Page 1: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

INFRASTRUCTUREUttar PradeshOn the Highway to Progress

Page 2: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Uttar Pradesh:Creating world class infrastructure with a vision of robust growthn

n43 National Highways connect it with 9 neighboring states and other parts of India

nLargest railway network in the country spanning over 8,763 KM

n6 Domestic Airports at Agra, Allahabad, Gorakhpur, Kanpur, Lucknow and Varanasi

and 1 international airport at Lucknow

nInvestment worth INR 23000 crore planned for 2500 km of state highway projects

n6730 km identified as core network by World Bank , of which 2466 km has

been developed by UPPWD

nConcession agreement signed for 4 roads of 463 km , costing INR 3867 crore

nFeasibility study has been completed and proposals for VGF are being

sent to GoI for 11 roads of 977 km , costing about INR 7129 crore

n11 hi –tech townships and 31 integrated townships are being developed

by private developers in major cities of the state.

n165-km six-lane Yamuna Expressway was .

Distance between New Delhi and Agra can be covered now in

just 2.5 hours

nBuddh International Circuit in Greater Noida with 5.14 Km length

spread across an area of 875 acres is India’s only circuit for

F1 motor racing

nAirports on PPP model – near Agra in the vicinity of DMIC to

provide facility of dry-cargo transport along with aircraft

maintenance hub and at Kushinagar in eastern Uttar Pradesh

to promote industrial development and tourism

nOne National Manufacturing Investment Zone being planned

each in Jhansi and Auraiya

UP accounts for about 9.45 % of the total National Highway (NH) network

recently inaugurated

Delhi Mumbai Industrial Corridor (DMIC) & Eastern Dedicated Freight Corridor (EDFC)

ROAD TYPE ROAD LENGTH (KM)

National Highways 5570

State Highways 8551

Major District Roads 7345

Other District Roads 29179

Village Roads 82459

Delhi Mumbai Industrial Corridor (DMIC)

Eastern Dedicated Freight Corridor (EDFC)

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

36,068 sq km (15%) of DMIC catchment area across 12 districts of UP

Immense opportunities for development of an Industrial corridor along the alignment of dedicated freight line

Shortlisted Projects

Dadri – Noida – Ghaziabad Investment Region

Meerut – Muzaffarnagar Manufacturing Zone in Ph-II

Multimodal Logistic Hub at Dadri

Boraki Integrated Transport Hub

High tech Industrial Township

High speed connectivity between Investment Region and New Delhi

1839 Km railway corridor between Ludhiana and Dankuni, Kolkata

55% or over 1049 km of EDFC falls in U.P.

Expected to facilitate uninterrupted transportation of goods to sea ports

GoUP envisages Industrial Estates & Logistic Hubs along EDFC

Benefits to investors:

Reduced congestion at terminals & junction stations

Higher fuel efficiency due to seamless and unhindered movement & reduced emmission of GHGs

With double stack containers, number of trains could be reduced to nearly half for same throughput

Line capacity on the existing corridors will be leading to more number of and faster movement of passenger trains

Source : UPSHA

Page 3: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Uttar Pradesh:Creating world class infrastructure with a vision of robust growthn

n43 National Highways connect it with 9 neighboring states and other parts of India

nLargest railway network in the country spanning over 8,763 KM

n6 Domestic Airports at Agra, Allahabad, Gorakhpur, Kanpur, Lucknow and Varanasi

and 1 international airport at Lucknow

nInvestment worth INR 23000 crore planned for 2500 km of state highway projects

n6730 km identified as core network by World Bank , of which 2466 km has

been developed by UPPWD

nConcession agreement signed for 4 roads of 463 km , costing INR 3867 crore

nFeasibility study has been completed and proposals for VGF are being

sent to GoI for 11 roads of 977 km , costing about INR 7129 crore

n11 hi –tech townships and 31 integrated townships are being developed

by private developers in major cities of the state.

n165-km six-lane Yamuna Expressway was .

