inter moor presentation nov 2011

18

Upload: schachtbrian

Post on 29-Jun-2015

656 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Inter Moor Presentation   Nov 2011
Page 2: Inter Moor Presentation   Nov 2011

A Global Leader

Page 3: Inter Moor Presentation   Nov 2011

Expertise and know-how delivered

MOORINGS Rig Moves

Permanent Moorings

Equipment

Inspection, Maintenance & Repair

Marine Assurance

FOUNDATIONS Well Conductors

Suction Piles

Driven Piles

SEPLAs

Anchors

Mudmats

SUBSEA

Heave Compensation

Abrasive Cutting

Decommissioning

Page 4: Inter Moor Presentation   Nov 2011

InterMoor Support Services

ENGINEERING FABRICATION SURVEY & POSITIONING

SHORE BASE

React in real time to the high complex needs of our clients

Page 5: Inter Moor Presentation   Nov 2011

InterMoor’s Reliability is Based on:

RESOURCES EXPERIENCE TECHNOLOGY Facilities

Shore Base & Offshore Crews

Technical & Operations Personnel

Extensive Inventory

Equipment

Rig Moves

Temporary & Permanent Moorings

Foundation Design, Supply & Install

Subsea Install/Retrieve

Abrasive Cutting

Back-of-boat Services

Deepwater Moorings

Synthetic Moorings

Suction Piles

Award-Winning SEPLA

Heave Compensation

Novel Installations & Operations

Page 6: Inter Moor Presentation   Nov 2011

6

Safety is Top Priority

• Strong Management Commitment

• HSE Policy

• Dedicated Safety Staff

• Continuous Improvement

• Commitment to Training

• Stop Work Authority

• Behavior Based Safety Program

• Job Risk Assessments & Job Safety Analyses

• AHV Back Deck Training Facility & 5-Day Training Program

Page 7: Inter Moor Presentation   Nov 2011

7

Quality is Top Priority

ISO 9001:2008 Certified • US Operations

• Houston, TX • Morgan City, LA • Fourchon, LA

• Brazil • Rio de Janeiro • Vitoria • Macae

• UK • Aberdeen

• Norway • Sandvika • Stavanger

• Singapore • ISO Compliance at other locations

Page 8: Inter Moor Presentation   Nov 2011

How does InterMoor add value?

Page 9: Inter Moor Presentation   Nov 2011

9

Foundations & Conductors

InterMoor Provides a Complete Solution: • DESIGN • IN-HOUSE FABRICATION • INSTALLATION

Page 10: Inter Moor Presentation   Nov 2011

10

Foundation Experience

• Designed and installed the first suction pile installed in GoM (1996)

• Designed and installed piles for GoM, West Africa, SE Asia, Brazil

• Includes mooring piles, manifold & PLET piles, subsea pump foundations

Page 11: Inter Moor Presentation   Nov 2011

11

Foundation Experience

Repeat customers: Shell, Chevron, Technip, Exxon, BP, Total, Cameron, FMC, Murphy Oil, LLOG, Petrobras

Project Management

• Experience • Diverse background • Industry knowledge

Engineering

• Offshore experience • Practical solutions • Innovation

Procurement

• Vendor relationship • Product knowledge • Buying Power

Page 12: Inter Moor Presentation   Nov 2011

Support Services

Page 13: Inter Moor Presentation   Nov 2011

13

Fabrication

• Suction piles • SEPLAs • Mudmats • Conductors • Driven Piles • Air cans • Buoys • Skids • Riser clamps • Centralizers • Jacking pedestals • Subsea tree frames

Page 14: Inter Moor Presentation   Nov 2011

14

Morgan City Facility

• 24 Acres / 1,290 ft of Bulkhead • 225 and 230 ton Cranes • 180,000 sq ft In-house Storage • 120,000 sq ft Rental Space • Fabrication Facilities

• 11,000 sq. ft. indoor facility including CNC Shop and 2 10T overhead cranes

• 2nd building: 14,400 sq. ft. indoor shop space and 2 x 30T overhead crane w/ 30 ft. hook height

• AWS D1.1 Welder Certification • Over 6 yrs without an LTA

Page 15: Inter Moor Presentation   Nov 2011

15

Shore Base

• Test Bed • Storage • Marshalling Services • Maintenance • Mobilization/Demobilization • Heavy Lifts

Page 16: Inter Moor Presentation   Nov 2011

16

Fourchon Facility

• 25 Acres w/ 1200 ft of bulkhead

• Heavy Lift Operations • 880 ton Ringer Crane, 300 & 225 ton

crawler cranes

• Homeland Security Approved

• Capacity for 4 simultaneous loadouts

• Inspection – Wire and Chain

• Spooling Units / Maintenance

• Tenant Storage

• Mooring Equipment

• 3,000,000lb Test Bed

Page 17: Inter Moor Presentation   Nov 2011

17

Engineering

• Mooring option FEED studies • Field development MODU mooring studies • Suction and driven pile design • Mooring design and analysis • Risk assessment • Anchor installation and holding capacity

analysis • Coupled 2 body mooring analysis • Installation engineering/analysis • Structural engineering • CAD and drafting services • Cost and feasibility studies

Page 18: Inter Moor Presentation   Nov 2011

Thank You