IRP1 Review - Y. Muttoni TS-ICC Equipment (compared to existing solution). Add energy extraction (DQR-DQS). Electrical feed box outside beam. Cold D1 magnet. Limit Implantation studied around Pt1 in UJ14 (UJ16 symmetrical). Implantation racks studied inside by-pass near USC55. Electrical feed box like DFBL used. New electrical link. New DQR (mechanical or semiconductor). Study inputs and limitations 1/24/20163

TRANSCRIPT

Page 1: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

Integration studies – Part 1Inner triplet

Y. Muttoni TS-ICC-LI31 July 2008

Page 2: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

SummaryStudy inputs and limitations

Equipment in place UJ14Study implantation new equipment

UJ14Equipment in place RZ54-USC55

Equipment in place UJ56Study implantation new equipment By-

pass USC55 Conclusions

05/03/23 2

Page 3: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment (compared to existing solution).Add energy extraction (DQR-DQS).Electrical feed box outside beam.Cold D1 magnet.

LimitImplantation studied around Pt1 in UJ14 (UJ16 symmetrical).Implantation racks studied inside by-pass near USC55.Electrical feed box like DFBL used.New electrical link. New DQR (mechanical or semiconductor).

Study inputs and limitations

05/03/23 3

Page 4: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Geographical location

05/03/23 4

Page 5: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment in place UJ14

5

Page 6: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment in place UJ14

UJ14 IP1

UJ13

Space reservedfor transport

05/03/23 6

Page 7: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment in place UJ14 1st floor

UJ141st floor

IP1

UJ13

UTA

05/03/23 7

Page 8: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UJ14

8

Transport area

Page 9: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UJ14

DFBL2x13KA6x600A2x120A

05/03/23 9

Page 10: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UJ14 1st floor

10

Page 11: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UJ14

Electrical link

Routing link should be studied more in detail

Existing holes through shielding wall1st floor

11

Page 12: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UJ14

05/03/23 12

Page 13: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in UL14D1 cold

Cryogenic link

Electrical link

13

Page 14: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in US15D1 cold

Cryogenic link

Electrical link

05/03/23 14

Page 15: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New equipment in US15D1 cold

Cryogenic link

Electrical link

05/03/23 15

Page 16: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Geographical location

USC55

05/03/23 16

Page 17: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment in place RZ54-USC55

17

Page 18: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

Equipment in place UJ56

18

Page 19: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New Equipment Point 5

New rack layoutsymmetrical for each side

Routing link should be studied more in detail

Transport area

19

Page 20: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New Equipment Point 5

USC55

By-Pass

Cross section

20

Transport area

Page 21: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

New Equipment Point 5

05/03/23 21

Page 22: Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC

ConclusionsNew electrical link:

Routing link should be studied in detail at point 5.Distance between DFB and Inner triplet is may be too far at point 5?

New rack layout New cable (Control, power) routing required.New cooling water pipe routing required.Audit of rack use required with all owners (optimize space?).New position of control access is necessary at point 1.

New energy extraction Required for space constraintsChecking metallic structure in point 1.

Electrical feed boxNew design or using DFBL?

Implantation equipment Radiation issue.

05/03/23 22