innolabs w ork p ackages grant. no. 2014-1-lv01-ka200-000521
TRANSCRIPT
INNOLABS
WORK PACKAGES
Grant. No. 2014-1-LV01-KA200-000521
WP1FEASIBILITY STUDIES
Developed for partners in LV, EST and CY = 3 in total (university partners)
Objective – to define the issues, objectives and needs of each partner for establishing Innovator model in their organization, background on innovation support structures, networks, initiatives etc
problems and gaps in innovation; recommendations how to overcome them; stakeholders mapping
ACTIVITIES
O1-A1 Definition of feasibility studies NHL – leading know-how partner AAU – contributor role FS SEI IFS VA EKA CUT
Define the structure, research methods, research sources, interviewee target groups, number of interviews etc.
Time frame: 01-10-2014 – 01-11-2014 – to be replanned
WP1FEASIBILITY STUDIES O1-A2 Research for feasibility studies
VA – leading organisation, overlook the activity and do their own data research and interviews
NHL – help with expert input AAU – help with expert input IFS – provide input and review function SEI – provide input and review function FS – provide input and review function EKA – do their own data research and interviews CUT – do their own data research and interviews
Carrying out research and data gathering for feasibility studies. Interviews (10-15 for each study), desktop research and statistical information will be searched.
Time frame 01-11-2014 – 31-01-2015 – to be replanned
WP1FEASIBILITY STUDIES
O1-A3 Feasibility studies: Analysis, synthesis and report
FS – leading organization, putting together the feasibility studies
SEI – putting together the feasibility studies IFS – putting together the feasibility studies VA – closely collaborate with the intermediaries CUT – closely collaborate with the intermediaries EKA – closely collaborate with the intermediaries AAU – expert competence where necessary NHL – expert competence where necessary
Drafting and finalizing feasibility studies so that they are usable and publishable.
Time frame 02-01-2015 – 28-02-2015 –to be replanned
OUTPUTS
Feasibility studies in LV, EST, CY (O1) Translation into English
WP2 DEVELOPMENT PLANS FOR INNOVATION LABS
Partners from LV, EST, CY (university partners) will start to develop their own bottom-up student innovation labs.- Description of proposed management structure;- Involved stakeholders and partners;- Participation in innovation networks and
undertakings;- Roles and responsibilities to be carried out by
innovation platform participants;- Future sustainability issues (after the project
ends);- How to develop innovative products and services
for their local industries and local regions.
WP2 DEVELOPMENT PLANS FOR INNOVATION LABSACTIVITIES – STAFF TRAINING/STUDY TRIP I
O2-A1 Learning innovation from living labs I
NHL – leading organization – prepare training workshop, materials and organize study visits to selected innovation lab places in Leeuwarden, Delft and Rotterdam.
AAU – help with their own expertise FS
02-01-2015 – 28-02-2015
WP2 DEVELOPMENT PLANS FOR INNOVATION LABSACTIVITIES – STAFF TRAINING/STUDY TRIP II
O2-A2 Learning innovation from living labs II
AAU – leading organization – prepare training workshop, materials and organize study visits to selected innovation lab places in Aalborg (Klimalab, WOFIE etc).
NHL – help with their own expertise FS
02-02-2015 – 31-03-2015
WP2 DEVELOPMENT PLANS FOR INNOVATION LABS
O3-A1 Preparation for Innovation labs development plans
FS – leading organization VA, EKA, CUT – apply the know-how in practice and set
up development plans for innovation labs NHL and AAU – will help with knowledge and
experiences about operation, institutionalization, sustenance and growth development of such innovation labs.
Foresee the workshops, internal meetings and drafting of development plans 01-04-2015 – 31-05-2015
WP2 DEVELOPMENT PLANS FOR INNOVATION LABS
O3-A2 Innovation labs development plansFS – leading organization, takes control of the progress and approval of development planUniversity partners LV, EST, CY – development plans ready for approval by university management Final review and approval of development
plans 01-06-2015 – 30-06-2015
WP3 INNOVATION LABS CO-CREATION PROJECTS
WP3 INNOVATION LABS CO-CREATION PROJECTSWP3 - OUTPUTS
O4 – Student teams will produce fully developed product or service concepts, resulting in prototypes and/or service visualisations/descriptions, social projects, examples for community initiatives or others.
