integrated marketplace update additional... · integrated marketplace savings • first year net...

47
Integrated Marketplace Update Bruce Rew, PE Vice President, Operations 1

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Integrated Marketplace Update

Bruce Rew, PE

Vice President, Operations

1

Page 2: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

2

SPP Integrated Marketplace Update

• Marketplace Highlights Over Last 12 Months

• Marketplace Statistical Information

• Marketplace Wind Peak and Penetration

• Enhancements under development

Page 3: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Marketplace Over Last 12 Months

• 172 Market Participants 110 financial only and 62 asset owning No new Market Participants during the quarter

• SPP BA has successfully maintained NERC control performance standards (BAAL & CPS)

• High System availability Day-Ahead Market was only delayed from posting once in 2016 Real-Time Balancing Market has successfully solved 99.93% of

all intervals

3

Page 4: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Integrated Marketplace Savings

• First year net savings calculated to be $380 million

• 2015 annual net savings calculated to be $422 million

• Provided approximately $900 million in cumulative benefits to the region through June

• Should top one billion in savings by year end

4

Page 5: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

5

$0

$10

$20

$30

$40

$50

$60

$70

Ap

ril

May

June July

Aug

ust

Sep

tem

ber

Oct

ober

Nov

emb

er

Dec

emb

er

Janu

ary

Feb

ruar

y

Mar

ch

Ap

ril

May

June July

Aug

ust

Sep

tem

ber

Oct

ober

Nov

emb

er

Dec

emb

er

Janu

ary

Feb

ruar

y

Mar

ch

Ap

ril

May

June

2014 2015 2016

$0

$100

$200

$300

$400

$500

$600

$700

$800

$900

$1,000

Ind

ivid

ual

Sav

ing

s in

Mil

lion

s of

Dol

lars

Cu

mu

lati

ve S

avin

gs

in M

illi

ons

of D

olla

rs

Integrated Marketplace Cost Savings

Cumulative Savings Individual Savings

Page 6: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

6

Dispatch by Fuel Type

Page 7: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

7

Fuel on the Margin in RT

Page 8: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

8

Real-Time versus DA pricing

Page 9: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

9

95 9286

6372

5565

49

88

73

34

76

91

15-Jun 15-Jul 15-Aug 15-Sep 15-Oct 15-Nov 15-Dec 16-Jan 16-Feb 16-Mar 16-Apr 16-May 16-Jun

MEC MLC MCC

MCC: Marginal Congestion CostMLC: Marginal Loss CostMEC: Marginal Energy Cost

% Contribution of LMP Difference

Page 10: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

• 2nd Quarter Peak Load of 48,323 on June 22, 2016 New market footprint record Largely due to addition of Integrated Systems October 2016 Will likely continue to see increases in peak numbers primarily driven

by the addition of new members

• Total of 12,400 MW of installed and operational wind capacity to date Additional 450MW of wind registered this quarter (for a total of

approximately 1,000 MW of registered capacity)

10

Marketplace Operational Highlights

Page 11: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Wind output represents the total real-time output of all wind generators in the SPP market at a point in time.

Max wind output: 10,989 MW 4/23 @22:31 All-Time Max: 10,989 MW 4/23/2016

Min wind output: 161 MW 5/2 @19:56 All-Time Min*: 30 MW 3/1/2015

Q2 Average wind output:4,934 MW

11*Since Integrated Marketplace Go-Live 3/1/2014

Wind Output: April – June 2016

Page 12: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Wind Penetration: April – June 2016

Wind penetration represents the instantaneous wind output divided by the total load. (Wind Gen/SPP Load)

• Max % penetration: 49.2% of load 4/24 @03:35 All-Time Max: 49.2% of load 4/24/2016

• Min % penetration: 0.7% of load 6/29 @15:44 All-time Min*: 0.1% of load 3/1/2015

• Q2 Average % penetration: 18.3% of load

12*Since Integrated Marketplace Go-Live 3/1/2014

Page 13: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

April – June 2016

13

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

55%

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

11000

Win

d P

enet

ratio

n

Win

d M

W

Daily Averages

Average of Wind Output MW Average of Wind Penetration

Page 14: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

April – June 2016 Summary

14

Wind Output Wind Penetration (% of Load)

Max 10,989 MW4/23 @22:31

49.2%4/24 @03:35

Min 161 MW5/2 @19:56

0.7%6/29 @15:44

Average 4,934 MW 18.3%

Page 15: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

July 2016 Implementation:

• Performance improvements in preparation for ECC

• Member Facing enhancements

On The Way:

(Scheduled 9/30/16 Production Date)

• Marketplace Timeline Changes DA Market and DA RUC Timeline Changes to

comply with Gas-Electric Coordination efforts

Near Term:

(Target Nov 11, 2016 Implementation)

• ECC functionality

• Significant non-ECC related API changes based on MP-Requested enhancements

• Planned MP Impacting/MP Facing items

Integrated Marketplace Enhancements

15

Page 16: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Bruce Rew, PEVice President, [email protected]

Page 17: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

THIRD QUARTERLY PROJECT TRACKING

REPORT 2016 July 2016

Page 18: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

CONTENTS

Executive Summary ................................................................................................................................................................ 3

NTC Project Summary ........................................................................................................................................................... 5

NTC Issuance................................................................................................................................................................................................ 7

NTC Withdraw ............................................................................................................................................................................................. 9

Completed Projects ................................................................................................................................................................................. 10

Project status summary ........................................................................................................................................................................ 13

Balanced Portfolio ................................................................................................................................................................. 14

Priority Projects ................................................................................................................................................................ ..... 16

2012 ITP10 ............................................................................................................................................................................... 18

Out-of-Bandwidth Projects ................................................................................................................................................ 20

Responsiveness Report ....................................................................................................................................................... 22

Appendix 1 ............................................................................................................................................................................... 24

Page 19: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 3

EXECUTIVE SUMMARY

SPP actively monitors and supports the progress of transmission expansion projects, emphasizing the importance of maintaining accountability for areas such as grid regional reliability standards, firm transmission commitments and Tariff cost recovery.

Each quarter SPP staff solicits feedback from the project owners to determine the progress of each approved transmission project. This quarterly report charts the progress of all SPP Transmission Expansion Plan (STEP) projects approved either directly by the SPP Board of Directors (Board) or through a FERC filed service agreement under the SPP Open Access Transmission Tariff (OATT).

The reporting period for this report is February 1, 2016 through April 30, 2016. Table 1 provides a summary of all projects in the current Project Tracking Portfolio (PTP), which includes all Network Upgrades in which construction activities are ongoing, or construction has completed but not all the close-out requirements have been fulfilled in accordance to Section 13 of Business Practice 7060. The PTP includes all active Network Upgrades including transmission lines, transformers, substations, and devices.

Table 1 below summarizes the PTP for this quarter. Figures 1 reflects the percentage cost of each upgrade type in the PTP. Figure 2 shows the percentage cost of each project status in the PTP.

Upgrade Type No. of Upgrades Estimated Cost Miles of

New Miles of Rebuild

Miles of Voltage

Conversion Economic 4 $37,946,093 0.0 0.0 28.8 High Priority 67 $1,138,311,034 776.1 5.1 0.0 Regional Reliability 331 $3,145,733,180 1697.3 428.0 328.1 Transmission Service 19 $87,864,499 12.9 17.0 0.0 Zonal Reliability 13 $135,698,578 34.7 73.5 0.0

NTC Projects Subtotal 434 $4,545,553,383 2521.1 523.5 356.9 Generation Interconnection 90 $316,597,826 20.0 0.0 0.0 Regional Reliability - Non OATT 1 $7,107,090 0.0 0.0 0.0 TO - Sponsored 7 $45,834,938 10.7 0.0 0.0

Non-NTC Projects Subtotal 98 $369,539,854 30.7 0.0 0.0 Total 532 $4,915,093,237 2551.8 523.5 356.9

Table 1: Q3 2016 Portfolio Summary

Page 20: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 4

Figure 1: Percentage of Project Type on Cost Basis

Figure 2: Percentage of Project Status on Cost Basis

0.8%

7%

23%

65%

2% 3%

Economic

Generation Interconnection

High Priority

Regional Reliability

Transmission Service

Zonal Reliability

1%

19%

38%

2%

28%

2% 8%

1%

Closed Out

Complete

On Schedule < 4

On Schedule > 4

Delay - Mitigation

Suspended

NTC - Commitment Window

Re-evaluation

Page 21: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 5

NTC PROJECT SUMMARY

In adherence to the OATT and Business Practice 7060, SPP issues Notifications to Construct (NTCs) to Designated Transmission Owners (DTOs) to commence the construction of Network Upgrades that have been approved or endorsed by the Board intended to meet the construction needs of the STEP, OATT, or Regional Transmission Organization (RTO).

Figure 3 reflects project status within each source study, and Table 2 provides the supporting data. Figure 4 shows the amount of estimated cost by in-service year for all Network Upgrades that have been issued an NTC or NTC-C. Note: Figures 3 and 4, and Table 2 provide data for all projects for which SPP has issued an NTC or NTC-C, regardless of completion date, and therefore include data from Network Upgrades no longer included in PTP.

Figure 3: Project Status by NTC Source Study

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

On Schedule

Suspended

Delayed

Complete

$ M

illio

n

Page 22: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 6

Source Study Complete Delayed Suspended On Schedule Total

2006 STEP $189,388,776 $0 $0 $0 $189,388,776 2007 STEP $501,043,194 $1,050,000 $0 $0 $502,093,194 2008 STEP $414,962,280 $0 $0 $0 $414,962,280 Balanced Portfolio $831,367,452 $0 $0 $0 $831,367,452 2009 STEP $531,671,210 $1,400,000 $0 $0 $533,071,210 Priority Projects $852,413,361 $127,995,000 $0 $336,433,874 $1,316,842,235 2010 STEP $106,819,723 $14,357,490 $0 $1,731,419 $122,908,632 2012 ITPNT $148,809,440 $44,238,898 $0 $0 $193,048,338 2012 ITP10 $313,376,623 $0 $452,517,245 $765,893,868 2013 ITPNT $262,271,854 $195,339,454 $0 $41,462,612 $499,073,919 2014 ITPNT $65,503,283 $328,193,205 $0 $207,359,505 $601,055,993 HPILS $182,023,661 $103,527,234 $0 $396,824,034 $682,374,929 2015 ITPNT $31,198,070 $146,962,856 $62,996,125 $6,607,406 $247,764,456 2015 ITP10 $0 $0 $15,234,358 $50,054,430 $65,288,788 IS Integration Study $205,500,000 $38,000,000 $0 $116,800,000 $360,300,000 2016 ITPNT $0 $297,816,459 $0 $201,514,674 $499,331,133 Ag Studies $689,415,802 $78,331,477 $0 $83,500,470 $851,247,749 DPA Studies $179,399,512 $2,070,655 $0 $10,373,590 $191,843,757 GI Studies $487,208,232 $0 $0 $255,399,784 $742,608,016

Total $5,678,995,851 $1,692,659,350 $78,230,483 $2,160,579,041 $9,610,464,726 Table 2: Project Status by NTC Source Study

Figure 4: Estimated Cost for NTC Project per In-Service Year

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

$1,600

$1,800

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

$58 $58

$182

$340$391

$341

$980

$554

$1,743

$799

New Q2 2016 NTC

Modified Q2 2016 NTC

Previous NTC

$ M

illio

n

$1,307

$714

$1,455

$303

$32

$349

Page 23: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 7

NTC ISSUANCE Twenty-two new NTCs were issued since the last quarterly report totaling an estimated $521.7 million.

Five NTCs were issued as a result of the completion of Aggregate Studies, SPP-2014-AG1-AFS-6 and SPP-2015-AG1-AFS-6. The total estimated cost of the Network Upgrades listed in these NTCs is $6.1 million.

NTC No. 200384 was issued to Southwestern Public Service Co. (SPS) as a result of the Delivery Point Addition Study, DPA-2013-JUN-342. The total estimated cost of the two Network Upgrades listed in this NTC is $4.6 million.

NTC No. 200385 was issued to Mid-Kansas Electric Company (MKEC) after the Board in April 2016 concluded the Transmission Owner Selection Process for the Competitive Upgrade to build a new 21-mile 115 kV line from Walkemeyer to North Liberal. The estimated cost of the Network Upgrade is $8,325,610.

Ten NTCs and three Notification to Construct with Conditions (NTC-C) were issued as a result of the Board approval of the 2016 Integrated Transmission Planning Near-Term Assessment (ITPNT). The total estimated cost of the Network Upgrades described in these NTCs is $499.5 million.

One Generation Interconnection NTC was issued to Oklahoma Gas & Electric Company (OGE) for a Network Upgrade estimated to cost $20,000.

Table 3 summarizes the NTC activity from April 1, 2016 through June 30, 2016. NTC ID values in bold font indicate NTC-Cs.

Page 24: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 8

NTC ID Owner NTC Issue Date Upgrade Type Source Study

No. of Upgra

des

Estimated Cost of New

Upgrades

Estimated Cost of

Previously Approved Upgrades

200378 OGE 4/5/2016 Regional Reliability SPP-2015-AG1-AFS-6 1 $500,000

200379 WR 4/5/2016 Regional Reliability SPP-2015-AG1-AFS-6 2 $645,773

200380 GRDA 4/20/2016 Regional Reliability SPP-2014-AG1-AFS-6 2 $675,000

200381 SPS 4/12/2016 Regional Reliability SPP-2014-AG1-AFS-6 1 $5,000

200382 AEP 4/12/2016 Regional Reliability SPP-2014-AG1-AFS-6 1 $4,319,501

200384 SPS 4/20/2016 Regional Reliability DPA-2013-JUN-342 2 $4,555,114

200385 MKEC 5/17/2016 Regional Reliability 2015 ITP10 1 $8,325,610

200386 AEP 5/17/2016 Regional

Reliability/Zonal Reliability

2016 ITPNT 9 $55,261,359

200387 BEPC 5/17/2016 Regional Reliability 2016 ITPNT 6 $123,391,600 200388 BEPC 5/17/2016 Regional Reliability 2016 ITPNT 4 $21,919,028 200389 ETEC 5/17/2016 Regional Reliability 2016 ITPNT 1 $1,712,000 200390 GRDA 5/17/2016 Regional Reliability 2016 ITPNT 4 $3,400,600 $295,000 200391 OGE 5/17/2016 Regional Reliability 2016 ITPNT 4 $29,300,000 200392 OGE 5/17/2016 Regional Reliability 2016 ITPNT 2 $750,000 $4,009,000 200393 OPPD 5/17/2016 Regional Reliability 2016 ITPNT 1 $619,277 200394 SEPC 5/17/2016 Regional Reliability 2016 ITPNT 1 $1,909,424

200395 SPS 5/17/2016 Regional Reliability/Economic 2016 ITPNT 28 $48,683,192 $158,782,895

200396 WFEC 5/17/2016 Regional Reliability 2016 ITPNT 2 $21,700,000 200397 WFEC 5/17/2016 Regional Reliability 2016 ITPNT 12 $18,791,325 $8,652,000 200398 WR 5/17/2016 Zonal Reliability 2016 ITPNT 1 $364,080 200401 SPS 5/25/2016 Regional Reliability 2014 ITPNT 1 $3,187,532

200402 OGE 6/7/2016 Generation Interconnection GEN-2014-057 1 $20,000

Total 87 $344,258,459 $177,515,851 Table 3: Q2 2016 NTC Issuance Summary

Page 25: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 9

NTC WITHDRAW Five NTCs were withdrawn for 16 Network Upgrades since the last quarterly report, totaling an estimated $56.5 million.

Thirteen of the withdrawn Network Upgrades were determined to no longer be needed as a part of the ongoing 2016 ITP Near-Term Assessment. The Board approved the withdrawals at its meeting in April 2016.

Table 4 lists the NTC Withdraw activity from April 1, 2016 through June 30, 2016. NTC ID values in bold font indicate NTC-Cs.

NTC ID Owner NTC

Withdraw Date

Upgrade Type Source Study No. of Upgrades

Estimated Cost of

Withdrawn Upgrades

200380 GRDA 4/20/2016 Regional Reliability SPP-2014-AG1-

AFS-6 2 $7,719,238

200383 OGE 4/20/2016 Transmission Service SPP-2015-AG1-

AFS-6 1 $700,000 200386 AEP 5/17/2016 Regional Reliability 2016 ITPNT 1 $5,699,679 200392 OGE 5/17/2016 Regional Reliability 2016 ITPNT 1 $0

200397 WFEC 5/17/2016 Regional Reliability/High

Priority 2016 ITPNT 11 $42,389,641 Total 16 $56,508,558

Table 4: Q1 2016 NTC Withdraw Summary

Page 26: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 10

COMPLETED PROJECTS Twenty-three (23) Network Upgrades with NTCs and one Generation Interconnection Network Upgrade were verified as completed during the reporting period, totaling an estimated $309.3 million.

Table 5 lists the Network Upgrades reported and confirmed as completed during the reporting period. Table 6 summarizes the completed projects over the previous year, including Network Upgrades not yet confirmed as completed. Figure 5 reflects the completed projects by upgrade type on a cost basis for the current year and the following year based on current projected in-service dates. Tables 7 and 8 summarize all Network Upgrades that include construction of transmission lines, both for the current year and the following year. Note: Previous quarter’s updated results are listed as the Transmission Owners may make adjustments to final costs and status of projects completed during the year.

UID Network Upgrade Name Owner NTC Source Study Cost Estimate

10524 GRANDFIELD 138/69KV TRANSFORMER CKT 1 WFEC 2007 STEP $5,000,000 10615 Forbing Tap - South Shreveport 69 kV Ckt 1 AEP 2013 ITPNT $1,221,505 10657 Ellerbe Road - Forbing T 69 kV Ckt 1 AEP 2014 ITPNT $8,174,689 11009 HAPPY INTERCHANGE 115/69KV TRANSFORMER CKT 2 SPS 2010 STEP $1,565,056 11052 PLEASANT HILL 230/115KV TRANSFORMER CKT 1 SPS 2009 STEP $15,713,303 11317 Grassland Interchange 230/115 kV Transformer Ckt 1 SPS 2013 ITPNT $4,003,560 11425 Cole - Criner 138 kV Ckt 1 WFEC 2013 ITPNT $1,400,000

50328 HALSTEAD SOUTH BUS - SEDGWICK COUNTY NO. 12 COLWICH 138KV CKT 1 WR Ag Studies $108,694

50334 WINNSBORO 138KV AEP 2010 STEP $1,166,400 50453 Bowers - Howard 115 kV SPS DPA Studies $30,851,077

50516 Deaf Smith County Interchange 230/115 kV Transformer Ckt 2 SPS 2013 ITPNT $4,225,233

50607 Messick 500/230 kV Transformer Ckt 1 AEP 2013 ITPNT $30,369,537 50615 Messick 500 kV Terminal Upgrades AEP 2013 ITPNT $21,508,234 50624 Medford Tap - Pond Creek 138 kV (WFEC) WFEC DPA Studies $3,540,000 50696 Neosho 138/69 kV Ckt 1 Transformer WR 2014 ITPNT $7,000,099

50726 City of Wellington - Sumner County No.4 Rome 69 kV Ckt 1 Rebuild WR 2014 ITPNT $5,226,656

50764 Ahloso - Harden City 138 kV Ckt 1 Voltage Conversion OGE 2014 ITPNT $6,929,179 50821 Potash Junction 230/115 kV Ckt 1 SPS HPILS $3,687,581 50881 Andrews 230/115 kV Ckt 1 Transformer SPS HPILS $10,671,660 50882 Andrews - NEF 115 kV Ckt 1 SPS HPILS $3,523,472 51132 Road Runner 115 kV SVC SPS 2015 ITPNT $28,918,070 51361 Meadow Grove 230kV (GEN-2014-031 TOIF) NPPD GI Studies $100,000

Total $194,904,006

Table 5: Q2 2016 Completed Network Upgrades

Page 27: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 11

Upgrade Type Q3 2015 Q4 2015 Q1 2016 Q2 2016 Total

Regional Reliability 15 11 24 18 68

$84,114,928 $47,450,683 $313,704,267 $167,768,024 $613,037,903

Transmission Service 4 1 2 1 8

$15,753,551 $4,800,000 $1,617,301 $108,694 $22,279,546

High Priority 4 2 3 3 12

$21,937,103 $61,928,987 $23,382,497 $17,882,713 $125,131,300

Zonal Reliability 1 0 1 0 2

$355,000 $0 $816,203 $0 $1,171,203

Generation Interconnection

8 12 1 2 23 $52,719,246 $53,100,204 $1,588,977 $1,600,377 $109,008,805

Table 6: Completed Project Summary through 2nd Quarter 2016

Figure 5: Completed Upgrades by Type per Quarter

$0.0

$100.0

$200.0

$300.0

$400.0

$500.0

$600.0

$700.0

$800.0

Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016Projected

Q4 2016Projected

Q1 2017Projected

Q2 2017Projected

Generation Interconnection

Zonal Reliability

Economic

High Priority

Balanced Portfolio

Transmission Service

Regional Reliability

$ M

illio

n

Page 28: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 12

Voltage Class

Number of Upgrades New

Rebuild/ Reconductor

Voltage Conversion Estimated Cost

69 18 73.6 63.3 0.0 $121,900,674 115 12 134.1 0.0 4.5 $109,106,944 138 5 13.0 19.1 17.5 $27,528,757 161 0 0.0 0.0 0.0 $0 230 5 87.9 0.0 122.0 $88,858,508 345 2 145.0 0.0 0.0 $164,000,000

Total 42 453.5 82.4 144.0 $511,394,883 Table 7: Line Upgrade Summary for Previous 12 Months

Voltage Class

Number of Upgrades New

Rebuild/ Reconductor

Voltage Conversion Estimated Cost

69 5 2.0 29.7 0.0 $17,237,371 115 8 81.0 37.2 1.0 $95,969,752 138 5 40.8 16.1 11.7 $52,704,268 161 0 0.0 0.0 0.0 $0 230 0 0.0 0.0 0.0 $0 345 7 376.7 0.0 0.0 $608,199,308

Total 25 500.5 82.9 12.8 $774,110,699 Table 8: Line Upgrade Projections for Next 12 Months

Page 29: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 13

PROJECT STATUS SUMMARY SPP assigns a project status to all Network Upgrades based on the projected in-service dates provided by the DTOs relative to the Need Date determined for the project. Project status definitions are provided below:

• Complete: Construction complete and in-service • Closed Out: Construction complete and in-service; all close-out requirements fulfilled • On Schedule < 4: On Schedule within 4-year horizon • On Schedule > 4: On Schedule beyond 4-year horizon • Delayed: Projected In-Service Date beyond Need Date; interim mitigation provided or

project may change but time permits the implementation of project • Within NTC Commitment Window: NTC/NTC-C issued, still within the 90-day written

commitment to construct window and no commitment received • Within NTC-C Project Estimate Window: Within the NTC-C Project Estimate (CPE)

window • Within RFP Response Window: RFP issued for the project • Re-evaluation: Project active; pending re-evaluation • Suspended: Project suspended; pending re-evaluation

Figure 6 reflects a summary of project status by upgrade type on a cost basis.

