inspection test plan for civil works
DESCRIPTION
inspection test plan for civil worksTRANSCRIPT
CONTRA
CONTRA
QP EXTE
DOCUM
DOCUM
No.
1
ACT NUMBER
ACT TITLE
ERNAL TRANSM
MENT NUMBER
MENT TITLE
CODE 1 –REQUIRED)
ITTAL REFERENC
QP C
APPROVED –
C
GC12
EPIC
CE EDM
3513
INSP
COMMENTS
MAY PROCEE
COMMENT
2105200
FOR UPGRADAT
/GC12105200/E
3‐M3GE‐1‐25‐00
ECTION AND TE
ED (RE‐SUBMISS
TS RESOL
TION OF AC UPS
EXT/TN/0510
01
ST PLAN FOR CIV
SION DOCUME
UTION SH
QP
UNITS IN NGL3,
DAT
DOC
VIL WORKS
ENT SUBMITTED
HEET[ CRS
PROJECT NUMB
, MESAIEED
TE
CUMENT REVISI
CONTRACTO
D FOR AFC STAM
]
BER 3
3
ION 2
OR RESPONS
MPING/SIGNATU
P
3513
30‐Oct‐2013
2
SE
RE
Page 1 of 1
1 EXCAVATION WORKS
1.1 Setting out AFC Drawing 3513-M3GE-1-50-0001 Site Survey Report Site Super visor/Engr.
1.2 Expolortary Excavation Approved Procedure Site Super visor/Engr. W M
1.3 Excavation Approved Procedure Site survey Report Site Super visor/Engr.
1.4Compaction Specifications 3513-M3GE-1-50-0004 FD test Report Q.C Engineer W/H
Sub Contractor
1.5 Compaction Test Specifications 95% Compaction FD test Report Q.C Engineer H W/H W/H
2 BLINDING CONCRETE SRC152.1 Visual Inspection AFC Drawing 3513-M3GE-1-50-0004 Survey Coordinates, Levels, Third party FD Test Report Q.C Engineer H W M
2.2Compaction Test Specifications FD Test Report Q.C Engineer W/H
Sub Contractor
2.3Inspection for Pouring Site Inspection
After Reviewing Third party Test report
Inspection Request Site Super visor/Engr. H H/W H/W
2.4
Concrete Pouring Mix no 3513-MS-CIV-0001SRC15-NS25G60C15
MAR/Delivery Ticket Q.C Engineer H H/W H/W
Cl less than 500 mg/l
CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED
INSPECTION TEST PLAN FOR CIVIL WORKS
RAY PROJECTS /
DOPETSl.No Activity Report
Test/Inspection Activity
RemarksAcceptance Criteria Drawing No ParametersVerifying
DocumentsResponsibility QP
2.5 Curing Water test report
Cl - less than 500 mg/l , SO3 - less than 1000 mg/l, Alkali carbonates &bicarbonates - less than 500 mg/l , TDS -less than 2000mg/l , Ph - 6.5 to 9
Water test report Site Super visor/Engr. H W
3 CONCRETE PROTECTION
3.1Application of Bitumen
Primer Specifications Ref:3513-MS-
CIV-0003 3513-M3GE-1-14-0008
After completion Visual Inspection
Material Approval (Poly Prime SB)