Different medias for presenting (according to the student works outcomes)
At least 20-25 project, 4-5 projects per university (VA, EKA, CUT, AAU, NHL)
WP3 INNOVATION LABS CO-CREATION PROJECTS
O4-A1 Preparation of INNOLABS co-creation projects
NHL – leading organization, available for help via electronic communications and will take a part in stakeholder workshops, overlook this activity for all partners
AAU – available for help via electronic communications and will take a part in stakeholder workshops
VA, EKA, CUT – organize local workshops, meetings with stakeholders, carry out needs analysis and foster studen idea generation pocess and integrate the innovation labs processes into education process
FS, SEI, IFS –follow this process and provide feedback and support for this action.
Concrete implementation plans for each co-creation project for chosen stakeholder.
01-05-2015 – 30-08-2015
WP3 INNOVATION LABS CO-CREATION PROJECTS
O4-A2 INNOLABS implementation 1st stage: co-creation project idea generation
FS – leading organization, follow this process and provide feedback and support
SEI, IFS – follow this process and provide feedback and support
VA, EKA, CUT – organize internal working groups to develop projects, involve student teams and staff
NHL, AAU – help via electronic communications and provide feedback
Students of diverse study fields will start to develop the ideas for solutions for raised problems in previous stage. In multidisciplinary teams student teams will co-create concepts. The result-concrete innovation ideas for stakeholders.
01-09-2015 – 31-12-2015
WP3 INNOVATION LABS CO-CREATION PROJECTS
O4-A3 INNOLABS Implementation 2nd stage: co-creation project development
NHL – leading organization, provide feedback in one workshop, help via electronic communications
AAU – provide feedback in one workshop, help via electronic communications
VA, EKA, CUT – organize internal working groups to develop projects, involve student teams and staff.
FS, SEI, IFS – follow this process and provide feedback and support
01-12-2015 – 31-03-2016
WP3 INNOVATION LABS CO-CREATION PROJECTS
O4-A4 INNOLABS Implementation 3rd stage: Co-creation project development
NHL – leading organization, provide feedbacks in workshops and help via electronic communications
AAU – provide feedbacks in workshops and help via electronic communications
VA, EKA, CUT – organize internal working groups to develop projects, involve student teams and staff
FS, SEI, IFS – follow this process and provide feedback and support
01-03-2016 – 30-05-2016
WP 4 METHODOLOGY DEVELOPMENT
O5-A1 Ssustainable Innovation And Entrepreneurship Methodology
All partners will be involved in the preparation of Methodology
Leading organization – NHL All others participate with their input and provide
necessary contents for the Guidelines.
01-02-2016 – 30-07-2016
WP 4 METHODOLOGY DEVELOPMENT
O6-A1 Preparation and publication of Guidelines for Intermediary Innovation Networks
All partners will be involved in the preparation of the Guidelines for intermediaries.
AAU – leading organization All others participate with their input and provide
necessary contents for the Guidelines
01-02-2016 – 30-07-2016
WP 5 DISSEMINATION
O7-A1 Project website development IFS – leading organization for website development
and operation. All partners will provide input for website
Development of website structure, registering domain name, preparation of visual identity (including logo) and other necessary actions for website development.
01-10-2014 – 31-01-2015
O7-A2 Operation of project website
IFS – leading organization, maintain the website technically and in relation to contents.
All partners feed in the information to the website.
Updating and content management of the website
01-01-2015 – 31-08-2016
WP 5 DISSEMINATION
O8-A1 Preparation of dissemination plan
CUT – leading organization, responsible for development of the common English version.
All partners feed in the document the channels, responisibilities and activities to reach their desired stakeholder groups.
Drafting and preparing of detailed dissemination plan.
01-01-2015 – 30-04-2015
WP 5 DISSEMINATION
O8-A2 Implementation of dissemination plan
Each partner implements its dissemination activities according to the plan.
02-01-2015 – 31-08-2016
WP5 - ACTIVITIES
Project meeting and final event; Development of project website (including visual
identity); Brochure; Development of detailed communication plan; Press releases (2 in each country); At least 1 project presentation at international
conference; Summer camp and contest for project team and
best studen project authors (4 from each country); Youtube channelling; Workshops for stakeholders – 1 in 3 countries (LV,
CY, EST).
WP5 - OUTPUTS
1 website 1 youtube channelling 10 press releases Brochure in 4 languages Final event
…TO THE HAPPY ENDING 31/08/2016
POINTS FOR DISCUSSION
Criteria definition for student work Level/competences of students Methodology Multidisciplinary teams Involvement of stakeholders Durability Social relevance
Conceptual framework What is INNOLABS