THE INTEGRATED COASTAL MANAGEMENT ACT NO 24 OF 2008 (ICMA) – AND THE
AMENDMENT BILL
Jennifer WHITTAL, South Africa
![Page 2: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/2.jpg)
Introduction
PROBLEM: differently interpreted, and possibly contested, by
the various professions who will need to operate within the framework it creates
some aspects have complex implications
AIM: to understand the ICMA from a professional land
surveyor’s perspective to propose some solutions
![Page 3: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/3.jpg)
This presentation addresses the following:
The definition and nature of HWM in SA legislation
Datums, water marks, legislation in the coastal zone
The HWM as a cadastral boundary Coastal Zone boundaries derived from the
HWM
![Page 4: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/4.jpg)
THE INTEGRATED COASTAL MANAGEMENT ACT
![Page 5: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/5.jpg)
Coastal waters
![Page 6: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/6.jpg)
Coastal Waters‘coastal waters’ means—(a) the internal waters, territorial waters, exclusive economic zone and continental shelf of the Republic referred to in sections 3, 4, 7 and 8 of the Maritime Zones Act, 1994 (Act No.15 of 1994), respectively; and(b) an estuary;
![Page 7: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/7.jpg)
The HWM definitions HWM (old)
“means the highest line reached by the water of the sea during ordinary storms occurring during the most stormy period of the year, excluding exceptional or abnormal floods” (SSA, section 1)
HWM (ICMA) “means the highest line reached by coastal
waters, but excluding any line reached as a result of exceptional or abnormal floods or storms that
occur no more than once in ten years, or an estuary being closed to the sea”
(ICMA, Section 1(1)).
![Page 8: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/8.jpg)
The HWM definitionsHWM (ICMA Amendment Act) ‘high-water mark’ means the highest line
reached by coastal waters, but excluding any line reached as a result of—(a) exceptional or abnormal [floods or storms that occur no more than once in ten years] weather or sea conditions; or(b) an estuary being closed to the sea;
(ICMA Amendment Bill, Section 1(q)).
![Page 9: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/9.jpg)
HWM (b) definition swash line or a hard line
(harbours) influenced by weather
(winds, storms, air pressure, temperature and humidity etc.) or sea conditions (wave action, the tides, sea level changes, water composition etc.)
a line of variable height - not a contour; not a tidal datum
no time limit/period
![Page 10: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/10.jpg)
Estuary‘estuary’ means a body of surface water—
(a) [that is part of a water course] that is permanently or periodically open to the sea;(b) in which a rise and fall of the water level as a result of the tides ismeasurable at spring tides when the [water course] body of surfacewater is open to the sea; or(c) in respect of which the salinity is [measurably] higher than freshwater as a result of the influence of the sea, and where there is asalinity gradient between the tidal reach and the mouth of the bodyof surface water;
![Page 11: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/11.jpg)
What events are included in defining the HWM?
Ordinary storm events Over any time period incl annual Weather and sea conditions flooding estuaries?
Estuaries can be flooded by weather conditions and still remain an estuary in terms of the definition
All spring tides included Open estuaries
Temporarily closed to the sea? If closed for 1 year vs 20 years…
when can it be considered a closed estuary?
![Page 12: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/12.jpg)
EROSION AND ACCRETION
![Page 13: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/13.jpg)
Section 14 ICMA AAPosition of high-water mark14. (1) No person may replace the high-water mark curvilinear boundary witha straight line boundary in terms of section 34 of the Land Survey Act.(2) If the high-water mark is landward of a straight line boundary of acoastal land unit when this Act took effect, or the high-water mark moveslandward of a straight line boundary of a coastal land unit due to the erosion of the coast, sea-level rise or other causes, the owner of that coastal land unit—(a) loses ownership of any portion of that coastal land unit that is situated below the high-water mark to the extent that such land unit becomes coastal public property; and (b) is not entitled to compensation from the State for that loss of ownership, unless the movement of the high-water mark was caused by an intentional or negligent act or omission by an organ of state and was a reasonably foreseeable consequence of that act or omission.
![Page 14: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/14.jpg)
Erosion and accretion – str line Str line seaward boundary – Erosion:
Erosion leads to portion below the HWM transferring ownership of the “land unit” to CPP
Looking at definition of “land unit” this implies registrability under the Deeds Registries Act which implies formal subdivision at least if not formal transfer.
Confusion as to whether the whole land unit becomes CPP Str line seaward boundary – Accretion:
Accretion prior to subdivision will not result in the former land unit regaining land if CPP extent inland can be proven
Accretion prior to subdivision will result in the land unit regaining land if the CPP extent inland cannot be shown
Accretion after subdivision and transfer will have no effect as the subdivided land unit will be declared CPP in its entirety and be owned by the State. No portion will revert to ownership of the former parent land parcel.
![Page 15: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/15.jpg)
Erosion and accretion - ambulatory Note – a HWM boundary can no longer be substituted by a
straight line boundary The ICMA AA is silent on erosion and accretion of ambulatory
HWM boundary and so the principles of the SSA are the same here
HWM seaward boundary – Erosion: The boundary is ambulatory and if there is erosion, the land unit
loses land to the CPP. There is not requirement to survey or transfer land
HWM seaward boundary – Accretion: The boundary is ambulatory and if there is accretion, the land unit
gains land from the CPP. There is not requirement to survey or transfer land Reclamation ≠ accretion
![Page 16: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/16.jpg)
LOCATING THE HWM
![Page 17: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/17.jpg)
Locating the position of the HWM
Note that there is a HWM irrespective of whether this is a cadastral boundary or not at the location in question. Case law - physical inspection by PLS
and SGO: debris and waste, vegetation types, drift sands, discolouration on coastal rocks, evidence of local residents
Beaconing does not alter ambulatory position
![Page 18: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/18.jpg)
![Page 19: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/19.jpg)
![Page 20: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/20.jpg)
![Page 21: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/21.jpg)
![Page 22: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/22.jpg)
![Page 23: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/23.jpg)
![Page 24: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/24.jpg)
Drift sand developed into a dune field adjoining a stabilised dune covered with hardwood coastal forest northeast of the Mcantsi estuary.
