Integrated Distribution Planning: A holistic approach to meeting grid needs and expanding customer choice by unlocking the benefits of distributed energy resources Power forever. Ryan Hanley September 2015

Upload: truongthu

Post on 01-May-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

Integrated Distribution Planning: A holistic approach to meeting grid needs and expanding customer choice by unlocking the benefits of distributed energy resources

Power forever.

Ryan Hanley September 2015

Page 2: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 2 2

Designing the 21st Century Grid

Page 3: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 3 3

Rule 21

Distribution

Resource

Planning

Integrated

Demand

Side

Resources

Key California Regulatory Proceedings

Interconnection

Procurement

Planning

Page 4: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 4 4

Integrated Distribution Planning

Data

Inter- connection

Procurement

Planning

Creating a Holistic Framework

Page 5: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 5 5

Data

Inter-

connection

Procurement

Planning

Increased modernization is needed

A holistic approach to meeting grid needs and expanding customer

choice by unlocking the benefits of distributed energy resources

Integrated Distribution Planning

Planning Interconnection

Traditional Planning

Image Sources: CYME, Kevala, PG&E

Page 6: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 6 6

Integrated Distribution Planning

Data

Inter- connection

Procurement

Planning

Agenda

Page 7: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 7 7

Challenge: Interconnection processes can be avoidably slow, include

unwarranted costs, and unnecessarily limit DER interconnections

Solution: Streamline DER interconnection process, eliminate

unwarranted costs, and expand allowable interconnection approvals

• While many states establish

timeline requirements for

utilities to complete

interconnection, timelines are

often not met.

• Best-in-class utilities

standardize their

interconnection process and

and have drastically reduced

their processing timelines.

Streamline Process

• Cost certainty is a critical

component of successful

interconnection. Upgrade costs

to DER owners vary

significantly by project.

• Upgrade requirements are

frequently based on outdated

technical information, resulting

in undue DER integration costs

Eliminate Costs Expand Approvals

• Outdated interconnection

technical standards

unnecessarily limit the amount

of DERs that are allowed to

interconnect

• Utilize automated hosting

capacity analyses to increase

allowable interconnections.

Page 8: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 8 8

How do you incorporate Hosting Capacity Analyses into

business processes?

FastT

rack

Interconnection

Application

Initial Technical Review with

Penetration Screen

Interconnection

Approval

Pass

Supplemental Review with

Hosting Capacity

Change operating

characteristics and/or

system configuration

Fail

Fail Any Screen

Detailed Impact

Study

Fail all

configurations

Pass

Incorporate Hosting Capacity

into automated Supplemental

Reviews

Examine alternative DER

configurations to enable

allowable approval

Page 9: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 9 9

Integrated Distribution Planning

Data

Inter- connection

Procurement

Planning

Agenda

Page 10: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 10 10

Include DERs as an option to

proactively meet grid needs

Incorporate DER growth in

addition to load growth forecasts

Forecast Growth

& Maintenance Forecast load and DER

growth and required

equipment maintenance

Identify

Needs Compare growth to

available hosting and

circuit capacities

Specify

Solutions Propose solutions to meet

identified needs, including

the use of DER portfolios

Image Source: EPRI Image Source: Pacific Gas & Electric

1 2 3

Image Source: Integral Analytics

Challenge: Utility planning processes do not leverage DERs to

provide grid services, lower system costs, and increase resiliency

Solution: Modernize distribution planning to leverage DERs

Page 11: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 11 11

Integrated Distribution Planning

Data

Inter- connection

Procurement

Planning

Agenda

Page 12: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 12 12

Challenge: Utility distribution procurement processes do not

adequately leverage DERs to provide grid services, lower system

costs, and increase grid resiliency

Solution: Modernize distribution procurement to evaluate and deploy

DERs to meet grid needs

Deploy least cost / best fit portfolio, including DERs

rather than solely traditional infrastructure

Select Least

Cost / Best Fit

Identify least cost / best fit

portfolio of DER and

traditional assets

Deploy

Resources

Conduct pricing, program

and procurement efforts to

obtain needed assets

Monitor

Performance

Monitor, measure and verify

performance, adjusting

portfolio as needed

Image Source: Clean Power Research Image Source: SCE

1 2 3

Page 13: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 13 13

Distribution Loading Order A policy to encourage the utilization of DER portfolios to meet grid needs

Proposed Distribution Loading Order Selection of Resource Examples

1. Distributed Energy Resources (DERs)

Energy efficiency, controllable loads/demand response, renewable generation, advanced inverters, energy storage, electric vehicles

2. Conventional Distribution Infrastructure

Transformers, reconductoring, capacitors, voltage regulators, sectionalizers

Rank Order

Procurement Mechanism

Description Selection of Practical Examples

1 Price Signals (DERs)

DER portfolios that voluntarily respond to price signals sent from the utility that incent the desired behavior to meet grid needs.

Voluntary Critical Peak Power / TOU Pricing

Voluntary Distributed Marginal Pricing (DMP)

Voluntary Voltage Support Pricing

2 Firm Contracts (DERs)

DER portfolios that are contractually obligated to deliver grid services based on contracted prices.

Week-Ahead Reactive Power Payments

1-10 year ahead availability contracts for peak substation real power capacity

3 Traditional Utility Infrastructure

Traditional utility infrastructure self-supplied through General Rate Case capital budgets.

Utility investment in Substation transformer

Utility investment in feeder reconducturing

Procurement Solutions

Procurement Mechanisms

Page 14: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 14 14

Evaluate Options

14

10

8

32

Total Identified

Need

Traditional

Infrastructure

1

Firm Contracts

3

Price Signals

8

System Need

(i.e. MW,

MVAR, MWh)

Cushion

Non-Delivered

Capacity

Expected Delivery

Distribution Loading Order: Procurement Mechanisms

Source: SolarCity illustrative Loading Order analysis

3

2

Utilize Distribution Loading

Order to ensure least-

cost/best-fit procurement

1 22

13

9

Page 15: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 15 15

Integrated Distribution Planning

Data

Transparency

& Access

Inter- connection

Distribution Planning

DER Integration

Agenda

Page 16: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 16 16

Challenge: Utility data critical for driving innovation is not

accessible by broader industry

Solution: Utilities must commit to data transparency and access

to enable industry innovation

Data Access Data Transparency

Page 17: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 17 17

Data to be Shared

Locational

Value

Hosting

Capacity

Planned

Investments

Operational

Support

Market

Support

2 1 3 4 5

Page 18: Integrated Distribution Planning - gridworks.orggridworks.org/wp-content/uploads/2015/06/SolarCity-Integrated... · SolarCity Confidential 3Slide 3 Rule 21 Distribution Resource Planning

SolarCity Confidential Slide 18 18

Thank you