Site Super visor/Engr. H W M
3.2Laying of Bitumen Sheet
Specifications Ref:3513-MS-CIV-0003
3513-M3GE-1-14-0008After completion Visual
Inspection Material Approval (Bitustick XL
1.6mm thick)Site Super visor/Engr. M M M
3.3Screeding
Specifications Ref:3513-MS-CIV-0003
3513-M3GE-1-14-0008After completion Visual
Inspection AFC 3513-M3GE-1-50-0004 Site Super visor/Engr. H W M
3.4Installation of Bitu board
Specifications Ref:3513-MS-CIV-0003
3513-M3GE-1-14-0008After completion Visual
Inspection Material Approval (Bituboard
FS 4mm thick)Q.C Engineer
DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 2 OF 6
CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED
INSPECTION TEST PLAN FOR CIVIL WORKS
RAY PROJECTS /
DOPETSl.No Activity Report
Test/Inspection Activity
RemarksAcceptance Criteria Drawing No ParametersVerifying
DocumentsResponsibility QP
4
CONCRETE WORKS FOR
FOUNDATIONS C40
4.1 Form work Installation AFC Drawing
3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
Verifi the Dimensons , Supports and Shuttering Oil for smooth
finishAFC Drawing Site Super visor/Engr. H/W W M
4.2 Fabrication of Rebars Bar Bending Schedule
3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
AFC Drawing Site Super visor/Engr. H/W W M
4.3 Rebar Installation AFC Drawing
3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003,
Bar Bending Schedule along with AFC drawings
Site Super visor/Engr. H/W W M
,3513-M3GE-1-51-0004
4.4 Anchor bolt installation Locations NA AFC Drawings Site Super visor/Engr. H/W W M
4.5 Inspection for Pouring AFC Drawings / Specifi.
3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
Survey Report,Dimenson Check,Level Check
Inspection Request Q.C Engineer H H/W H/W
4.6Inspection of ReadyMix
ConcreteMix No
Flakiness Index - Max 30 Elongation Index - Max 35 Acid Soluble Chloride-Max 0.03 Acid Soluble Sulphate-Max 0.3 MSS - Max 15 los Angeles Abrasion - max 30
MAR for C40 / Delivery Ticket Q.C Engineer H H/W H/W
4.7
Concrete Pouring Mix Design/specification 3513-MS-CIV-0001Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40-40N/MM2
MAR for C40 / Delivery Ticket Q.C Engineer H H/W H/W
4.8
Removal of form work Specification/Cube test
report
Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40-40N/MM2
Inspection Request / min 24hrs from concrete poured
Q.C Engineer M M M
4.9 Inspection of surface Smooth Surface Surface Neat and Clean Visual Inspection Site Super visor/Engr. H H/W W
4.10 Concrte protection Specifications Ref
no:3513MS-CIV-0003 Specifications Site Super visor/Engr. H W M
4.11
Back Filling Back Filling Specifications 3513-M3GE-1-50-0004
Sulphate - less then 2.5 g/L, Max.Size of material 50mm, Plasticity index <11%, Liquid limit <40 %, Organic matter <12%
FD test Report Q.C Engineer W M M
DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 3 OF 6
CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED
INSPECTION TEST PLAN FOR CIVIL WORKS
RAY PROJECTS /
DOPETSl.No Activity Report
Test/Inspection Activity
RemarksAcceptance Criteria Drawing No ParametersVerifying
DocumentsResponsibility QP
5CONCRETE WORKS C40
5.1Compaction of floor area Compaction test
Test Report Should be 95% Compaction
FD test Report Q.C Engineer H W M
5.2 Form works for pannels Dimension
3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
Verifi the Dimensons , Supports and Shuttering Oil for smooth
finishAFC Drawings Site Super Visor/Engr. M M M
5.3 Reinforcement works AFC drawings
3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
Bar Bending Schedule along with AFC drawings
Site Super Visor/Engr. H/W W M
5.4 Inspection for Pouring AFC Drawings/Specification
3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004
Survey Report,Dimenson Check,Level Check
Inspection Request Q.C Engineer H H/W H/W
Concrete Pouring Mix Design / Specification 3513-MS-CIV-0001Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40- Delivery Ticket/ RFI Q C Engineer H W M
5.5Concrete Pouring Mix Design / Specification 3513 MS CIV 0001 daysSRC15 15N/MM2 OPC40
40N/MM2Delivery Ticket/ RFI Q.C Engineer H W M
5.6 Isolation Joints Specification3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002
Material Approval ( Flexcel board)
Site Super Visor/Engr. H H/W W
6 BLOCK WORKS