Picture of a storm-damaged beach at Salt Rock. A sand berm indicates a natural re-establishment of the high water mark after a storm
removed all evidence of its lawful position
EC SG information
![Page 25: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/25.jpg)
The Halophyte Sarcocornia perennis growing in the intertidal zone between the Mlele estuary and the sea – they are found below the
HWM
A sandy seashore at the mouth of the Cefane River, indicating several types of vegetation that can be considered to define the
position of high water mark. Xerophytes are found above the HWM.
![Page 26: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/26.jpg)
Summary from EC SG Tidal ebb and flow, wave action and wind are the key
features of the littoral (intertidal) zone. The high water mark being the inland border thereof is
seldom visibly defined by the very distinct line of the edge of the hardwood coastal forests visible on aerial photographs.
Instead, it is an ambulatory line – a continually moving line needing close inspection for the presence of: Halophytes, salt water washed landscape and rock
discolouration below the high water mark, and Xerophytes, Mesophytes, debris, drift sand and wind-
dominated landscape above the high water mark.
![Page 27: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/27.jpg)
DATUMS, WATER MARKS, AND LEGISLATION IN THE COASTAL ZONE
![Page 28: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/28.jpg)
![Page 29: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/29.jpg)
LAND BOUNDARIES AND THE MOVING HWM:ACCRETION, EROSION AND THE ICMA
![Page 30: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/30.jpg)
Proposals which have now been incorporated:
Leave the HWM cadastral boundaries as they were under the Sea Shore Act HWM boundary remains curvilinear and ambulatory
over time – simple to understand and implement Is not legally affected by survey or beaconing –
surveyed position does not become the legal HWM legal HWM coincides with physical HWM ……
![Page 31: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/31.jpg)
Proposals which have now been incorporated:
The principle of submerged boundaries falls away – a partially submerged land unit then has a HWM curvilinear and ambulatory boundary Becomes an investment/insurance/market issue for
property owner – no state liability Rights to the sea shore override land owners rights
when HWM over the land Accretion and erosion principles of 150 years
of case law retained
![Page 32: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/32.jpg)
EXTENT OF COASTAL PROTECTED ZONE
![Page 33: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/33.jpg)
Coastal Management Line‘coastal management line’ means a line determined by an MEC in accordance with section 25 in order to demarcate an area within which development will be prohibited or controlled in order to achieve the objects of this Act or coastal management objectives…..Section 25 the MEC must consider the location of
immovable property and the ownership and zonation of vacant land.
![Page 34: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/34.jpg)
Coastal Protected Zone All land within 1000 m (1km) of HWM
Zoned agricultural Zoning undetermined or Not zoned Excluding lawful township, urban area or human
settlement All other land within 100m of HWM If part of water body is in these areas then include it All private land below HWM Sea shore (LWM-HWM) and littoral active zones Admiralty reserves, sensitive areas, CPAs 1:50 year flood/storm plains
![Page 35: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/35.jpg)
DETERMINING THE EXTENT OF COASTAL PROTECTED ZONE
![Page 36: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/36.jpg)
Incorrect method 1:
![Page 37: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/37.jpg)
Incorrect method 2:
![Page 38: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/38.jpg)
Correct construction of derived lines from the surveyed HWM
![Page 39: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/39.jpg)
Survey procedures
PLS surveys the physical HWM – evidence should be used to ascertain its position as per definition in AA
E-Record submitted to SGO as in HWM survey – position noted on Noting Sheets, accuracy given to nearest 2 metres (?)
HWM position conveyed to local authority for planning and property development control purposes
Local authority should need help with calculating the position of CPZ inland boundary in relation to the cadastre
If tasked to do this, force the CPZ boundary to coincide with inland cadastral boundaries of all parcels in accordance with ICMA AA
![Page 40: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/40.jpg)
WHO SHOULD CONDUCT A SURVEY OF HWM?
![Page 41: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/41.jpg)
Theoretical/methodological framework
Land Management Paradigm: Rights Restrictions and Responsibilities (RRRs)
Usual real rights associated with ownership Development rights and restrictions Use rights and restrictions Responsibilities (e.g. maintenance)
All are real since relate to land not owner Determination of boundaries of these RRRs is a cadastral
function
![Page 42: integrated coastal managment, land, cadatre, Whittal fisher icma_am_bill_may2014](https://reader034.vdocuments.site/reader034/viewer/2022042907/5884e92a1a28abf76f8b458d/html5/thumbnails/42.jpg)
Who should conduct HWM surveys? Land rights at sea shore are limited by the HWM
HWM is cadastral HWM and coastal zone determination are not as
simple as they seem – measurement and modelling needs to stand up in the courts
The extent of coastal zones can be determined without a Land Surveyor, but their position relative to cadastral boundaries is to be indicated on zoning maps for owners
Registrar notes in register that the HWM has been surveyed
PROFESSIONAL LAND SURVEYOR