installation monarch en - bainultra...• use 12 awg (or greater) copper conductors that resist heat...

36
INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER TO BE KEPT BY THE OWNER

Upload: others

Post on 12-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

INSTALLATION INSTRUCTIONS

IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER

TO B

E K

EP

T B

Y T

HE

OW

NE

R

Page 2: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

2

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

TABLE OF CONTENTS

IMPORTANT SAFETY INSTRUCTIONS .....................................................................................................................1

PARTS & TOOLS ...................................................................................................................................................3

SITE PREPARATION .............................................................................................................................................6

PLUMBING PREPARATION .................................................................................................................................13

INSTALLATION

• BOX ..........................................................................................................................................................15

• DROP-IN ...................................................................................................................................................20

• ALCOVE (BETWEEN 2 OR 3 WALLS ........................................................................................................23

BATH INSTALLATION - PLUMBING & ELECTRICAL CONNECTIONS ........................................................................26

ELECTRICAL WIRING DIAGRAMS ........................................................................................................................32

CUTTING TEMPLATES: ELECTRONIC CONTROLS & AIR VENT ...............................................................................34

Page 3: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

1

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH COLLECTION

IMPORTANT SAFETY INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY

READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS

THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTIONS OF THE OWNER’S MANUAL.

WARNING

• Risk of hyperthermia; people using medication and/or having an adverse medical history should consult a physician before using a Hydro-thermo massage® bathtub equipped with a heater.

• Risk of hyperthermia and possible drowning: do not use a Hydro-thermo massage® bathtub equipped with heater immediately following strenuous exercise.

• Risk of fetal injury; pregnant or possibly pregnant women should consult a physician before using a Hydro-thermo massage® bathtub equipped with a heater.

• Risk of accidental injury or drowning; do not use drugs or alcohol before or during the use of a Hydro-thermo massage® bathtub equipped with a heater.

• Use this unit only for its intended purposes or as described in this manual. Use only accessories or devices recommended by the manufacturer.

• Risk of hyperthermia and possible drowning. Check and adjust water temperature before use. Water temperature exceeding 100ºF (38ºC) may be injurious to your health.

• To reduce the risk of injury, as with any other conventional bath, do not allow children or physically impaired people to use this unit unless they are closely supervised at all times.

• To avoid injury, exercise care when entering or exiting the bathtub.

• The Geysair (option) should always be connected to the hot water intake. If it is not the case, then, the Geysair option should be deactivated via the bath control.

RISK OF ELECTRICAL SHOCK

• Disconnect electric power before servicing.

• Do not permit electrical appliances (hair dryer, lamp, telephone, radio, television, etc.) within 5’ (1,5 m) of the Thermomasseur®.

• Before using the Thermomasseur®, its exterior construction (podium or skirting) should be finished so that a bather cannot accidentally come in contact with electrical components (turbine and power module).

• For indoor use only.

Page 4: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

2

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS

THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTIONS OF THE OWNER’S MANUAL.

ELECTRICAL CONNECTIONS:

• Never drop or insert objects into any openings.

• The Thermomasseur® must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit interrupter (GFCI). Optional therapies such as Chromotherapy and/or 2nd heated backrest and/or WarmTouchShell® must be connected to a supply circuit that is protected by a 15 amp class A ground fault circuit interrupter (GFCI). This interrupter is supplied by a certified electrician and must be tested on a regular basis in accordance with manufacturer’s instructions. The GFCI ground must be connected. If defective, do not use the Thermomasseur. Disconnect immediately and call a certified electrician.

• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC).

• Canada only: for permanently connected units. A green-colored terminal (or a wire connector marked g., gr., ground or grounding) is provided within the terminal compartment (not applicable if unit supplied with an electric plug). To reduce the risk of electrocution, connect this terminal or connector to the grounding terminal of your electric service or supply panel with conductor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG or more.

• All electrical connections must be carried out by a certified electrician and must respect Federal, Provincial/State, and local building codes and regulations.

• Install in accordance with manufacturer’s installation instructions.