Figure 6: Project Status Summary on a Cost Basis

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500

RegionalReliability

TransmissionService

High Priority Economic GenerationInterconnection

Suspended

Re-evaluation

Within NTC Commitment Window

Delayed

On Schedule > 4

On Schedule < 4

Complete

Closed Out

$ M

illio

n

Page 30: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 14

BALANCED PORTFOLIO

Approved in April 2009, the Balanced Portfolio was an initiative to develop a group of economic transmission upgrades that benefit the entire SPP region, and to allocate those project costs regionally. The projects that were issued NTCs as a result of the study include a diverse group of projects, estimated to add approximately 702 miles of new 345 kV transmission line to the SPP system.

The total cost estimate of $831.4 million for the projects making up the Balanced Portfolio decreased by less than 1% from the previous quarter’s total.

All the projects making up the Balanced Portfolio have been completed and placed into service. A final reallocation of Revenue Requirements for deficient Zone(s) will be performed once all actual costs have been reported.

Figure 7 below depicts a historical view of the total estimated cost of the Balanced Portfolio. Table 9 provides a project summary of the projects making up the Balanced Portfolio.

Figure 7: Balanced Portfolio Cost Estimate Trend

$691.2

$832.3

$903.0

$810.5

$831.4

$650.0

$700.0

$750.0

$800.0

$850.0

$900.0

$950.0

BP R

epor

t 6/0

9O

rigi

nal N

TCs

2009

Q3

Q4

2010

Q1

Q2

Q3

Q4

2011

Q1

Q2

Q3

Q4

2012

Q1

Q2

Q3

Q4

2013

Q1

Q2

Q3

Q4

2014

Q1

Q2

Q3

Q4

2015

Q1

Q2

Q3

Q4

2016

Q1

Q2

FERC Filing $896.7

$ M

illio

n

Page 31: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 15

Project ID(s)

Project Owner(s) Project Name Line

Length Study

Estimates Q1 2016 Cost

Estimates Q2 2016 Cost

Estimates Var.

%

705/709 WFEC/OGE Gracemont Substation 345 kV N/A $8,000,000 $14,486,622 $14,859,014 2.6%

707/708 ITCGP/NPPD Spearville - Post Rock - Axtell 345 kV 226.9 $236,557,015 $207,495,845 $206,798,467 -0.3%

698/699 OGE/GRDA Sooner - Cleveland 345 kV 36 $33,530,000 $50,262,358 $50,269,871 0.0%

702 KCPL Swissvale - Stilwell Tap 345 kV N/A $2,000,000 $2,875,727 $2,875,727 0.0%

700 OGE Seminole - Muskogee 345 kV 118 $129,000,000 $163,416,396 $163,456,250 0.0%

701/704 OGE/SPS Tuco – Woodward 345 kV 290.1 $227,727,500 $330,003,491 $330,158,871 0.0%

703 GMO/KCPL Iatan – Nashua 345 kV 30.9 $54,444,000 $62,949,252 $62,949,252 0.0%

Total 701.9 $691,258,515 $831,489,691 $831,367,452 0.0% Table 9: Balanced Portfolio Cost Summary

Page 32: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 16

PRIORITY PROJECTS

In April 2010 the Board and Members Committee approved for construction a group of "priority" high voltage electric transmission projects estimated to bring benefits of at least $3.7 billion to the SPP region over 40 years. The projects issued NTCs as a result of the study are estimated to add 291 miles of new single circuit 345 kV transmission line and 435 miles of double circuit 345 kV transmission to the SPP region.

In October 2010 the Board approved an overall cost increase for the Priority Projects due to line rerouting and addition costs for reactive compensation. The total cost estimate for the Priority Projects after the variances were approved was $1.42 billion.

The total cost estimate of $1.32 billion for the projects included in the Priority Projects report decreased by less than 1% from the previous quarter’s total.

Figure 8 below depicts a historical view of the total estimated cost of the Priority Projects. Table 10 provides a project summary of the projects making up the Priority Projects. Table 11 lists construction status updates for the Priority Projects not yet completed.

Figure 8: Priority Project Cost Estimate Trend

$1,144.9

$1,449.7

$1,388.2 $1,381.0

$1,387.9

$1,316.8

$1,100.0

$1,150.0

$1,200.0

$1,250.0

$1,300.0

$1,350.0

$1,400.0

$1,450.0

$1,500.0

Additional Costs Approved by Board

$1,416.3

$ M

illio

n

Page 33: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 17

Project ID(s)

Project Owner(s) Project

Est. Line

Length

Board Approved Estimates (10/2010)

Q1 2016 Cost Estimates

Q2 2016 Cost Estimates

Var. %

937 AEP Tulsa Power Station 138 kV Reactor N/A $842,847 $614,753 $614,753 0.0%

940/941 SPS/OGE Hitchland – Woodward District 345 kV Dbl Ckt 128.8 $221,572,283 $229,563,977 $229,667,207 0.0%

942/943 PW/OGE Thistle – Woodward District 345 kV Dbl Ckt 106.6 $201,940,759 $185,687,533 $185,315,142 -0.2%

945 ITCGP Spearville – Ironwood – Clark Co. – Thistle 345 kV Dbl Ckt

122.5 $293,235,000 $318,138,968 $316,862,107 -0.4%

946 PW/WR Thistle – Wichita 345 kV Dbl Ckt 77.5 $163,488,000 $120,525,851 $119,954,152 -0.5%

936 AEP Valliant – NW Texarkana 345 kV 76.3 $131,451,250 $127,995,000 $127,995,000 0.0%

938/939 OPPD/TSMO Nebraska City – Mullin Creek – Sibley 345 kV 215.0 $403,740,000 $336,433,874 $336,433,874 0.0%

Total 726.7 $1,416,270,139 $1,318,959,956 $1,316,842,235 -0.2%

Table 10: Priority Projects Summary

Proj

ect I

D

Proj

ect N

ame

Proj

ecte

d In

-Ser

vice

D

ate

Engi

neer

ing

Siti

ng a

nd R

outi

ng

Envi

ronm

enta

l Stu

dies

Perm

its

Mat

eria

l Pro

cure

men

t

Cons

truc

tion

C Complete

936 Valliant – NW Texarkana 345 kV 10/1/2016 C C C IP IP IP IP In Progress

938 Nebraska City – Mullin Creek – Sibley 345 kV (TSMO) 12/31/2016 C C C C IP IP

NS Not Started

939 Nebraska City – Mullin Creek – Sibley 345 kV (OPPD) 12/31/2016 IP C C IP IP IP

N/A Not Applicable

Table 11: Priority Projects Construction Status

Page 34: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 18

2012 ITP10

In January 2012 the Board approved the first Integrated Transmission Planning 10-Year Assessment (ITP10). The projects approved as a part of the report ranged from comprehensive regional solutions to local reliability upgrades to address the expected reliability, economic, and policy needs of the studied 10- year horizon. The approved portfolio from the 2012 ITP10 is expected to add approximately 513 circuit miles of new 345 kV transmission.

All the projects from the 2012 ITP10 are currently in the planning or construction phases. The first 2012 ITP10 project expected to complete is the new Matthewson 345 kV substation and second 345 kV circuit from Matthewson to Cimarron projected to be energized in July 2016.

Figure 9 below depicts a historical view of the total estimated cost of the 2012 ITP10 projects. Table 12 provides a summary of the projects approved as part of the 2012 ITP10.

Figure 9: 2012 ITP10 Cost Estimate Trend

$774.7 $774.7 $770.0 $773.2

$765.9

$500.00

$600.00

$700.00

$800.00

$900.00

$1,000.00

$1,100.00

+20%

-20%

$ M

illio

n

Page 35: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 19

Project ID(s)

Project Owner(s) Project

Est. 345 kV Line Length

Established Baseline Cost

Estimates (Adj. for

Inflation)

Q1 2016 Cost Estimates

Q2 2016 Cost Estimates

Var. %

(Q1 vs. Q2)

30361 AEP/OGE Chisholm - Gracemont 345 kV 101.8 $175,481,866 $162,952,357 $162,952,357 0.0%

30364 OGE Woodward District EHV - Tatonga - Matthewson - Cimarron 345 kV Ckt 2

126.0 $191,915,155 $178,212,300 $178,212,300 0.0%

30367 ITCGP/WR Elm Creek - Summit 345 kV 58.2 $121,741,449 $115,673,049 $111,352,588 -3.7%

30375 NPPD Gentleman - Cherry Co. - Holt Co. 345 kV 227.0 $337,472,347 $313,376,623 $313,376,623 0.0%

Total 513.0 $826,610,817 $773,355,709 $765,893,868 -0.6 Table 12: 2012 ITP10 Summary

Page 36: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 20

OUT-OF-BANDWIDTH PROJECTS

In adherence to the Business Practice 7060, SPP reports projects that have updated cost values that exceed their established baseline values based upon a ±20% bandwidth. Variances are determined by total project cost.

Two projects with a cost estimate greater than $5 million were identified as having exceeded the ±20% bandwidth requirement during the reporting period.

Table 13 provides summary information and Table 14 lists the cost detail for the out-of-bandwidth projects for Q2 2016.

PID Project Name Owner NTC Source Study Upgrade Type In-Service

Date

412 Line - 64th - Eastborough 69 kV Rebuild WR 2013 ITPNT Regional

Reliability 5/29/2015

834 Line - Portales - Zodiac 69 kV to 115 kV Conversion SPS 2009 STEP Regional

Reliability 11/30/2015

30346 Sub - Cornville 138 kV AEP 2012 ITPNT Regional Reliability 12/31/2014

30472 Line - Hardy Street - Waterworks 69 kV AEP 2013 ITPNT Regional

Reliability 6/25/2015

30473/ 30474/30475

Line - Midland REC - North Huntington 69 kV AEP 2013 ITPNT Regional

Reliability 5/15/2015

30501 Multi - Renfrow - Medford Tap - Chikaskia 138 kV OGE/WFEC DPA Studies Regional

Reliability 4/1/2016

30584 Line - Montgomery - Sedan 69 kV Ckt 1 WR 2014 ITPNT Zonal Reliability 12/1/2018

30645 Line - Harper - Rago 138 kV Ckt 1 MKEC HPILS High Priority 2/18/2018

30769 Line - Benteler - Port Robson 138 kV Ckt 1 and 2 AEP HPILS High Priority 12/11/2014

Table 13: Out-of-Bandwidth Project Summary

Page 37: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 21

PID Baseline

Cost Estimate

Baseline Cost

Estimate Year

Baseline Cost

Estimate with

Escalation

Latest Estimate or Final Cost

Variance Variance %

412 $4,104,097 2013 $4,311,867 $5,251,837 $939,970 21.80% 834 $6,500,000 2014 $6,662,500 $8,231,332 $1,568,832 23.55%

30346 $21,664,838 2012 $22,761,620 $15,289,076 ($7,472,544) -32.83% 30472 $7,519,658 2013 $7,900,341 $5,366,606 ($2,533,735) -32.07%

30473/30474/30475 $16,627,509 2013 $17,469,277 $11,990,487 ($5,478,790) -31.36% 30501 $25,246,084 2015 $25,334,584 $19,626,692 ($5,707,892) -22.53% 30584 $43,086,308 2014 $45,267,552 $35,125,571 ($10,141,981) -22.40% 30645 $13,666,262 2014 $14,358,117 $11,475,555 ($2,882,562) -20.08% 30769 $4,797,318 2014 $4,797,318 $13,875,792 $9,078,474 189.24%

Table 14: Out-of-Bandwidth Project Cost Detail

Page 38: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 22

RESPONSIVENESS REPORT

Table 15 and Figures 10 and 11 provide insight into the responsiveness of DTOs constructing Network Upgrades within SPP in the Quarterly Project Tracking Report for Q2 2016. Note: Network Upgrades with statuses of “Suspended”, “Re-evaluation”, “Within NTC Commitment Window”, “Within NTC-C Project Estimate Window”, and “Within RFP Response Window” were excluded from this analysis.

Project Owner

Number of Upgrades

Number of Upgrades Reviewed

Reviewed %

Number of ISD

Changes

ISD Change %

Number of Cost

Changes

Cost Change

%

AEP 51 8 16% 7 14% 2 4% BEPC 18 18 100% 0 0% 0 0% GMO 4 0 0% 0 0% 0 0%

GRDA 8 0 0% 0 0% 1 13% ITCGP 8 4 50% 0 0% 4 50% KCPL 6 4 67% 4 67% 0 0% LES 2 2 100% 0 0% 0 0%

MIDW 13 0 0% 0 0% 0 0% MKEC 13 10 77% 3 23% 5 38% NPPD 30 5 17% 2 7% 3 10% OGE 47 9 19% 5 11% 2 4%

OPPD 14 14 100% 2 14% 1 7% SPS 134 134 100% 8 6% 34 25%

TSMO 5 3 60% 3 60% 0 0% WFEC 31 0 0% 3 10% 4 13%

WR 36 35 97% 6 17% 5 14% Total 425 249 59% 43 10% 61 14%

Table 15: Responsiveness Summary by Project Owner

Page 39: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 23

Figure 10: In-Service Date Changes by Project Owner

Figure 11: Cost Changes by Project Owner

0

20

40

60

80

100

120

140

160

In-Service Date Changes

0

20

40

60

80

100

120

140

160

Cost Changes

Page 40: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

Southwest Power Pool, Inc.

Q3 2016 Project Tracking Report 24

APPENDIX 1

{See accompanying list of active Applicable Projects}

Page 41: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

COMPLETECLOSED OUT

ON SCHEDULE < 4ON SCHEDULE > 4

NTC-C PROJECT ESTIMATE WINDOWDELAY - MITIGATION

DELAY - NO MITIGATIONSUSPENDED

RE-EVALUATIONNTC - COMMITMENT WINDOW

RFP RESPONSE WINDOW

NTC

_ID

PID

UID

Proj

ect O

wne

r

Stat

e(s)

Upg

rade

Nam

e

Proj

ect T

ype

Proj

ect O

wne

r In

dica

ted

In-S

ervi

ce

Dat

e

RTO

Det

erm

ined

N

eed

Dat

e

Lett

er o

f Not

ifica

tion

to

Con

stru

ct Is

sue

Dat

e

NTC

Sou

rce

Stud

y

Base

line

Cost

Es

tim

ate

Base

line

Cost

Es

tim

ate

Year

Base

line

Cost

Es

tim

ate

wit

h Es

cala

tion

Curr

ent C

ost

Esti

mat

e

Fina

l Cos

t

Proj

ect S

tatu

s

Volt

ages

(kV)

Num

ber

of N

ew

Num

ber

of

Rebu

ild/R

econ

duct

or

Num

ber

of V

olta

ge

Conv

ersi

on

20003 138 10176 WFEC OK WOODWARD - WOODWARD 69KV CKT 1 Regional Reliability 11/1/2016 4/1/2009 2/13/2008 2007 STEP $1,050,000 2014 $1,103,156 $1,050,000 DELAY - MITIGATION 69 3.519985 140 10179 WFEC OK ACME - WEST NORMAN 69KV CKT 1 Regional Reliability 12/1/2014 6/1/2008 2/2/2007 2006 STEP $912,000 2014 $958,170 $912,000 COMPLETE 69 3.8

200397 242 10308 WFEC OK Elmore - Paoli 69 kV Ckt 1 Rebuild Regional Reliability 12/31/2016 6/1/2009 5/17/2016 2016 ITPNT $3,240,000 NTC - COMMITMENT WINDOW 69 10.820003 311 10401 WFEC OK ACME - FRANKLIN SW 138KV CKT 1 Regional Reliability 3/27/2015 6/1/2010 2/13/2008 2007 STEP $2,065,000 2014 $2,169,541 $2,065,000 $1,311,026 CLOSED OUT 138 4.920003 311 10402 WFEC OK ACME - WEST NORMAN 138KV CKT 1 Regional Reliability 3/27/2015 6/1/2010 2/13/2008 2007 STEP $1,601,000 2014 $1,682,051 $1,601,000 $133,385 CLOSED OUT 138 3.820003 311 10403 WFEC OK OU SW - WEST NORMAN 138KV CKT 1 Regional Reliability 3/27/2015 6/1/2010 2/13/2008 2007 STEP $1,577,000 2014 $1,656,836 $1,577,000 $596,204 CLOSED OUT 138 8.3

200291 319 10413 WR KS Cowskin - Westlink 69 kV Ckt 1 Rebuild Regional Reliability 5/22/2015 6/1/2014 8/4/2014 SPP-2012-AG1-AFS-7 $4,151,903 2014 $4,362,093 $4,151,903 COMPLETE 69 2.11200291 319 10414 WR KS Tyler - Westlink 69 kV Ckt 1 Rebuild Regional Reliability 12/1/2015 6/1/2014 8/4/2014 SPP-2012-AG1-AFS-7 $5,834,124 2014 $6,129,477 $6,278,731 COMPLETE 69 2.65