Distance between New Delhi and Agra can be covered now in

just 2.5 hours

nBuddh International Circuit in Greater Noida with 5.14 Km length

spread across an area of 875 acres is India’s only circuit for

F1 motor racing

nAirports on PPP model – near Agra in the vicinity of DMIC to

provide facility of dry-cargo transport along with aircraft

maintenance hub and at Kushinagar in eastern Uttar Pradesh

to promote industrial development and tourism

nOne National Manufacturing Investment Zone being planned

each in Jhansi and Auraiya

UP accounts for about 9.45 % of the total National Highway (NH) network

recently inaugurated

Delhi Mumbai Industrial Corridor (DMIC) & Eastern Dedicated Freight Corridor (EDFC)

ROAD TYPE ROAD LENGTH (KM)

National Highways 5570

State Highways 8551

Major District Roads 7345

Other District Roads 29179

Village Roads 82459

Delhi Mumbai Industrial Corridor (DMIC)

Eastern Dedicated Freight Corridor (EDFC)

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

36,068 sq km (15%) of DMIC catchment area across 12 districts of UP

Immense opportunities for development of an Industrial corridor along the alignment of dedicated freight line

Shortlisted Projects

Dadri – Noida – Ghaziabad Investment Region

Meerut – Muzaffarnagar Manufacturing Zone in Ph-II

Multimodal Logistic Hub at Dadri

Boraki Integrated Transport Hub

High tech Industrial Township

High speed connectivity between Investment Region and New Delhi

1839 Km railway corridor between Ludhiana and Dankuni, Kolkata

55% or over 1049 km of EDFC falls in U.P.

Expected to facilitate uninterrupted transportation of goods to sea ports

GoUP envisages Industrial Estates & Logistic Hubs along EDFC

Benefits to investors:

Reduced congestion at terminals & junction stations

Higher fuel efficiency due to seamless and unhindered movement & reduced emmission of GHGs

With double stack containers, number of trains could be reduced to nearly half for same throughput

Line capacity on the existing corridors will be leading to more number of and faster movement of passenger trains

Source : UPSHA

Page 4: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Stamp duty concessions

n100% stamp duty concessions to be given to:

lNew IT, Bio-tech, BPO, Food processing, Food park, Alternative energy resources units

lPrivate sector infrastructure development projects excluding PPP projects

lIndustrial units in all sectors on purchase, lease or acquisition of land by industrial units in Eastern U.P., Central U.P. and Bundelkhand region

n75% stamp duty concession to new units on purchase of land from government agencies and 50% stamp duty concession on purchase of land from private sources in Western U.P

nReimbursement of 25% of stamp duty, if a private developer completes development of industrial estate or area within 3 years after purchase of land and a minimum of 50% land is sold.

Investment Promotion Scheme

nInterest-free loan quivalent to VAT and Central Sales Tax paid by industrial units or 10 percent of the annual urnover hichever is less will be provided for a period of 10 years repayable after 7 years from the date of first disbursement.

nWho is eligible:

lIn Eastern U.P, Central U.P and Bundelkhand, new industrial units with total capital investment of INR 5 crore or more

lIn Western U.P, new industrial units with total capital investment of INR 12.5 crore or more

lIndustrial units undertaking expansion by minimum 25% of existing production capacity.

Infrastructure interest subsidy scheme

nInterest on loan taken by industrial units for developing infrastructure facilities for self-use, such as- road, sewer, water drainage, power line etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years

Capital interest subsidy scheme

nInterest on loan taken for plant and machinery by new industrial units set up in Eastern U.P., Central U.P and Bundelkhand, will be reimbursed @ 5 percentage points with a ceiling of INR 50 lac/annum for a maximum period of 5 years

Industrial quality development subsidy scheme

nInterest on loan taken by industrial association, group of industrial units for establishing testing labs, quality certification lab, tool-rooms, etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years

Special facilities for Mega Projects

nMega projects with an investment of more than INR 200 crore and less than INR 500 crore will be provided with special concessions within schemes covered under this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet.

nMega projects with an investment of more than INR 500 crore will be provided with additional incentives over and above those provided in this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet.

Industrial infrastructure on offer to investorsIndustrial Park

Textile Park Apparel Ghaziabad Training Centre, Fashion Design Centre, Tool Room

Textile & Hosiery Kanpur Centre, Quality Control Lab, CETP, etc

Agro Park Agro & food processing Barabanki Multi Chamber and Controlled Atmospheric Cold

& Varanasi Storages with Sorting, Grading and Cleaning facility and

Quality Control Labs

Leather Park Leather Banthar Unnao Training and Design Centre, Technological Support (near Kanpur) Service, Quality Control for Saddlery and Export

Management has been set up by NLDP supportedInternational Institute for Saddlery and ExportManagement

Export Promotion Greater Noida & Agra Provides the infrastructure facilities to the units to Industrial Parks boost-up the export of various commodities and services (EPIP)

Growth Centres Promote industrialisation Bijoli, Jhansi, Shajahanpur, Basic infrastructure facilities such as power, water,of backward areas Dibiyapur and Jaunpur telecommunications and banking

Leather Mega Leather Kanpur , Agra, Hardoi Concept report under finalisationCluster