• For Geysair-equipped baths using remote turbine installation (not mounted on the bath), grounding continuity must be tested between the bath grounding terminal and the bath power supply. Failure to perform the grounding continuity test could result in serious personal injury.

WATER LEAK TEST

• Once plumbing is fully installed and before beginning any other work, fill the ThermoMasseur® with water to overflow level and wait 30 minutes. Check all plumbing hook-ups and bath for leaks. BainUltra® is not responsible for any water damage caused by improper installation (see Warranty section).

IMPORTANT SAFETY INSTRUCTIONS (cont’d) PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY

Page 5: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

3

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

B. OPTIONAL PARTS – PLUMBING

DESCRIPTION QTY

H Articulated overflow cap 1

I Overflow pipe 1

J Plated drain clicker 1

K Strainer 1

L Seal 1

M PVC cable driven drain 1

N T Shape PVC connector (pipe) 1

J

K

L

M

D

F

H

I

E

A

B

N

C

PARTS & TOOLS

A. STANDARD PARTS - PLUMBING

DESCRIPTION QTY

A «TigerFlex» PVC flexible pipe 1

B Plated drain clicker 1

C Strainer 1

D 1-1/2” drain male-to-male connector 1

E Rubber seal 1

F T Shape PVC drain 1

Page 6: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

4

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

STANDARD PARTS

STANDARD PARTS – THERMOMASSEUR®

DESCRIPTION QTY

A Turbine & Geysair 1

B MiaPlus® Control 1

C MiaMulti® Control (Optional) 1

48 in. level

Teflon tape

ABS & PVC Glue

Silicone

Caulking gun

Measuring tape

Square Screwdriver Philips #2

Slip joint pliers

MATERIAL & TOOLS REQUIRED

C

A

B

Page 7: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

5

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

SITE PREPARATION

SERVICE ACCESS AND VENTILATION

• A service access is necessary. Minimum dimensions are 22 in. x 18 in. (55 cm x 46 cm) to properly reach all electrical components of the system.

• An air vent is necessary. Minimum dimensions are: 2 in. x 4 in. (5 cm x 10 cm) to ensure proper functioning of the turbine.

There is a technical specification sheet for each BainUltra® ThermoMasseur® which includes information such as necessary dimensions of site before installation.

If you do not already have the technical specifications, download from the BainUltra® Web site at: bainultra.com or call us at: 1 800 463-2187.

FLOOR

1500 LB (680 KG)

PLUMBING

• See faucet manufacturer’s specifications for zoning and plan water supply location accordingly.

• Position drain according to bath’s technical specifications.

WARNING

• All Monarch baths collection quartz deck surface must be drilled by a specialized installer with the appropriate drilling tools for quartz.

• Observe manufacturer’s permitted zones for drilling deck surface with a minimum distance of 1-1 / 2“ (4 cm) from the outside or inside edges. For detailed drilling plans, please contact BainUltra customer service.

• BainUltra® can not be held responsible for any drilling damage to the deck surface while installation

BEDDING

Before installing, ensure that the floor underneath the bath can support 1500 lb (680 kg).

No special installation is recommended by the manufacturer for the bedding of the bathtub; It can sit directly on the floor.

For this type of installation, it is preferable to insulate the concrete between two sheets of plastic, one installed on the floor and the other under the bathtub.

