    Inspection particulars of Axle counters

    Station: Date of Inspection

    Signature and Designation of SSE/JE/Signal

    Axlecounter No

    Conditionof trackdevices

    Conditionof EJBearth

    Cleanlinessof EJB

    Location

    Proper fixing &Functioning of

    EJB

    Properadjustment

    of trackdevices

    Checking ofparameters

    of EJB

    Checking ofparametersof Evaluatorand resetting

    unitAny other problem noticed during

    inspection

  • 8/6/2019 Inspection Format JES_SSES

    2/14

    Inspection particulars of Signals

    Station: Date of Inspection

    Any other problem noticedSignal No

    Condition offittings of

    signal postand sealing of

    unit withgasket

    Conditionof earth

    Cleanlinessof LED Unit

    Properadjustment of

    Current regulator

    Voltage &cutrrent ofLED signal

    aspect

    Condition ofrelay and otherfittings inside

    signal location.

  • 8/6/2019 Inspection Format JES_SSES

    3/14

    Signature and Designation of SSE/JE/Signal

  • 8/6/2019 Inspection Format JES_SSES

    4/14

    Inspection particulars of Points

    ation: Date of Insp

    oint No

    Signature an

    Conditionof fittings

    insidepoint

    machine

    Condition ofground

    connections

    Cleanlinessand

    lubricationof Pt

    machine

    Setting of point inproper

    correspondencewith panel

    Obstructiontest

    Tracklocking

    test

    Emergencyoperation

    and counterfunctioning

    Crankhandlecontact

    functioning

  • 8/6/2019 Inspection Format JES_SSES

    5/14

    ion

    Any other problem noticed

    Designation of SSE/JE/Signal

  • 8/6/2019 Inspection Format JES_SSES

    6/14

    Inspection particulars of Track circuits

    ation: Date of Inspection

    F/end V/I R/End V/I

    TR terminal voltage

    Drainage Any other problem noticedWith TSRack cctNo

    Conditionof Trackleads&

    jumpers

    Conditionof OHEbonds

    Conditionof G/Joints

    Condition ofTrack relay

    ,chokes & fusesWith outTSR

  • 8/6/2019 Inspection Format JES_SSES

    7/14

    Signature and Designation of SSE/JE/Signal

  • 8/6/2019 Inspection Format JES_SSES

    8/14

    Inspection particulars of Electronic Interlocking System

    Station:

    Sr No Directive Remarks

    1

    2

    3

    4

    5

    6

    7

    8 Any other problem noticed

    Signature and Designation of SSE/JE/Signal

    Date of Inspection:

    Check that all the modules in the EI Card files of bothsystems are properly inserted & are in correct state andall normal indications on modules are available

    Physically check and ensure that wiring,fuses etc are inorder and cable entry holes are properly plugged toavoid lizards,rats etc in all panels and modules of thesystem..

    Ensure that the total EI system is clean and itspheripherals are cleaned with blower and brush so that

    they are free of dust and dirt

    Check that all input supplies 110V DC, 24V DC, 12V DC&5V DC are available in proper limits .Also check thatAC 230V supply for Optg PC & Maint PC from Inverter isavailable in proper limit

    Ensure that both the EI systems are in good workingcondition and ensure that the change over arrangementsystem is also functioning

    Take Event and Error log report for the system in theMaintenance VDU

    a)Ensure the rigid connectivity of ring earth to the EIsystem & the earth value is less than 1ohm.

    b)Observe the SPD of all input and out put connectionsfor any burning or damage

  • 8/6/2019 Inspection Format JES_SSES

    9/14

    Inspection particulars of Interlocked LC Gate

    ation: Date of Inspection

    Any other problem not

    Signature and Designation of SSE/JE/Signal

    C Gateo & KMNo

    Condition &functioning of

    boom,pedestal,lockpost , winch ,lever

    frame,wire, insulatorand other

    mechanical fittings

    Effectivenessof boomlocking

    Conditionof hooter

    Conditionof roadsignals

    Interlockingwith stationsignals and

    panelFunctioning

    of EKTGate

    telephone

    Angle ofbooms in

    Opened andclosed

    conditions

  • 8/6/2019 Inspection Format JES_SSES

    10/14

    PREVENTIVE MAINTENANCE CHECK LIST FOR IPS

    Station:

    Type of Check Description of maintainance work to be carried out Remarks

    1

    2 Main supply Check the main AC input supply .It should be 150 to 275v.

    3b)Observe the SPD of all input and out put connections for any burning or damage

    4

    5

    6 SMPS Panel

    a) Observe that all normal indications are available on all modules

    b)Check the no of SMPS Modules in use .It should be in (N+I ) configuration.

    c)Check that with the SMPS Modules switched on , all the DC Load should work on it

    e) Check with SMPS modules switch OFF, all load should work on battery.

    f) Take the measurements of Input AC Voltage/Current & Out put DC Voltage/Current

    g) Check that all the cooling fans are in working order.

    7

    a) Observe that all normal indications are available on all modules

    b)Check the auto change over in IPS

    c)Check the lightening and surge protection devices in the panel

    e) Check the input voltage to CVT on display unit and ensure that CVT is in working order

    Sro

    Measurementsof Battery

    a)Switch off the SMPS Modules and after 4Hrs take the voltage reading of cells( The Individualcell voltage should not fall below 1.9V and specific gravity should not be less than 1200 )

    b)Then switch on the SMPS Modules and see that all modules are on and all are equally sharingthe load .i.e, their voltage and current should be same

    Checking of

    Earthconnection

    a)Ensure the rigid connectivity of earth to the all modules of all the panels of the IPS system &earthing of the armour of power cables

    VisualInspection and

    cleaning

    a)Check that all the modules in the SMPS ,ACDP & DCDP Panels are properly inserted & are incorrect state and all normal indications on modules are available

    b)Physically check and ensure that wiring,fuses etc are in order and cable entry holes are properlyplugged to avoid lizards,rats etc in all panels and modules of the system..

    c)Check the Cleanliness of the total IPS system and its pheripherals and ensure that they arefree of dust and dirt

    Checking thefunctioning ofDSCA Module

    Check one by one all functions by operating the buttons on key board on the DSCA Module andensure that all are functioning properly& proper indications are displayed on the LCD Screen andensure that all voltage limits are adjusted properly.

    d)Check the voltage of each module & keep voltage setting for float and boost to same valuewithin 0.1V

    AC DistrtibutionPanel

    d) Check the input voltage to Inverter display unit and ensure that both the inverters are inworking order.

    f) Conduct the automatic load transfer test by switching off the inverters one by one and ensurethat the load is transferring to CVT when both the inverters are switched off.

  • 8/6/2019 Inspection Format JES_SSES

    11/14

    Type of Check Description of maintainance work to be carried out Remarks

    8

    a) Observe that all normal indications are available on all modules

    c) Check the input DC voltage( It shall be within 98--138V)

    d)Check the out put voltage of each DC-DC Converter module.

    9

    a) Observe that all normal indications are available on the Remote Alarm Panel In the SM Room

    b)Physically check and ensure that wiring,fuses etc are in order in the panel

    0

    Signature and Designation of SS

    g) Check the out put voltage of all signal /track transformer modules and ensure that all transformermodules are in working order.

    Sro

    DC DistrtibutionPanel

    b)Check the no of DC-DC Converter Modules in use for each circuit .It should be in (N+I )configuration. And ensure that all converter modules are in working order.

    e)Check the DC under voltage across terminal point .It should be 98V.Check the DC over voltageacross terminal point .It should be 138V

    Remote AlarmPanel

    c)Check and ensure that thedifferent alarms and indications on the panel are all functioning as perthe specified conditions .

    Any otherobservations

  • 8/6/2019 Inspection Format JES_SSES

    12/14

    Inspection particulars of Panel & VDU

    Station:

    Sr No Directive Remarks

    1

    2

    3

    4

    5

    6 Check the intigrity of the SM'Key in the panel

    7

    8

    Ensure the rigid connectivity of earth to the Panel.

    9 Any other problem noticed

    Signature and Designation of SSE/JE/Signal

    Date of Inspection:

    Check that all the normal indications are available in thepanel .

    b)Physically check and ensure that the panel surfaceand the interior is clean and wiring inside panel is inorder .Cable entry holes are properly plugged to avoidlizards,rats etc into the panel and all dominos with theircomponents are in proper position

    Ensure that proper sealing and locking arrangement ofthe panel and the emergency operation buttons

    Check that all the indications in the panel are in correctcorrespondence with the panel operations and trainoperations at the station.

