Subsea

    Wellhead Systems

    Casing Hanger Seal Assembly Running Tools (CHSARTs) are

    single-trip tools that allow installation of the casing hanger

    and PBM metal-to-metal seal assembly in a single trip.

    Cameron offers these tools in a variety of load capacities and

    sizes for all of our wellhead systems.

    There are three tools available for the 18-3/4 15,000 psi WP

    wellhead systems depending on the load requirement:

    1 MM lb, 1.5 MM lb, and a special high-capacity tool for the

    first position hanger which provides 2 MM lb load capacity.

    These tools are installed in the casing hanger using left-hand

    makeup and right-hand release. Unlike standard systems,

    which set the seal by closing the BOP rams on the running

    string and pressuring the annulus, Camerons CHSARTs use

    pressure down the drillpipe to hydraulically set the seal.

    Annulus pressure is used only to test the seal. This hydraulic

    system generates 200,000 lb of force to set the seal and only

    requires 3500 psi fluid pressure through the drillpipe.

    Single-trip tools are also available for the XL5 wellhead

    system for the 16 and 18 casing strings and for the DW5

    wellhead system 16 casing string. A 13 CHSART is

    available for the DW5/XL5 slimline drill-through

    conversion system.

    18 CHSART16 CHSART

    Seal AssemblyRunning Tool (SART)

    Mill and Flush Tool

    12

  • 8/14/2019 Introductory to well head

    13/20

  • 8/14/2019 Introductory to well head

    14/20

    Drill Ahead Tool

    MechanicalLockdown Tool

    High-Capacity Running

    Tools for STM-15 Subsea

    Wellhead Systems

    STM wellhead systems help reduce drilling costs

    by eliminating unnecessary trips while providing

    advanced pressure control technology with advanced,

    trip-reducing, high-capacity running tools.

    Camerons Drill Ahead Tool (DAT) allows for jetting in

    the conductor, releasing the single-piece 1 MM lb load

    capacity center stem and drilling ahead for the next

    casing string. The tool permits a two-foot pickup of

    the BHA without releasing the tool from the wellhead,

    has a 6-5/8 standard top connection and drifts

    10 collars.

    Tools for running and handling the low- and

    high-pressure wellhead housings are standard.

    Camerons Mechanical Lockdown Tool (MLT) delivers a

    2 MM lb mechanical pre-load between the low- and

    high-pressure housings with a single 180,000 lb over-

    pull, after running and landing the high-pressure

    housing and 20/22 casing.

    Installation of DW5 Wellhead Housing

    14

  • 8/14/2019 Introductory to well head

    15/20

    Jetting Drill Ahead

    Landed Pre-Loaded

    The center stem and BHA are released after jetting to drillahead and retrieved with the BHA after drill out.

    A 2 MM lb pre-load is achieved witha single 180,000 lb over-pull.

    Mechanical Lockdown ToolDrill Ahead Tool

    15

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    16/20

    Optional Trip-SavingRunning Tools

    Bit or BHA-run wear bushings and wear sleeves are available for

    all of Camerons wellhead systems, in addition to three BOP test

    tools to cover all situations for testing the BOP stack.

    There are special tools for running the primary seal, secondary

    seal and emergency seal assemblies separately from the hanger,

    along with mill and flush tools to clean debris from the seal

    area for all casing hangers.

    Stabilizer and Running Adapters

    STM Parallel Bore

    Metal-to-Metal (PBM) Seal

    The PBM seal is used for casing hangers in the 18-3/4 15,000 psWP high-pressure housing and is interchangeable on all hangers

    in the wellhead from 13-3/8 down to 7. It is radially engaged,

    bi-directional and provides constant contact pressure on inner

    and outer sealing surfaces. The PBM seal is designed for a

    parallel sealing surface. It provides equal seal protection from

    pressures above or below. Camerons parallel bore seal design

    allows for vertical movement of the seal without affecting

    seal integrity. During laboratory testing, the seal assembly was

    moved as much as 1/4 while maintaining full test pressure of

    15,000 psi. PBM seals are rated for continuous operation in

    temperatures up to 350

    o

    F (177

    o

    C ) and can be used in H2Senvironments.

    The PBM seal assembly and high-pressure housing design

    provides for two additional contingency seals: an optional

    elastomeric seal and a standard metal-to-metal secondary seal

    that uses a protected, recessed area in the housing bore. The

    lockdown feature for the seal to the wellhead has been physi-

    cally tested to more than 1 MM lb at Camerons Technology

    Development Center in Houston, Texas.

    Standard Seal

    Housing Lock Ring

    Metal-to-Metal

    Seals

    Actuating Ring

    Hanger Lock Ring

    Retainer Wire

    Standard Elastomer Seal

    Metal-to-Metal Seals

    Metal-to-Metal Seals

    Standard O-Rings

    Wellhead Housing

    Recessed SecondarySeal Area

    Casing Hanger

    B

    B

    BB A

    A

    A A

    Wear Bushing

    Wear SleeveWear Bushingand Wear SleeveStabilizer

    Wear Bushingand Wear SleeveRunning Adapter

    16

  • 8/14/2019 Introductory to well head

    17/20

    Cameron offers a variety of supplemental

    hangers and running tools. In the 20 or 22

    casing strings below the high-pressure housing,

    individual adapters can be used to suspend

    and seal 16 hangers, both standard (3000 psi

    WP/500,000 lb) and high-capacity (5000 psi WP/

    1 MM lb). The XL high-pressure 16 hanger is

    rated 6500 psi WP with metal-to-metal seals and

    1 MM lb hang-off capacity. An 18 adapter and

    hanger with a 3500 psi WP elastomeric seal and

    1 MM lb hang-off capacity also is available for

    use in Camerons STM-15 Type XL5 large-bore

    subsea wellhead system.