Page 8: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

6

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

SITE PREPARATION

MONARCH 6030 / 6031 / 6032

MONARCH 6032L • CURVED 1 SIDE • LEFT

Page 9: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

7

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

SITE PREPARATION

MONARCH 6032R CURVED 1 SIDE • RIGHT

MONARCH 6233C • CURVED 4 SIDES

Page 10: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

8

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

MONARCH 6035 / 6036

MONARCH 6037L • CURVED 1 SIDE • LEFT

SITE PREPARATION

Page 11: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

9

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

MONARCH 6037R CURVED 1 SIDE • RIGHT

MONARCH 6337C • CURVED 4 SIDES

SITE PREPARATION

Page 12: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

10

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

MONARCH 6636

MONARCH 66638F • CURVED 1 SIDE

SITE PREPARATION

Page 13: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

11

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

MONARCH 6938C CURVED 4 SIDES

MONARCH 7236 / 7240

SITE PREPARATION

Page 14: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

12

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

MONARCH 7238F

MONARCH 7338C • CURVED 4 SIDES

SITE PREPARATION

Page 15: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

13

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

PLUMBING PREPARATION

STANDARD WASTE & OVERFLOW –

MONARCH 6030 / 6031 / 6032 / 6233 / 6035 / 6036 / 6037 / 6337

WASTE & OVERFLOW (OFFERED IN OPTION) –

MONARCH 6030 / 6031 / 6032 / 6233 / 6035 / 6036 / 6037 / 6337

WARNING

• Refer to manufacturer’s instructions supplied with packaging of components for final assembly.

DRILLING FOR FAUCET INSTALLATION

All Monarch baths collection quartz deck sur-face must be drilled by a specialized installer with the appropriate drilling tools for quartz.

Observe permitted drilling zones by keeping a 1-1/2 in (4 cm) distance away from outside and inside deck surface edges.

For drilling detailed plans please contact BainUltra’s Customer Service.

WARNING

• BainUltra® is not responsible for any drilling damage caused to deck surface during installation.

WARNING

• Refer to manufacturer’s instructions supplied with packaging of components for final assembly.

Page 16: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

14

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

STANDARD WASTE & OVERFLOW – MONARCH 6636 / 6638 / 6938 / 7236 / 7238 / 7240 / 7338

OPTIONAL WASTE & OVERFLOW–

MONARCH 6636 / 6638 / 6938 / 7236 / 7238 / 7240 / 7338

PLUMBING PREPARATION

WARNING

• Refer to manufacturer’s instructions supplied with packaging of components for final assembly.

WARNING

• Refer to manufacturer’s instructions supplied with packaging of components for final assembly.

DRILLING FOR FAUCET INSTALLATION

All Monarch baths collection quartz deck sur-face must be drilled by a specialized installer with the appropriate drilling tools for quartz.

Observe permitted drilling zones by keeping a 1-1/2 in (4 cm) distance away from outside and inside deck surface edges.

For drilling detailed plans please contact BainUltra’s Customer Service.

WARNING

• BainUltra® is not responsible for any drilling damage caused to deck surface during installation.

Page 17: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

15

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

BOX CONSTRUCTION

WARNING

• Before starting box construction, you must consider to clear opening minimum dimen-sions and the max outside edge dimen-sions so the deck rim exceeds the box. See table below.

• A service access is necessary. Mini-mum dimensions are 22 in. x 18 in. (55 cm x 46 cm) to properly reach all electrical components of the system to facilitate repairs.

• An air intake of at least 2 in x 4 in (5 cm x 10 cm) is necessary to ensure proper functioning of the turbine.

BOX INSTALLATION

Model Clear Opening BOX maximum dimensions

LENGTH (in) WIDTH (in) LENGTH (cm) WIDTH (cm) LENGTH. (in) WIDTH (in) LENGTH (cm) WIDTH (cm)

6030 56-1/2 25 144 64 59-1/2 29-1/2 151 75

6031 56-1/2 25 144 64 59-1/2 30-1/2 151 77

6032 56-1/2 25 144 64 59-1/2 31-1/2 151 80

6032L 56-1/2 25 144 64 59-1/2 29-1/2 151 75

6032R 56-1/2 25 144 64 59-1/2 29-1/2 151 75

6233 56-1/2 25 144 64 58-1/2 29-1/2 149 75

6035 56 29 142 74 59-1/2 34-1/2 151 88

6036 56 29 142 74 59-1/2 35-1/2 151 90

6037L 56 29 142 74 59-1/2 34-1/2 151 88

6037R 56 29 142 74 59-1/2 34-1/2 151 88

6337C 56 29 142 74 57-1/2 33-1/2 146 85

6636 59 31-3/4 150 81 65-1/2 35-1/2 166 90

6638F 59 31-3/4 150 81 65-1/2 35-1/2 166 90

6938C 59 31-3/4 150 81 62-5/8 35-1/2 159 90

7236 65 31-3/4 165 81 71-1/2 35-1/2 181 90

7238F 65 31-3/4 165 81 71-1/2 35-1/2 181 90

7240 65 31-3/4 165 81 71-1/2 39-1/2 181 100

7338C 65 31-3/4 165 81 67-1/2 35-1/2 171 90

Page 18: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

16

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

WARNING

• Make sure that the structure is levelled to the ground and square.