334 10431 GMO MO GREENWOOD ENERGY CENTER - LONE JACK 161KV CKT 1 TO - Sponsored 12/1/2019 $7,096,402 ON SCHEDULE < 4 16120003 361 10471 WFEC OK FLETCHER - MARLOW JCT 69KV CKT 1 Regional Reliability 9/25/2015 6/1/2011 2/13/2008 2007 STEP $2,000,000 2014 $2,101,250 $2,000,000 COMPLETE 69 720003 399 10519 WFEC OK LINDSAY SW - WALLVILLE 69KV CKT 1 Regional Reliability 3/13/2015 6/1/2012 2/13/2008 2007 STEP $1,347,000 2014 $1,415,192 $1,347,000 COMPLETE 69 4.8520003 402 10522 WFEC OK GRANDFIELD - INDIAHOMA 138KV CKT 1 Regional Reliability 10/15/2015 6/1/2012 2/13/2008 2007 STEP $1,125,000 2014 $1,181,953 $1,125,000 COMPLETE 138 320003 402 10523 WFEC OK CACHE - INDIAHOMA 138KV CKT 1 Regional Reliability 3/31/2015 6/1/2012 2/13/2008 2007 STEP $7,306,000 2014 $7,675,866 $7,306,000 COMPLETE 138 13.720003 402 10524 WFEC OK GRANDFIELD 138/69KV TRANSFORMER CKT 1 Regional Reliability 4/1/2016 6/1/2012 2/13/2008 2007 STEP $5,000,000 2014 $5,253,125 $5,000,000 COMPLETE 138/69

200395 409 10533 SPS TX Hereford Interchange 115/69 kV #1 Transformer Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $2,468,463 NTC - COMMITMENT WINDOW 115/69200395 409 10534 SPS TX Hereford Interchange 115/69 kV #2 Transformer Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $2,437,078 NTC - COMMITMENT WINDOW 115/69200395 409 51459 SPS TX Hereford Interchange 115 kV #1 Terminal Upgrades Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $457,209 NTC - COMMITMENT WINDOW 115200395 409 51460 SPS TX Hereford Interchange 115 kV #2 Terminal Upgrades Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $457,209 NTC - COMMITMENT WINDOW 115200212 412 10538 WR KS Eastborough - Sixty-Fourth (64th) 69 kV Ckt 1 Regional Reliability 5/29/2015 6/1/2013 2/20/2013 2013 ITPNT $4,104,097 2013 $4,419,664 $5,251,837 COMPLETE 69 2

414 10540 KCPL KS CEDAR NILES - CLARE 161KV CKT 1 TO - Sponsored 11/1/2019 $13,360,000 ON SCHEDULE < 4 161418 10544 KCPL KS Waldron 161 kV TO - Sponsored 6/1/2019 $2,200,000 ON SCHEDULE < 4 161

200216 451 10583 AEP AR Chamber Springs - Farmington REC 161 kV Ckt 1 Regional Reliability 6/1/2017 6/1/2013 2/20/2013 2013 ITPNT $12,705,537 2013 $13,682,474 $12,705,537 DELAY - MITIGATION 161 11.1

200166 461 10597 SPS TX/NM Bailey County Interchange - Curry County Interchange 115 kV Ckt 1 Regional Reliability 9/30/2016 6/1/2012 4/9/2012 2012 ITPNT $35,099,588 2012 $38,743,378 $37,938,898 DELAY - MITIGATION 115 41.5

200379 468 10604 WR KS Arkansas City - Paris 69 kV Terminal Upgrades Transmission Service 6/1/2017 4/5/2016 SPP-2015-AG1-AFS-6 $500,000 NTC - COMMITMENT WINDOW 69 1.67200216 478 10615 AEP LA Forbing Tap - South Shreveport 69 kV Ckt 1 Regional Reliability 4/13/2016 6/1/2013 2/20/2013 2013 ITPNT $1,221,505 2013 $1,315,428 $1,221,505 COMPLETE 69 2.3200216 501 10646 AEP TX Evenside - Northwest Henderson 69 kV Ckt 1 Regional Reliability 6/1/2018 6/1/2018 2/20/2013 2013 ITPNT $11,980,465 2013 $12,901,650 $11,980,465 ON SCHEDULE < 4 69 6.4200167 503 10648 AEP TX Diana - Perdue 138 kV Ckt 1 Regional Reliability 12/31/2014 6/1/2013 4/9/2012 2012 ITPNT $1,004,187 2012 $1,108,434 $1,004,187 COMPLETE 138200216 504 10649 AEP LA Brownlee - North Market 69 kV Ckt 1 Regional Reliability 12/31/2016 6/1/2013 2/20/2013 2013 ITPNT $12,424,849 2013 $13,380,203 $12,424,849 DELAY - MITIGATION 69 4.7200246 512 10657 AEP LA Ellerbe Road - Forbing T 69 kV Ckt 1 Regional Reliability 4/13/2016 6/1/2014 2/19/2014 2014 ITPNT $8,174,689 2014 $8,588,533 $8,174,689 COMPLETE 69 2

20031 633 10828 SPS NM ARTESIA SOUTH RURAL SUB - ARTESIA TOWN SUB 69KV CKT 1 Regional Reliability 12/17/2015 6/1/2009 1/27/2009 2008 STEP $2,700,000 2014 $2,836,688 $4,754,316 Included in UID 10825

CLOSED OUT 69 3

636 10834 TEXLA TX Chireno 138 kV - Martinsville 138 kV TO - Sponsored 9/1/2019 $8,894,000 ON SCHEDULE < 4 138 10.6920130 764 11007 SPS TX HAPPY INTERCHANGE 115/69KV TRANSFORMER CKT 1 Regional Reliability 1/8/2016 6/1/2012 2/14/2011 2010 STEP $2,809,520 2014 $2,951,752 $1,518,414 COMPLETE 115/6920130 764 11009 SPS TX HAPPY INTERCHANGE 115/69KV TRANSFORMER CKT 2 Regional Reliability 3/20/2016 6/1/2012 2/14/2011 2010 STEP $2,812,436 2014 $2,954,816 $1,565,056 COMPLETE 115/69

200256 766 11010 SPS TX Newhart 230/115 kV Ckt 2 Transformer Regional Reliability 10/3/2016 6/1/2015 2/19/2014 2014 ITPNT $6,886,931 2014 $7,235,582 $7,500,000 DELAY - MITIGATION 230/115200229 772 11017 SPS TX Carlisle Interchange - Wolfforth Interchange 230 kV Ckt 1 Regional Reliability 12/20/2017 6/1/2017 9/10/2013 2013 ITPNT $32,429,240 2013 $34,922,745 $33,465,000 DELAY - MITIGATION 230 16.8200381 777 11027 SPS TX East Plant 115 kV Terminal Upgrade Regional Reliability 6/1/2017 6/1/2017 4/12/2016 SPP-2014-AG1-AFS-6 $5,000 NTC - COMMITMENT WINDOW 115200214 802 11064 SPS NM Eddy County Interchange 230/115 kV Transformer Ckt 1 Regional Reliability 7/12/2016 6/1/2016 2/20/2013 2013 ITPNT $4,255,145 2013 $4,582,326 $4,022,313 DELAY - MITIGATION 230/115200190 805 50453 SPS TX Bowers - Howard 115 kV Regional Reliability 2/28/2016 6/1/2013 1/18/2013 DPA-2011-SEPTEMBER-095 $30,851,077 2013 $33,223,236 $30,851,077 $21,906,370 COMPLETE 115 3320086 819 11082 WR KS GILL ENERGY CENTER EAST - MACARTHUR 69KV CKT 1 #2 Regional Reliability 5/21/2015 6/1/2013 2/8/2010 2009 STEP $6,384,142 2014 $6,707,339 $6,699,694 $6,653,491 CLOSED OUT 69 5.5620084 834 11101 SPS NM PORTALES INTERCHANGE - ZODIAC 115KV CKT 1 Regional Reliability 11/30/2015 6/1/2013 2/8/2010 2009 STEP $6,500,000 2014 $6,829,063 $8,231,332 COMPLETE 115 3

200166 836 11104 SPS TX Convert Muleshoe 69 kV to 115 kV Regional Reliability 11/28/2015 6/1/2012 4/9/2012 2012 ITPNT $4,673,759 2012 $5,158,955 $5,676,288 COMPLETE 115 0.3 1.5200214 841 11110 SPS TX Graham Interchange 115/69 kV Transformer Ckt 1 Regional Reliability 12/9/2015 6/1/2014 2/20/2013 2013 ITPNT $2,101,391 2013 $2,262,968 $1,400,000 COMPLETE 115/69200397 844 11113 WFEC OK Sara Road - Sunshine Canyon 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2020 5/17/2016 2016 ITPNT $4,725,000 NTC - COMMITMENT WINDOW 69 10200256 856 11127 SPS TX Centre St. - Hereford NE 115 kV Ckt 1 Regional Reliability 2/1/2018 6/1/2014 2/19/2014 2014 ITPNT $9,247,136 2014 $9,715,272 $11,526,448 DELAY - MITIGATION 115 7.8200256 856 50754 SPS TX Hereford 115 kV Load Conversion Regional Reliability 12/15/2016 6/1/2014 2/19/2014 2014 ITPNT $435,146 2014 $457,175 $0 DELAY - MITIGATION 115200207 865 11142 OPPD NE Sub 917 - Sub 918 69 kV Ckt 1 Regional Reliability 6/1/2018 6/1/2018 2/20/2013 2013 ITPNT $475,340 2013 $511,889 $475,340 ON SCHEDULE < 4 69200216 879 11158 AEP OK Bluebell - Prattville 138 kV Ckt 1 Regional Reliability 6/2/2015 6/1/2014 2/20/2013 2013 ITPNT $10,241,314 2013 $11,028,775 $10,241,314 COMPLETE 138 9200340 879 51298 OGE OK Bluebell 138 kV Terminal Upgrades Regional Reliability 3/9/2016 5/7/2015 2013 ITPNT $0 DELAY - MITIGATION 138200208 909 11205 WFEC OK Cole - OU Switchyard 138 kV Ckt 1 Regional Reliability 6/1/2016 6/1/2013 2/20/2013 2013 ITPNT $1,705,000 2013 $1,836,099 $1,705,000 DELAY - MITIGATION 138200208 909 11425 WFEC OK Cole - Criner 138 kV Ckt 1 Regional Reliability 4/1/2016 6/1/2013 2/20/2013 2013 ITPNT $1,400,000 2013 $1,507,647 $1,400,000 COMPLETE 138200208 909 50579 WFEC OK Criner - Payne Switching Station 138 kV Regional Reliability 9/25/2015 6/1/2013 2/20/2013 2013 ITPNT $3,000,000 2013 $3,230,672 $3,000,000 COMPLETE 138200208 909 50580 WFEC OK Payne Switching Station 138 kV Regional Reliability 9/25/2015 6/1/2013 2/20/2013 2013 ITPNT $250,000 2013 $269,223 $250,000 COMPLETE 13820110 910 11207 OGE OK BRYANT - MEMORIAL 138KV CKT 1 Transmission Service 6/1/2019 6/1/2019 8/25/2010 SPP-2008-AGP1-AFS-9 $225,000 2014 $236,391 $225,000 ON SCHEDULE < 4 13820096 936 11236 AEP TX/OK NORTHWEST TEXARKANA - VALLIANT 345KV CKT 1 High Priority 10/1/2016 10/1/2014 6/30/2010 Priority Projects $127,995,000 2014 $134,474,747 $127,995,000 DELAY - MITIGATION 345 76.2520097 938 11238 TSMO MO Sibley - Mullin Creek 345 kV High Priority 12/31/2016 6/1/2017 7/23/2010 Priority Projects $184,665,083 2015 $189,281,710 $184,665,083 ON SCHEDULE < 4 345 10520097 938 11239 TSMO MO Nebraska City - Mullin Creek 345 kV (GMO) High Priority 12/31/2016 6/1/2017 7/23/2010 Priority Projects $81,407,015 2015 $83,442,190 $81,407,015 ON SCHEDULE < 4 345 6520098 939 11240 OPPD NE Nebraska City - Mullin Creek 345 kV (OPPD) High Priority 12/31/2016 6/1/2017 6/30/2010 Priority Projects $70,361,776 2015 $72,120,820 $70,361,776 ON SCHEDULE < 4 345 45

20104 947 11261 AEP OK BROKEN ARROW NORTH - SOUTH TAP - ONETA 138KV CKT 1 #2 Transmission Service 6/1/2016 6/1/2015 8/25/2010 SPP-2008-AGP1-AFS-9 $6,072,000 2014 $6,379,395 $6,072,000 DELAY - MITIGATION 138 4.33

970 11285 AECI OK Gypsy - Stroud City 138 kV Regional Reliability - Non OATT 6/1/2018 $7,107,090 ON SCHEDULE < 4 13820126 997 11311 MIDW KS COLBY 115/34.5 kV transformer Ckt 4 Regional Reliability 5/1/2013 6/1/2011 2/14/2011 2010 STEP $1,097,586 COMPLETE 115/34.5

200368 1001 11315 SPS TX Randall County Interchange - South Georgia Interchange 115 kV Ckt 1 Regional Reliability 7/1/2017 6/1/2016 2/12/2016 2010 STEP $10,316,217 2016 $10,316,217 $10,316,217 DELAY - MITIGATION 115 2

Within the NTC-C Project Estimate (CPE) windowBehind schedule, interim mitigation provided or project may change but time permits the implementation of project; asterisk (*) indicates interim

Quarter 3 2016 Project Tracking Portfolio

Projected in-service date after RTO Determined Need Date and mitigation plan not yet provided by Transmission OwnerNTC/GIA suspendedNTC/NTC-C active; pending re-evaluationNTC/NTC-C issued, still within the 90 day written commitment to construct window and no commitment receivedRFP Issued

Complete and in-serviceIn-service and all required project close-out documentation supplied by TOOn Schedule within 4-year horizonOn Schedule beyond 4-year horizon

Page 42: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

200214 1003 11317 SPS TX Grassland Interchange 230/115 kV Transformer Ckt 1 Regional Reliability 2/19/2016 6/1/2013 2/20/2013 2013 ITPNT $3,961,322 2013 $4,265,911 $4,003,560 COMPLETE 230/115200256 1004 11318 SPS TX Swisher County Interchange 230/115 kV Ckt 1 Transformer Regional Reliability 12/3/2015 6/1/2014 2/19/2014 2014 ITPNT $3,183,028 2014 $3,344,169 $2,886,575 COMPLETE 230/11520110 1021 11343 OGE OK ARCADIA - REDBUD 345KV CKT 3 Transmission Service 6/1/2019 6/1/2019 8/25/2010 SPP-2008-AGP1-AFS-9 $18,000,000 2014 $18,911,250 $18,000,000 ON SCHEDULE < 4 345 5

200214 1031 11355 SPS TX Crosby County Interchange 115/69 kV Transformer Ckt 1 Regional Reliability 5/1/2015 6/1/2013 2/20/2013 2013 ITPNT $2,378,798 2013 $2,561,705 $2,360,380 COMPLETE 115/69200214 1031 11356 SPS TX Crosby County Interchange 115/69 kV Transformer Ckt 2 Regional Reliability 9/10/2015 6/1/2013 2/20/2013 2013 ITPNT $2,301,000 2013 $2,477,925 $1,880,585 $1,861,774 COMPLETE 115/69

200166 1033 11358 SPS TX Randall County Interchange - South Georgia Interchange 115 kV Ckt 1 # 2 Regional Reliability 7/1/2017 6/1/2017 4/9/2012 2012 ITPNT $6,300,000 2014 $6,618,938 $6,300,000 DELAY - MITIGATION 115 4.1

20130 1036 11372 SPS TX Soncy Tap 115 kV - New Soncy 115 kV Regional Reliability 3/31/2017 6/1/2015 2/14/2011 2010 STEP $929,500 2014 $976,556 $4,041,273 DELAY - MITIGATION 115 1.04200305 1083 11423 AEP TX Welsh Reserve - Wilkes 138 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 9/30/2014 2014 ITPNT $24,880,495 2014 $26,140,070 $24,880,495 ON SCHEDULE < 4 138 23.7420132 1084 11424 WFEC OK ALVA - FREEDOM 69KV CKT 1 Regional Reliability 3/28/2014 6/1/2011 2/14/2011 2010 STEP $6,243,750 2014 $6,559,840 $6,243,750 COMPLETE 69 18.5

200297 1139 11501 SPS TX Allen Substation - Lubbock South Interchange 115 kV Ckt 1 Regional Reliability 6/1/2019 6/1/2019 5/5/2015 SPP-2012-AG3-AFS-9 $1,164,782 2015 $1,193,902 $622,932 ON SCHEDULE < 4 115

200369 1142 11506 SPS TX Canyon East Sub - Randall County Interchange 115 kV Ckt 1 Rebuild Regional Reliability 12/31/2020 2/1/2014 2/12/2016 SPP-2011-AG3-AFS-11 $12,806,065 2016 $12,806,065 $12,806,065 DELAY - MITIGATION 115 18.5

200262 1144 11508 SPS TX Hitchland 230/115 kV Ckt 2 Transformer Regional Reliability 12/15/2016 6/1/2019 4/9/2014 SPP-2011-AG3-AFS-11 $4,087,144 2014 $4,294,056 $4,525,487 ON SCHEDULE < 4 230/115200359 1146 11509 SPS TX Carlisle 230/115 kV Ckt 1 Transformer Regional Reliability 6/1/2023 10/1/2015 12/2/2015 SPP-2014-AG1-AFS-6 $3,853,326 2016 $3,853,326 $3,853,326 DELAY - MITIGATION 230/115200214 1147 11512 SPS TX Channing - Potter County 230 kV Ckt 1 Regional Reliability 12/31/2015 6/1/2013 2/20/2013 2013 ITPNT $1,819,440 2013 $1,959,338 $1,775,315 COMPLETE 230 52200214 1147 11514 SPS TX Channing - XIT 230 kV Ckt 1 Regional Reliability 12/31/2015 6/1/2013 2/20/2013 2013 ITPNT $9,166,904 2013 $9,871,753 $9,171,505 COMPLETE 230 70200214 1147 11515 SPS TX XIT 230/115/13.2 kV Transformer Ckt 1 Regional Reliability 12/31/2015 6/1/2013 2/20/2013 2013 ITPNT $3,863,195 2013 $4,160,239 $1,954,807 COMPLETE 230/11520003 30079 50085 WFEC OK CARTER JCT 69KV Regional Reliability 10/15/2015 6/1/2010 2/13/2008 2007 STEP $324,000 2014 $340,403 $324,000 COMPLETE 69

200242 30097 50103 WR KS Vaughn 115 kV Cap Bank Zonal Reliability 11/25/2015 6/1/2014 2/19/2014 2014 ITPNT $1,184,617 2014 $1,244,588 $816,203 COMPLETE 11520017 30160 50168 OGE AR FT SMITH 500/161KV TRANSFORMER CKT 5 Transmission Service 5/1/2018 6/1/2017 1/16/2009 SPP-2006-AG3-AFS-11 $14,000,000 2014 $14,708,750 $16,051,280 DELAY - MITIGATION 500/16120017 30164 50172 OGE AR VBI - VBI NORTH 69KV CKT 1 Transmission Service 6/1/2014 6/1/2017 1/16/2009 SPP-2006-AG3-AFS-11 $100,000 2014 $105,063 $0 COMPLETE 16120078 30190 50197 MIDW KS PAWNEE 115KV Regional Reliability 1/31/2013 6/1/2011 2/8/2010 2009 STEP $712,979 COMPLETE 11520080 30201 50208 NPPD NE CLARKS 115KV Regional Reliability 6/1/2018 11/1/2012 2/8/2010 2009 STEP $700,000 2014 $735,438 $700,000 DELAY - MITIGATION 11520080 30202 50209 NPPD NE Ainsworth 115 kV Cap Bank Regional Reliability 6/1/2013 11/1/2012 2/8/2010 2009 STEP $50,000 2014 $52,531 $50,000 CLOSED OUT 11520080 30203 50210 NPPD NE ONEILL 115KV Regional Reliability 6/1/2018 11/1/2012 2/8/2010 2009 STEP $700,000 2014 $735,438 $700,000 DELAY - MITIGATION 115

20108 30290 50328 WR KS HALSTEAD SOUTH BUS - SEDGWICK COUNTY NO. 12 COLWICH 138KV CKT 1 Transmission Service 4/20/2016 6/1/2019 8/25/2010 SPP-2008-AGP1-AFS-9 $700,000 2014 $735,438 $108,694 COMPLETE 138

20122 30296 50334 AEP TX WINNSBORO 138KV Regional Reliability 4/21/2016 6/1/2016 2/14/2011 2010 STEP $1,166,400 2014 $1,225,449 $1,166,400 COMPLETE 13820122 30298 50336 AEP LA LOGANSPORT 138KV Regional Reliability 6/1/2016 6/1/2016 2/14/2011 2010 STEP $1,166,400 2014 $1,225,449 $1,731,419 ON SCHEDULE < 4 138

