MTH Rao II Bridge Project no. 280924 Kt qu phun va/ Grouting result
Cng trnh/ Work Toe grouting under 1000 bores piles
Hng mc/ Item: Tn h khoan/ Name of bored pile
a im/ Location on phun s /grouting sec, No: from: m to: m
Ngy th/ Tested on / / 2010 Chiu di phun/ Grouting length: L= m Gi tr lu/ Rolling value:
Thi gian/ Duration (minute) Thnh phn va/Grout property Grouting/ Phun va Xi mng/ Cement
T/ from Ti/ to
Va/ Grout
M/ batch Lt/ Litre (lt/ litre) (litre)/ (lt) (kG) (kG)
p lc va phun/Grout pressure Ghi ch
(mu / caoNote
(sample/elevatt
T l/Ratio(N/X)
Nc (kg/m)/ Water(litre/batch)
Cement(kG/batch)
Phun vo/Grout in
Lu lng/Capacity
D b/Discharge
Phun vo/Grout in
D b/Discharge
(litre/ minute)/( lt/ pht) (kG/cm2)
m
-
8/6/2019 Inspection Form Grouting
2/4
.. ..
..
..
Phun va / Grouting
T/ from Ti/ to
Va/ Grout
(Litre) (Litre) (Litre) (Mpa)
TOTAL :
IDC MTH ENGINEER
RAO II BRIDGE PROJECTToe Grouting Work
Date : ...
Page : ...
Cng trnh/ Work : Tn cc/Name of bored pile :
Hng mc/ Item : Bm t / Grouting from : ....
a im/ Location: Ti / to : ....
Thi gian/Duration (minute) Thnh phn va / Grout property p lc vaphun/Grout
pressure
Thi giangi p /Time ofKeepingpressure(minute)
Ghi chNotet
Nc /Water
(kG/batch)
Xi mng/Cement
(kG/batch)
Ph gia /Additive
(Lit/batch)
T l/Ratio(N/X)
chy /Flow
(s)
SamplesTaken
Phun vo/Grout in
D b/Discharge
M/batch
-
8/6/2019 Inspection Form Grouting
3/4
.. ..
..
.. ..... .
Phun va / Grouting
T/ from Ti/ to
Va/ Grout
(Litre) (Litre) (Litre) (Mpa)
TOTAL :
MTH ENGINEER
RAO II BRIDGE PROJECTGrouting Work
Date : ...
Page : ...
Cng trnh/ Work : Tn cc/Name of bored pile :
Hng mc/ Item : Bm va / Grouting for :.......
a im/ Location:
Thi gian/Duration (minute) Thnh phn va / Grout property p lc vaphun/Grout
pressure
Thi giangi p /Time ofKeepingpressure(minute)
Ghi chNotet
Nc /Water
(kG/batch)
Xi mng/Cement
(kG/batch)
Ph gia /Additive
(Lit/batch)
T l/Ratio(N/X)
chy /Flow
(s)
SamplesTaken
Phun vo/Grout in
D b/Discharge
M/batch
-
8/6/2019 Inspection Form Grouting
4/4
.. ..
..
.. ......
Phun va / Grouting
T/ from Ti/ to
Va/ Grout
(Litre) (Litre) (Litre)
TOTAL :
MTH ENGINEER
RAO II BRIDGE PROJECTGrouting Work
Date : ...
Page : ...
Cng trnh/ Work : Tn cc/Name of bored pile :
Hng mc/ Item : Bm va / Grouting for : .......
a im/ Location:
Thi gian/Duration (minute) Thnh phn va / Grout property
Ghi chNotet
Nc /Water
(kG/batch)
Xi mng/Cement(kG/batch)
Ph gia /Additive(Lit/batch)
T l/Ratio(N/X)
chy /Flow(s)
SamplesTaken
Phun vo/Flow in
Chy ra/Flow out
M/batch