• The deck surface and the bottom of the bath must be supported simul-taneously.

BOX – CONSTRUCTION

• Drill an opening in the floor where the drain will be positioned.

• Build a wood base (2” x 3’’ or other) to hold the lateral panels.

• Adding studs to the four corners can facili-tate the fixing of the panels together

TIP :

To ensure the simultaneous support of the bottom of the bath and the bottom of the deck, a concrete bed under the bath is recommended. For this type of installation, it is preferable to insulate the concrete between two sheets of plastic, one installed on the floor and the other under the bathtub. Ceramic cement-glue can also be used instead of concrete; it is more malleable and does not break.

Bath deck surface

Finish coating

Intermediate panel

Structure

Concrete bed

BOX INSTALLATION

Page 19: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

17

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

WARNING

• Do not remove the protective plastic film on the tub and place a drop-cloth in the tub during installation to protect the acrylic.

• Be careful not to damage to the turbine and all other components during bath insertion in the box.

WARNING

• Keep an access to perform electrical & plumbing connections.

• An air intake of at least 2“ x 4” (5 cm x 10 cm) is necessary to ensure proper functioning of the turbine.

WARNING

• Keep an access to perform electrical & plumbing connections.

• Apply the finish coating on the walls, around opening.

• Place the bath in the box opening.

TIPS :

• Make an opening of sufficient dimension in the panels to allow connection access.

BOX – CONSTRUCTION (CONT’D)

• Fix intermediate panels (plywood recommended) on the sides and at the top.

BOX INSTALLATION

Page 20: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

18

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

3-1/4”(8.5 cm)

5-1/2”(14 cm)

Floor Floor

BOX – CONSTRUCTION (CONT’D)

•CONNECT THE DRAIN

WARNING

• Ensure that there is the minimum clearance below the floor as shown below to insert the drain connector down following the appropriate waste & overflow assembly.

• Perform a leak test before completing the bath installation in the box.

MONARCH 6030 / 6031 / 6032 / 6233 / 6035 / 6036 / 6037 / 6337

MONARCH 6636 / 6638 / 6938 / 7236 / 7238 / 7240 / 7338

Standard waste & overflow Waste & overflow (Offered as option)

Standard waste & overflow Waste & overflow (Offered as option)

Detail - Standard waste & overflow Detail - Waste & overflow (Offered as option)

BOX INSTALLATION

Page 21: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

19

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

WARNING

• Before closing the box, make all the connections of the electrical components. See pages 27 to 31 for this step.

• A minimum 22 in x 18 in (55 cm x 46 cm) access is necessary to reach all electrical components and facilitate repairs.

• In addition, an air intake of at least 2 in x 4 in (5 cm x 10 cm) is necessary to ensure the proper functioning of the turbine.

WARNING

• Make sure you have enough space to make electrical con-nections to the components.

• Leave the plastic film on the bath and place a drop-cloth in the bath during installation.

• The bath is molded with a slope towards the drain. If the bathtub is levelled according to bath deck surface, the water will drain completely.

• The use of shims is required to level the bath. However, the placement of a concrete bed under the bath is recommended to ensure a well distributed support the bottom of the deck.

• Apply a bead of silicone to the perimeter of the bath to seal the top of the box.

BOX – CONSTRUCTION (CONT’D)

• FINAL STEP OF BATH INSTALLATION

• COMPLETE BOX FINISH

BOX INSTALLATION

Page 22: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

20

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

DROP-IN INSTALLATION

DROP-IN – CONSTRUCTION

• Drill an opening in the floor where the drain will be positioned.

