civil works mstart

32
GB 33RF900B_V12-11 CIVIL WORK AND INSTALLATION M‘START INDEX 1. No enclosure Energy chain 6 •  Dimensions 6 •  Installation of parts 7 Catenary connection 8 •  Dimensions 8 •  Installation of parts 9 Measurements and cross sections10 •  No underchassis wash 10 •  With underchassis wash 12 Piping 14 •  Overground underchassis wash 14 •  Fitted underchassis wash 14 Frames and grates 15 2. With enclosure Energy chain 16 •  Dimensions 16 •  Installation of parts 17 Catenary connection 18 •  Dimensions 18 •  Installation of parts 19 Measurements and cross sections 20 •  No underchassis wash 20 •  With underchassis wash 22 Piping 24 •  Overground underchassis wash 24 •  Fitted underchassis wash 24 Frames and grates 25 3. Installation Overhead service connections 26 Underground connections 28 Electrical data 30 •  Installed on machine 30 •  on the machine 30 •  Electrical distribution cabinet 31 MOD. 4PD6000

Upload: sabah-muhanad

Post on 22-Jan-2018

142 views

Category:

Automotive


2 download

TRANSCRIPT

Page 1: Civil works mstart

G B33RF900B_V12-11

C I V I L W O R K A N D I N S T A L L A T I O N M ‘ S T A R T

I N D E X1. No enclosure

Energy chain 6•  Dimensions 6•  Installation of parts 7

Catenary connection 8•  Dimensions 8•  Installation of parts 9

Measurements and cross sections 10•  No underchassis wash 10•  With underchassis wash 12

Piping 14•  Overground underchassis wash 14•  Fitted underchassis wash 14

Frames and grates 152. With enclosure

Energy chain 16•  Dimensions 16•  Installation of parts 17

Catenary connection 18•  Dimensions 18•  Installation of parts 19

Measurements and cross sections 20•  No underchassis wash 20•  With underchassis wash 22

Piping 24•  Overground underchassis wash 24•  Fitted underchassis wash 24

Frames and grates 253. Installation

Overhead service connections 26

Underground connections 28

Electrical data 30•  Installed on machine 30•  on the machine 30•  Electrical distribution cabinet 31

M O D . 4 P D 6 0 0 0

Page 2: Civil works mstart

SAFETY 2SAFE PRACTICE AND SAFETY RULES

To guarantee your safety, please cooperate with the company at all times and obey the safety rules detailed here to help ensure that accidents are avoided. (Article 29. Safety at Work Act). The following list of obligations shall be respected by all workers carrying out work whether directly employed by ISTOBAL or subcontracted.

• Please make proper use of the personal protection equipment provided.

• Follow the instructions of your superiors, and any indications given by the person responsible for the facility.

• Keep tools and personal and collective protection equipment in good order. If you observe any deterioration in them, advise your superior immediately.

• Keep the work site clean and tidy.

• Advise your superiors and colleagues of any danger or risk that you perceive on the facility. In case of serious and imminent risk, do as indicated above while also ceasing to perform any activity which may add to such risk.

PREVENTIVE MEASURES

ISTOBAL, S.A. personnel and workers subcontracted by the company are to take into account the following preventive measures while carrying out work:

• Hand-held ladders are not permitted for performing jobs. For work where use of a scaffold is not physically possible or where its use would be an added risk, a platform step ladder is to be used.

• If a certified scaffold is used, follow the manufacturer's assembly instructions closely. Make sure it is in perfect condition before use. Do not place it near power lines. If the scaffold is moveable, put the brakes on all the wheels and use securing bars to stop it moving unexpectedly. Do not move the scaffold with workers on it. Do not leave tools or materials lying around on the scaffold.

• If a platform step ladder is used, it must only be used by duly trained and authorised personnel. Make sure that it is used in accordance with the instructions supplied with it.

• All waste generated is to be collected and removed from the work area as and when it is generated. The work area should be kept as clean as possible at all times.

• Make sure the work area is organised - do not leave materials and tools lying around as these could cause accidents.

• When materials are being loaded and unloaded with winches / cranes; materials are being lifted; heavy parts are being mounted, etc., make sure there are no workers underneath. Check this before starting to move anything.

