Deconstruct UK case study for the financial sectorTRANSCRIPT
Deconstruct UK case study for the financial sector.
Client: Unidata UK LimitedLocation: Acton, London
Contractor: Deconstruct UK LtdCompletion Date: January 2010
Sector: Financial
About the Project:
Installation of a secondary structural steelframe into Colt Data Centre, Acton.
This project saw the installation of secondary steel frames into a live Data Centre to provide additional support to battery back up rooms located over live mechanical plant rooms.
The works required a clinical approach to the sensitive nature of the structure and emphasis on dust and vibration management was of extreme importance.
Using our experience of Asbestos Removal, we carried out a very successful installation that was both timely and safe.
Project Challenges:
This Data Centre was a live facility and required all works to be carried out without dust or vibration.
Works were also carried out around live mechanical and HV power supplies with absolute emphasis on operatives understanding of status, location andnature of existing services.
Deconstruct also had to thread this installation into a busy structural frame within the live plant room.
Client Testimonial:
“This project was completed safely without incident to the complete satisfaction of our client.” Unidata UK Ltd
Services provided by Deconstruct UK:
Our services:
Deconstruction Services ✓
Demolition Services
Enabling Works ✓
Asbestos Removal Services
Asbestos Surveying Services
Ground Works Services
Piling Services
Steelwork Installations ✓
Builders Works ✓
Emergency Dangerous Structures
Temporary Works ✓
Contact Details:
Deconstruct (UK) LimitedSilver House, 31-35 Beak StreetLondonW1F 9DPTel: 020 7734 6655Fax: 020 7734 6626
Email [email protected] Address www.deconstructuk.com