6.1 Procurement of Blocks Com. Strength 7 N/mm2 Test Report Q.C Engineer R M M
6.2 Inspection of Blocks Com. Strength Dimension, Pouracity, Test Report Q.C Engineer H H/W W
6.3 Laying of Blocks Visual Inspection 3513-M3GE-1-71-0005 Line and level AFC Drawings Site Super Visor/Engr. W W M
Concrete Filling AFC drawings 3513-M3GE-1-71-0005 AFC Drawing/Speci. Site Super Visor/Engr. M
7 PLASTERING
7.1Preparation of Surface Visual Inspection
Surface Cleaning and preparation
Specifications Site Super Visor/Engr. H W M
7.2 Installation of Blockmesh Specifications Ref : 3513-MS-
CIV-00043513-M3GE-1-71-0005, 3513-M3GE-1-14-0008
After Completion of Visual Inspection
AFC Drawings Site Super Visor/Engr. H W M
7.3 Installation of AnglebeadSpecifications Ref : 3513-MS-
CIV-00043513-M3GE-1-71-0005, 3513-M3GE-1-14-0008
After Completion of Visual Inspection
AFC Drawings Site Super Visor/Engr. H W M
7.4Rough Plaster
Specifications Ref : 3513-MS-CIV-0004
3513-M3GE-1-71-0005After Completion of Visual
Inspection Approved Procedure Site Super Visor/Engr. H H/W W
7.5Plastering Visual Inspection 3513-M3GE-1-71-0005
After Completion of Visual Inspection
Specifications Site Super Visor/Engr. H W W/M
7.6
Curing Water test report
Cl - less than 500 mg/l , SO3 - less than 1000 mg/l, Alkali carbonates &bicarbonates - less than 500 mg/l , TDS -less than 2000mg/l , Ph - 6.5 to 9
Specifications Site Super Visor/Engr. M M
DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 4 OF 6
CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED
INSPECTION TEST PLAN FOR CIVIL WORKS
RAY PROJECTS /
DOPETSl.No Activity Report
Test/Inspection Activity
RemarksAcceptance Criteria Drawing No ParametersVerifying
DocumentsResponsibility QP
8 WALL PAINTING
8.1 Inspection of Surfaces Visual Inspection Specifications Site Super Visor/Engr. H W M
8.2 Inspection for Moisture Specifications 3513-M3GE-1-71-0005 Moisture content less than 4% Field Tests Q.C Engineer H W M
8.3Application of Primer
Specifications Ref :3513-MS-CIV-0007
3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M
8.4 Application of Puttyfiller Specifications Ref :3513-MS-CIV-0007
3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M
8.5 Application of Primer Specifications Ref :3513-
MS-CIV-00073513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M
8.6 Application of First coat Specifications 3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M
8.7 Application of 2nd Coat Specifications 3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M
9
INSTALALTION OF DOORS & WINDOWS
9.1 Verification of opening size Dimension/AFC Drawings 3513-M3GE-1-71-0001, 3513-M3GE-1-71-0002
AFC Drawings Site Super Visor/Engr.
9.2 Fabrication Specifications AFC Drawings Site Super Visor/Engr. M M M
9.3 Installation Specifications AFC Drawings Site Super Visor/Engr. H W M
3513-M3GE-1-69-00019.4 Opening Directions AFC Drawings
3513 M3GE 1 69 0001, 3513-M3GE-1-69-0002, 3513-M3GE-1-69-0003
AFC Drawings Site Super Visor/Engr. H/W W M
9.5 Sealent application Visual Inspection Material Approvals Q.C Engineer M M M
9.6 Installation of hardwares Specifications 3513-M3GE-1-14-0008 Materials Approvals Q.C Engineer M M M
10 FLOOR COATING
10.1 Prepration of Surfaces Smooth Surface 3513-M3GE-1-14-0008 Approved Procedure Site Super Visor/Engr. M M
10.2 Application of Primer Specifications 3513-M3GE-1-14-0008 Material Approvals Q.C Engineer H/W W M
10.3 Application of Coating Specifications 3513-M3GE-1-14-0008 Material Approval Q.C Engineer H/W W M
Prepared by: PREMNATHReviewed by: KARUPPIAH Approved by:
W-Witness, H-Hold,R-Review,M-Monitoring, TP-Third Party
DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 5 OF 6
Date : RFI No :
Discipline: Civil Mechanical Electrical Instrumentation commissioning
Location:
Doc. /Drawing No: Rev:
Rev:
Rev:
Date of Inspection: Time of Inspection:
Description of activities for Inspection:
1. Site Engineer:
Date:
EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED
GC12105200
Name: Signature:
REQUEST FOR INSPECTION (RFI)
Date:
2. Contractor QA/QC Comments:
Date:
Approved Approved with Comments Rejected
3. QP comments:
Date:
DOPET/An Civil/RFI . Rev 0 - 27.10.13
Name: Signature:
Name: Signature:
Name: Signature:
DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 6 OF 6