CONDUCT ON SITE

• Station your vehicle in designated parking zones. Turn off the engine. Parking is not permitted in classified areas or where the vehicle would obstruct the passage of persons or vehicles.

• Inform the supervisor or person responsible for the facility of the presence of the vehicle and why it is there.

• Before starting work, put up signs and cordon off the areas where you will be setting up equipment such as winches, compressors, etc.

• After the work is completed, remove leftover waste from the work area, such as plastic, cardboard, wood, etc.

• Collect your tools and other equipment.

• Inform the Supervisor or person responsible for the facility that the work is completed and what the situation is now.

PROTECTION EQUIPMENT

Personal and collective protection equipment used should be appropriate to the task, certified with the mark, and display the corresponding inspection dates.

2

GB

Page 3: Civil works mstart

SAFETY2Personal protection equipment should give effective protection against the risks they are intended for. Such equipment should not constitute a risk in itself nor cause unnecessary inconvenience. The equipment should:

• Respond to the conditions existing in the workplace.

• Take into account the anatomy, physiology, and state of health of the operator.

• Fit the bearer properly after the pertinent adjustments.

• Where multiple risks are involved which require several types of personal protection equipment to be used together, they should be mutually compatible and maintain their level of efficiency in relation to the corresponding risk or risks.

PERSONAL PROTECTION EQUIPMENT

COMPULSORY PROTECTION

Safety footwear.Mechanical protection, waterproof, and with a dielectric sole, anti-slip, and anti-perforation protection.

High visibility reflective vest.

Safety helmet.

Safety gloves.

OTHER PROTECTION DEPENDING ON THE WORK TO BE DONE

Tool belt.

3

GB

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

Page 4: Civil works mstart

SAFETY 2PERSONAL PROTECTION EQUIPMENT

OTHER PROTECTION DEPENDING ON THE WORK TO BE DONE

Safety harness.For work at a height of 2 m. and above.

Back support belt.For tasks which require unusual positions to be adopt-ed, or straining.

High impact safety goggles.Use of drills, radial saws, etc.

Ear protection.Use of drills, radial saws, etc.

Welding screens and masks with metal smoke filter.Use of welding sets.

4

GB

Page 5: Civil works mstart

SAFETY2COLLECTIVE PROTECTION EQUIPMENT

Safety tape and conesTo indicate and cordon off the work area.

No entry sign.To prevent unauthorized access, and indicate the need for PPE to be worn.

Portable fire extinguisher.

Fire blankets For work generating heat (welding, radial saws, etc.).

5

GB

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

Page 6: Civil works mstart

6

G B

NO ENCLOSURE

Between rails: 2700±5

Between rails: 2854±5

Between rails: 2500±5

No enclosure Energy chainDimensions

The distance between the underside of the foot and the floor must not exceed 10 mm.If the space K or L is smaller than recommended (500 mm), you will need to install the anti-smashing system and wire or rubber switch.

Z

Y

Detail Z

Detail Y

K D

B

E

M

C

N

P

Q

AF

H

L

Measurements in mm.

Left side connection

Right side connection

Page 7: Civil works mstart

7

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

NO ENCLOSURE

Y

Installation of parts

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000D Chassis width 3520 3520 3520 3520 3520 3520

ERecommended 4520 4520 4520 4520 4520 4520

Minimum 4000 4000 4000 4000 4000 4000

Without cutting supporting arm 4924 4924 4924 4924 4924 4924

F Chassis height 3113 3113 3313 3313 3513 3513

HRecommended 2260 2260 2260 2260 2260 2260

Minimum 2040 2040 2040 2040 2040 2040

Without cutting supporting arm 2664 2664 2664 2664 2664 2664

KRecommended 500 500 500 500 500 500

Minimum 280 280 280 280 280 280

Without cutting supporting arm 904 904 904 904 904 904

LRecommended 500 500 500 500 500 500

Minimum 200 200 200 200 200 200

M Max. vehicle length 6000 7000 6000 7000 6000 7000

N Bay length 9500 10500 9500 10500 9500 10500

P Between centres of posts 4320 4820 4320 4820 4320 4820

Q Between centres of rails 2854 2854 2854 2854 2854 2854

Y Between centring guides 2050 2050 2050 2050 2050 2050

Measurements in mm.