Plastic City Plastics Auraiya Land earmarked and concept plan under finalisation

IT Park IT/ITeS Lucknow RFP floated for developer by Lucknow Industrial Development Authority (LIDA)

Integrated Dairy Lucknow Concept report under finalisationDairy Plan

Mega Food Park Food Processing Jagdishpur Concept report under finalisation

National Investment Multi-sector Dadri-Noida-Ghaziabad, Proposal for Auraiya and Jhansi submitted to & Manufacturing Auraiya, Jhansi Govt of IndiaZone (NIMZ)

Product Location Facilities

Attractive incentives under the new Infrastructure and Industrial Investment Policy 2012

Page 5: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Stamp duty concessions

n100% stamp duty concessions to be given to:

lNew IT, Bio-tech, BPO, Food processing, Food park, Alternative energy resources units

lPrivate sector infrastructure development projects excluding PPP projects

lIndustrial units in all sectors on purchase, lease or acquisition of land by industrial units in Eastern U.P., Central U.P. and Bundelkhand region

n75% stamp duty concession to new units on purchase of land from government agencies and 50% stamp duty concession on purchase of land from private sources in Western U.P

nReimbursement of 25% of stamp duty, if a private developer completes development of industrial estate or area within 3 years after purchase of land and a minimum of 50% land is sold.

Investment Promotion Scheme

nInterest-free loan quivalent to VAT and Central Sales Tax paid by industrial units or 10 percent of the annual urnover hichever is less will be provided for a period of 10 years repayable after 7 years from the date of first disbursement.

nWho is eligible:

lIn Eastern U.P, Central U.P and Bundelkhand, new industrial units with total capital investment of INR 5 crore or more

lIn Western U.P, new industrial units with total capital investment of INR 12.5 crore or more

lIndustrial units undertaking expansion by minimum 25% of existing production capacity.

Infrastructure interest subsidy scheme

nInterest on loan taken by industrial units for developing infrastructure facilities for self-use, such as- road, sewer, water drainage, power line etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years

Capital interest subsidy scheme

nInterest on loan taken for plant and machinery by new industrial units set up in Eastern U.P., Central U.P and Bundelkhand, will be reimbursed @ 5 percentage points with a ceiling of INR 50 lac/annum for a maximum period of 5 years

Industrial quality development subsidy scheme

nInterest on loan taken by industrial association, group of industrial units for establishing testing labs, quality certification lab, tool-rooms, etc. will be reimbursed @ 5 percentage points with a ceiling of INR 100 acannum for a maximum period of 5 years

Special facilities for Mega Projects

nMega projects with an investment of more than INR 200 crore and less than INR 500 crore will be provided with special concessions within schemes covered under this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet.

nMega projects with an investment of more than INR 500 crore will be provided with additional incentives over and above those provided in this policy on case-to-case basis on recommendation of Empowered Committee and approval of the State Cabinet.

Industrial infrastructure on offer to investorsIndustrial Park

Textile Park Apparel Ghaziabad Training Centre, Fashion Design Centre, Tool Room

Textile & Hosiery Kanpur Centre, Quality Control Lab, CETP, etc

Agro Park Agro & food processing Barabanki Multi Chamber and Controlled Atmospheric Cold

& Varanasi Storages with Sorting, Grading and Cleaning facility and

Quality Control Labs

Leather Park Leather Banthar Unnao Training and Design Centre, Technological Support (near Kanpur) Service, Quality Control for Saddlery and Export

Management has been set up by NLDP supportedInternational Institute for Saddlery and ExportManagement

Export Promotion Greater Noida & Agra Provides the infrastructure facilities to the units to Industrial Parks boost-up the export of various commodities and services (EPIP)

Growth Centres Promote industrialisation Bijoli, Jhansi, Shajahanpur, Basic infrastructure facilities such as power, water,of backward areas Dibiyapur and Jaunpur telecommunications and banking

Leather Mega Leather Kanpur , Agra, Hardoi Concept report under finalisationCluster

Plastic City Plastics Auraiya Land earmarked and concept plan under finalisation

IT Park IT/ITeS Lucknow RFP floated for developer by Lucknow Industrial Development Authority (LIDA)

Integrated Dairy Lucknow Concept report under finalisationDairy Plan

Mega Food Park Food Processing Jagdishpur Concept report under finalisation

National Investment Multi-sector Dadri-Noida-Ghaziabad, Proposal for Auraiya and Jhansi submitted to & Manufacturing Auraiya, Jhansi Govt of IndiaZone (NIMZ)

Product Location Facilities

Attractive incentives under the new Infrastructure and Industrial Investment Policy 2012