• Build a wood base (2” x 3’’ or other) to hold the lateral panels.

WARNING

• Make sure that the structure is levelled to the ground and square.

• Consider the thickness of the intermediate panels (plywood), the choice of finish (ceramic, laminate, granite, marble, quartz or other), and height of the bath under the deck.

• The deck surface and the bottom of the bath must be supported simultaneously.

TIPS :

To ensure the simultaneous support of the bottom of the bath and the bottom of the deck, a concrete bed under the bath is recommended. For this type of installation, it is preferable to insulate the concrete between two sheets of plastic, one installed on the floor and the other under the bathtub. Ceramic cement-glue can also be used instead of concrete; it is more malleable and does not break.

Thickness

Page 23: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

21

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

• Apply the finish coating on the perimeter and top on the podium.

• Position the bath in the opening of the podium.

WARNING

• Draw the outside contour of the bath on the top panel.

• Cut the top of the panel at 1 in (2.5cm) inside the outline of tub deck dimension.

• Keep access for electrical and plumbing connections.

WARNING

• Draw the outer contour of the bath area on the top panel.

• Cut the outline of the bath on the top panel to 1 in. (2.5 cm) inside the outline of the bath deck surface.

• If the finish is composed of ceramic tiles, you can trim the tiles by guiding the edge of the intermediate panel previously mounted to the structure.

• Keep access for electrical and plumbing connections.

WARNING

• Leave the plastic film on the bath and make sure to extend a cover in the bath during installation.

• Pay attention to the turbine and the other components attached to the bath during insertion.

DROP-IN INSTALLATION

DROP-IN – CONSTRUCTION (SUITE)

• Fix the intermediate panels (plywood recommended) on the sides and top.

Page 24: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

22

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

DROP-IN INSTALLATION

DROP-IN – CONSTRUCTION (SUITE)

• Connect the drain. See page 18 for this step.

• Final step of bath installation.

WARNING

• Make sure you have enough space to perform the electrical connections of the components.

• Leave the plastic film on the bath and place a drop-cloth a cover in the bath during installation.

• The bath is molded with a slope towards the drain. If the bathtub is level from the beaches, the water will drain completely.

• The use of shims is required to level the bath. However, a concrete bed under the bath is recommended to ensure a well distributed support in conjunction with the bottom of the deck.

• Apply a bead of silicone to the perimeter of the bath to seal with the top of the box.

WARNING

• Before closing the box, complete all electrical connections of the components. See pages 27 to 31.

• A minimum 22 in x 18 in (55 cm x 46 cm) access is necessary to reach all electrical components and facilitate repairs.

• In addition, an air intake of at least 2 in x 4 in (5 cm x 10 cm) is necessary to ensure the proper functioning of the turbine.

• COMPLETE DROP-IN FINISH

Page 25: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

23

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

HEIGHT ADJUSTEMENT

• Place the bath against the walls.

• Adjust level on deck by length and width. Use shims for leveling.

ALCOVE INSTALLATION (BETWEEN 2 OR 3 WALLS)

WARNING

• Observe manufacturer’s permitted zones for drilling deck surface with a minimum distance of 1-1 / 2“ (4 cm) from the outside or inside edges. For detailed drilling plans, please contact BainUltra customer service.

• In addition, an air intake of at least 2 in x 4 in (5 cm x 10 cm) is required to ensure proper turbine operation.

WARNING

• The deck surface and the bottom of the bath must be supported simultaneously.

TIPS :

• Glue shims to the ground to prevent them from moving.

• To ensure simultaneous support of the bottom of the bath and the bottom of the bath deck surface, a concrete bed under the bath is recommended. For this type of installation, it is preferable to insulate the concrete between two sheets of plastic, one installed on the floor and the other under the bathtub. Ceramic cement-glue can also be used instead of concrete; it is more mal-leable and does not break.

• Using a pencil, mark position of wood support to be attached to wall by tracing a line underneath the deck of the bath.

Page 26: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

24

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

• Remove bath from its location.

• Make an opening to the floor for the drain.

• Fasten rails to the supporting walls by aligning them under the lines drawn below the rim edges.