Page 8: Civil works mstart

8

G B

NO ENCLOSURE

The distance between the underside of the foot and the floor must not exceed 10 mm.If the space K or L is smaller than recommended (500 mm), you will need to install the anti-smashing system and wire or rubber switch. Measurements in mm.

Catenary connectionDimensions

Between rails: 2700±5

Between rails: 2854±5

Between rails: 2500±5

Z

Y

Detail Z

Detail Y

K D

B

E

MC

N

P

Q

AF

H

L

Left side connection

Right side connection

Page 9: Civil works mstart

9

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

NO ENCLOSURE

Y

Installation of parts

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000D Chassis width 3520 3520 3520 3520 3520 3520

ERecommended 4520 4520 4520 4520 4520 4520

Minimum 4000 4000 4000 4000 4000 4000

Without cutting supporting arm 4920 4920 4920 4920 4920 4920

F Chassis height 3113 3113 3313 3313 3513 3513

HRecommended 2260 2260 2260 2260 2260 2260

Minimum 2040 2040 2040 2040 2040 2040

Without cutting supporting arm 2664 2664 2664 2664 2664 2664

KRecommended 500 500 500 500 500 500

Minimum 280 280 280 280 280 280

Without cutting supporting arm 904 904 904 904 904 904

LRecommended 500 500 500 500 500 500

Minimum 200 200 200 200 200 200

M Max. vehicle length 6000 7000 6000 7000 6000 7000

N Bay length 9500 10500 9500 10500 9500 10500

P Between centres of posts 3950 4950 3950 4950 3950 4950

Q Between centres of rails 2854 2854 2854 2854 2854 2854

Y Between centring guides 2050 2050 2050 2050 2050 2050

Measurements in mm.

Page 10: Civil works mstart

10

G B

NO ENCLOSURE

Measurements and cross sectionsNo underchassis wash

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000N Bay length 9500 10500 9500 10500 9500 10500

Q Between centres of rails 2854 2854 2854 2854 2854 2854

S Bay width 4830 4830 4830 4830 4830 4830

T Distance connection box (Energy chain) 4926 5426 4926 5426 4926 5426

W Length of entry grid, no Under chassis wash 3500 4500 3500 4500 3500 4500

Surface of bay treated with non-slip finish.Any guarantees as to the dimensions of the concrete beds depend on the floor being properly compacted.The dimensions of the frames and grates can be consulted on page 15.

A

B

C C’

B’

D’ D

A’

S

T

N

W

Q

Measurements in mm.

Page 11: Civil works mstart

11

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

NO ENCLOSURE

Energy chain or catenary connection, right or left (depending on the layout of the facility).

SECTION A - A’

SECTION B - B’

SECTION C - C’

SECTION D - D’

HEA Section 100x9000 mmNot supplied by Istobal SA

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

PVC pipe D160 mm LPN 30x3 mm

Drain pipe D50 mm

Hollow brick wall 250x120x90 laid with M-40 morter

Measurements in mm.

Concrete FCK=25 n/mm2

Macadam

Page 12: Civil works mstart

12

G B

NO ENCLOSURE

A

B

C C’

B’

D’ D

A’

With underchassis wash

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000N Bay length 9500 10500 9500 10500 9500 10500

Q Between centres of rails 2854 2854 2854 2854 2854 2854

S Bay width 4830 4830 4830 4830 4830 4830

T Distance connection box (Energy chain) 4926 5426 4926 5426 4926 5426

U Length of entry grid, with Under chassis wash 2000 3000 2000 3000 2000 3000

Surface of bay treated with non-slip finish.Any guarantees as to the dimensions of the concrete beds depend on the floor being properly compacted. The dimensions of the frames and grates can be consulted on page 15.

S

T

N

U

Q

Measurements in mm.

Page 13: Civil works mstart

13

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

NO ENCLOSURE

Energy chain or catenary connection, right or left (depending on the layout of the facility).

SECTION A - A’

SECTION B - B’

SECTION C - C’

SECTION D - D’

HEA Section 100x9000MMNot supplied by Istobal SA

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s Rebar mat 150x150x6 mm B 500 s

PVC pipe D160 mm LPN 30x3 mm

Drain pipe D50 mm

Hollow brick wall 250x120x90 laid with M-40 morter

Rebar mat 150x150x6 mm B 500 s

Measurements in mm.

