installation - operation• ip address, setup and descriptions may be changed in the field using a...
TRANSCRIPT
-
MarleyGard LINK™ BACnet/IP communication panel INSTALLATION - OPERATION
Z1126362 ISSUED 9/2020 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT.
user manua l
-
2
contents
Description ...................................................................................................................4
System Diagram ..........................................................................................................5
I/O Module - Panel Specifications ..........................................................................5
Quick Start Guide .......................................................................................................6
Input Assignment Table .............................................................................................7
Setup Programming ...................................................................................................7
Web Page Configuration...........................................................................................9
This manual contains vital information for the proper installation and operation of the MarleyGard LINK. Carefully read the manual before installation or operation and follow all instructions. Save this manual for future reference.
Note
-
3
introduction
These instructions are intended to assure that field connections are completed properly and the control system operates for the maximum time possible. Since product warranty may depend on your actions, please read these instructions thoroughly prior to operation.
If you have questions about the operation and/or maintenance of this control system and you do not find the answers in this manual, please contact your Marley sales representative.
Hazard of electrical shock or burn. Be sure to turn off power to the panel before servicing. If working on equipment out of site of panel disconnect, lockout using standard lockout procedure.
Safety First
The MarleyGard LINK uses UL listed components installed in accordance with the National Electric Code. The location of the cooling tower and field installation of the control system can affect the safety of those responsible for installing, operating or maintaining the tower and controls. However, since SPX Cooling Technologies does not control the tower location, or field installation, we cannot be responsible for addressing safety issues that are affected by these items.
The following safety issues should be addressed by those responsible for installation, maintenance or repair of the tower and controls:
• Access to and from the control panel (including the customer supplied main disconnect/branch circuit protection)
• Proper grounding of electrical control circuits
• Sizing and protection of branch circuits feeding the control panel
• Qualification of persons who will install, maintain and service the electri-cal equipment
These are only some of the safety issues that may arise in the design and installation process. Consult a safety engineer for additional guidance.
Other safety issues are addressed in literature supplied with your tower. You should closely review the literature prior to installing, maintaining or repairing your tower.
Warning
Warning
-
4
description
Power Supply
Enclosure Heater
Main Circuit Breaker
Surge Protector
User Terminal Strip
I/O Module
Incoming power: 120 VAC, 2A, 50/60 HzMain circuit breaker: 6AAmbient temperature: -10°F (-23°C) to 110°F (43°C) Enclosure: NEMA 4X (IP56) outdoor fiberglass 18"W x 20"H x 9"D Surge protection: YesEnclosure heater: YesI/O module terminals: RemovableUser terminal strip: YesStandards: UL/CUL 508A AssemblyModule: BACnet/IP
The MarleyGard LINK panel, in conjunction with a Marley cooling tower control panel provides a means for a BACnet/IP system to capture status points and analog readings from a Marley cooling tower.
-
5
Vibration Switch
Marley Cooling Tower Cell
Component Status Points
Marley Control Panel
MarleyGard LINK Panel BMS System
Oil Level Switch
Water LevelControl
Status Pointsand Power
BACnet/IPCableFan Motor
Basin Heater
System Diagram
description
Input points from Marley cooling tower control panel
24 VDC power input
RJ45 BACnet/IP out to BMS
RJ45 input from VFD ethernet BACnet/IP
adapter
Output points not used
I/O Module
Note: All Marley VFDs with a LINK interface have an Ethernet module with an RJ45 jack for connecting the VFD to the LINK control panel.
Note: CoolBoost fluid cooler control panels require two I/O modules
-
6
The communications module is BACnet compliant and programmed by Marley for job specific configuration. The LINK panel is available as an “add on box” integrated into a Marley cooling tower control panel system.
Each LINK panel is serialized with a cooling tower order number located on the inside door of the control panel. Refer to this number when addressing questions or support with SPX Cooling Technologies.
The MarleyGard LINK panel is compatible with Marley control panels:
• AIO control panel
• SPPC control panel
• CoolBoost control panel
• ABH control panel
Quick Start Guide
• Mount LINK enclosure adjacent to a Marley control panel.
• Identify job site points to monitor in the Marley control panel.
• Run 120VAC power wiring from the Marley control panel to the LINK panel in separate conduit.
• Run conduit for status wires from the control panel to BACnet panel in separate conduit.
• Seal conduit runs with expanding foam or silicone making a vapor barrier to prevent condensation.
• Spring clamp terminal block instructions: Strip field wire insulation back 7/16". Insert small flat blade screw driver into the square hole then push downwards to release the internal wire clamp, while holding downward insert the field wiring then release the driver.
installation
-
installation
Setup Programming
• The BAScontrol22C module used in the LINK control panel is pre programmed according to cooling tower components status points selected for a project. Actual monitoring points may vary by project requirements for BMS monitoring.