30310 50354 SPS NM Norton Switching Station 115KV TO - Sponsored 5/23/2015 $5,653,536 COMPLETE 11520136 30320 50366 WFEC OK CANTON - TALOGA 69KV CKT 1 Transmission Service 10/15/2015 6/1/2011 5/27/2011 SPP-2009-AGP2-AFS-6 $4,800,000 2014 $5,043,000 $4,800,000 COMPLETE 69 9.720140 30326 50372 WR KS Clay Center Switching Station - TC Riley 115 kV Ckt 1 Zonal Reliability 6/1/2018 10/1/2012 5/27/2011 SPP-2009-AGP2-AFS-6 $9,308,090 2014 $9,779,312 $9,308,090 DELAY - MITIGATION 115 6.720140 30328 50374 WR KS TC RILEY 115KV Zonal Reliability 6/1/2018 10/1/2012 5/27/2011 SPP-2009-AGP2-AFS-6 $963,441 2014 $1,012,215 $963,441 DELAY - MITIGATION 115

200282 30331 50378 SPS NM Eagle Creek 115 kV Cap Bank High Priority 10/15/2016 6/1/2015 5/19/2014 HPILS $1,470,325 2014 $1,544,760 $1,470,325 DELAY - MITIGATION 11530345 50391 LES NE SW 7th & Bennet - 40th & Rokeby 115 kV TO - Sponsored 6/8/2015 $7,531,000 COMPLETE 115

200166 30351 50401 SPS TX Crosby 115 kV #2 Regional Reliability 11/4/2015 6/1/2012 4/9/2012 2012 ITPNT $985,519 2012 $1,087,828 $1,283,027 COMPLETE 115200166 30356 50406 SPS TX Diamondback Interchange 115/69 kV Transformer Ckt 1 Regional Reliability 8/14/2015 6/1/2012 4/9/2012 2012 ITPNT $5,524,876 2012 $6,098,430 $6,628,573 COMPLETE 115/69 17.79200166 30356 50407 SPS TX Sulphur Interchange - Diamondback Interchange 115 kV Ckt 1 Regional Reliability 8/14/2015 6/1/2012 4/9/2012 2012 ITPNT $7,699,644 2012 $8,498,966 $8,000,000 COMPLETE 115 12.5200173 30358 50409 MKEC KS Bushton - Ellsworth 115 kV (MKEC) Regional Reliability 3/26/2015 6/1/2012 4/9/2012 2012 ITPNT $13,151,512 2012 $14,516,808 $11,880,984 $10,926,010 CLOSED OUT 115 18.08200173 30358 50410 MKEC KS Ellsworth Tap 115 kV ring bus Regional Reliability 4/29/2015 6/1/2012 4/9/2012 2012 ITPNT $5,914,221 2012 $6,528,193 $6,713,869 $6,528,281 CLOSED OUT 115200173 30358 50449 MKEC KS Ellsworth Substation 115 kV Regional Reliability 3/26/2015 6/1/2012 4/9/2012 2012 ITPNT $2,669,385 2012 $2,946,502 $3,193,453 $2,940,771 CLOSED OUT 115200172 30358 50549 MIDW KS Bushton 115 kV Regional Reliability 6/1/2015 6/1/2012 2012 ITPNT $1,459,629 2012 $1,611,157 $1,459,629 COMPLETE 115200255 30361 50413 AEP OK Chisholm - Gracemont 345kV Ckt 1 (AEP) Regional Reliability 3/1/2018 3/1/2018 2/6/2014 2012 ITP10 $93,361,588 2013 $100,540,219 $93,361,588 ON SCHEDULE < 4 345 72200255 30361 50414 AEP OK Chisholm 345/230 kV Substation Regional Reliability 3/1/2018 3/1/2018 2/6/2014 2012 ITP10 $20,410,547 2013 $21,979,927 $20,410,547 ON SCHEDULE < 4 345/230200240 30361 50419 OGE OK Chisholm - Gracemont 345 kV Ckt 1 (OGE) Regional Reliability 3/1/2018 3/1/2018 12/20/2013 2012 ITP10 $43,853,500 2013 $47,225,423 $43,853,500 ON SCHEDULE < 4 345 29.8200255 30361 50768 AEP OK Chisholm 230 kV Regional Reliability 3/1/2018 3/1/2018 2/6/2014 2012 ITP10 $5,326,722 2013 $5,736,297 $5,326,722 ON SCHEDULE < 4 230 2200223 30364 50420 OGE OK Tatonga - Woodward District EHV 345 kV Ckt 2 Regional Reliability 7/1/2018 3/1/2021 5/23/2013 2012 ITP10 $59,522,400 2013 $64,099,115 $59,522,400 ON SCHEDULE < 4 345 49200223 30364 50421 OGE OK Matthewson - Tatonga 345 kV Ckt 2 Regional Reliability 7/1/2018 3/1/2021 5/23/2013 2012 ITP10 $65,785,650 2013 $70,843,950 $65,785,650 ON SCHEDULE < 4 345 61200223 30364 50456 OGE OK Cimarron - Matthewson 345 kV Ckt 2 Regional Reliability 7/1/2016 3/1/2021 5/23/2013 2012 ITP10 $32,936,400 2013 $35,468,900 $32,936,400 ON SCHEDULE < 4 345 16200223 30364 50458 OGE OK Matthewson 345 kV Regional Reliability 7/1/2016 3/1/2021 5/23/2013 2012 ITP10 $19,967,850 2013 $21,503,190 $19,967,850 ON SCHEDULE < 4 345200222 30367 50425 ITCGP KS Elm Creek - Summit 345 kV Ckt 1 (ITCGP) Regional Reliability 3/1/2018 3/1/2018 3/21/2013 2012 ITP10 $31,312,169 2013 $33,719,781 $40,106,983 ON SCHEDULE < 4 345 29.77200222 30367 50426 ITCGP KS Elm Creek 345/230 kV Transformer Regional Reliability 12/31/2016 3/1/2018 3/21/2013 2012 ITP10 $5,405,101 2013 $5,820,703 $2,262,870 ON SCHEDULE < 4 345/230200222 30367 50427 ITCGP KS Elm Creek 345 kV Terminal Upgrades Regional Reliability 12/31/2016 3/1/2018 3/21/2013 2012 ITP10 $8,243,291 2013 $8,877,123 $10,223,344 ON SCHEDULE < 4 345200222 30367 50428 ITCGP KS Elm Creek 230 kV Terminal Upgrades Regional Reliability 12/31/2016 3/1/2018 3/21/2013 2012 ITP10 $1,886,035 2013 $2,031,053 $1,666,911 ON SCHEDULE < 4 230200221 30367 50429 WR KS Elm Creek - Summit 345 kV Ckt 1 (WR) Regional Reliability 12/31/2016 3/1/2018 3/21/2013 2012 ITP10 $66,202,442 2013 $71,292,789 $57,092,480 ON SCHEDULE < 4 345 28.46200212 30369 10425 WR KS Moundridge 138/115 kV Transformer Ckt 2 Regional Reliability 4/7/2015 6/1/2013 2/20/2013 2013 ITPNT $19,770,066 2013 $21,290,199 $12,833,515 COMPLETE 138/115200253 30374 50440 NPPD NE Hoskins - Neligh 345 kV Ckt 1 Regional Reliability 5/11/2016 6/1/2016 2/19/2014 2014 ITPNT $68,774,278 2014 $72,255,976 $53,741,554 ON SCHEDULE < 4 345 41200253 30374 50441 NPPD NE Neligh 345/115 kV Substation Regional Reliability 5/11/2016 6/1/2016 2/19/2014 2014 ITPNT $12,118,564 2014 $12,732,066 $9,574,507 ON SCHEDULE < 4 345/115200253 30374 50621 NPPD NE Neligh 115 kV Terminal Upgrades Regional Reliability 6/1/2016 6/1/2016 2/19/2014 2014 ITPNT $17,804,878 2014 $18,706,250 $20,378,603 ON SCHEDULE < 4 115 11.4 7200220 30375 50442 NPPD NE Cherry Co. - Gentleman 345 kV Ckt 1 Regional Reliability 10/1/2018 1/1/2018 3/11/2013 2012 ITP10 $139,090,440 2013 $149,785,191 $139,090,440 DELAY - MITIGATION 345 110200220 30375 50444 NPPD NE Cherry Co. Substation 345 kV Regional Reliability 10/1/2018 1/1/2018 3/11/2013 2012 ITP10 $11,896,383 2013 $12,811,103 $11,896,383 DELAY - MITIGATION 345200220 30375 50445 NPPD NE Cherry Co. - Holt Co. 345 kV Ckt 1 Regional Reliability 10/1/2018 1/1/2018 3/11/2013 2012 ITP10 $146,065,000 2013 $157,296,029 $146,065,000 DELAY - MITIGATION 345 117200220 30375 50446 NPPD NE Holt Co. Substation 345 kV Regional Reliability 10/1/2018 1/1/2018 3/11/2013 2012 ITP10 $16,324,800 2013 $17,580,024 $16,324,800 DELAY - MITIGATION 345200309 30376 50452 SPS NM Hobbs 345/230 kV Ckt 1 Transformer High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $16,204,449 2014 $17,024,799 $16,204,449 ON SCHEDULE < 4 345/230200309 30376 50457 SPS NM/TX Hobbs - Yoakum 345 kV Ckt 1 High Priority 6/1/2020 6/1/2020 12/3/2014 HPILS $90,628,750 2014 $95,216,830 $90,628,750 ON SCHEDULE > 4 345 52

30385 50468 KCPL KS Merriam - Overland Park 161 kV Ckt 1 TO - Sponsored 2/26/2016 $1,100,000 COMPLETE 161200296 30390 10600 WR KS East Manhattan - Jeffrey Energy Center 230 kV Ckt 1 Rebuild Regional Reliability 6/1/2017 6/1/2017 9/2/2014 2014 ITPNT $58,317,000 2014 $61,269,298 $58,317,000 ON SCHEDULE < 4 230 30200190 30410 50503 SPS TX Bowers - Canadian 69 kV Rebuild Regional Reliability 1/15/2016 6/1/2012 1/18/2013 DPA-2011-SEPTEMBER-095 $34,999,584 2013 $37,690,724 $31,779,309 COMPLETE 69 39 10

30416 50509 MKEC KS North Ft. Dodge - Spearville 115kV Ckt 2 Generation Interconnection 5/22/2015 $12,042,751 $9,546,545 COMPLETE 115 2030416 51007 MKEC KS Ft. Dodge - North Ft. Dodge 115 kV Ckt 2 Generation Interconnection 5/22/2015 $15,397,701 $15,397,551 COMPLETE 11530417 50510 MKEC KS Spearville 345/115 kV Transformer CKT 1 Generation Interconnection 5/22/2015 $18,276,977 $15,829,550 COMPLETE 345/115

200262 30420 50513 SPS TX Bushland Interchange - Deaf Smith Co Interchange 230 kV Ckt 1 Terminal Upgrade Regional Reliability 6/1/2016 2/1/2014 4/9/2014 SPP-2011-AG3-AFS-11 $285,176 2014 $299,613 $321,786 DELAY - MITIGATION 230

200193 30422 50515 SPS TX Deaf Smith County Interchange 230/115 kV Transformer Ckt 1 #2 Regional Reliability 12/29/2015 6/1/2012 11/20/2012 SPP-2010-AGP1-AFS-8 $4,273,633 2012 $4,717,291 $4,236,816 COMPLETE 230/115

200214 30423 50516 SPS TX Deaf Smith County Interchange 230/115 kV Transformer Ckt 2 Regional Reliability 4/1/2016 6/1/2013 2/20/2013 2013 ITPNT $4,225,233 2013 $4,550,114 $4,225,233 COMPLETE 230/115200214 30424 50517 SPS TX/OK Ochiltree - Tri-County REC Cole 115 kV Ckt 1 Rebuild Regional Reliability 11/25/2015 6/1/2013 2/20/2013 2013 ITPNT $11,332,148 2013 $12,203,484 $13,091,337 COMPLETE 115 17200210 30426 50519 MIDW KS Pheasant Run - Seguin 115 kV Ckt 1 Regional Reliability 7/15/2014 6/1/2014 2/20/2013 2013 ITPNT $11,128,231 2013 $11,983,888 $7,811,905 COMPLETE 115 19.3200325 30427 50520 SEPC KS Mingo 345/115 kV Ckt 2 Transformer Regional Reliability 7/15/2016 6/1/2015 2/18/2015 2015 ITPNT $6,921,684 2015 $7,094,726 $7,155,709 DELAY - MITIGATION 345/115200325 30427 51180 SEPC KS Mingo 345 kV Terminal Upgrades Regional Reliability 7/15/2016 6/1/2015 2/18/2015 2015 ITPNT $2,920,633 2015 $2,993,649 $3,540,983 DELAY - MITIGATION 345200216 30436 50531 AEP TX New Gladewater - Perdue 138 kV Ckt 1 Regional Reliability 12/31/2014 6/1/2016 2/20/2013 2013 ITPNT $1,000,000 2013 $1,076,891 $1,000,000 COMPLETE 138200242 30437 50532 WR KS Geary County 345/115 kV Substation Regional Reliability 6/1/2018 6/1/2014 2/19/2014 2014 ITPNT $20,530,196 2014 $21,569,537 $20,530,196 DELAY - MITIGATION 345/115200242 30437 50534 WR KS Chapman Junction - Geary County 115 kV Ckt 1 Regional Reliability 6/1/2018 6/1/2014 2/19/2014 2014 ITPNT $27,938,225 2014 $29,352,598 $27,938,225 DELAY - MITIGATION 115 4.67 10.42200242 30437 50605 WR KS Geary County 345 kV Regional Reliability 6/1/2017 6/1/2014 2/19/2014 2014 ITPNT $16,190,561 2014 $17,010,208 $16,190,561 DELAY - MITIGATION 345200241 30438 50533 GRDA OK Kerr - 412 Sub 161 kV Ckt 1 Terminal Upgrades Regional Reliability 6/1/2017 6/1/2017 2/19/2014 2014 ITPNT $161,100 2014 $169,256 $161,100 ON SCHEDULE < 4 161200241 30440 50535 GRDA OK 412 Sub - Kansas Tap 161 kV Ckt 1 Terminal Upgrades Regional Reliability 6/1/2018 6/1/2018 2/19/2014 2014 ITPNT $54,500 2014 $57,259 $161,100 ON SCHEDULE < 4 161

Page 43: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

200384 30444 50539 SPS TX Cochran 115 kV Cap Bank Regional Reliability 6/1/2018 6/1/2016 4/20/2016 DPA-2013-JUN-342 $1,833,655 NTC - COMMITMENT WINDOW 115200231 30449 50545 AEP LA Rock Hill - Springridge Pan-Harr REC 138 kV Ckt 1 Regional Reliability 10/1/2016 6/1/2014 9/23/2013 2013 ITPNT $25,060,655 2013 $26,987,585 $25,060,655 DELAY - MITIGATION 138 27.6200214 30451 50546 SPS NM Atoka - Eagle Creek 115 kV Ckt 1 Regional Reliability 12/31/2016 6/1/2015 2/20/2013 2013 ITPNT $20,808,304 2013 $22,408,267 $18,699,741 DELAY - MITIGATION 115 22.1200214 30466 50560 SPS NM Potash Junction 115/69 kV Transformer Ckt 1 Regional Reliability 8/7/2015 6/1/2013 2/20/2013 2013 ITPNT $2,127,697 2013 $2,291,297 $2,496,879 COMPLETE 115/69200229 30469 50563 SPS NM Kilgore Switch - South Portales 115 kV Ckt 1 Regional Reliability 3/31/2018 6/1/2018 9/10/2013 2013 ITPNT $5,136,476 2013 $5,531,423 $4,736,510 ON SCHEDULE < 4 115 5.3200229 30469 50564 SPS NM Market St. - South Portales 115 kV Ckt 1 Regional Reliability 11/13/2017 6/1/2018 9/10/2013 2013 ITPNT $6,498,682 2013 $6,998,370 $9,499,650 ON SCHEDULE < 4 115 6200229 30469 50565 SPS NM Market St. - Portales 115 kV Ckt 1 Regional Reliability 6/8/2017 6/1/2018 9/10/2013 2013 ITPNT $15,394,429 2013 $16,578,116 $14,770,647 ON SCHEDULE < 4 115 10.4200216 30471 50567 AEP TX Dekalb - New Boston 69 kV Ckt 1 Regional Reliability 6/5/2015 6/1/2013 2/20/2013 2013 ITPNT $16,548,317 2013 $17,820,727 $16,548,317 $15,777,911 COMPLETE 69 13.2200216 30472 50568 AEP LA Hardy Street - Waterworks 69 kV Ckt 1 Regional Reliability 6/25/2015 6/1/2013 2/20/2013 2013 ITPNT $7,519,658 2013 $8,097,849 $7,519,658 $5,366,606 COMPLETE 69 1.65200216 30473 50569 AEP AR Midland REC - North Huntington 69 kV Ckt 1 Regional Reliability 5/15/2015 6/1/2013 2/20/2013 2013 ITPNT $1,829,026 2013 $1,969,661 $1,829,026 $11,990,487 COMPLETE 69 1.3

200216 30474 50570 AEP AR Midland - Midland REC 69 kV Ckt 1 Regional Reliability 5/15/2015 6/1/2013 2/20/2013 2013 ITPNT $5,653,353 2013 $6,088,043 $5,653,353 Included in UID 50569

COMPLETE 69 4.3

200216 30475 50571 AEP AR Howe Interchange - Midland 69 kV Ckt 1 Regional Reliability 5/15/2015 6/1/2013 2/20/2013 2013 ITPNT $9,145,130 2013 $9,848,305 $9,145,130 Included in UID 50569