Concrete FCK=25 n/mm2

Macadam

Page 14: Civil works mstart

14

G B

NO ENCLOSURE

PipingOverground underchassis wash Mod. 4827400

Fitted underchassis wash Mod. 4300400 or 4300700

Self-service command post

Positioning by platform

To main drain

To shop terminal for self-service code

A Flexible PVC pipe D50 mmB PVC pipe D160 mmC PVC pipe D30 mmD 1” pipe DIN 24401 Energy chain connection box2 Catenary connection box

Self-service command post

Positioning by platform

To main drain

To shop terminal for self-service code

Measurements in mm.

B

A

A

A

A

A

A

A

A

A

A

B

D C

D C

1 2

1 2

Page 15: Civil works mstart

15

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

NO ENCLOSURE

Frames and gratesFrame for fitted underchassis wash (not supplied by Istobal).

Grate with 820x1516mm frame ref. 2375600 (optional)

Anchoring

“L” Section 60x60x8 mm

Prefabricated guttering

Prefabricated guttering

Prefabricated guttering

Prefabricated guttering

Measurements in mm.

Page 16: Civil works mstart

16

G B

WITH ENCLOSURE

With enclosure Energy chainDimensions

Measurements in mm.

Between rails: 2700±5

Between rails: 2854±5

Between rails: 2500±5

Left side connection

Right side connection

MC

Q

R

P

A

G

J

H

E

Z

Detail Z

Detail YY

The distance between the underside of the foot and the floor must not exceed 10 mm.With the enclosure of 4500 mm. you will need to install the anti-smashing system and wire or rubber switch.

Page 17: Civil works mstart

17

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

WITH ENCLOSURE

Y

Measurements in mm.

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000

ERecommended 4520 4520 4520 4520 4520 4520

Minimum 4000 4000 4000 4000 4000 4000

Without cutting supporting arm 4924 4924 4924 4924 4924 4924

GRecommended 3550 3550 3750 3750 3950 3950

Minimum 3150 3150 3350 3350 3550 3550

HRecommended 2260 2260 2260 2260 2260 2260

Minimum 2040 2040 2040 2040 2040 2040

Without cutting supporting arm 2664 2664 2664 2664 2664 2664

J Height service line 3084 3084 3284 3284 3484 3484

M Max. vehicle length 6000 7000 6000 7000 6000 7000

P Between centres of posts 4320 4820 4320 4820 4320 4820

Q Between centres of rails 2854 2854 2854 2854 2854 2854

R Length bay enclosure 10100 11100 10100 11100 10100 11100

Y Between centring guides 2050 2050 2050 2050 2050 2050

Installation of parts

Page 18: Civil works mstart

18

G B

WITH ENCLOSURE

Catenary connectionDimensions

Between rails: 2700±5

Between rails: 2854±5

Between rails: 2500±5

Left side connection

Right side connection

MC

Q

R

P

A

GJ

H

E

Z

Detail Z

Detail YY

Measurements in mm.

The distance between the underside of the foot and the floor must not exceed 10 mm.With the enclosure of 4500 mm. you will need to install the anti-smashing system and wire or rubber switch.

Page 19: Civil works mstart

19

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

WITH ENCLOSURE

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000

ERecommended 4520 4520 4520 4520 4520 4520

Minimum 4000 4000 4000 4000 4000 4000

Without cutting supporting arm 4924 4924 4924 4924 4924 4924

GRecommended 3550 3550 3750 3750 3950 3950

Minimum 3150 3150 3350 3350 3550 3550

HRecommended 2260 2260 2260 2260 2260 2260

Minimum 2040 2040 2040 2040 2040 2040

Without cutting supporting arm 2664 2664 2664 2664 2664 2664

J Height service line 2364 2364 2564 2564 2764 2764

M Max. vehicle length 6000 7000 6000 7000 6000 7000

P Between centres of posts 3950 4950 3950 4950 3950 4950

Q Between centres of rails 2854 2854 2854 2854 2854 2854

R Length bay enclosure 10100 11100 10100 11100 10100 11100

Y Between centring guides 2050 2050 2050 2050 2050 2050

Y

Installation of parts

Measurements in mm.

