insulated panels ksi
TRANSCRIPT
INSULATED PANELS KSI
CONCRETE PLATEBRICKWORK
FLEXIBLE PROJECT
BRICKWORK AND CONCRETE PLATEAny change in the project involves loss of the material, requiring the demolition of the materials already applied and the use of new materials, with a waste of investments.
INSULATED PANELS KSIWith the Kingspan Isoeste system, changing or enlarging your project is simple and fast, as well as avoiding waste and using the entire system already applied in any changes.
System of fixing and splicing of panels in the structure
DURABILITY AND MAINTENANCE
BRICKWORK AND CONCRETE PLATEThe material suffers damage with ease, besides needing constant maintenance to maintain the visual quality of its painting and coating.
INSULATED PANELS KSIWith the Kingspan Isoeste system, its work has greater durability and resistance, avoiding damage to the structure and reducing maintenance and remodeling costs.
DURABILITY AND MAINTENANCE
BRICKWORK AND CONCRETE PLATEThe System is easily damaged by leaks and infiltrations, wearing paints and weakening the coating, generating maintenance services and constant need for rework.
INSULATED PANELS KSIWith a factory pre-painted polyester exterior and interior, the Kingspan Isoeste system ensures durability and agility in delivery.
FIRE RESISTANCE
BRICKWORK AND CONCRETE PLATEIn fires the system is strongly hit, causing damage to the structure and compromising the safety of people and nearby structures.
INSULATED PANELS KSIThe Kingspan Isoeste system, has high fire resistance, allowing greater security of lives, equipment and structures, its PIR (polyisocyanurate) core is self extinguishing, besides containing high temperatures.
EASY APPLICATION
APPLICATION ONMETAL STRUCTURE
INSULATED PANELS KSI has an incredible finish and ease of application.
The product can be fixed on metal structures, thus reducing the total cost of the work and facilitating the application of the product.
With easy handling and application INSULATED PANELS KSI is a simplified product that can be handled with ease.
The material is versatile and can be used in conjunction with various structures.
APPLICATION ONCONCRETE STRUCTURE
INSULATED PANELS KSI can be applied to concrete structures, with easy work and safe and predictable finishing, facilitating transparency between the amounts invested and the final result of each service.
MORE BENEFITSThe constant changes in the perception of civil construction contribute to a greater use of Kingspan Isoeste panels in substitution for the materials most used in the current market.
Due to the development and application of a product that meets various standards and specifications, the Kingspan Isoeste panel is the future in regards to construction in general, serving the most varied public.
The Kingspan Isoeste panels, developed in PIR (polyisocyanurate), has high flame resistance, drastically reducing fire damage or exposure to high temperatures.
Its insulating core ensures thermal comfort and reduces thermal loss, causing equipment that emits cold air or heated air to be boosted, reducing overall cost and energy consumption, as well as avoiding the absorption of heat and cold from external environments.
With the INSULATED PANELS KSI Kingspan Isoeste
thermal panels, you ensure greater thermal comfort.
Throughout its composition the inputs applied to
INSULATED PANELS KSI panels are recyclable, so they
are aligned with a good environmental vision.
The INSULATED PANELS KSI panel ensures fire
resistance, providing more security for its
construction.
It reduces energy consumption for heating and
cooling, making better use of equipment such as
heaters and air conditioners.
The material does not require maintenance, like the
other products used in conventional construction
systems.
It has greater durability than other construction
materials used, in addition to being resistant to water
and natural wear.
50mmPUR ou PIR
80mmEPS
90mm 100mm
120mm
280mm780mm 1360mm
ROCK WOOLGLASS WOOL
WOODFIBER
PINUSWOOD
BLOCKS OFCONCRETE
TIJOLOSMACIÇOS
2300mmCONCRETE
CORK
Wall thickness required forthe same level of thermal insulation.
11KG(m²)
325KG(m²)
BRIC
KW
ORK
AN
D C
ON
CRE
TE P
LATE
INSU
LATE
D P
ANEL
S K
SIWORK CONCLUDED
WORK CONCLUDED
6 DAYS COMPARATIVE OF 1,000m ²
20 DAYS
INSTALLERS
CONSTRUCTOR(PAINTERS, INSTALLERS,
PEDREIROS E ETC.)
RUBBLE
RUBBLE
DURABILITYTHERMAL COMFORTRESISTANCE TO TIME
FLEXIBLE PROJECTALLOWS CHANGESAND ENLARGEMENTSWALL READY
INSTALLATIONCHAPISCOREBOCOTREATMENTPAINTING
MAINTENANCE DUETO THE WEAR OF WEATHERLITTLE MATERIALINSULATING
REDUCED FREIGHT COST AND VOLUME
COST AND FREIGHT VOLUME WITH HIGH
COST INVOLVED
01 02 03 04 05 06
07 08 09 10 11 12 19 20
13 14 15 16 17 18
01 02 03
04 05 06
All information in this catalog may be changed at any time without notice.
Merely illustrative images.
Version 01 / 14.08.18
Central of Sales:0800 747 1122
www.isoeste.com.br