COMPLETE 69 7

200202 30476 50572 GRDA OK Chelsea - Childers 69 kV Ckt 1 Zonal Reliability 7/29/2015 6/1/2015 2/20/2013 2013 ITPNT $355,000 2013 $382,296 $355,000 COMPLETE 69200207 30478 50574 OPPD NE 915 Tap South - Sub 915 T2 69 kV Ckt 1 Regional Reliability 3/13/2015 6/1/2015 2/20/2013 2013 ITPNT $260,590 2013 $280,627 $260,590 COMPLETE 69 0.71200194 30481 50577 OGE OK El Reno - Service PL El Reno 69 kV CKT 1 Transmission Service 6/1/2014 6/1/2017 11/20/2012 SPP-2010-AGP1-AFS-8 $10,000 2013 $10,769 $0 COMPLETE 69200212 30483 50581 WR KS Gill 138/69 kV Transformer Ckt 3 Regional Reliability 9/17/2015 6/1/2015 2/20/2013 2013 ITPNT $7,122,480 2013 $7,670,132 $5,803,853 COMPLETE 138/69200228 30484 50582 WR KS Viola 345/138 kV Transformer Ckt 1 Regional Reliability 6/1/2019 6/1/2018 9/10/2013 2013 ITPNT $14,331,670 2013 $15,433,641 $14,331,670 DELAY - MITIGATION 345/138200228 30484 50583 WR KS Clearwater - Viola 138 kV Ckt 1 Regional Reliability 6/1/2019 6/1/2018 9/10/2013 2013 ITPNT $35,992,903 2013 $38,760,420 $35,992,903 DELAY - MITIGATION 138 21.8200228 30484 50584 WR KS Gill - Viola 138 kV Ckt 1 Regional Reliability 6/1/2019 6/1/2018 9/10/2013 2013 ITPNT $22,234,744 2013 $23,944,387 $22,234,744 DELAY - MITIGATION 138 27.9200228 30484 50612 WR KS Viola 345 kV Terminal Equipment Regional Reliability 6/1/2019 6/1/2018 9/10/2013 2013 ITPNT $5,007,657 2013 $5,392,699 $5,007,657 DELAY - MITIGATION 345200212 30487 50593 WR KS Potwin 69 kV Capacitor Zonal Reliability 6/1/2018 6/1/2013 2/20/2013 2013 ITPNT $767,165 2013 $826,153 $767,165 DELAY - MITIGATION 69200200 30488 50595 WFEC OK Noel Switch - Wakita 138 kV Ckt 1 Regional Reliability 1/28/2013 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $17,928,848 2013 $19,307,408 $17,928,848 $19,103,991 COMPLETE 138200200 30488 50596 WFEC OK Sandridge Tap - Wakita 138 kV Ckt 1 Regional Reliability 6/30/2013 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $7,220,000 2013 $7,775,150 $7,220,000 $8,876,911 COMPLETE 138 16.52200200 30488 50597 WFEC OK Wakita 138/69 kV Transformer Ckt 1 Regional Reliability 6/24/2013 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $3,573,553 2013 $3,848,326 $3,573,553 $3,247,997 COMPLETE 138/69200200 30488 50619 WFEC OK Sandridge Tap - Renfrow 138 kV Ckt 1 (WFEC) Regional Reliability 4/30/2014 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $2,000,000 2013 $2,153,781 $2,000,000 COMPLETE 138200200 30490 50599 WFEC OK Fairview 69 kV Capacitor Regional Reliability 4/24/2015 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $237,000 2013 $255,223 $237,000 COMPLETE 69200200 30491 50600 WFEC OK Hazelton 69 kV Capacitor Regional Reliability 9/1/2016 1/1/2013 3/1/2013 DPA-2012-MAR-143-147 $237,000 2013 $255,223 $237,000 DELAY - MITIGATION 69200210 30494 50606 MIDW KS Hays Plant - South Hays 115 kV Ckt 1 #2 Regional Reliability 6/1/2016 6/1/2013 2/20/2013 2013 ITPNT $8,832,219 2013 $9,511,334 $8,922,219 DELAY - MITIGATION 115 3.25200231 30495 50607 AEP LA Messick 500/230 kV Transformer Ckt 1 Regional Reliability 4/29/2016 6/1/2013 9/23/2013 2013 ITPNT $30,369,537 2013 $32,704,670 $30,369,537 COMPLETE 500/230200231 30495 50615 AEP LA Messick 500 kV Terminal Upgrades Regional Reliability 4/29/2016 6/1/2013 9/23/2013 2013 ITPNT $21,508,234 2013 $23,162,016 $21,508,234 COMPLETE 500200253 30496 50608 NPPD NE Stegall 345/115 kV Transformer Ckt 1 Regional Reliability 6/1/2017 6/1/2014 2/19/2014 2014 ITPNT $5,800,000 2014 $6,093,625 $5,928,479 DELAY - MITIGATION 345/115200253 30496 50609 NPPD NE Scottsbluff - Stegall 115 kV Ckt 1 Regional Reliability 6/1/2017 6/1/2014 2/19/2014 2014 ITPNT $23,782,900 2014 $24,986,909 $26,027,015 DELAY - MITIGATION 115 23200253 30496 50616 NPPD NE Stegall 345 kV Terminal Upgrades Regional Reliability 6/1/2017 6/1/2014 2/19/2014 2014 ITPNT $5,417,100 2014 $5,691,341 $4,749,663 DELAY - MITIGATION 345200200 30497 50610 WFEC OK Buffalo Bear - Buffalo 69 kV Ckt 1 Regional Reliability 12/19/2014 12/1/2013 3/1/2013 DPA-2012-MAR-143-147 $6,000,000 2013 $6,461,344 $1,500,000 COMPLETE 69200200 30497 50611 WFEC OK Buffalo Bear - Ft. Supply 69 kV Ckt 1 #2 Regional Reliability 12/19/2014 12/1/2013 3/1/2013 DPA-2012-MAR-143-147 $1,500,000 2013 $1,615,336 $6,000,000 COMPLETE 69

200234 30501 50624 WFEC OK Medford Tap - Pond Creek 138 kV (WFEC) Regional Reliability 4/1/2016 5/1/2013 10/28/2013 DPA-2012-MAR-151-154-161-JUL-218-SEP-243 $3,540,000 2015 $3,628,500 $3,540,000 COMPLETE 138 13

200234 30502 50626 WFEC OK Renfrow-Sandridge Capacitor 138 kV Regional Reliability 6/1/2016 6/1/2017 10/28/2013 DPA-2012-MAR-151-154-161-JUL-218-SEP-243 $185,004 2013 $199,229 $185,004 ON SCHEDULE < 4 138

200234 30503 50628 WFEC OK Hazelton Capacitor 69 kV #2 Regional Reliability 9/1/2016 6/1/2017 10/28/2013 DPA-2012-MAR-151-154-161-JUL-218-SEP-243 $185,004 2013 $199,229 $185,004 ON SCHEDULE < 4 69

200263 30507 50634 MIDW KS Hays Plant - Vine Street 115kV Ckt 1 Terminal Upgrade Regional Reliability 10/1/2014 2/1/2014 3/31/2014 SPP-2011-AG3-AFS-11 $15,720 2014 $16,516 $15,720 COMPLETE 115200264 30508 50635 OGE OK Division Ave - Lakeside 138 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 3/31/2014 SPP-2011-AG3-AFS-11 $1,720,000 2014 $1,807,075 $1,720,000 ON SCHEDULE < 4 138 3.6200369 30509 50636 SPS TX Canyon East Sub - Canyon West Sub 115 kV Ckt 1 Rebuild Regional Reliability 12/31/2017 2/1/2014 2/12/2016 SPP-2011-AG3-AFS-11 $2,694,811 2016 $2,694,811 $2,694,811 DELAY - MITIGATION 115 3.7200262 30510 50637 SPS TX Mustang - Shell CO2 115 kV Ckt 1 Transmission Service 12/15/2017 6/1/2015 4/9/2014 SPP-2011-AG3-AFS-11 $15,473,119 2014 $16,256,446 $15,473,119 DELAY - MITIGATION 115 7.71200314 30526 50657 AEP OK Hobart - Roosevelt Tap 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2015 2/18/2015 2015 ITPNT $10,389,072 SUSPENDED 69 10200314 30526 50658 AEP OK Roosevelt Tap - Snyder 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2015 2/18/2015 2015 ITPNT $20,643,085 SUSPENDED 69 19.87200256 30552 50690 SPS NM Oxy Permian Sub - West Bender Sub 115 kV Ckt 1 Rebuild Regional Reliability 10/28/2016 6/1/2018 2/19/2014 2014 ITPNT $971,535 2014 $1,020,719 $668,829 ON SCHEDULE < 4 115 0.5200242 30553 50691 WR KS Butler - Weaver 138 kV Terminal Upgrades Ckt 1 Regional Reliability 1/28/2016 6/1/2015 2/19/2014 2014 ITPNT $221,294 2014 $232,497 $0 COMPLETE 138200256 30555 50693 SPS NM Quahada Switching Station 115 kV Regional Reliability 7/9/2015 6/1/2015 2/19/2014 2014 ITPNT $6,943,260 2014 $7,294,763 $8,250,000 COMPLETE 115 0.68200242 30558 50696 WR KS Neosho 138/69 kV Ckt 1 Transformer Regional Reliability 4/25/2016 6/1/2014 2/19/2014 2014 ITPNT $7,790,221 2014 $8,184,601 $7,000,099 COMPLETE 138/69 0.5200246 30559 50697 AEP TX Chapel Hill REC - Welsh Reserve 138 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 2/19/2014 2014 ITPNT $6,651,694 2014 $6,988,436 $6,651,694 ON SCHEDULE < 4 138 4.39200296 30560 50698 WR KS Sumner County - Viola 138 kV Ckt 1 Zonal Reliability 6/1/2020 6/1/2019 9/2/2014 2014 ITPNT $51,513,963 2014 $54,121,857 $51,513,963 DELAY - MITIGATION 138 28200258 30561 50699 OPPD NE S1366 161/69 kV Ckt 1 Transformer Regional Reliability 5/31/2016 6/1/2016 2/19/2014 2014 ITPNT $4,426,730 2014 $4,650,833 $4,426,730 COMPLETE 161/69200258 30561 50761 OPPD NE S1366 161 kV Ckt 1 Terminal Upgrades Regional Reliability 5/31/2016 6/1/2016 2/19/2014 2014 ITPNT $422,270 2014 $443,647 $422,270 COMPLETE 161200245 30563 50702 WFEC OK Sandy Corner 138 kV Cap Bank Regional Reliability 6/1/2016 6/1/2017 2/19/2014 2014 ITPNT $504,000 2014 $529,515 $504,000 ON SCHEDULE < 4 138200242 30568 50706 WR KS Clay Center Switching Station 115 kV Cap Bank Zonal Reliability 6/1/2018 6/1/2016 2/19/2014 2014 ITPNT $1,390,166 2014 $1,460,543 $1,390,166 DELAY - MITIGATION 115200309 30569 50708 SPS NM Potash Junction - Road Runner 230 kV Ckt 1 High Priority 10/27/2015 6/1/2015 12/3/2014 HPILS $43,096,827 2014 $45,278,604 $51,035,181 COMPLETE 230 40.4200309 30569 50709 SPS NM Road Runner 230/115 kV Substation High Priority 10/27/2015 6/1/2015 12/3/2014 HPILS $10,576,672 2014 $11,112,116 $10,893,806 COMPLETE 230/115 1200246 30573 50718 AEP LA Broadmoor - Fort Humbug 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 2/19/2014 2014 ITPNT $6,695,986 2014 $7,034,970 $6,695,986 ON SCHEDULE < 4 69 1.7200246 30574 50719 AEP TX Daingerfield - Jenkins REC T 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 2/19/2014 2014 ITPNT $2,819,806 2014 $2,962,559 $2,819,806 ON SCHEDULE < 4 69 1.3200246 30575 50720 AEP TX Hallsville - Longview Heights 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2014 2/19/2014 2014 ITPNT $8,851,677 2014 $9,299,793 $8,851,677 DELAY - MITIGATION 69 6.6200246 30576 50721 AEP TX Hallsville - Marshall 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2014 2/19/2014 2014 ITPNT $15,248,925 2014 $16,020,902 $15,248,925 DELAY - MITIGATION 69 11.2200256 30577 50722 SPS NM Chaves - Price 115 kV Ckt 1 Rebuild Regional Reliability 12/30/2017 6/1/2017 2/19/2014 2014 ITPNT $4,701,279 2014 $4,939,281 $5,961,279 DELAY - MITIGATION 115 5 5200256 30577 50723 SPS NM CV Pines - Price 115 kV Ckt 1 Rebuild Regional Reliability 12/30/2017 6/1/2017 2/19/2014 2014 ITPNT $4,158,668 2014 $4,369,201 $3,793,668 DELAY - MITIGATION 115 3200256 30577 50724 SPS NM Capitan - CV Pines 115 kV Ckt 1 Rebuild Regional Reliability 12/30/2017 6/1/2017 2/19/2014 2014 ITPNT $5,415,053 2014 $5,689,190 $3,793,053 DELAY - MITIGATION 115 5200333 30578 50725 SPS TX Bailey Co. - Bailey Co. Pump 115 kV Ckt 1 Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $8,208,578 2014 $8,624,137 $8,208,578 DELAY - MITIGATION 115200333 30578 50729 SPS TX Bailey Co. Pump - Sundan Rural 115 kV Ckt 1 Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $8,038,605 2014 $8,445,559 $8,038,605 DELAY - MITIGATION 115 11.7200333 30578 50731 SPS TX New Amherst 116/69 kV Ckt 1 Transformer Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $5,367,770 2014 $5,639,513 $5,367,770 DELAY - MITIGATION 115/69 0.2200333 30578 50732 SPS TX New Amherst - Sudan Rural 115 kV Ckt 1 Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $5,074,202 2014 $5,331,083 $5,074,202 DELAY - MITIGATION 115 8.6200333 30578 50734 SPS TX New Amherst 115 kV Terminal Upgrades Ckt 1 Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $3,028,707 2014 $3,182,035 $3,028,707 DELAY - MITIGATION 115200333 30578 50735 SPS TX Lamb Co. - New Amherst 115 kV Ckt 1 Regional Reliability 9/1/2019 6/1/2016 2/18/2015 2014 ITPNT $16,737,611 2014 $17,584,953 $16,737,611 DELAY - MITIGATION 115 13.71200401 30578 50736 SPS TX West Littlefield - West Littlefield Tap 115 kV Ckt 1 Regional Reliability 9/1/2019 6/1/2016 5/25/2016 2014 ITPNT $3,187,532 2014 $3,348,901 $3,187,532 DELAY - MITIGATION 115 8.6

200242 30579 50726 WR KS City of Wellington - Sumner County No.4 Rome 69 kV Ckt 1 Rebuild Regional Reliability 3/16/2016 6/1/2014 2/19/2014 2014 ITPNT $7,405,817 2014 $7,780,736 $5,226,656 COMPLETE 69 9

200242 30579 50727 WR KS Creswell - Sumner County No.4 Rome 69 kV Ckt 1 Rebuild Regional Reliability 11/20/2015 6/1/2014 2/19/2014 2014 ITPNT $8,131,536 2014 $8,543,195 $4,259,395 COMPLETE 69 9.5200242 30580 50730 WR KS Crestview - Northeast 69 kV Ckt 1 Rebuild Regional Reliability 11/13/2015 6/1/2014 2/19/2014 2014 ITPNT $8,968,153 2014 $9,422,166 $8,968,153 COMPLETE 69 5.59200242 30580 50733 WR KS Kenmar - Northeast 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2017 6/1/2014 2/19/2014 2014 ITPNT $5,590,592 2014 $5,873,616 $6,740,273 DELAY - MITIGATION 69 1.74200299 30581 50763 OGE OK Ahloso - Park Lane 138 kV Ckt 1 Voltage Conversion Regional Reliability 1/19/2016 6/1/2015 9/18/2014 2014 ITPNT $5,693,264 2014 $5,981,485 $5,693,264 COMPLETE 138 4.39200299 30581 50764 OGE OK Ahloso - Harden City 138 kV Ckt 1 Voltage Conversion Regional Reliability 4/1/2016 6/1/2015 9/18/2014 2014 ITPNT $6,929,179 2014 $7,279,969 $6,929,179 COMPLETE 138 10.12 10.12200299 30581 50765 OGE OK Frisco - Harden City 138 kV Ckt 1 Voltage Conversion Regional Reliability 6/1/2016 6/1/2015 9/18/2014 2014 ITPNT $2,121,320 2014 $2,228,712 $2,121,320 DELAY - MITIGATION 138 3.42 3.42200299 30581 50766 OGE OK Frisco - Lula 138 kV Ckt 1 Voltage Conversion Regional Reliability 12/30/2016 6/1/2015 9/18/2014 2014 ITPNT $6,749,202 2014 $7,090,880 $6,749,202 DELAY - MITIGATION 138 8.3 8.3200247 30582 50738 OGE OK Wildhorse 69 kV Cap Bank Regional Reliability 6/1/2017 6/1/2017 2/19/2014 2014 ITPNT $740,254 2014 $777,729 $740,254 ON SCHEDULE < 4 69200250 30583 50741 GMO MO Harrisonville 161/69 kV Ckt 2 Transformer Regional Reliability 2/10/2014 6/1/2014 2/19/2014 2014 ITPNT $2,773,480 2014 $2,913,887 $2,773,480 $261,239 CLOSED OUT 161/69200250 30583 50762 GMO MO Harrisonville 161 kV Ckt 2 Terminal Upgrades Regional Reliability 4/14/2014 6/1/2014 2/19/2014 2014 ITPNT $1,005,220 2014 $1,056,109 $1,005,220 $2,163,063 CLOSED OUT 161

Page 44: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

200242 30584 50739 WR KS Elk Junction - Montgomery 69 kV Ckt 1 Rebuild Zonal Reliability 12/1/2017 6/1/2018 2/19/2014 2014 ITPNT $10,537,806 2014 $11,071,282 $16,110,343 ON SCHEDULE < 4 69 7.9200242 30584 50740 WR KS Elk Junction - Sedan 69 kV Ckt 1 Rebuild Zonal Reliability 12/1/2018 6/1/2018 2/19/2014 2014 ITPNT $32,548,502 2014 $34,196,270 $19,015,228 DELAY - MITIGATION 69 19200320 30588 50745 OPPD NE Fremont 161/69 kV Transformer Ckt 1 Regional Reliability 10/1/2018 6/1/2016 2/18/2015 2015 ITPNT $2,416,277 2015 $2,476,684 $2,416,277 DELAY - MITIGATION 161/69200320 30588 50746 OPPD NE Fremont - S6801 69 kV Ckt 1 Regional Reliability 10/1/2018 6/1/2016 2/18/2015 2015 ITPNT $3,606,519 2015 $3,696,682 $3,606,519 DELAY - MITIGATION 161/69 3200320 30588 50747 OPPD NE S1226 - S1301 161kV Ckt 1 Regional Reliability 10/1/2018 6/1/2016 2/18/2015 2015 ITPNT $29,069,150 2015 $29,795,879 $29,069,150 DELAY - MITIGATION 161 17200258 30590 50748 OPPD NE S906 - S924 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2019 2/19/2014 2014 ITPNT $1,360,327 2014 $1,429,194 $1,360,327 ON SCHEDULE < 4 69 1.34200258 30590 50749 OPPD NE S924 - S912 69 kV Ckt 1 Terminal Upgrades Regional Reliability 6/1/2018 6/1/2019 2/19/2014 2014 ITPNT $69,679 2014 $73,206 $69,679 ON SCHEDULE < 4 69