Page 20: Civil works mstart

20

G B

WITH ENCLOSURE

Surface of bay treated with non-slip finish.Any guarantees as to the dimensions of the concrete beds depend on the floor being properly compacted. The dimensions of the frames and grates can be consulted on page 25.

A

B

C C’

B’

D’ D

A’

V

Q

R

W

Measurements in mm.

Measurements and cross sectionsNo underchassis wash

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000Q Between centres of rails 2854 2854 2854 2854 2854 2854

R Length bay enclosure 10100 11100 10100 11100 10100 11100

VWidth for enclosure 4.5 m. 5000 5000 5000 5000 5000 5000

Width for enclosure 4.8 m. 5300 5300 5300 5300 5300 5300

W Length of entry grid, no Underchassis wash 3500 4500 3500 4500 3500 4500

Page 21: Civil works mstart

21

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

SECTION C - C’

SECTION D - D’

WITH ENCLOSURE

Energy chain or catenary connection, right or left (depending on the layout of the facility).

SECTION A - A’

SECTION B - B’

HEA Section 100x9000 mmNot supplied by Istobal SA

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

PVC pipe D160 mm LPN 30x3 mm

Drain pipe D50 mm

Hollow brick wall 250x120x90 laid with M-40 morter

AEH-400 NAEH-400 N

AEH-400 N AEH-400 N

Measurements in mm.

Concrete FCK=25 n/mm2

Macadam

Rebar mat 150x150x6 mm B 500 s Rebar mat 150x150x6 mm B 500 s

Page 22: Civil works mstart

22

G B

WITH ENCLOSURE

Surface of bay treated with non-slip finish.Any guarantees as to the dimensions of the concrete beds depend on the floor being properly compacted. The dimensions of the frames and grates can be consulted on page 25.

With underchassis wash

Measurements in mm.

V

Q

R

U

A

B

C C’

B’

D’ D

A’

A Max. vehicle height 2300 2500 2700B Max. vehicle width 2400C Rail length 9000 10000 9000 10000 9000 10000Q Between centres of rails 2854 2854 2854 2854 2854 2854

R Length bay enclosure 10100 11100 10100 11100 10100 11100

U Length of entry grid, with Under chassis wash 2000 3000 2000 3000 2000 3000

VWidth for enclosure 4.5 m. 5000 5000 5000 5000 5000 5000

Width for enclosure 4.8 m. 5300 5300 5300 5300 5300 5300

Page 23: Civil works mstart

23

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

WITH ENCLOSURE

Energy chain or catenary connection, right or left (depending on the layout of the facility).

SECTION A - A’

SECTION B - B’

SECTION C - C’

SECTION D - D’

HEA Section 100x9000 mmNot supplied by Istobal SA

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

PVC pipe D160 mm LPN 30x3 mm

AEH-400 NAEH-400 N

AEH-400 N AEH-400 N

Drain pipe D50 mm

Hollow brick wall 250x120x90 laid with M-40

morter

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

Rebar mat 150x150x6 mm B 500 s

Measurements in mm.

Concrete FCK=25 n/mm2

Macadam

Page 24: Civil works mstart

24

G B

WITH ENCLOSURE

A Flexible PVC pipe D50 mmB PVC pipe D160 mmC PVC pipe D30 mmD 1” pipe DIN 24401 Energy chain connection box2 Catenary connection box

PipingOverground underchassis wash Mod. 4827400

Measurements in mm.

Fitted underchassis wash Mod. 4300400 or 4300700

Self-service command post

Positioning by platform

To main drain

To shop terminal for self-service code

Self-service command post

Positioning by platform

To main drain

To shop terminal for self-service code

B

A

A

A

A

A

A

A

A

A1 2

A

B

D C

D C

1 2

Page 25: Civil works mstart

25

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

WITH ENCLOSURE

Frames and gratesFrame for fitted underchassis wash (not supplied by Istobal).

Grate with 820x1516mm frame ref. 2375600 (optional)

Anchoring

Prefabricated guttering

Prefabricated guttering “L” Section 60x60x8 mm

Prefabricated guttering

Prefabricated guttering

Measurements in mm.

