infrastructure -what's happening in washington dc...review of infrastructure projects...

25
© Copyright Baker Botts 2017. All Rights Reserved. Molly Cagle Infrastructure - What's Happening in Washington DC

Upload: others

Post on 01-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

CONFIDENTIAL©CopyrightBakerBotts2017.AllRightsReserved.

MollyCagle

Infrastructure- What'sHappeninginWashingtonDC

Page 2: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS 2

Page 3: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS 3

Page 4: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

FocusonInfrastructureisNotNew

• InfrastructurePrivatization– EO 12803(Bush41)

• PrinciplesforFederalInfrastructureInvestments– EO 12893(Clinton)

• EnvironmentalStewardship&TransportationInfrastructureProjectReviews– EO 13274(Bush43)

• ImprovingPerformanceofFederalPermitting&ReviewofInfrastructureProjects– EO 13604(Obama)

4

Page 5: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

Priority List

Emergency&National SecurityProjects

President-elect Trump

Page 6: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

BasicMetrics - Running Total/ Initial 50Projects

Total Investment: $137.5 Billion

Private Investment: 50%

Jobs

Direct: 193,350 job years

Indirect (est.): 241,700 job years

Long-term:

Page 7: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

44. HuntingtonBeachDesalinationPlant

1.Description: A cost-effective, environmentally sensitive solution to provide a safe and reliable water supply to Orange County residents and has the potential to bring significant economic benefits for the city of Huntington Beach and the region

2. Authority: Poseidon Water

3. Cost: $350 million

4. Jobs: 400 Direct Jobs

5. Status

1. Engineering: In progress

2. Permitting: In progress

3. Funding: In progress

Page 8: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

ANDTHENTHISHAPPENED

Page 9: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

MakingInfrastructureHappenisHappening

9

“Wewillbuildnewroads,andhighways,andbridges,andairports,andtunnels,andrailways all

acrossourwonderfulnation.”InauguralAddress- January20,2017

Page 10: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

How?

10

• EO 13766: “streamlineandexpedite,inamannerconsistentwithlaw,environmentalreviewsandapprovalsforallinfrastructureprojects"

• PresidentialAdvisoryCouncilonInfrastructure

Page 11: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

FIXTHENEPA PROCESS

11

Page 12: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

DakotaAccess- TheNEPA Timeline

http://www.startribune.com/months-needed-for-additional-study-of-dakota-access-pipeline/435216633/

• July2014- processbegins• July2016- EA/FONSI• Sept.- Dec2016- Moreconsultation• Dec.2016- Corpsmemo• Jan.18,2017- IntenttodoEIS• Jan.20,2017- Inauguration• Jan.24,2017- "Review&approve"• Feb.2017- EA affirmed,easement• June2017- DAPL operational

Page 13: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

ANDTHENTHISHAPPENED

13

Page 14: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

TheNEPA Opinion

• Corps"generallycomplied"withNEPA• BUT "substantialexceptions"

1. Areproject’seffectslikelytobehighlycontroversial?2. Impactofaspillon:

a) Fishing,huntingrightsb) Environmentaljustice

14

Page 15: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

SOtheWhiteHouseDidThis:EO 13807- August15,2017

• “EstablishingDisciplineandAccountabilityintheEnvironmentalReviewandPermittingProcessforInfrastructure”– majorinfrastructureprojects– multipleauthorizationsbyFederalagencieswillberequiredtoproceedwith

construction– anenvironmentalimpactstatement(EIS)underNEPA isrequired– projectsponsorhasidentifiedthereasonableavailabilityoffundssufficienttocomplete

theproject.

• Threecriticalagencies– OfficeofManagementandBudget(“OMB”)– WhiteHouseCouncilonEnvironmentalQuality(“CEQ”),– FederalPermittingImprovementSteeringCouncil(“FPISC”)

• FASTActof2015

15

Page 16: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

Discipline&Accountability

• AgencyAccountability– Average2Years– Tracking&Scoring

• ProcessEnhancements– OneFederalDecision– CEQActionPlan

• OneFederalDecision• Rules,Guidance,etc.• Dashboard• Disputeresolution

16

Page 17: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

LET'SMAKETHISHAPPEN

• Tobea"HighPriority"infrastructureproject.– CertainHighways,publictransportation,multimodalprojects,WaterInfrastructure

projectsandFastActprojects– ProjectsdesignatedbytheFPISC ExecutiveDirector– Governor– Agencyhead– ChairmanofCEQ

• Thisdeterminationshallbemadeafterconsiderationoftheproject'simportancetothegeneralwelfare,valuetotheNation,environmentalbenefits,andsuchotherfactorsastheChairmandeemsrelevant

17

Page 18: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

WHAT'SKEEPINGTHISFROMHAPPENING

18

Page 19: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

FPISC -DeputySecretariesof:

• DepartmentofAgriculture– USDARD

– USFS

• ArmyCorpsofEngineers• DepartmentofEnergy• DepartmentofTransportation• DepartmentofCommerce

– NTIA

– NOAA

– NMFS

• DepartmentofInterior– USFW

– BLM

– BuRec

– NPS

– BOEM

• DepartmentofDefense• DepartmentofDefense• EnvironmentalProtectionAgency• NuclearRegulatoryCommission• FederalEnergyRegulatory

Commission• DepartmentofHousingandUrban

Development• AdvisoryCouncilonHistoric

Preservation• DepartmentofHomelandSecurity

– FEMA

– USCG

19

Page 20: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

WHATHAPPENSFIRSTISNOTTHEISSUE

20

Page 21: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

CEQ AlreadyhasstartedtoMakethisHappen

• Willdevelop“OneFederalDecision”frameworkandguidanceanddirectivestoassistagenciesinimplementingOneFederalDecision.

• Identifyindividualstoreceive“highpriorityinfrastructureprojects”requests.• Reviewitsrulesforchangesorupdated.• Revise,modify,and/orsupplementexistingguidance• Developnewguidanceto“simplifyandacceleratetheNEPA processfor

infrastructureprojects.”– publicinvolvementintheNEPA process– deferencetotheleadfederalagencyinmakingkeyNEPA determinations– methodsforassessingcumulativeimpactsofinfrastructureprojects– theuseofpriorstudiesinthesamegenerallocationastheproposedproject

• identifyimpedimentstotheefficientandeffectiveprocessinganddevelop“actionplans”andtimelinesforaddressingtheseimpediments.

21

Page 22: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS 22

Page 23: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS 23

Page 24: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

BAKERBOTTS

Questions?

24

Page 25: Infrastructure -What's Happening in Washington DC...Review of Infrastructure Projects –EO13604 (Obama) 4 BAKER BOTTS Priority List Emergency& NationalSecurity Projects President-elect

AUSTIN

BEIJING

BRUSSELS

DALLAS

DUBAI

HONGKONG

HOUSTON

LONDON

MOSCOW

NEWYORK

PALOALTO

RIYADH

SANFRANCISCO

WASHINGTON

bakerbotts.com

©BakerBottsL.L.P.,2017.Unauthorizeduseand/orduplicationofthismaterialwithoutexpressandwrittenpermissionfromBakerBottsL.L.P.isstrictlyprohibited.Excerptsandlinksmaybeused,providedthatfullandclearcreditisgivenwithappropriateandspecificdirectiontotheoriginalcontent.