30592 50752 SPS NM/TX Eddy County - Tolk 345kV Ckt 1 Generation Interconnection 9/30/2015 $13,224,349 COMPLETE 345200294 30596 50757 NPPD NE Broken Bow Wind - Ord 115 kV Ckt 1 Regional Reliability 3/1/2018 6/1/2014 8/26/2014 2014 ITPNT $34,182,113 2014 $35,912,582 $32,618,819 DELAY - MITIGATION 115 42200294 30596 50760 NPPD NE North Loup - Ord 115 kV Ckt 1 Regional Reliability 6/1/2018 6/1/2014 8/26/2014 2014 ITPNT $411,258 2014 $432,078 $362,040 DELAY - MITIGATION 115200392 30597 50758 OGE OK Knob Hill - Lane - Noel 138 kV Ckt 1 Regional Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $4,009,000 NTC - COMMITMENT WINDOW 138 0.09200397 30597 51030 WFEC OK Knob Hill - Noel 138 kV Ckt 1 Terminal Upgrades Regional Reliability 6/1/2019 6/1/2017 5/17/2016 2016 ITPNT $450,000 NTC - COMMITMENT WINDOW 138200361 30598 50759 AEP TX Letourneau 69 kV Cap Bank Regional Reliability 6/1/2017 6/1/2017 12/11/2015 2016 ITPNT $1,409,347 2016 $1,409,347 $1,409,347 ON SCHEDULE < 4 69200258 30609 50783 OPPD NE S907 - S919 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2019 6/1/2019 2/19/2014 2014 ITPNT $3,141,600 2014 $3,300,644 $3,141,600 ON SCHEDULE < 4 69 3.3200269 30612 50786 OGE OK Hefner - Tulsa 138 kV Ckt 1 Transmission Service 6/1/2019 6/1/2019 7/1/2014 SPP-2012-AG1-AFS-7 $1,131,409 2014 $1,188,687 $1,131,409 ON SCHEDULE < 4 138 1.25200256 30616 50794 SPS NM Curry County Interchange 115 kV Regional Reliability 6/1/2018 6/1/2018 2/19/2014 2014 ITPNT $813,381 2014 $854,558 $1,382,628 ON SCHEDULE < 4 115200310 30619 50802 AEP OK Darlington - Roman Nose 138 kV Ckt 1 (AEP) High Priority 5/31/2017 6/1/2015 12/2/2014 HPILS $11,652,107 2014 $12,241,995 $11,652,107 DELAY - MITIGATION 138 14.25200311 30619 51117 OGE OK Darlington - Roman Nose 138 kV Ckt 1 (OGE) High Priority 12/31/2016 6/1/2015 12/2/2014 HPILS $12,701,091 2014 $13,344,084 $12,701,091 DELAY - MITIGATION 138 13.2200311 30622 50805 OGE OK SW Station - Warwick Tap 138 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/2/2014 HPILS $12,767,120 2014 $13,413,455 $12,767,120 ON SCHEDULE < 4 138 13200311 30622 50806 OGE OK Linwood - SW Station 138 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/2/2014 HPILS $9,899,440 2014 $10,400,599 $9,899,440 ON SCHEDULE < 4 138 18200311 30622 50807 OGE OK Knipe - SW Station 138 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/2/2014 HPILS $8,218,020 2014 $8,634,057 $8,218,020 ON SCHEDULE < 4 138 5200397 30628 50813 WFEC OK Freedom 69 kV Cap Bank Regional Reliability 6/1/2015 6/1/2015 5/17/2016 2016 ITPNT $237,000 NTC - COMMITMENT WINDOW 69200284 30635 50817 WFEC OK Eagle Chief 69 kV Cap Bank High Priority 6/1/2015 6/1/2015 5/19/2014 HPILS $190,000 2014 $199,619 $237,000 COMPLETE 69200309 30637 50851 SPS NM Kiowa 345 kV Substation High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $11,249,526 2014 $11,819,033 $11,249,526 ON SCHEDULE < 4 345200309 30637 50875 SPS NM Hobbs - Kiowa 345 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $59,808,956 2014 $62,836,784 $59,808,956 ON SCHEDULE < 4 345 47.24200309 30638 50819 SPS NM China Draw - North Loving 345 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $19,255,234 2014 $20,230,030 $19,255,234 ON SCHEDULE < 4 345 18.2200309 30638 50820 SPS NM Kiowa - North Loving 345 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $25,716,516 2014 $27,018,415 $25,716,516 ON SCHEDULE < 4 345 20.4200309 30638 50849 SPS NM China Draw 345/115 kV Ckt 1 Transformer High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $4,649,045 2014 $4,884,403 $4,649,045 ON SCHEDULE < 4 345/115200309 30638 50850 SPS NM China Draw 345 kV Ckt 1 Terminal Upgrades High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $4,172,734 2014 $4,383,979 $4,172,734 ON SCHEDULE < 4 345200309 30638 50852 SPS NM North Loving 345/115 kV Ckt 1 Transformer High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $5,950,217 2014 $6,251,447 $5,950,217 ON SCHEDULE < 4 345/115200309 30638 50854 SPS NM North Loving 345 kV Terminal Upgrades High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $7,873,653 2014 $8,272,257 $7,873,653 ON SCHEDULE < 4 345200309 30639 50862 SPS NM Road Runner 345/115 kV Ckt 1 Transformer High Priority 6/1/2016 6/1/2018 12/3/2014 HPILS $3,989,689 2014 $4,191,667 $3,989,689 ON SCHEDULE < 4 345/115200309 30639 50863 SPS NM Road Runner 345 kV Substation Conversion High Priority 6/1/2016 6/1/2018 12/3/2014 HPILS $11,569,711 2014 $12,155,428 $11,569,711 ON SCHEDULE < 4 345200309 30639 50868 SPS NM Kiowa 345/115 kV Ckt 1 Transformer High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $5,443,140 2014 $5,718,699 $5,443,140 ON SCHEDULE < 4 345/115200309 30639 50871 SPS NM Kiowa - Potash Junction 345/115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $2,176,451 2014 $2,286,634 $2,176,451 ON SCHEDULE < 4 345 2200335 30644 50827 MKEC KS Anthony - Harper 138 kV Ckt 1 High Priority 2/18/2018 6/1/2018 2/18/2015 HPILS $13,253,238 2014 $13,924,183 $13,354,771 ON SCHEDULE < 4 138 14.8200276 30645 50828 MKEC KS Harper - Rago 138 kV Ckt 1 High Priority 2/18/2018 6/1/2015 5/19/2014 HPILS $13,666,262 2014 $14,358,117 $11,475,555 DELAY - MITIGATION 138 12.5200370 30649 50881 SPS NM Andrews 230/115 kV Ckt 1 Transformer High Priority 4/4/2016 6/1/2015 2/12/2016 HPILS $10,671,660 2016 $10,671,660 $10,671,660 COMPLETE 230/115 0.1200282 30649 50882 SPS NM Andrews - NEF 115 kV Ckt 1 High Priority 4/4/2016 6/1/2015 5/19/2014 HPILS $3,523,472 2014 $3,701,848 $3,523,472 COMPLETE 115 2.1200371 30666 50864 SPS NM China Draw 115 kV SVC Regional Reliability 6/30/2016 4/1/2015 2/12/2016 2015 ITPNT $25,925,187 2015 $26,573,317 $25,925,187 DELAY - MITIGATION 115200371 30666 51132 SPS NM Road Runner 115 kV SVC Regional Reliability 4/1/2016 4/1/2015 2/12/2016 2015 ITPNT $28,918,070 2015 $29,641,022 $28,918,070 COMPLETE 115200282 30672 50872 SPS NM Toboso Flats 115 kV Substation High Priority 6/1/2018 6/1/2018 5/19/2014 HPILS $822,700 2014 $864,349 $822,700 ON SCHEDULE < 4 115200282 30672 50874 SPS NM Dollarhide - Toboso Flats 115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 5/19/2014 HPILS $5,062,341 2014 $5,318,622 $5,062,341 ON SCHEDULE < 4 115 7.4200282 30675 50869 SPS NM China Draw - Yeso Hills 115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 5/19/2014 HPILS $14,583,586 2014 $15,321,880 $14,583,586 ON SCHEDULE < 4 115 18.4200282 30675 50988 SPS NM Yeso Hills 115 kV Substation High Priority 6/1/2018 6/1/2018 5/19/2014 HPILS $1,046,485 2014 $1,099,463 $1,046,485 ON SCHEDULE < 4 115200277 30678 50889 NPPD NE Thedford 345/115 kV Transformer High Priority 10/1/2018 6/1/2016 5/19/2014 HPILS $9,306,000 2014 $9,777,116 $9,306,000 DELAY - MITIGATION 345/115200277 30678 51002 NPPD NE Thedford 345 kV Terminal Upgrades High Priority 10/1/2018 6/1/2016 5/19/2014 HPILS $930,800 2014 $977,922 $930,800 DELAY - MITIGATION 345200313 30688 50915 OGE OK Park Lane 138 kV Terminal Upgrades Transmission Service 1/29/2016 6/1/2015 1/30/2015 SPP-2012-AG2-AFS-8 $89,100 2015 $91,328 $89,100 COMPLETE 138200395 30692 50920 SPS TX Seminole 230/115 kV #1 Transformer Regional Reliability 12/30/2021 6/1/2017 5/17/2016 2016 ITPNT $3,890,904 NTC - COMMITMENT WINDOW 230/115200395 30692 50921 SPS TX Seminole 230/115 kV #2 Transformer Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $3,890,904 NTC - COMMITMENT WINDOW 230/115200282 30694 50877 SPS NM Ponderosa 115 kV Substation High Priority 6/1/2017 6/1/2018 5/19/2014 HPILS $996,485 2014 $1,046,932 $996,485 ON SCHEDULE < 4 115200282 30694 50879 SPS NM Ponderosa Tap 115 kV Substation High Priority 6/1/2017 6/1/2018 5/19/2014 HPILS $4,174,446 2014 $4,385,777 $4,174,446 ON SCHEDULE < 4 115 0.2200282 30694 50923 SPS NM Ponderosa - Ponderosa Tap 115 kV Ckt 1 High Priority 6/1/2017 6/1/2018 5/19/2014 HPILS $5,404,344 2014 $5,677,939 $5,404,344 ON SCHEDULE < 4 115 9.3200309 30695 50925 SPS NM Sage Brush 115 kV Substation High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $3,822,672 2014 $4,016,195 $3,822,672 ON SCHEDULE < 4 115200309 30695 50926 SPS NM Livingston Ridge - Sage Brush 115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $8,811,206 2014 $9,257,273 $8,811,206 ON SCHEDULE < 4 115 13.9200309 30695 50927 SPS NM Lagarto 115 kV Substation High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $1,200,057 2014 $1,260,810 $1,200,057 ON SCHEDULE < 4 115200309 30695 50928 SPS NM Largarto - Sage Brush 115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $6,186,323 2014 $6,499,506 $6,186,323 ON SCHEDULE < 4 115 10.4200309 30695 50951 SPS NM Cardinal 115 kV Substation High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $6,115,613 2014 $6,425,216 $6,115,613 ON SCHEDULE < 4 115 0.2200309 30695 50967 SPS NM Cardinal - Lagarto 115 kV Ckt 1 High Priority 6/1/2018 6/1/2018 12/3/2014 HPILS $9,244,612 2014 $9,712,620 $9,244,612 ON SCHEDULE < 4 115 17.5200365 30708 50954 SPS NM Ochoa - Ponderosa Tap 115 kV Ckt 1 Rebuild Regional Reliability 8/31/2016 6/1/2018 1/12/2016 SPP-2014-AG1-AFS-6 $7,032,376 2016 $7,032,376 $7,032,376 ON SCHEDULE < 4 115200309 30717 50870 SPS NM Hopi Sub - North Loving 115 kV Ckt 1 High Priority 5/25/2015 6/1/2015 12/3/2014 HPILS $9,980,879 2014 $10,486,161 $11,345,995 COMPLETE 115 9.5200309 30717 50883 SPS NM China Draw - North Loving 115 kV Ckt 1 High Priority 5/25/2015 6/1/2015 12/3/2014 HPILS $13,283,227 2014 $13,955,690 $10,291,637 COMPLETE 115 19.7200306 30731 50990 AEP TX Mt Pleasant - West Mt Pleasant 69 kV Ckt 1 Rebuild Regional Reliability 4/20/2015 6/1/2015 11/24/2014 DPA-2013-SEP-351 $4,715,419 2015 $4,833,304 $7,381,799 COMPLETE 69 2.72200362 30732 50991 MKEC KS Anthony - Bluff City 138 kV Ckt 1 High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $17,226,557 2016 $17,226,557 $17,226,557 DELAY - MITIGATION 138 14.8200362 30732 50993 MKEC KS Bluff City - Caldwell 138 kV Ckt 1 High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $9,378,604 2016 $9,378,604 $9,378,604 DELAY - MITIGATION 138 15.2200362 30732 50994 MKEC KS Caldwell - Mayfield 138 kV Ckt 1 High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $7,527,006 2016 $7,527,006 $7,527,006 DELAY - MITIGATION 138 10200362 30732 50995 MKEC KS Mayfield - Milan 138 kV Ckt 1 High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $6,608,453 2016 $6,608,453 $6,608,453 DELAY - MITIGATION 138 6.6200362 30732 51394 MKEC KS Viola 138 kV Line Tap (MKEC) High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $4,414,629 2016 $4,414,629 $4,414,629 DELAY - MITIGATION 0.3 5.1200363 30732 51395 WR KS Viola 138 kV Line Tap (WR) High Priority 6/1/2018 6/1/2015 12/21/2015 HPILS $3,915,388 2016 $3,915,388 $3,915,388 DELAY - MITIGATION200272 30746 51013 AEP OK Darlington - Red Rock 138 kV Ckt 1 High Priority 10/4/2013 6/1/2015 5/19/2014 HPILS $15,277,233 2014 $16,050,643 $15,277,233 $14,980,117 CLOSED OUT 138 8200272 30747 51014 AEP OK Grady - Round Creek 138 kV Ckt 1 High Priority 11/5/2015 6/1/2015 5/19/2014 HPILS $12,132,497 2014 $12,746,705 $12,132,497 COMPLETE 138200272 30748 51015 AEP OK Grady - Phillips 138 kV Ckt 1 and 2 High Priority 12/31/2014 6/1/2015 5/19/2014 HPILS $8,318,584 2014 $8,739,712 $8,318,584 COMPLETE 138 4200272 30750 51017 AEP OK Stonewall - Wapanucka 138 kV Ckt 1 High Priority 12/31/2013 6/1/2015 5/19/2014 HPILS $8,934,149 2014 $9,386,440 $8,934,149 $7,200,874 COMPLETE 138 6.4

30753 51025 SPS OK Hitchland 115kV Interchange GEN-2007-046 Addition Generation Interconnection 9/1/2015 $990,329 COMPLETE 115200297 30755 50992 SPS TX Tuco 230/115 kV Ckt 1 Transformer Transmission Service 6/1/2018 6/1/2019 5/5/2015 SPP-2012-AG3-AFS-9 $3,800,415 2015 $3,895,425 $4,020,488 ON SCHEDULE < 4 230/115200282 30756 50873 SPS NM Battle Axe - Road Runner 115 kV Ckt 1 High Priority 11/12/2015 6/1/2018 5/19/2014 HPILS $13,816,310 2014 $14,515,761 $7,785,501 COMPLETE 115 18.9200282 30756 50968 SPS NM Battle Axe 115 kV Substation High Priority 12/4/2015 6/1/2018 5/19/2014 HPILS $2,964,499 2014 $3,114,577 $3,464,499 COMPLETE 115200298 30761 51033 AEP LA Cedar Grove - South Shreveport 138 kV Transmission Service 6/1/2020 6/1/2020 9/30/2014 SPP-2010-AGP1-AFS-8 $6,566,218 2014 $6,898,633 $6,566,218 ON SCHEDULE > 4 138200339 30762 51034 AEP LA Ellerbe Road - Lucas 69 kV Ckt 1 Rebuild Regional Reliability 3/1/2019 3/1/2019 3/17/2015 DPA-2013-MAR-296 $6,629,465 2015 $6,795,201 $6,629,465 ON SCHEDULE < 4 69 3.2200339 30762 51035 AEP LA Ellerbe Road - Lucas 69 kV Terminal Upgrades Regional Reliability 3/1/2019 3/1/2019 3/17/2015 DPA-2013-MAR-296 $652,658 2015 $668,974 $652,658 ON SCHEDULE < 4 69

30763 51036 OGE OK Woodward District EHV 345kV Substation Generation Interconnection 9/2/2016 $2,707,042 ON SCHEDULE < 4 345200262 30766 51039 SPS TX Yoakum County Interchange 230/115 kV Ckt 1 Transformer Transmission Service 6/1/2019 6/1/2019 4/9/2014 SPP-2011-AG3-AFS-11 $3,632,101 2014 $3,815,976 $3,632,101 ON SCHEDULE < 4 230/115200262 30766 51050 SPS TX Yoakum County Interchange 230/115 kV Ckt 2 Transformer Regional Reliability 6/1/2019 6/1/2019 4/9/2014 SPP-2011-AG3-AFS-11 $3,432,506 2014 $3,606,277 $3,432,506 ON SCHEDULE < 4 230/115

30768 51044 MIDW KS Post Rock 230kV Substation GEN-2008-092 Addition Generation Interconnection 9/1/2015 $599,380 COMPLETE 230200272 30769 51045 AEP LA Benteler - Port Robson 138 kV Ckt 1 High Priority 9/5/2014 6/1/2015 5/19/2014 HPILS $2,248,743 2014 $2,362,586 $2,248,743 $13,875,792 CLOSED OUT 138

200272 30769 51046 AEP LA Benteler - Port Robson 138 kV Ckt 2 High Priority 12/11/2014 6/1/2015 5/19/2014 HPILS $2,548,575 2014 $2,677,597 $2,548,575 Included in UID 51045

CLOSED OUT 138

Page 45: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

200272 30770 51047 AEP OK Ellis 138 kV Substation High Priority 6/1/2013 6/1/2015 5/19/2014 HPILS $4,100,000 2014 $4,307,563 $4,100,000 $4,086,696 COMPLETE 138200286 30771 51048 MIDW KS Midwest Pump Tap 115 kV Substation High Priority 7/2/2016 6/1/2015 5/19/2014 HPILS $4,477,251 2014 $4,703,911 $4,477,251 DELAY - MITIGATION 115200286 30771 51049 MIDW KS Midwest Pump - Midwest Pump Tap 115 kV Ckt 1 High Priority 7/2/2016 6/1/2015 5/19/2014 HPILS $2,443,469 2014 $2,567,169 $2,443,469 DELAY - MITIGATION 115 6

30782 51058 OGE OK Beaver County 345kV Substation GEN-2010-001 Addition Generation Interconnection 6/14/2015 $3,566,677 $485,663 COMPLETE 34530786 51069 NPPD NE Dixon County 230kV Substation Generation Interconnection 11/1/2018 $5,750,000 ON SCHEDULE < 4 23030787 51070 NPPD NE Twin Church - Dixon County 230kV Line Upgrade Generation Interconnection 11/1/2018 $100,000 ON SCHEDULE < 4 230

200382 30809 51096 AEP OK Keystone Dam - Wekiwa 138 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 6/1/2021 4/12/2016 SPP-2014-AG1-AFS-6 $4,319,501 NTC - COMMITMENT WINDOW 138 2 2 2200395 30817 51109 SPS TX Canyon West - Dawn 115 kV Ckt 1 Rebuild Regional Reliability 4/1/2018 6/1/2017 5/17/2016 2016 ITPNT $9,006,562 NTC - COMMITMENT WINDOW 115 13.7200395 30817 51110 SPS TX Dawn - Panda 115 kV Ckt 1 Rebuild Regional Reliability 4/1/2018 6/1/2017 5/17/2016 2016 ITPNT $5,447,497 NTC - COMMITMENT WINDOW 115 8.4200395 30817 51111 SPS TX Deaf Smith - Panda 115 kV Ckt 1 Rebuild Regional Reliability 4/1/2018 6/1/2017 5/17/2016 2016 ITPNT $3,232,285 NTC - COMMITMENT WINDOW 115 3.5

200297 30820 51112 SPS TX Carlisle Interchange - Tuco Interchange 230 kV Ckt 1 Terminal Upgrade Transmission Service 9/1/2016 10/1/2015 5/5/2015 SPP-2012-AG3-AFS-9 $362,250 2015 $371,306 $362,250 DELAY - MITIGATION 230