Page 26: Civil works mstart

INSTALATION 4

Hyd

roca

rbon

se

para

tor

Slu

dge

settl

er

Pre

-trea

ted

wat

er

tank

Dem

iner

alis

ed

wat

er ta

nk

Dad

o tru

nkin

g 15

0x60

mm

.

Ser

vice

line

s to

mac

hine

Inst

alla

tion

Ove

rhea

d se

rvic

e co

nnec

tions

613

1415

10

7

7

1

10

1

23

25

2

9

12

16

11

A

M

CD

EH

IF

F

BG

JK

L

11

26

G B

Page 27: Civil works mstart

INSTALATION4A

Ele

ctric

al d

istri

butio

n ca

bine

t

BC

ompr

esso

r

CP

hysi

cal r

ecyc

ler 5

m3/

h

D50

0 l s

tain

less

ste

el ta

nk (o

ptio

nal i

f rec

ycle

r is

not i

nsta

lled)

ER

ecyc

led

wat

er p

ump

F2-

way

dis

tribu

tor 3

0UQ

000

from

402

6400

GU

nder

chas

sis

was

h pu

mp

(with

pow

er s

witc

hing

)

H16

0 ba

r hig

h pr

essu

re w

heel

was

h pu

mp

I50

0 l s

tain

less

ste

el ta

nk

J80

bar

hig

h pr

essu

re p

ump

KR

ever

se o

smos

is d

emin

eral

iser

uni

t 560

0 L/

24 h

ours

LD

emin

eral

ised

wat

er p

ump

MU

nder

chas

sis

was

h

1P

VC

pip

e D

30m

m

2Fl

exib

le P

VC

pip

e D

50m

m

3P

VC

pip

e D

75m

m

4P

VC

pip

e D

110m

m

5P

VC

pip

e D

160m

m

61/

2” p

ipe

DIN

244

0

71”

pip

e D

IN 2

440

81”

pip

e D

IN 2

440

or p

olye

thyl

ene

D32

mm

91

1/2"

pip

e D

IN 2

440

or p

olye

thyl

ene

D50

mm

10P

olye

thyl

ene

pipe

D32

mm

11P

olye

thyl

ene

pipe

D40

mm

12Va

riopr

ess

hose

19x

29

1315

bar

med

ium

pre

ssur

e si

de p

rew

ash

1416

0 ba

r hig

h pr

essu

re w

heel

was

h

15H

igh

pres

sure

pre

was

h

16E

lect

ricity

to m

achi

ne

Elec

tric

ity s

uppl

y

Run

the

elec

trica

l lin

e un

derg

roun

d to

the

mai

n di

strib

utio

n bo

ard

thro

ugh

a D

100

flexi

ble

PV

C h

ose.

Cal

cula

tion

of th

e w

ire s

ize

of th

e m

ain

elec

trici

ty s

uppl

y de

pend

s on

the

sum

of s

imul

tane

ous

curr

ents

(use

the

elec

trica

l dat

a ta

ble

on

page

26)

it s

houl

d be

3F+

N+P

E fo

r 400

V a

nd 3

F +

PE

for 2

30 V

. Len

gth

of th

e ca

ble

alon

g th

e gr

ound

= 4

000

mm

.P

repa

re th

e el

ectri

cal c

abin

et in

acc

orda

nce

with

the

optio

nal e

xtra

s in

stal

led.

Wat

er s

uppl

y

Run

the

mai

ns w

ater

line

und

ergr

ound

thro

ugh

a 1

1/2”

pip

e D

IN 2

440

with

a m

inim

um fl

ow ra

te o

f 500

0 L/

h an

d 3

to 6

bar

s of

pr

essu

re.

Dep

th o

f the

pip

es u

nder

grou

nd -

100

mm

app

rox.

All

DIN

244

0 pi

pes

are

to b

e ga

lvan

ised

.A

ll po

lyet

hyle

ne p

ipes

mus

t be

able

to s

tand

at l

east

10

bar o

f pre

ssur

e. T

he le

ngth

of t

he s

uctio

n pi

pe m

ust n

ot e

xcee

d 10

000

mm

an

d th

e su

ctio

n de

pth

mus

t not

exc

eed

3000

mm

.