• Align wood support with markings and nail into place on the wall studs.

• Reposition the bath and make sure it is level.

• Connect the drain. See page 18 for the minimum clearance required under the floor.

• Make all the electrical connections of the components. See pages 27 to 31 for this step.

• To finish the front of the bath, make a structure to support the deck

WARNING

• Provide clearance at the front to compensate the thickness of a front panel.

WARNING

• The front panel can not provide on its own enough support to prevent the breakage of the quartz deck surface.

• Consider the thicknesses of the wood pieces ac-cording to the desired look of the deck and the thickness of the front panel finish.

• Provide a vertical upright stud every 16 in (40 cm) to provide constant support under the deck.

ALCOVE INSTALLATION (BETWEEN 2 OR 3 WALLS)

Page 27: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

25

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

• Apply the front panel.

TILING FLANGE

• Using a miter box and a fine-toothed saw cut 3 lengths adjusted to the edges of the deck against the walls.

• Cut corners at 45° angle (Figure A).

• Remove the protective film from the bath area.

• Remove the film from the adhesive tape on the back of the flanges, and stick it on the edges of the deck against the walls (Figure B).

• Apply a bead of silicone between the edge of the flange and the top of the deck (Figures C and D), and at the corners.

WARNING

• Minimum 22 in x 18 in (55 cm x 46 cm) access to all electrical and electronic components of the system must be provided to facilitate repairs.

• In addition, an air intake of at least 2 in x 4 in (5 cm x 10 cm) is required to ensure proper turbine operation.

Figure B

Figure A

Figure C Figure D

ALCOVE INSTALLATION (BETWEEN 2 OR 3 WALLS)

TIPS :

To help finishing work along the walls, a tile flange can be supplied with your bath.

To ensure the simultaneous support of the bottom of the bath and the bottom of the deck, a concrete bed under the bath is recommended. For this type of installation, it is preferable to insulate the concrete between two sheets of plastic, one installed on the floor and the other under the bathtub. Ceramic cement-glue can also be used instead of concrete; it is more malleable and does not break.

Page 28: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

26

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

ELECTRONIC CONTROL INSTALLATION – MIAPLUS® & MIAMULTI® (OPTIONAL)

ELECTRONIC CONTROL INSTALLATION – DOT

Jig saw with fine cut blade

Drill

1/4 in. drill bit

Push wiring through drilled holes.

Remove protective film from watertight seal.

Secure to the wall with permanent waterproof sealant (mold-free clear silicone for bathrooms).

Secure temporarily with a tape for about 24 h.

Push wiring through drilled holes.

Remove protective film from watertight seal.

Secure to the wall with permanent waterproof sealant (mold-free clear silicone for bathrooms).

Secure temporarily with a tape for about 24 h.

TOOLS REQUIRED

TOUCH PAD INSTALLATION

TOUCH PAD INSTALLATION

LOCATION: Determine the most convenient location, on the wall close to tub. Peel off the sticker’s protective film behind the control. You can add a silicone bead to secure to the wall.

WARNING

• Baths from Monarch collection cannot be drilled for faucet installation. Faucets must be freestanding or wall-mounted model

• DRILLING OF WALL: Refer to the Cutting Template on page 34 for the location and diameter of the holes.

WARNING

• You will find the control attached to the turbine, or to the electronic control modules.

7/8 in. Hole saw

Drill

TOOLS REQUIRED

DOT WarmTouchShell® (WTS)

DOT Chromatherapy (LED)

Page 29: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

27

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

REMOTE MOUNTING OF TURBINE

PIPING & WIRING UNDER FLOOR & NO ACCESS UNDER BATH BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

WARNING

• Provide access for cleaning of the Geysair backflow Preventer filter.

• The Geysair should never be remotely installed. Never disconnect it.

WARNING

• For Geysair-equipped baths using remote turbine installation (not mounted on the bath), grounding continuity must be tested between the bath grounding terminal and the bath power supply. Failure to perform the grounding continuity test could result in serious personal injury.

