integration studies – part 1 inner triplet y. muttoni ts-icc-li 31 july 2008
DESCRIPTION
IRP1 Review - Y. Muttoni TS-ICC Equipment (compared to existing solution). Add energy extraction (DQR-DQS). Electrical feed box outside beam. Cold D1 magnet. Limit Implantation studied around Pt1 in UJ14 (UJ16 symmetrical). Implantation racks studied inside by-pass near USC55. Electrical feed box like DFBL used. New electrical link. New DQR (mechanical or semiconductor). Study inputs and limitations 1/24/20163TRANSCRIPT
Integration studies – Part 1Inner triplet
Y. Muttoni TS-ICC-LI31 July 2008
IRP1 Review - Y. Muttoni TS-ICC
SummaryStudy inputs and limitations
Equipment in place UJ14Study implantation new equipment
UJ14Equipment in place RZ54-USC55
Equipment in place UJ56Study implantation new equipment By-
pass USC55 Conclusions
05/03/23 2
IRP1 Review - Y. Muttoni TS-ICC
Equipment (compared to existing solution).Add energy extraction (DQR-DQS).Electrical feed box outside beam.Cold D1 magnet.
LimitImplantation studied around Pt1 in UJ14 (UJ16 symmetrical).Implantation racks studied inside by-pass near USC55.Electrical feed box like DFBL used.New electrical link. New DQR (mechanical or semiconductor).
Study inputs and limitations
05/03/23 3
IRP1 Review - Y. Muttoni TS-ICC
Geographical location
05/03/23 4
IRP1 Review - Y. Muttoni TS-ICC
Equipment in place UJ14
5
IRP1 Review - Y. Muttoni TS-ICC
Equipment in place UJ14
UJ14 IP1
UJ13
Space reservedfor transport
05/03/23 6
IRP1 Review - Y. Muttoni TS-ICC
Equipment in place UJ14 1st floor
UJ141st floor
IP1
UJ13
UTA
05/03/23 7
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UJ14
8
Transport area
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UJ14
DFBL2x13KA6x600A2x120A
05/03/23 9
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UJ14 1st floor
10
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UJ14
Electrical link
Routing link should be studied more in detail
Existing holes through shielding wall1st floor
11
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UJ14
05/03/23 12
IRP1 Review - Y. Muttoni TS-ICC
New equipment in UL14D1 cold
Cryogenic link
Electrical link
13
IRP1 Review - Y. Muttoni TS-ICC
New equipment in US15D1 cold
Cryogenic link
Electrical link
05/03/23 14
IRP1 Review - Y. Muttoni TS-ICC
New equipment in US15D1 cold
Cryogenic link
Electrical link
05/03/23 15
IRP1 Review - Y. Muttoni TS-ICC
Geographical location
USC55
05/03/23 16
IRP1 Review - Y. Muttoni TS-ICC
Equipment in place RZ54-USC55
17
IRP1 Review - Y. Muttoni TS-ICC
Equipment in place UJ56
18
IRP1 Review - Y. Muttoni TS-ICC
New Equipment Point 5
New rack layoutsymmetrical for each side
Routing link should be studied more in detail
Transport area
19
IRP1 Review - Y. Muttoni TS-ICC
New Equipment Point 5
USC55
By-Pass
Cross section
20
Transport area
IRP1 Review - Y. Muttoni TS-ICC
New Equipment Point 5
05/03/23 21
IRP1 Review - Y. Muttoni TS-ICC
ConclusionsNew electrical link:
Routing link should be studied in detail at point 5.Distance between DFB and Inner triplet is may be too far at point 5?
New rack layout New cable (Control, power) routing required.New cooling water pipe routing required.Audit of rack use required with all owners (optimize space?).New position of control access is necessary at point 1.
New energy extraction Required for space constraintsChecking metallic structure in point 1.
Electrical feed boxNew design or using DFBL?
Implantation equipment Radiation issue.
05/03/23 22