Construction Works: 23rdMarch to 6th April
Project Pegasus
Issue #4020th March 2020
SRM Special Projects Site Team offices
are now located within the basement
of the building with access through the
East hoarding opposite Kings Bench
Walk where ‘Visitor Entrance:’ signage
can be found on the hoarding door to
assist. Please press the bell to attract
attention.
Site working hours will be from:
8.00am – 6.00pm Monday – Friday
9.00am – 2.00pm Saturday
Project Manager: John Walker
SRM Special Projects
T: 07866 783710
If unavailable contact,
Chief Engineer: Joshua Murray
T: 07875 190945
Contact Us
• Demolition of existing level 3 floor slab in the North
East corner
• M&E installation within the basement plant rooms,
kitchen and new book store
• Internal brickwork and blockwork infills throughout
the building
• Brickwork for the new fire escape stairs on the North
façade
• Scaffold tower to facilitate the formation of the new lift
shaft brickwork
• Waterproofing within the basement
• Concrete work on level 3 to support the new structural
steel
• Installation of structural steel
Concrete Works on 3rd Floor
Structural Steel Installation