GEYSAIR® connection

• Connect the Geysair® hose with a flow regulator to a hot water supply line.

TURBINE & GEYSAIR® CONNECTIONS (THERMOMASSEUR®)

• See page 32 for electrical diagram.

Junction Box (Canada)

To GFCI Outlet United States

Geysair hose & backflow preventer

Geysair connection

Turbine power cable

Hot water supply

Page 30: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

28

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

1”

WARNING

• Choose a location for the turbine with the shortest possible distance from the Thermomasseur® bath, no more than 15 ft. (4,6m), and a maximum of six elbow directional changes to ensure system performance. It can be under the floor, in a closet or any other place that can hide the turbine and if needed optional modules. Easy access must remain possible at all time and sufficient air ventilation is necessary for turbine.

• A service access is necessary. Minimum dimensions are 22 in. x 18 in. (55 cm x 46 cm) to properly reach all electrical components of the system.

• An air vent is necessary. Minimum dimensions are: 2 in. x 4 in. (5 cm x 10 cm) to ensure proper functioning of the turbine.

• Geysair® cannot be remotely installed.

REMOTE MOUNTING OF TURBINE

Bottom of door When located in an enclosed location.

Floor

Page 31: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

29

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

EXTENSION CORD (If extra-length is required, contact BainUltra to order)

Turbine power connector

Geysair connection

Junction box Canada

TO GFCI Outlet United States

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

REMOTE MOUNTING OF TURBINE - AIR PIPE (THERMOMASSEUR®)

1-1/2 I.D. ABS, PVC PIPE (RIGID or «TIGERFLEX») & Fittings (not included)

WARNING

• For Geysair® equipped baths using remote turbine installation (not mounted on the bath), grounding continuity must be tested between the bath grounding terminal and the bath power supply. Failure to perform the grounding continuity test could result in serious personal injury.

7 REMOTE MOUNTING OF TURBINE - ELECTRICAL CONNECTIONS (THERMOMASSEUR®)

• See page 32 for electrical diagram

Page 32: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

30

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

OPTIONAL THERAPIES ELECTRICAL CONNECTIONS - THERMOMASSEUR®

• See page 32 for electrical diagram.

D

BC

A

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

Junction box Canada

Junction box Canada

TO GFCI Outlet United States

TO GFCI Outlet United States

A: 2nd Heated Backrest

B: Chromatherapy (LED)

C: MiaPlus®

D: MiaMulti® (Option)

WARNING

• Electrical outlet must be installed by a certified electrician. Installation must be conducted in accordance with all local, provincial/state, and federal building/electrical codes and regulation.

• Connect electrical supply only after all low voltage wiring is properly installed on turbine.

• If you did not follow this last step, shut off and then restart your home’s circuit breaker.

• Turbine and air pipe should be clear of building materials and wiring.

Page 33: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

31

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

OPTIONAL THERAPIES ELECTRICAL CONNECTIONS - TUB (WITHOUT AIR JETS)

• See page 33 for electrical diagram.

A : WarmTouchShell®

C : Chromatherapy (LED)

C : DOT WarmTouchShell®

D : DOT Chromatherapy (LED)

DOT WarmTouchShell® (WTS)

DOT Chromatherapy (LED)

D

D

B

C C

A

Junction box Canada

TO GFCI Outlet United States

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

Page 34: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

MO

NA

RC

H -

in

sta

lla

tio

n

32

MONARCH BATH

INSTALLATION INSTRUCTIONS

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

ELECTRICAL DIAGRAM – THERMOMASSEUR

15A CIRCUIT20A CIRCUIT

NEUTRAL N L LOAD NEUTRAL N L LOAD

GROUND FAULT CIRCUIT INTERRUPTERS

GROUND FAULT CIRCUIT INTERRUPTERS

JUNCTIONBOX

JUNCTIONBOX

TURBINE WITH GEYSAIR(FOR MIAPLUS®, MIAMULTI®)

TURBINE WITHOUT GEYSAIR(FOR MIAPLUS®, MIAMULTI®)