    Conduct all emergency opeartions like emergency routerelease , signal cancellation ,emergency point operation ,calling on signal operation etc on the panel and checkthe counter readings and tally them with the numberrecorded in the register.

    Check the change over between PC &Panel and ensurethat all operations are possible from both PC and Panel

  • 8/6/2019 Inspection Format JES_SSES

    13/14

    Inspection particulars of Datalogger

    Station: Date of Inspection :

    Type of Check Description of maintainance work to be carried out Remarks

    1

    c) Check the input voltage of charger( It shall be with in 180-260V)

    2

    3

    b)Observe all GDT for any burning or damage

    4

    5

    6

    7b) Ensure that data is transmitting from both ports

    8 FAS Check

    Check the working of the following software functions in FAS

    b)On line simulation of with all options in submenus

    c) Track Off simulation with all options in submenus

    d) Report software with all options in submenus

    9 Printer check

    Signature and Designation of SSE/JE/Sign

    SrNo

    Battery charger& Battery

    a)Switch off the battery charger and after 15min take the voltagereading of cells( Total battery voltage shall not be less than 24V)

    b)Then switch on the charger and see that the charger shall asumeboost mode and then it changes to float mode

    DC-DCConverters

    Measure the DC-DC Converters output voltage ( It shall not be lessthan 24V-28V)

    Checking ofEarth

    a)Ensure the rigid connectivity of earth to the datalogger & earthing ofthe armour of quad cable

    VisualInspection

    a)Check that all the modules and cards in the datalogger are properlyinserted & are in correct state and all normal indications on modulesare available

    b)Physically check and ensure that wiring,fuses etc are in order andcable entry holes are properly plugged to avoid lizards,rats etc.

    c)Ensure that the total datalogger system and its pheripherals aremaintained clean

    Checking ofDatalogger time

    Check and ensure that the datalogger time & FAS time issynchronising with the station time

    Checking of keyboard functions

    Check one by one all functions by operating the buttons on key boardon the datalogger and ensure that all are functioning properly&proper indications are displayed on the LCD Screan

    Connectivity tonet work

    a) Observe that all normal indications are available on modem card/

    separate modem

    c)Confirm from the person at the CMU that all the current data fromthe datalogger is correctly transmitted to the CMU through net work.

    a) Check the correct functioning of NMDL software & Correctappearance of online faults and alarms in pop up screan

    Switch on the printer and take print outs of reports from FAS andensure that it is in proper working order

  • 8/6/2019 Inspection Format JES_SSES

    14/14

    CHECK LIST FOR DETAILED INSPECTION OF A SIGNALING INSTALLATION BY JES/SSE SIGNAL

    Station : Dates of Inspection:

    Sr No Checked or not Main Objectives of Inspection

    1

    2

    Track circuits

    3

    Point machines

    4

    Axle counters (Analog& SSDAC)

    5

    Inrerlocked LC Gates

    6

    7

    8

    9 EI System &Maintenance VDU

    10 IPS and backup battery

    11

    12 Siding point

    13 Data logger

    14

    15Relay rooms and goomties

    16

    17Condition of cable insulation

    18

    19 SWR of the station

    20Any other item checked

    Signature and Designation of SSE/JE/Signal

    Name of Gear/Equipment/Record to be checked

    Analysis of Failures recorded at

    station.

    1) To Check the quality of maintenace of gears and to tak

    necessary steps for its improvement

    2) To check the condition of the gear/equipment and totake necessary preventive steps for its repair/renewal

    3) To check the safe working of the gear /system and totake necessary steps for the improvement of safetystandard

    4) To utilize the data available in records and dataloggerfor the identification cause of failures and to initiateremedial measures

    5) To identify problems where assistence of otherdepartments is needed and to convey the same to

    relavant officials for early solution of the problem

    Signal Posts,locations and LEDunits

    6) To counsel the maintenace staff of the station for thimprovement of their technical knowledge/skills ansafety awareness.

    Block instruments and theirinterlocking with signals

    Operating cum Indication Panel &VDU

    Crank handles & telephone atlocation

    Local/AT/DG Power supply atstation including change overarrangement

    Earthing arrangement of differentequipment

    Station records , maintenanceregisters & approved drawings