Air

supp

lyM

inim

um p

ress

ure

7 ba

r

Was

te d

ispo

sal s

tage

sP

hysi

cal r

ecyc

ler;

see

book

let r

ef: 3

1NX

000

Bio

logi

cal r

ecyc

ler;

see

book

let r

ef: 3

1NX

200

27

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

Page 28: Civil works mstart

INSTALATION 4

7

4

1

23

6

6

5

5

10

5

9

13

1415

10

11

12

11

7

7A

M

CD

EH

IF

F

BG

JK

L

4,000 mm.D

ado

trunk

ing

150x

60m

m.

Ser

vice

line

s to

m

achi

ne

Con

nect

ions

box

Und

ergr

ound

con

nect

ions

Hyd

roca

rbon

se

para

tor

Slu

dge

settl

er

Pre

-trea

ted

wat

er

tank

Dem

iner

alis

ed

wat

er ta

nk

28

G B

Page 29: Civil works mstart

INSTALATION4A

Ele

ctric

al d

istri

butio

n ca

bine

t

BC

ompr

esso

r

CP

hysi

cal r

ecyc

ler 5

m3 /h

D50

0 l s

tain

less

ste

el ta

nk (o

ptio

nal i

f rec

ycle

r is

not i

nsta

lled)

ER

ecyc

led

wat

er p

ump

F2-

way

dis

tribu

tor 3

0UQ

000

from

402

6400

GU

nder

chas

sis

was

h pu

mp

(with

pow

er s

witc

hing

)

H16

0 ba

r hig

h pr

essu

re w

heel

was

h pu

mp

I50

0 l s

tain

less

ste

el ta

nk

J80

bar

hig

h pr

essu

re p

ump

KR

ever

se o

smos

is d

emin

eral

iser

uni

t 560

0 L/

24 h

ours

LD

emin

eral

ised

wat

er p

ump

MU

nder

chas

sis

was

h

1P

VC

pip

e D

30m

m

2Fl

exib

le P

VC

pip

e D

50m

m

3P

VC

pip

e D

75m

m

4P

VC

pip

e D

110m

m

5P

VC

pip

e D

160m

m

61/

2” p

ipe

DIN

244

0

71”

pip

e D

IN 2

440

81”

pip

e D

IN 2

440

or p

olye

thyl

ene

D32

mm

91

1/2"

pip

e D

IN 2

440

or p

olye

thyl

ene

D50

mm

10P

olye

thyl

ene

pipe

D32

mm

11P

olye

thyl

ene

pipe

D40

mm

12Va

riopr

ess

hose

19x

29

1315

bar

med

ium

pre

ssur

e si

de p

rew

ash

1416

0 ba

r hig

h pr

essu

re w

heel

was

h

15H

igh

pres

sure

pre

was

h

16E

lect

ricity

to m

achi

ne

Elec

tric

ity s

uppl

y

Run

the

elec

trica

l lin

e un

derg

roun

d to

the

mai

n di

strib

utio

n bo

ard

thro

ugh

a D

100

flexi

ble

PV

C h

ose.

Cal

cula

tion

of th

e w

ire s

ize

of th

e m

ain

elec

trici

ty s

uppl

y de

pend

s on

the

sum

of s

imul

tane

ous

curr

ents

(use

the

elec

trica

l dat

a ta

ble

on

page

26)

it s

houl

d be

3F+

N+P

E fo

r 400

V a

nd 3

F +

PE

for 2

30 V

. Len

gth

of th

e ca

ble

alon

g th

e gr

ound

= 4

000

mm

.P

repa

re th

e el

ectri

cal c

abin

et in

acc

orda

nce

with

the

optio

nal e

xtra

s in

stal

led.

Wat

er s

uppl

y

Run

the

mai

ns w

ater

line

und

ergr

ound

thro

ugh

a 1

1/2”

pip

e D

IN 2

440

with

a m

inim

um fl

ow ra

te o

f 500

0 L/

h an

d 3

to 6

bar

s of

pr

essu

re.

Dep

th o

f the

pip

es u

nder

grou

nd -

100

mm

app

rox.