N LN L

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

Page 35: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

33

MO

NA

RC

H -

in

sta

lla

tio

n

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

MONARCH BATH

INSTALLATION INSTRUCTIONS

ELECTRICAL DIAGRAM - THERAPIES

15A CIRCUIT

AIRSTREME(WARMTOUCHSHELL®)

N L N L

NEUTRAL N L LOAD

INMIX MODULE (CHROMATHERAPY)

GROUND FAULT CIRCUIT INTERRUPTERS

JUNCTIONBOX

BATH INSTALLATION

PLUMBING AND ELECTRICAL CONNECTIONS

Page 36: INSTALLATION MONARCH EN - BainUltra...• Use 12 AWG (or greater) copper conductors that resist heat of at least 194ºF (90ºC). • Canada only: for permanently connected units. A

CU

TT

ING

TE

MP

LA

TE

S /

GA

BA

RIT

S D

E P

ER

ÇA

GE

MONARCH

CUTTING TEMPLATES / GABARITS DE PERÇAGE

MONARCH

CUTTING TEMPLATES / GABARITS DE PERÇAGE

34 35

www.bainultra.com

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.Certains produits, spécifications et services mentionnés dans le présent manuel sont décrits dans des demandes de brevets en instance ou protégés par des brevets.

1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)

Du lundi au jeudi, De 8 h à 20 h (HE) . Vendredi de 8 h à 17 h (HE) Printed in Canada. Copyright © March 2017 BainUltra Inc. All rights reserved. 45200654

Imprimé au Canada. Copyright © mars 2017 BainUltra inc. Tous droits réservés.

11.313"[28.7 cm]

1.063"[2.7 cm]

R0.125"[R0.3 cm]

0.813"[2.1 cm]

11.063"[28.1 cm]

1.625"[4.1 cm]

1.125"[2.9 cm]

1.375" [3.5 cm]

0.875"[2.2 cm]

R0.125"[R0.3 cm]

1.625"±0.04"[4.1 cm±0.1 cm]

5.125"±0.04"[13.0 cm±0.1 cm]

R0.250"[R0.6 cm]5.591" [14.2 cm]

Control cut-outTrou du contrôle

Control outlineContour du contrôle

2.165"[5.5 cm]

AIR INTAKE - OPENING

PRISE D'AIR - OUVERTURE

MIAPLUS & MIAMULTI

Trou pour infrarouge MiaMulti®Cut-out for MiaMulti® infrared

11.313"[28.7 cm]

1.063"[2.7 cm]

R0.125"[R0.3 cm]

0.813"[2.1 cm]

11.063"[28.1 cm]

1.625"[4.1 cm]

1.125"[2.9 cm]

1.375" [3.5 cm]

0.875"[2.2 cm]

R0.125"[R0.3 cm]

1.625"±0.04"[4.1 cm±0.1 cm]

5.125"±0.04"[13.0 cm±0.1 cm]

R0.250"[R0.6 cm]5.591" [14.2 cm]

Control cut-outTrou du contrôle

Control outlineContour du contrôle

2.165"[5.5 cm]

AIR INTAKE - OPENING

PRISE D'AIR - OUVERTURE

MIAPLUS & MIAMULTI

Trou pour infrarouge MiaMulti®Cut-out for MiaMulti® infrared

11.313"[28.7 cm]

1.063"[2.7 cm]

R0.125"[R0.3 cm]

0.813"[2.1 cm]

11.063"[28.1 cm]

1.625"[4.1 cm]

1.125"[2.9 cm]

1.375" [3.5 cm]

0.875"[2.2 cm]

R0.125"[R0.3 cm]

1.625"±0.04"[4.1 cm±0.1 cm]

5.125"±0.04"[13.0 cm±0.1 cm]

R0.250"[R0.6 cm]5.591" [14.2 cm]

Control cut-outTrou du contrôle

Control outlineContour du contrôle

2.165"[5.5 cm]

AIR INTAKE - OPENING

PRISE D'AIR - OUVERTURE

MIAPLUS & MIAMULTI

Trou pour infrarouge MiaMulti®Cut-out for MiaMulti® infrared