• IP address, setup and descriptions may be changed in the field using a PC and RJ45 ethernet patch cable, software is not required. The default IP address is 192.168.92.68.
• For additional support see I/O module manufacturer's website www.ccontrols.com
-
8
Obj
ect
Inst
ance
Obj
ect N
ame
Obj
ect T
ype
Obj
ect D
escr
iptio
nU
nits
Mar
ley
Fiel
d de
vice
sU
I1U
I2U
I3U
I4U
I5U
I6U
I7U
I8B
I1B
I2B
I3B
I4
12
VIB
_SW
_TR
IPB
inar
y In
put
Vibr
atio
n sw
itch
(coo
ling
tow
er s
hutd
own
- hi
gh v
ibra
tion)
no-u
nits
68
5A
, 68
5B
, 68
6B
, 55
50
, 44
0X
Mod
ule
1
AIO
SP
PC
AB
H
Coo
lBoo
st
Con
trol
Pan
el
11
VIB
_SW
_ALM
Bin
ary
Inpu
tVi
brat
ion
switc
h al
arm
(co
oing
tow
er n
otifi
catio
n -
incr
easi
ng v
ibra
tion)
no-u
nits
68
5B
, 44
0X
8V
IB_L
VL_
XM
TRA
nalo
g In
put
Vibr
atio
n le
vel t
rans
mitt
er (
cool
ing
tow
er -
loop
pow
ered
by
pane
l)m
A6
40
BX
8V
IB_L
VL_
XM
TRA
nalo
g In
put
Vibr
atio
n le
vel t
rans
mitt
er (
cool
ing
tow
er -
loop
pow
ered
by
switc
h)m
A6
85
B, 4
40
X
10
OIL
_LV
L_A
LMB
inar
y In
put
Oil
leve
l (co
olin
g to
wer
- lo
w o
il in
gea
rbox
)no
-uni
tsLU
10
X
7W
ATE
R_L
VL_
CW
BA
nalo
g In
put
Wat
er L
evel
tran
smitt
er (
cool
ing
tow
er C
WB
- lo
op p
ower
ed b
y pa
nel)
mA
DL1
0, D
L24
X
6W
ATE
R_T
EM
P_C
WB
Ana
log
Inpu
tW
ater
tem
pera
ture
tran
smitt
er (c
oolin
g to
wer
CW
B -
loop
pow
ered
by p
anel
)m
AA
BH
with
4-2
0m
A T
emp
card
X
5W
ATE
R_H
IGH
_ALM
Bin
ary
Inpu
tW
ater
leve
l hig
h (c
oolin
g to
wer
CW
B)
no-u
nits
LLC
HA
X
4W
ATE
R_M
AK
EU
P_O
NB
inar
y In
put
Wat
er m
akeu
p so
leno
id v
alve
ope
n (c
oolin
g to
wer
CW
B)
no-u
nits
LLC
MU
X
3W
ATE
R_L
OW
_ALM
Bin
ary
Inpu
tW
ater
leve
l low
(co
olin
g to
wer
CW
B)
no-u
nits
LLC
LA
X
9B
AS
IN_H
EAT
ER
_ON
Bin
ary
Inpu
tB
asin
hea
ter
ON
(co
olin
g to
wer
- h
eate
r dr
awin
g cu
rren
t)no
-uni
tsA
BH
X
1B
AS
IN_H
EAT
ER
_FA
ILB
inar
y In
put
Bas
in h
eate
r fa
iled
(hea
ter
is n
ot d
raw
ing
curr
ent)
no-u
nits
AB
HX
2S
PAR
EB
inar
y In
put
Spa
re In
put (
bina
ry)
no-u
nits
N/A
X
9S
PR
AY_P
UM
P_1
_ON
Bin
ary
Inpu
tS
pray
pum
p 1
ON
(flu
id c
oole
r -
cont
acto
r is
ene
rgiz
ed)
no-u
nits
Coo
lBoo
st s
pray
pum
p 1
X
Mod
ule
2
Coo
lBoo
st
Con
trol
Pan
el
10
SP
RAY
_PU
MP
_1_T
RIP
Bin
ary
Inpu
tS
pray
pum
p 1
TR
IP (
fluid
coo
ler
- m
otor
ove
r lo
ad)
no-u
nits
Coo
lBoo
st s
pray
pum
p 1
X
11
SP
RAY
_PU
MP
_2_O
NB
inar
y In
put
Spr
ay p
ump
2 O
N (
fluid
coo
ler
- co
ntac
tor
is e
nerg
ized
)no
-uni
tsC
oolB
oost
spr
ay p
ump
2X
12
SP
RAY
_PU
MP
_2_T
RIP
Bin
ary
Inpu
tS
pray
pum
p 2
TR
IP (
fluid
coo
ler
- m
otor
ove
r lo
ad)
no-u
nits
Coo
lBoo
st s
pray
pum
p 2
X
1S
PR
AY_P
UM
P_S
AF
ETY
_TR
IPB
inar
y In
put
Spr
ay p
ump
(flu
id c
oole
r -
low
wat
er o
r fr
eezi
ng w
ater
saf
ety
trip
)no
-uni
tsC
oolB
oost
spr
ay p
ump
safe
ty s
hutd
own
X
2D
AM
PE
R_1
_OP
EN
Bin
ary
Inpu
tD
ampe
r 1
(flu
id c
oole
r -
cont
acto
r is
ene
rgiz
ed)
no-u
nits
Coo
lBoo
st d
ampe
r 1 c
onta
ctor
ene
rgize
dX
3D
AM
PE
R_1
_OP