    Supplemental Hanger Systems for STM-15 and

    STC-10 Subsea Wellhead Systems

    18 SupplementalHanger

    Locked toAdapter

    SealAssembly

    LandingShoulder

    Adapter

    Hanger

    16 XL High-PressureSupplemental Hanger

    Locked toAdapter

    LandingShoulder

    Adapter

    Hanger

    Locked toHanger

    PBM SealAssembly

    16 High-CapacitySupplemental Hanger

    Locked toHanger

    Seals

    LandingShoulder

    Adapter

    Hanger

    LockdownRing

    STM Large Diameter Shoulder-Type Supplemental Hangers

    17

    Cameron offers a variety of shoulder adapters for

    supplemental hangers and running tools located belowthe low-pressure wellhead in the 30 or 36 conductor

    string. Weld-in shoulder type adapters and hangers can

    be used for suspension and sealing of 26 and 28

    supplemental casing strings.

    26/28 Receptaclew/No Flow-By

    26 Receptaclew/Horizontal Flow-By

    26 Receptaclew/Vertical Flow-By

    26/28 Casing Hanger

    26/28 Casing HangerRunning Tool

    6-5/8 Box

    4-1/2 Pin

    4-1/2 IF

    Lock Dogs

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    18/20

    Innovation and Quality

    CAMERON IS A LEADER INTECHNOLOGY DEVELOPMENT

    Camerons Technology Development Center is located

    in Houston, Texas, and is equipped with state-of-the art

    analysis and testing equipment. Cameron engineers

    and technicians can perform a wide range of testing

    procedures on new and existing products to help ensure

    performance in the field.

    TEST LABORATORY STATE-OF-THE-ART CAPABILITIES

    Erosion A drilling fluids flow loop simulates the ero-sive effects of cuttings and sand flowing up from thewell during drilling. It can circulate up to 6.2 barrels peminute at 5000 psi WP.

    Flow Loop It empirically determines the flowcharacteristics, Cv, of various flow control devices.

    Fatigue A load frame with a fixed tail stock on one end

    and a rotating spindle on the other is used for dynamicbend testing with up to 20,000 lb of deflection load toprovide simulation of undersea wave action.

    Pull/Push Rams Large hydraulic rams simulate tubingand casing loads on wellhead slips and hangers or drill-

    pipe suspension loads on ram BOPs.

    Test Pits Two 25-ft deep floodable test pits allow as-sembly of tall equipment such as BOP stacks. With aspecially constructed cover in place, they can serve as ablast mitigation chamber for higher-risks tests.

    Corrosion A salt fog cabinet is used for acceleratedcorrosion testing on samples. It is used for corrosiveresistance evaluation of coatings, plating and corrosioninhibitors.

    Subsea Pressure The hyperbaric chamber is rated forpressures of water depths in excess of 10,000 ft (3048 m)

    Pressure Hydrostatic testing is performed with avariety of pumps capable of producing up to 40,000

    psig. Gas testing is conducted in reinforced test cellswith gas boosters generating up to 36,000 psig.

    Bending Two large test frames are available forstructural bending and torsion tests. The larger framecan sustain up to 15 MM ft-lb of bending load.

    Temperature Extremes Several test chambers areutilized for testing at temperatures ranging from-100o F to 500o F (-73o C to 260o C).

    Hot Oil One fixed 106-kw and two portable 30-kwhot-oil circulating units produce internal bore temperatures up to 400o F (204oC) on products as large asa subsea BOP or as small as a 2 gate valve.

    Experimental Stress Analysis Hundreds of bondedresistance strain gauges, used primarily for empiricalverification of finite element analysis, are available foruse during testing.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    1

    3

    5

    7

    9

    11

    2

    4

    6

    8

    10

    12

    18

  • 8/14/2019 Introductory to well head

    19/20

    CAMERON INTERNATIONAL MALAYSIA SYSTEMSCENTER OF SUBSEA WELLHEAD MANUFACTURING EXCELLENCE

    The Cameron International Malaysia Systems (CIMS) manufacturing facility is Camerons center of excellence for

    the manufacture of subsea wellhead systems worldwide. The plant offers unique and highly efficient systems

    and equipment specifically tailored to the production of subsea wellhead systems.

    19

    SUBSEA SYSTEMS

  • 8/14/2019 Introductory to well head

    20/20

    SUBSEA SYSTEMS

    PO Box 1212

    Houston, Texas 77251-1212 USATel 1.713.939.2211

    5 Mondial Way

    Harlington

    Hayes, UB3 5AR

    England, UK

    Tel 44.208.990.1800

    Level 11, 12-14

    The EsplanadePerth, Western Australia

    6000

    Tel 61.8.9483.4444

    Learn more about subsea

    wellhead systems at:

    www.c-a-m.com

    or email:

    [email protected]

    HSE Policy StatementAt Cameron, we are committed ethically, financially and personallyto a working environment where no one gets hurt, nothing gets harmed.