All

DIN

244

0 pi

pes

are

to b

e ga

lvan

ised

.A

ll po

lyet

hyle

ne p

ipes

mus

t be

able

to s

tand

at l

east

10

bar o

f pre

ssur

e. T

he le

ngth

of t

he s

uctio

n pi

pe m

ust n

ot e

xcee

d 10

000

mm

an

d th

e su

ctio

n de

pth

mus

t not

exc

eed

3000

mm

.

Air

supp

lyM

inim

um p

ress

ure

7 ba

r

Was

te d

ispo

sal s

tage

sP

hysi

cal r

ecyc

ler;

see

book

let r

ef: 3

1NX

000

Bio

logi

cal r

ecyc

ler;

see

book

let r

ef: 3

1NX

200

29

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

Page 30: Civil works mstart

INSTALATION 4Electrical dataInstalled on machine

Model Description PowerkW

230 V Current

Simultane-ous A

400 VCurrent

Simultane-ous A

Sum currents

SimultaneousA

Rollover M’START (no dryer) 3.5 17.2 13.1

Rollover M’START (top dryer 2X3.8KW) 7.49 30.4 20.6

Rollover M’START (top dryer 2X3.8kW + side 2X3kW) 13.49 53.4 33.8

4300200 Heater products column 0.5 2 2

Values for calculating main supply Total amperes

on the machine

Model Description PowerkW

230V 400V 230 V Current

Simultane-ousA

400 VCurrent

Simultane-ousA

Sum currents

Simultane-ousA

Wire sizemm2 AGL

Wire sizemm2

AGL

Rollover (*) (*)x3F+PE (*) (*)

x3F+N+PE (*) (*) (*)

33HR800 Water pump 3 bar 140l/min (1st water)

1.5 1.5x3F+PE 10 1.5

x3F+PE 6 6 3.5

33HS600 Water pump 3 bar 125l/min (2nd water)

33HS900 Water pump 10 bar 90l/m 3 2.5x3F+PE 16 1.5

x3F+PE 10 11.5 6.6

33HT600 Water pump 15 bar 120l/m 5.5 4

x3F+PE 25 2.5x3F+PE 16 20 11.5

33YC700 Water pump 80 bar 42l/m 6 6x3F+PE 32 2.5

x3F+PE 20 24 14

Water pump 70 bar 21l/m onboard 3 2.5

x3F+PE 16 1.5x3F+PE 10 12 7

Physical recycler 5m3/h

5 4x3F+PE 25 4

x3F+N+PE

2518 15

Biological recycler 6m3/h

4DA1 Osmosis unit (with optional extras) 4 4

x3F+PE 20 4x3F+N+PE 20 16.5 15

4DA2 Osmosis unit(with optional extras) 6 4

x3F+PE 25 4x3F+PE 25 22 19

Compressor 1.5kw (min.) 1.5 1.5x3F+PE 10 1.5

x3F+PE 6 6 3.5

Values for calculating main supply Total amperes

30

G B

Page 31: Civil works mstart

INSTALATION4El

ectr

ical

dis

trib

utio

n ca

bine

t

Not

sup

plie

d by

Isto

bal

230

/ 400

VR

OLL

OV

ER

PU

MP

1ST

WAT

ER

PU

MP

2ND

W

ATE

RW

ATE

R P

UM

P 10

BA

R 9

0L/M

WAT

ER

PU

MP

15 B

AR

120

L/M

W

ATE

R P

UM

P 80

BA

R 4

2L/M

OS

MO

SIS

UN

IT

4DA

1O

SM

OS

IS U

NIT

4D

A2

CO

MP

RE

SS

OR

QF1

QF2

QF3

QF4

QF5

QF6

QF9

QF1

0Q

F11

400V

**

6A10

A16

A20

A20

A20

A6A

230V

**

10A

16A

25A

32A

25A

25A

10A

Trip

ping

cu

rve

CC

CC

CC

C

* The

gau

ge o

f the

se d

evic

es w

ill d

epen

d on

the

valu

e in

am

pere

s de

fined

as

"mai

n su

pply

" by

the

sum

of t

he s

imul

tane

ous

curr

ents

.

31

G B

CIV

IL W

OR

K A

ND

IN

ST

AL

LA

TIO

N

Page 32: Civil works mstart

G BINSTALATION