200282 30824 50821 SPS NM Potash Junction 230/115 kV Ckt 1 High Priority 4/15/2016 6/1/2015 5/19/2014 HPILS $3,508,346 2014 $3,685,956 $3,687,581 COMPLETE 230/115200282 30825 50931 SPS NM China Draw - Wood Draw 115 kV Ckt 1 High Priority 6/15/2017 6/1/2018 5/19/2014 HPILS $13,704,501 2014 $14,398,291 $16,425,742 ON SCHEDULE < 4 115 14200330 30838 51133 OPPD NE Sub 3459 345/161 kV Transformer Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITP10 $6,588,939 2015 $6,753,663 $6,588,939 ON SCHEDULE < 4 345/161200330 30838 51136 OPPD NE Sub 3459 345 kV Terminal Upgrades Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITP10 $3,604,757 2015 $3,694,876 $3,604,757 ON SCHEDULE < 4 345200329 30843 51139 OGE OK Cimarron - Draper 345 kV Terminal Upgrades Regional Reliability 4/1/2019 4/1/2019 2/18/2015 2015 ITP10 $1,500,000 2015 $1,537,500 $1,500,000 ON SCHEDULE < 4 345200395 30844 51140 SPS TX Amoco - Sundown 230 kV Terminal Upgrades Economic 4/1/2020 1/1/2019 5/17/2016 2016 ITPNT $436,093 NTC - COMMITMENT WINDOW 230200316 30848 51146 GRDA OK Claremore 161 kV Terminal Upgrades Regional Reliability 6/1/2018 6/1/2018 2/18/2015 2015 ITPNT $11,200 2015 $11,480 $11,200 ON SCHEDULE < 4 161200328 30850 51151 KCPL MO Iatan 345 kV Voltage Conversion Economic 1/1/2019 1/1/2019 2/25/2015 2015 ITP10 $3,263,000 2015 $3,344,575 $3,263,000 ON SCHEDULE < 4 345 18200337 30850 51283 GMO MO Iatan - Stranger Creek 345 kV Ckt 1 Voltage Conversion (GMO) Economic 1/1/2019 1/1/2019 2/25/2015 2015 ITP10 $6,237,000 2015 $6,392,925 $6,237,000 ON SCHEDULE < 4 345200338 30850 51284 WR KS Iatan - Stranger Creek 345 kV Ckt 1 Voltage Conversion (WR) Economic 1/1/2019 1/1/2019 2/25/2015 2015 ITP10 $28,010,000 2015 $28,710,250 $28,010,000 ON SCHEDULE < 4 345 10.83200336 30859 51163 SPS NM Plains Interchange 115 kV Cap Bank Regional Reliability 11/15/2017 6/1/2019 2/26/2015 2015 ITP10 $1,217,275 2015 $1,247,707 $850,733 ON SCHEDULE < 4 115200326 30866 51170 SPS TX Amarillo South 230 kV Terminal Upgrades Regional Reliability 4/1/2020 4/1/2020 2/18/2015 2015 ITPNT $31,198 2015 $31,978 $31,198 ON SCHEDULE < 4 230200314 30873 51187 AEP OK Southwestern Station - Carnegie 138 kV Ckt 1 Rebuild Regional Reliability 12/31/2017 6/1/2016 2/18/2015 2015 ITPNT $15,821,763 2015 $16,217,307 $15,821,763 DELAY - MITIGATION 138 16.52 138200326 30875 51189 SPS NM PCA Interchange - Quahada 115 kV Ckt 1 Rebuild Regional Reliability 6/15/2017 6/1/2016 2/18/2015 2015 ITPNT $7,264,308 2015 $7,445,916 $7,264,308 DELAY - MITIGATION 115 12.1200319 30876 51190 OGE OK Little River - Maud 69 kV Ckt 1 Rebuild Regional Reliability 10/31/2016 6/1/2015 2/18/2015 2015 ITPNT $387,822 2015 $397,518 $387,722 DELAY - MITIGATION 69 10.7200317 30881 51197 KCPL MO South Waverly 161/69 kV Ckt 1 Transformer Regional Reliability 5/26/2016 6/1/2015 2/18/2015 2015 ITPNT $2,000,000 2015 $2,050,000 $2,000,000 COMPLETE 161/69200317 30881 51268 KCPL MO South Waverly 161 kV Terminal Upgrades Regional Reliability 5/26/2016 6/1/2015 2/18/2015 2015 ITPNT $280,000 2015 $287,000 $280,000 COMPLETE 161200318 30883 51200 NPPD NE Bassett 115 kV Substation Regional Reliability 6/1/2018 6/1/2016 2/18/2015 2015 ITPNT $5,163,000 2015 $5,292,075 $5,163,000 DELAY - MITIGATION 115 0.1200318 30883 51277 NPPD NE Bassett 115 kV Cap Bank Regional Reliability 6/1/2018 6/1/2016 2/18/2015 2015 ITPNT $902,000 2015 $924,550 $902,000 DELAY - MITIGATION 115200319 30884 51202 OGE OK Stillwater 138/69 kV Ckt 1 Transformer Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITPNT $3,989,023 2015 $4,088,749 $2,786,625 ON SCHEDULE < 4 138/69200319 30884 51269 OGE OK Stillwater 138 kV Terminal Upgrades Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITPNT $611,398 ON SCHEDULE < 4 138200326 30888 51206 SPS TX Lynn County 115/69 kV Ckt 1 Transformer Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITPNT $1,699,629 2015 $1,742,120 $1,695,000 ON SCHEDULE < 4 115/69200326 30888 51270 SPS TX Lynn County 115 kV Terminal Upgrades Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITPNT $0 ON SCHEDULE < 4 115200323 30891 51211 WR KS Benton 138 kV Terminal Upgrades Regional Reliability 6/1/2016 6/1/2015 2/18/2015 2015 ITPNT $734,229 2015 $752,585 $734,229 DELAY - MITIGATION 138200390 30892 51212 GRDA OK CPPXF#22 69 kV Terminal Upgrades Regional Reliability 12/31/2016 6/1/2015 5/17/2016 2016 ITPNT $134,800 NTC - COMMITMENT WINDOW 69 2200326 30894 51214 SPS TX Cargill 115 kV Cap Bank Regional Reliability 6/1/2019 6/1/2019 2/18/2015 2015 ITPNT $1,262,485 2015 $1,294,047 $1,262,485 ON SCHEDULE < 4 115200314 30895 51215 AEP LA Brooks Street - Edwards Street 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2016 2/18/2015 2015 ITPNT $4,294,228 2015 $4,401,584 $4,294,228 DELAY - MITIGATION 69 0.85200319 30900 51220 OGE OK Warner Tap 69 kV Terminal Upgrades Regional Reliability 6/1/2016 6/1/2015 2/18/2015 2015 ITPNT $2,565,000 2015 $2,629,125 $3,404,703 DELAY - MITIGATION 69200390 30909 51230 GRDA OK Collinsville - Skiatook 69 kV Terminal Upgrades Regional Reliability 6/1/2017 6/1/2017 5/17/2016 2016 ITPNT $160,200 NTC - COMMITMENT WINDOW 69200343 30912 51235 SPS KS Stevens Co. 345 kV Substation Regional Reliability 6/1/2018 6/1/2015 8/13/2015 2015 ITPNT $13,831,957 2015 $14,177,756 $13,831,957 SUSPENDED 345 0.1200344 30912 51240 SEPC KS Walkemeyer - Stevens Co. 115 kV Ckt 1 Regional Reliability 6/1/2018 6/1/2015 8/13/2015 2015 ITPNT $767,645 2015 $786,836 $767,645 SUSPENDED 115 1200344 30912 51241 SEPC KS Walkemeyer 115 kV Terminal Upgrades Regional Reliability 6/1/2018 6/1/2015 8/13/2015 2015 ITPNT $5,668,987 2015 $5,810,712 $5,668,987 SUSPENDED 115200344 30912 51327 SEPC KS Stevens Co. 345/115 kV Transformer Regional Reliability 6/1/2018 6/1/2015 8/13/2015 2015 ITPNT $11,695,379 2015 $11,987,763 $11,695,379 SUSPENDED200343 30913 51237 SPS NM RIAC 115 kV Voltage Conversion Regional Reliability 6/1/2018 6/1/2015 8/13/2015 2015 ITPNT $4,811,635 2015 $4,931,926 $4,811,635 DELAY - MITIGATION 115 0.1 1.5200360 30914 50952 SPS NM IMC #1 Tap - Livingston Ridge 115 kV Ckt 1 Rebuild Regional Reliability 11/16/2018 6/1/2015 12/7/2015 2015 ITPNT $5,846,342 2015 $5,992,501 $5,846,342 DELAY - MITIGATION 115 9.5 9.3200360 30914 50955 SPS NM Ponderosa Tap - Whitten 115 kV Ckt 1 Rebuild Regional Reliability 5/31/2017 6/1/2015 12/7/2015 2015 ITPNT $3,943,853 2015 $4,042,449 $3,943,853 DELAY - MITIGATION 115 3.92200360 30914 50957 SPS NM Intrepid West - Potash Junction 115 kV Ckt 1 Rebuild Regional Reliability 11/16/2018 6/1/2015 12/7/2015 2015 ITPNT $3,196,240 2015 $3,276,146 $3,196,240 DELAY - MITIGATION 115 1.5200360 30914 50958 SPS NM IMC #1 Tap - Intrepid West 115 kV Ckt 1 Rebuild Regional Reliability 11/16/2018 6/1/2015 12/7/2015 2015 ITPNT $3,121,473 2015 $3,199,510 $3,121,473 DELAY - MITIGATION 115 3.9200360 30914 51131 SPS NM Byrd Tap - Monument Tap 115 kV Ckt 1 Rebuild Regional Reliability 11/16/2018 6/1/2015 12/7/2015 2015 ITPNT $3,163,083 2015 $3,242,160 $3,163,083 DELAY - MITIGATION 115 4.6200360 30914 51194 SPS NM Potash Junction 230 kV Cap Bank Regional Reliability 11/16/2018 6/1/2015 12/7/2015 2015 ITPNT $3,659,456 2015 $3,750,942 $3,659,456 DELAY - MITIGATION 230200360 30914 51245 SPS NM Cardinal - Targa 115 kV Ckt 1 Rebuild Regional Reliability 5/31/2018 6/1/2015 12/7/2015 2015 ITPNT $2,667,006 2015 $2,733,681 $2,667,006 DELAY - MITIGATION 115 3200360 30914 51250 SPS NM National Enrichment Plant - Targa 115 kV Ckt 1 Regional Reliability 8/15/2017 6/1/2015 12/7/2015 2015 ITPNT $4,430,052 2015 $4,540,803 $4,430,052 DELAY - MITIGATION 115 3200325 30916 51209 SEPC KS Buckner - Spearville 345 kV Ckt 1 Terminal Upgrades Regional Reliability 5/1/2017 6/1/2015 2/18/2015 2015 ITPNT $2,437,937 2015 $2,498,885 $2,437,937 DELAY - MITIGATION 345200394 30917 51271 SEPC KS Ellsworth 115 kV Cap Bank Regional Reliability 6/1/2019 6/1/2017 5/17/2016 2016 ITPNT $1,909,424 NTC - COMMITMENT WINDOW 115200365 30918 51272 SPS NM Cooper Ranch - Oil Center 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 6/1/2021 1/12/2016 SPP-2014-AG1-AFS-6 $3,044,258 2016 $3,044,258 $3,044,258 ON SCHEDULE > 4 2.6200365 30918 51273 SPS NM Byrd Tap - Cooper Ranch 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 6/1/2021 1/12/2016 SPP-2014-AG1-AFS-6 $3,261,324 2016 $3,261,324 $3,261,324 ON SCHEDULE > 4 5.7200365 30918 51407 SPS NM Lea Road - Oil Center 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 6/1/2021 1/12/2016 SPP-2014-AG1-AFS-6 $3,630,770 2016 $3,630,770 $3,630,770 ON SCHEDULE > 4 115 4.25200318 30921 51276 NPPD NE Ainsworth - Ainsworth Wind 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2020 6/1/2020 2/18/2015 2015 ITPNT $200,000 2015 $205,000 $209,500 ON SCHEDULE > 4 115200385 30922 51242 MKEC KS North Liberal - Walkemeyer 115 kV Ckt 1 Regional Reliability 6/1/2019 5/17/2016 2015 ITP10 $8,325,610 2015 $8,533,750 $8,325,610 SUSPENDED 115 21200342 30922 51243 MKEC KS North Liberal 115 kV Terminal Upgrades Regional Reliability 6/1/2019 6/1/2019 6/30/2015 2015 ITP10 $6,908,748 2015 $7,081,467 $6,908,748 SUSPENDED 115

30931 51289 MIDW KS South Hays 230kV Substation GEN-2009-008 Addition Generation Interconnection 10/16/2015 $2,949,038 COMPLETE 23030932 51290 MIDW KS Walnut Creek 69kV Substation Generation Interconnection 10/14/2015 $3,233,388 COMPLETE 6930932 51399 MIDW KS Walnut Creek 69kV Substation (TOIF) Generation Interconnection 10/14/2015 $457,882 COMPLETE

30932 51400 MIDW KS Nekoma 115/69 kV Substation GEN-2014-025 Addition to Walnut Creek 69kV Generation Interconnection 7/29/2016 $231,564 ON SCHEDULE < 4

30933 51291 SPS TX Crosby County Interchange - Floyd County Interchange 115kV Ckt 1 Generation Interconnection 3/31/2017 $4,043,580 ON SCHEDULE < 4 115

30934 51292 NPPD NE Hoskins - Dixon County 230kV Line Upgrade Generation Interconnection 11/1/2018 $500,000 ON SCHEDULE < 4 23030936 51297 WR KS Cresswell 138kV Substation GEN-2011-057 Addition Generation Interconnection 5/14/2015 $1,258,420 COMPLETE 13830937 51299 SPS TX TUCO 230kV Switching Station GEN-2012-020 Addition Generation Interconnection 4/1/2016 $1,500,377 ON SCHEDULE < 4 23030938 51300 ITCGP KS Clark County 345kV Switching Station GEN-2012-024 Addition Generation Interconnection 10/7/2016 $1,286,407 ON SCHEDULE < 4 34530939 51301 WFEC OK Lake Creek - Lone Wolf 69kV Ckt 1 Current Transformers Generation Interconnection 8/8/2015 $197,972 COMPLETE 6930943 51306 BEPC ND AVS - Charlie Creek 345 kV Ckt 2 Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $96,000,000 2014 $100,860,000 $82,000,000 COMPLETE 345 7030943 51307 BEPC ND AVS 345 kV Substation Regional Reliability 6/1/2016 12/1/2017 IS Integration Study $3,000,000 2014 $3,151,875 $5,800,000 ON SCHEDULE < 4 34530943 51308 BEPC ND Charlie Creek 345 kV Substation Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $9,000,000 2014 $9,455,625 $9,000,000 COMPLETE 34530944 51310 BEPC ND Charlie Creek - Judson 345 kV Ckt 1 Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $103,000,000 2014 $108,214,375 $82,000,000 COMPLETE 345 7530944 51311 BEPC ND Judson 345/230 kV Substation Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $19,000,000 2014 $19,961,875 $27,000,000 COMPLETE 34530944 51312 BEPC ND Judson - Williston 230 kV Ckt 1 Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $2,400,000 2014 $2,521,500 $3,500,000 COMPLETE 23030944 51313 BEPC ND Williston 230 kV Terminal Upgrades Regional Reliability 12/22/2015 12/1/2017 IS Integration Study $2,000,000 2014 $2,101,250 $2,000,000 COMPLETE 23030945 51314 BEPC ND Judson - Tande 345 kV Ckt 1 Regional Reliability 10/31/2017 12/1/2017 IS Integration Study $86,000,000 2014 $90,353,750 $86,000,000 ON SCHEDULE < 4 345 5830945 51315 BEPC ND Tande 345/230 kV Substation Regional Reliability 10/31/2017 12/1/2017 IS Integration Study $18,000,000 2014 $18,911,250 $18,000,000 ON SCHEDULE < 4 34530945 51316 BEPC ND Neset - Tande 230 kV Ckt 1 Regional Reliability 10/31/2017 12/1/2017 IS Integration Study $3,000,000 2014 $3,151,875 $3,000,000 ON SCHEDULE < 4 230 230945 51317 BEPC ND Neset 230 kV Terminal Upgrades Regional Reliability 10/31/2017 12/1/2017 IS Integration Study $4,000,000 2014 $4,202,500 $4,000,000 ON SCHEDULE < 4 23030946 51318 BEPC SD Lower Brule - Witten 230 kV Ckt 1 Regional Reliability 1/1/2018 12/1/2016 IS Integration Study $31,500,000 2014 $33,094,688 $31,500,000 DELAY - MITIGATION 230 6530946 51319 BEPC SD Lower Brule 230 kV Substation Regional Reliability 1/1/2018 12/1/2016 IS Integration Study $4,500,000 2014 $4,727,813 $4,500,000 DELAY - MITIGATION 230

Page 46: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

30946 51320 BEPC SD Lower Brule - Witten 230 kV Terminal Upgrades Regional Reliability 1/1/2018 12/1/2016 IS Integration Study $2,000,000 2014 $2,101,250 $2,000,000 DELAY - MITIGATION 230

30950 51348 LES NE Interconnection Substation for GEN-2013-002 & GEN-2013-019 (LES) Generation Interconnection 10/15/2016 $2,838,685 ON SCHEDULE < 4

30950 51349 NPPD NE Interconnection Substation for GEN-2013-002 & GEN-2013-019 (NPPD) Generation Interconnection 10/15/2016 $92,000 ON SCHEDULE < 4

30951 51331 NPPD NE Antelope - County Line - 115kV Rebuild Generation Interconnection 5/1/2017 $2,047,174 ON SCHEDULE < 430951 51340 NPPD NE Battle Creek - County Line 115kV Rebuild Generation Interconnection 5/1/2017 $1,952,826 ON SCHEDULE < 430955 51335 OGE OK Otter 138kV - rebuild and add terminal for GEN-2014-064 NU Generation Interconnection 6/30/2017 $2,807,651 ON SCHEDULE < 430955 51362 OGE OK Otter 138kV - rebuild and add terminal for GEN-2014-064 TOIF Generation Interconnection 6/30/2017 $410,000 ON SCHEDULE < 430956 51339 NPPD NE Antelope 115kV - Add terminal for GEN-2013-032 Generation Interconnection 5/1/2017 $2,300,000 ON SCHEDULE < 430957 51336 SPS TX Castro County 115kV - add terminal for GEN-2014-040 Generation Interconnection 11/14/2016 $1,250,017 ON SCHEDULE < 4

30958 51337 SPS TX Sidewinder 230kV Substation - GEN-2014-012 Interconnection Substation Generation Interconnection 3/1/2018 $11,537,056 ON SCHEDULE < 4

30960 51341 OGE OK Beaver County Substation - Add 345kV terminal for GEN-2013-030 Generation Interconnection 3/3/2017 $3,952,199 ON SCHEDULE < 4

30961 51342 OGE OK Renfrow 345 kV - add terminal for GEN-2013-029 Generation Interconnection 11/12/2015 $1,588,977 COMPLETE30962 51343 GRDA OK GRDA3 345kV - Interconnection Substation for GEN-2013-028 Generation Interconnection 2/24/2017 $17,847,821 ON SCHEDULE < 430962 51344 GRDA OK GRDA3 345kV - GRDA1 Relays Generation Interconnection 2/24/2017 $0 ON SCHEDULE < 430962 51345 GRDA OK GRDA3 345kV - Tonnece Relays Generation Interconnection 2/24/2017 $0 ON SCHEDULE < 430964 51347 OGE OK Interconnection Substation for GEN-2013-007 Generation Interconnection 9/11/2015 $2,779,863 COMPLETE30965 51351 ITCGP KS Clark County 345kV Switching Station GEN-2011-008 Addition Generation Interconnection 10/7/2016 $3,118,020 ON SCHEDULE < 4

30966 51352 OGE OK Tap and Tie South 4th - Bunch Creek & Enid Tap - Fairmont (GEN-2012-033-Tap) 138kV Generation Interconnection 8/14/2015 $2,223,890 $2,644,977 COMPLETE

30966 51522 OGE OK Tap and Tie South 4th - Bunch Creek & Enid Tap - Fairmont (OG&E) 138kV Generation Interconnection 8/14/2015 $0 $19,997,096 COMPLETE

30966 51523 OGE OK Tap and Tie South 4th - Bunch Creek & Enid Tap - Fairmont (GEN-2012-033-Tap) 138kV (TOIF) Generation Interconnection 8/14/2015 $410,000 $350,666 COMPLETE

30967 51353 OGE OK Open Sky 345kV Substation Generation Interconnection 7/10/2015 $7,554,395 $9,302,063 COMPLETE30967 51354 WR KS Open Sky 345kV Substation (WERE) Generation Interconnection 5/8/2015 $30,000 ON SCHEDULE < 430967 51423 OGE OK Open Sky 345kV Substation (TOIF) Generation Interconnection 7/10/2015 $1,099,958 $869,455 COMPLETE30969 51356 OGE OK Border 345kV Substation - GEN-2011-049 Addition Generation Interconnection 8/2/2016 $2,554,395 ON SCHEDULE < 4

200384 30971 51358 SPS TX Cochran - Whiteface Tap 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2016 4/20/2016 DPA-2013-JUN-342 $2,721,459 NTC - COMMITMENT WINDOW30972 51361 NPPD NE Meadow Grove 230kV (GEN-2014-031 TOIF) Generation Interconnection 3/31/2016 $100,000 COMPLETE30973 51363 AEP OK Terry Road 345kV Station (TOIF) Generation Interconnection 11/30/2016 $1,869,249 ON SCHEDULE < 430973 51364 AEP OK Terry Road 345kV Station (NU) Generation Interconnection 11/30/2016 $13,026,889 ON SCHEDULE < 4

200402 30973 51365 OGE OK Sunnyside Relays for GEN-2014-057 Interconnection Generation Interconnection 11/23/2016 6/7/2016 $20,000 ON SCHEDULE < 430974 51366 SPS OK Hitchland 345kV Substation GEN-2010-014 Addition (TOIF) Generation Interconnection 11/17/2017 $307,375 ON SCHEDULE < 430974 51367 SPS OK Hitchland 345kV Substation GEN-2010-014 Addition (NU) Generation Interconnection 11/17/2017 $2,443,882 ON SCHEDULE < 430975 51368 SEPC KS Buckner 345kV Substation GEN-2010-045 Addition (TOIF) Generation Interconnection 10/15/2017 $4,000,000 ON SCHEDULE < 430975 51369 SEPC KS Buckner 345kV Substation GEN-2010-045 Addition (NU) Generation Interconnection 10/15/2017 $8,200,000 ON SCHEDULE < 4

30976 51370 OGE OK Woodward District EHV 345kV Substation GEN-2011-019 Addition (TOIF) Generation Interconnection 5/15/2017 $1,099,958 ON SCHEDULE < 4

30976 51371 OGE OK Woodward District EHV 345kV Substation GEN-2011-019 Addition (NU) Generation Interconnection 5/15/2017 $2,554,395 ON SCHEDULE < 4

30977 51372 OGE OK Woodward District EHV 345kV Substation GEN-2011-020 Addition (TOIF) Generation Interconnection 5/15/2017 $1,099,958 ON SCHEDULE < 4