EN
_EN
D_S
WB
inar
y In
put
Dam
per
1 (
fluid
coo
ler
- op
en e
nd s
witc
h is
clo
sed)
no
-uni
tsC
oolB
oost
dam
per
1 o
pen
X
4D
AM
PE
R_1
_CLO
SE
D_E
ND
_SW
Bin
ary
Inpu
tD
ampe
r 1
(flu
id c
oole
r -
clos
ed e
nd s
witc
h is
clo
sed)
no
-uni
tsC
oolB
oost
dam
per
1 c
lose
dX
5D
AM
PE
R_2
_OP
EN
Bin
ary
Inpu
tD
ampe
r 2
(flu
id c
oole
r -
cont
acto
r is
ene
rgiz
ed)
no-u
nits
Coo
lBoo
st d
ampe
r 2 c
onta
ctor
ene
rgize
dX
6D
AM
PE
R_2
_OP
EN
_EN
D_S
WB
inar
y In
put
Dam
per
2 (
fluid
coo
ler
- op
en e
nd s
witc
h is
clo
sed)
no
-uni
tsC
oolB
oost
dam
per
2 o
pen
X
7D
AM
PE
R_2
_CLO
SE
D_E
ND
_SW
Bin
ary
Inpu
tD
ampe
r 2
(flu
id c
oole
r -
clos
ed e
nd s
witc
h is
clo
sed
no-u
nits
Coo
lBoo
st d
ampe
r 2
clo
sed
X
8S
PAR
EB
inar
y In
put
Spa
re In
put (
bina
ry)
no-u
nits
N/A
X
Typi
cal I
nput
Ass
ignm
ent T
able
installation
Not
e: D
ata
poin
ts s
how
n ar
e pr
e-pr
ogra
mm
ed in
to th
e m
odul
e bu
t may
not
all
be a
vaila
ble
depe
ndin
g on
type
and
num
ber o
f fie
ld d
evic
es
Fiel
d de
vice
s fo
r bin
ary
inpu
ts u
se a
nor
mal
ly o
pen
cont
act u
nles
s ot
herw
ise
note
d
-
9
installation
Web Page Configuration — Main Page and System
The Model BAScontrol22C I/O user manual is included with the MarleyGard Link control panel and is also available at www.ccontrols.com
Access to the web pages is intended for the installer or skilled technicians. In order to access any of the web pages authentication is required. The default IP address is 192.168.92.68 and the default User Name and Password is admin/admin. Once on the main page, the System Configuration button can be clicked.
The main web page provides an overview of all real points plus access to other web pages. To configure a point, click on the point and a configuration page will appear. To observe the updated data for each point, click Auto Refresh button to ON. Point values can be temporarily forced by checking the box adjacent to the point and entering a value into the point’s text box (make sure Auto Refresh button is OFF). The value will remain forced until the box is unchecked or the unit power cycled. Care must be exercised when forcing values into points.
The IP settings can be changed to the desired values. Either DHCP or a static IP address can be selected. If a static ad-dress is desired, enter the value along with the network mask and gateway address. If domain address is required, enter in the Primary and Secondary DNS addresses.
BACnet device data must be entered when using BACnet. Make sure the Device Instance and Device Object Name are both unique over the complete BACnet Internetwork.
-
Z1126362 | ISSUED 9/2020
©2020 SPX COOLING TECHNOLOGIES. ALL RIGHTS RESERVED
In the interest of technological progress, all products are subject to design
and/or material change without notice.
MarleyGard LINKUS E R MAN UAL
SPX COOLING TECHNOLOGIES, INC.
7401 WEST 129 STREET
OVERLAND PARK, KS 66213 USA
913 664 7400 | [email protected]
spxcooling.com