30977 51373 OGE OK Woodward District EHV 345kV Substation GEN-2011-020 Addition (NU) Generation Interconnection 5/15/2017 $2,554,395 ON SCHEDULE < 4

30978 51374 OGE OK Tap Beaver County - Woodward District EHV 345kV DBL CKT (GEN-2011-014 POI) (TOIF) Generation Interconnection 10/2/2016 $1,099,958 ON SCHEDULE < 4

30978 51375 OGE OK Tap Beaver County - Woodward District EHV 345kV DBL CKT (GEN-2011-014 POI) (NU) Generation Interconnection 10/2/2016 $15,744,936 ON SCHEDULE < 4

30979 51377 SPS OK Hitchland 345kV GEN-2011-022 Addition (TOIF) Generation Interconnection 11/4/2016 $270,000 ON SCHEDULE < 430979 51378 SPS OK Hitchland 345kV GEN-2011-022 Addition (NU) Generation Interconnection 11/4/2016 $2,895,365 ON SCHEDULE < 430980 51379 AEP OK Santa Fe 138kV GEN-2011-050 Addition (TOIF) Generation Interconnection 12/1/2016 $983,000 ON SCHEDULE < 430980 51380 AEP OK Santa Fe 138kV GEN-2011-050 Addition (NU) Generation Interconnection 12/1/2016 $1,100,000 ON SCHEDULE < 4

30981 51381 OGE OK Tap Tatonga - Woodward District EHV 345kV (GEN-2011-051 POI) (TOIF) Generation Interconnection 9/1/2017 $1,099,958 ON SCHEDULE < 4

30981 51382 OGE OK Tap Tatonga - Woodward District EHV 345kV (GEN-2011-051 POI) (NU) Generation Interconnection 9/1/2017 $8,176,915 ON SCHEDULE < 4

200380 30984 51392 GRDA OK Claremore 161 kV Ckt 1 Terminal Upgrades Regional Reliability 6/1/2021 6/1/2021 4/20/2016 SPP-2014-AG1-AFS-6 $335,000 ON SCHEDULE > 4 161200380 30984 51393 GRDA OK Claremore 69 kV Terminal Upgrades Regional Reliability 6/1/2021 6/1/2021 4/20/2016 SPP-2014-AG1-AFS-6 $340,000 RE-EVALUATION 69

30985 51396 AEP OK Leonard 138kV Switching Station (TOIF) Generation Interconnection 10/31/2017 $668,626 ON SCHEDULE < 430985 51397 AEP OK Leonard 138kV Switching Station (NU) Generation Interconnection 10/31/2017 $6,996,176 ON SCHEDULE < 430985 51398 OGE OK Leonard 138kV Switching Station (NU - OGE) Generation Interconnection 10/31/2017 $20,000 ON SCHEDULE < 4

30986 51402 TSMO MO Sub - Tap Nebraska City - Mullin Creek 345kV (Holt County) POI for GEN-2014-021 (TOIF) Generation Interconnection 2/28/2017 $600,000 ON SCHEDULE < 4

30986 51403 TSMO MO Sub - Tap Nebraska City - Mullin Creek 345kV (Holt County) POI for GEN-2014-021 (TSMO NU) Generation Interconnection 2/28/2017 $940,000 ON SCHEDULE < 4

200367 30986 51404 OPPD NE Tap Nebraska City - Mullin Creek 345 kV (Holt County) POI for GEN-2014-021 (OPPD NU) Generation Interconnection 10/31/2016 10/31/2016 1/12/2016 GEN-2014-021 $122,455 2016 $122,455 $122,455 ON SCHEDULE < 4

30986 51405 TSMO MO Sub - Tap Nebraska City - Mullin Creek 345kV (Holt County) POI for GEN-2014-021 (SANU) Generation Interconnection 2/28/2017 $16,570,000 ON SCHEDULE < 4

200365 30987 51406 SPS NM Cunningham - Monument Tap 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 1/12/2016 SPP-2014-AG1-AFS-6 $5,129,356 2016 $5,129,356 $5,129,356 ON SCHEDULE > 4 115200366 30988 51408 SPS NM Eddy Co. 230 kV Bus Tie Transmission Service 6/1/2019 10/1/2017 1/12/2016 SPP-2013-AG3-AFS-6 $10,425,309 2016 $10,425,309 $10,425,309 DELAY - MITIGATION 0.2200365 30989 51409 SPS NM Potash Junction 230 kV Terminal Upgrade Regional Reliability 6/1/2018 6/1/2018 1/12/2016 SPP-2014-AG1-AFS-6 $63,251 2016 $63,251 $63,251 ON SCHEDULE < 4 230200365 30990 51410 SPS NM Jal - Teague 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2021 6/1/2021 1/12/2016 SPP-2014-AG1-AFS-6 $6,640,592 2016 $6,640,592 $6,640,592 ON SCHEDULE > 4 115200365 30991 51411 SPS NM National Enrichment Plant - Teague 115 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 6/1/2018 1/12/2016 SPP-2014-AG1-AFS-6 $4,915,370 2016 $4,915,370 $4,915,370 ON SCHEDULE < 4 115200375 30992 51425 OGE OK Woodward EHV 138kV Phase Shifting Transformer circuit #1 Generation Interconnection 6/1/2017 6/1/2017 3/11/2016 GEN-2011-019 $7,103,971 NTC - COMMITMENT WINDOW

30993 51412 ITCGP KS Ironwood 345 kV Substation GEN-2011-016 Addition (TOIF) Generation Interconnection 9/1/2017 $838,727 ON SCHEDULE < 430993 51413 ITCGP KS Ironwood 345 kV Substation GEN-2011-016 Addition Generation Interconnection 9/1/2017 $8,663,243 ON SCHEDULE < 4

200397 30995 51430 WFEC OK Harrisburg 69 kV Cap Bank Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $450,000 NTC - COMMITMENT WINDOW 69200395 30996 51431 SPS TX Hobbs - Yoakum Tap 230 kV Substation Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $9,441,616 NTC - COMMITMENT WINDOW 230/115200395 30996 51432 SPS TX Hobbs - Yoakum Tap 230/115 kV Transformer Regional Reliability 12/28/2016 6/1/2017 5/17/2016 2016 ITPNT $2,966,656 NTC - COMMITMENT WINDOW 230/115200386 30997 51433 AEP OK Sayre 138 kV Cap Bank Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $758,441 NTC - COMMITMENT WINDOW 138200395 30999 51436 SPS TX Potter Co. - Harrington 230 kV Terminal Upgrades Regional Reliability 12/31/2021 6/1/2019 5/17/2016 2016 ITPNT $1,033,584 NTC - COMMITMENT WINDOW 230

Page 47: Integrated Marketplace Update additional... · Integrated Marketplace Savings • First year net savings calculated to be $380 million • 2015 annual net savings calculated to be

200395 31001 51438 SPS NM Agave Red Hills - Road Runner 115 kV Ckt 1 New Line Regional Reliability 4/1/2020 5/17/2016 2016 ITPNT $443,866 NTC - COMMITMENT WINDOW 115 0.75200395 31001 51439 SPS NM Ochoa - Road Runner 115 kV Ckt 1 New Line Regional Reliability 4/1/2020 5/17/2016 2016 ITPNT $519,061 NTC - COMMITMENT WINDOW 115 1.13200395 31001 51440 SPS NM Custer Mountain - Road Runner 115 kV Ckt 1 New Line Regional Reliability 4/1/2020 5/17/2016 2016 ITPNT $759,610 NTC - COMMITMENT WINDOW 115 1200395 31001 51441 SPS NM Road Runner 115 kV Terminal Upgrades Regional Reliability 10/31/2017 4/1/2020 5/17/2016 2016 ITPNT $4,580,864 NTC - COMMITMENT WINDOW 115200395 31001 51442 SPS NM Ochoa 115 kV Terminal Upgrades Regional Reliability 10/31/2017 4/1/2020 5/17/2016 2016 ITPNT $25,280 NTC - COMMITMENT WINDOW 115200395 31001 51443 SPS NM Agave Red Hills 115 kV Terminal Upgrades Regional Reliability 10/31/2017 4/1/2020 5/17/2016 2016 ITPNT $25,280 NTC - COMMITMENT WINDOW 115200392 31002 51444 OGE OK Lincoln - Meeker 138 kV Ckt 1 New Line (OGE) Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $750,000 NTC - COMMITMENT WINDOW 138200397 31002 51445 WFEC OK Lincoln - Meeker 138 kV Ckt 1 New Line (WFEC) Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $6,000,000 NTC - COMMITMENT WINDOW 138 12200386 31003 51446 AEP OK Northeastern Station 138 kV Terminal Upgrades Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $518,011 NTC - COMMITMENT WINDOW 138200386 31005 51448 AEP OK Elk City 138 kV Move Load Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $2,904,911 NTC - COMMITMENT WINDOW 138200396 31006 51449 WFEC OK Arco 138 kV SVC Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $20,500,000 NTC - COMMITMENT WINDOW 138200395 31008 51451 SPS NM Artesia Country Club 115 kV Voltage Conversion Regional Reliability 10/31/2019 6/1/2017 5/17/2016 2016 ITPNT $5,201,175 NTC - COMMITMENT WINDOW 115200395 31008 51452 SPS NM Artesia Country Club Tap 115 kV Line Tap Regional Reliability 10/31/2019 6/1/2017 5/17/2016 2016 ITPNT $336,134 NTC - COMMITMENT WINDOW 115

200395 31008 51453 SPS NM Artesia Country Club - Artesia Country Club Tap 115 kV Ckt 1 New Line Regional Reliability 10/31/2019 6/1/2017 5/17/2016 2016 ITPNT $2,814,758 NTC - COMMITMENT WINDOW 115 3

200397 31010 51455 WFEC OK Blanchard 69 kV Cap Bank Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $341,325 NTC - COMMITMENT WINDOW 6931014 51467 NPPD NE Friend 115kV Substation - GEN-2014-039 Addition (TOIF) Generation Interconnection 10/15/2017 $875,000 ON SCHEDULE < 431014 51468 NPPD NE Friend 115kV Substation - GEN-2014-039 Addition Generation Interconnection 10/15/2017 $4,300,000 ON SCHEDULE < 4

31015 51469 SPS NM Chaves County Interchange 115kV Substation GEN-2014-033 Addition (TOIF) Generation Interconnection 6/1/2016 $260,000 ON SCHEDULE < 4

31015 51470 SPS NM Chaves County Interchange 115kV Substation GEN-2014-033 Addition Generation Interconnection 6/1/2016 $1,830,343 ON SCHEDULE < 4

31016 51471 SPS TX Plant X - Tolk 230kV rebuild circuit #1 Generation Interconnection 12/31/2017 $4,960,847 ON SCHEDULE < 431016 51472 SPS TX Plant X - Tolk 230kV rebuild circuit #2 Generation Interconnection 12/31/2017 $4,960,847 ON SCHEDULE < 431017 51473 SPS TX TUCO Interchange 345/230kV CKT 1 Replacement Generation Interconnection 6/1/2018 $3,347,036 ON SCHEDULE < 431018 51474 OGE OK Minco 345kV Substation GEN-2014-056 Addition (TOIF) Generation Interconnection 10/1/2016 $40,000 ON SCHEDULE < 431019 51475 OGE OK Ranch Road 345kV Substation GEN-2015-001 Addition (TOIF) Generation Interconnection 8/19/2016 $1,099,958 ON SCHEDULE < 431019 51476 OGE OK Ranch Road 345kV Substation GEN-2015-001 Addition Generation Interconnection 8/19/2016 $1,150,142 ON SCHEDULE < 431020 51477 AEP TX Welsh Interconnection 345kV Generation Interconnection 10/27/2015 $5,675,265 COMPLETE

200395 31022 51481 SPS TX Canyon East Tap - Randall 115 kV Ckt 1 Rebuild Regional Reliability 5/1/2018 6/1/2017 5/17/2016 2016 ITPNT $4,960,481 NTC - COMMITMENT WINDOW 115 3200390 31024 51486 GRDA OK Skiatook 69 kV Cap Bank Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $1,134,600 NTC - COMMITMENT WINDOW 69200390 31025 51487 GRDA OK Sallisaw 161 kV Terminal Upgrades Regional Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $2,266,000 NTC - COMMITMENT WINDOW 161200389 31030 51500 ETEC TX Latexo 138 kV Cap Bank Regional Reliability 12/1/2017 5/17/2016 2016 ITPNT $1,712,000 NTC - COMMITMENT WINDOW 138200387 31031 51501 BEPC ND Kummer Ridge - Roundup 115 kV Ckt 1 New Line Regional Reliability 12/31/2019 6/1/2017 5/17/2016 2016 ITPNT $49,589,600 RE-EVALUATION 115 32.4200387 31031 51503 BEPC ND Roundup 345/115 kV Transformer Regional Reliability 9/1/2016 6/1/2017 5/17/2016 2016 ITPNT $6,662,000 ON SCHEDULE < 4 345/115200387 31031 51504 BEPC ND Patent Gate 345/115 kV Transformer Regional Reliability 9/1/2016 6/1/2017 5/17/2016 2016 ITPNT $6,122,000 ON SCHEDULE < 4 345/115200387 31031 51543 BEPC ND Patent Gate 345 kV Substation Regional Reliability 9/1/2016 6/1/2017 5/17/2016 2016 ITPNT $30,000,000 ON SCHEDULE < 4 345200387 31031 51544 BEPC ND Roundup 345 kV Substation Regional Reliability 9/1/2016 6/1/2017 5/17/2016 2016 ITPNT $27,100,000 ON SCHEDULE < 4 345200387 31031 51546 BEPC ND Kummer Ridge 115 kV Substation Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $3,918,000 RE-EVALUATION 115200388 31032 51506 BEPC ND Plaza 115 kV Substation Regional Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $3,918,000 NTC - COMMITMENT WINDOW 115200388 31032 51507 BEPC ND Blaisdell - Plaza 115 kV New Line Regional Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $14,841,308 NTC - COMMITMENT WINDOW 115 36200388 31032 51508 BEPC ND Plaza 115 kV Cap Bank Regional Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $283,000 NTC - COMMITMENT WINDOW 115200388 31033 51509 BEPC ND Berthold - Southwest Minot 115 kV Ckt 1 Reconductor Regional Reliability 12/31/2016 6/1/2017 5/17/2016 2016 ITPNT $2,876,720 NTC - COMMITMENT WINDOW 115 26.44

31034 51514 SPS NM Chaves County Interchange 115kV Substation GEN-2014-034 Addition (TOIF) Generation Interconnection 8/16/2016 $260,000 ON SCHEDULE < 4

31034 51515 SPS NM Chaves County Interchange 115kV Substation GEN-2014-034 Addition Generation Interconnection 8/16/2016 $997,430 ON SCHEDULE < 4

200393 31038 51521 OPPD NE S964 69 kV Cap Bank Regional Reliability 6/1/2020 5/17/2016 2016 ITPNT $619,277 NTC - COMMITMENT WINDOW 69200397 31040 51525 WFEC OK Ringwood 138 kV Cap Bank Regional Reliability 6/1/2018 5/17/2016 2016 ITPNT $450,000 NTC - COMMITMENT WINDOW 138200397 31041 51526 WFEC OK Driftwood 138 kV Substation Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $550,000 NTC - COMMITMENT WINDOW 138200397 31041 51527 WFEC OK Driftwood 138/69 kV Transformer Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $3,000,000 NTC - COMMITMENT WINDOW 138/69200391 31042 51528 OGE OK DeGrasse 345 kV Substation Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $15,000,000 NTC - COMMITMENT WINDOW 345200391 31042 51529 OGE OK DeGrasse 345/138 kV Transformer Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $6,000,000 NTC - COMMITMENT WINDOW 345/138200391 31042 51530 OGE OK DeGrasse - Knob Hill 138 kV New Line Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $8,300,000 NTC - COMMITMENT WINDOW 138 12200396 31042 51531 WFEC OK DeGrasse 138 kV Substation (WFEC) Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $1,200,000 NTC - COMMITMENT WINDOW 138200391 31042 51569 OGE OK DeGrasse 138 kV Substation (OGE) Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $0 NTC - COMMITMENT WINDOW 138

31044 51534 SEPC KS Arnold 115kV Substation GEN-2014-041 Addition (TOIF) Generation Interconnection 11/25/2017 $1,200,000 ON SCHEDULE < 431044 51535 SEPC KS Arnold 115kV Substation GEN-2014-041 Addition Generation Interconnection 11/25/2017 $3,443,230 ON SCHEDULE < 431045 51536 SEPC KS Arnold-Ransom 115kV Ckt 1 Generation Interconnection 11/25/2017 $268,321 ON SCHEDULE < 431046 51537 SEPC KS Ransom-Ness City 115kV Ckt 1 Generation Interconnection 11/25/2017 $200,000 ON SCHEDULE < 4

200386 31049 51542 AEP LA Cedar Grove - Linwood 138 kV Reactor Regional Reliability 6/1/2018 6/1/2020 5/17/2016 2016 ITPNT $3,534,979 NTC - COMMITMENT WINDOW 138 0.1200377 31050 51548 WR KS Summit 115 kV Terminal Upgrades Transmission Service 12/1/2016 6/1/2021 3/17/2016 SPP-2015-AG1-AFS-6 $261,758 2016 $261,758 $261,758 ON SCHEDULE < 4 115200395 31051 51549 SPS TX Terry Co. - Wolfforth 115 kV Terminal Upgrades Regional Reliability 6/1/2018 4/1/2020 5/17/2016 2016 ITPNT $1,845,868 NTC - COMMITMENT WINDOW 115200395 31054 51552 SPS NM Bopco 115 kV Cap Bank Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $273,060 NTC - COMMITMENT WINDOW 115200398 31056 51557 WR KS Sunset 69 kV Cap Bank Zonal Reliability 6/1/2017 5/17/2016 2016 ITPNT $364,080 RE-EVALUATION 69200386 31057 51558 AEP OK Army Ammo - McAlester 69 kV Ckt 1 Rebuild Zonal Reliability 5/31/2017 6/1/2017 5/17/2016 2016 ITPNT $7,458,042 NTC - COMMITMENT WINDOW 69 9.9200386 31057 51559 AEP OK Army Ammo - Savanna - Pittsburg 69 kV Ckt 1 Rebuild Zonal Reliability 12/31/2017 6/1/2017 5/17/2016 2016 ITPNT $7,232,496 NTC - COMMITMENT WINDOW 69 9.6200386 31057 51560 AEP OK Atoka - Atoka Pump - Pittsburg 69 kV Ckt 1 Rebuild Zonal Reliability 12/31/2018 6/1/2017 5/17/2016 2016 ITPNT $20,404,361 NTC - COMMITMENT WINDOW 69 27.1200386 31058 51561 AEP OK Fort Towson - Kiamichi Pump Tap 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 5/17/2016 2016 ITPNT $8,119,642 NTC - COMMITMENT WINDOW 69 9200386 31058 51562 AEP OK Kiamichi Pump Tap - Valliant 69 kV Ckt 1 Rebuild Regional Reliability 6/1/2018 5/17/2016 2016 ITPNT $4,330,476 NTC - COMMITMENT WINDOW 69 4.8200379 31059 51563 WR KS Crawford - Neosho 69 kV Terminal Upgrades Transmission Service 6/1/2021 4/5/2016 SPP-2015-AG1-AFS-6 $145,773 NTC - COMMITMENT WINDOW200397 31065 51484 WFEC OK Cleo Junction 138 kV Terminal Upgrades Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $4,000,000 NTC - COMMITMENT WINDOW 138200397 31066 51485 WFEC OK Ringwood 138 kV Terminal Upgrades Regional Reliability 6/1/2017 5/17/2016 2016 ITPNT $4,000,000 NTC - COMMITMENT WINDOW 138200395 31067 50924 SPS NM Livingston Ridge 115 kV Substation Conversion Regional Reliability 6/1/2018 6/1/2017 5/17/2016 2016 ITPNT $5,283,323 NTC - COMMITMENT WINDOW 115200395 31068 50447 SPS TX Tuco - Yoakum 345 kV Ckt 1 Regional Reliability 6/1/2020 6/1/2017 5/17/2016 2016 ITPNT $128,473,352 NTC - COMMITMENT WINDOW 345 107200395 31068 50451 SPS TX Yoakum 345/230 kV Ckt 1 Transformer Regional Reliability 6/1/2020 6/1/2017 5/17/2016 2016 ITPNT $5,138,920 NTC - COMMITMENT WINDOW 345/230