Page 6: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Major State Highway upgradation projects in progress by UPSHA

Road projects by UPSHA currently in pipeline

Major UPSIDC Industrial Infrastructure Projects

Upcoming UPSIDC Projects

S.No. Name of Road SH No. Length Project Cost Concessionaire Expected Date (km) (INR crore) of Completion

1. Delhi-Saharanpur- 57 206.09 1718.35 M/s SEW-PRASAD 16-09-2014Yamunotri Road Consortium, Hyderabad

2. Bareilly- Almora 37 54.00 354.07 M/s PNC Infratech 18-08-2015Road(up to Limited, Agrauttarakhand border)

3. Varanasi- Shaktinagar 5A 115 1211.96 M/s Apco-Chetak-Patel 18-09-2015Road (up to Hathinala Consortium, Lucknowjunction)

4. Meerut-Karnal road 82 87.16 583.23 M/s Abhijeet Roads 01-04-2015Ltd., Nagpur

Total 462.25 3867.61

S.No. Name of Road SH No. Length Project Cost Stage(km) (INR crore)

1. Shahjahanpur-Hardoi-Lucknow Road 25 162.4 1288.6 RFQ

2. Basti-Mehndawal-Kaptanganj- 64 166.12 328.49 RFQ

3. Akbarpur-Jaunpur-Mirzapur-Dudhi Road 5 207.47 1865 RFQ

4. Gorakhpur-Maharajganj road 81 53.16 586.91 RFQ

5. Balrampur-Gonda-Jarwal Road 1A 88 765 RFQ

6. Aligarh-Mathura Road 80 38.96 424.39 RFQ

7. Etah-Tundla Road 31 57.16 186.61 RFQ

8. Etah-Sikohabad Road 85 51.42 358.21 RFQ

9. Varanasi-Bhadohi-Gopiganj Road 87 60.12 362.70 RFQ

10. Tarighat-Bara Road 99 39.2 188.93 RFQ

11. Muzaffarnagar-Saharanpur via Deoband Road 59 52.7 773.8 RFQ

12. Bahraich-Gonda- Faizabad Road (may be extended 30 190 2100 Feasibility up to Ambedkarnagar)

13. Bareilly-Badaun-Kasganj-Hathras Road (may be extended 33 232 2552 Feasibilityup to Rajasthan Border Via Mathura)

14. Bharwari-Manjhanpur-Chitrakoot Road 94 &MDR-26B 78 858 Feasibility

15. Sitapur-Lakhimpur Kheri road (may 21 45 495 Feasibilitybe extended upto Palia and Dudhwa)

16. Pilibhit-Farukhabad-Bewar Road 29 214 2354 Feasibility

17. Windhamganj-Kon-Kota-Chopan Road ODR 59.3 416 Feasibility

Total 1795.01 15,903.64

Project Description

Mandhna-Bhaunti Integrated 960 acre Integrated industrial township in Kanpur on NH 24Township

Leather Park , Agra 283 acre located 17 km from Agra

Dedicated STP proposed in the scheme

Greater Mathura Knowledge City 453 acre located at Agra-Delhi National Highway near Kosi

Engineering & medical colleges , IT education centre planned

Plastic City , Dibiyapur(Auraiya) 100 acre at Auraiya district

First Plastic City project of UP , to be developed in PPP model

MoU signed with GAIL for smooth supply of raw material

200 MW power plant being built adjacent to the site

Trans Ganga Hi-tech City , Kanpur 1151 acre located on bank of river Ganga on other side of Kanpur city

IT, electronics and software industries will be priority sectors

Automobile hub planned with modern Auto expo mart

l

l

l

l

l

l

l

l

l

l

l

l

Project Description

Moradabad Special Economic Zone 467 acres of land, 160 km from New Delhi

Infrastructure facilities in accordance with GoI SEZ norms

Tronica City , Ghaziabad Industrial township over 1975 acres, 2.5 km from Delhi border

Presently 750 medium size industries are operational in the area

EPIP at Greater Noida and Agra 200 acres at Gautam Buddh Nagar and 100 acre at Agra

Developed to promote exports

High quality infrastructure facilities like concrete road, earth station etc.

Apparel Parks Tronica and Rooma Located at Tronica city and Rooma , Kanpur

Textile training centre set up by ATDC operational at both parks

Growth Centres 385 acres at Jhansi , 300 acres at Jainpur and 330 acres at Shahjahnpur

Self sustainable integrated townships for industrial development

Leather Technology Park 232 acres of land at Banthar Unnao on NH 25

CETP in operation on PPP

Institute for Saddlery and Footwear Training operational in the area

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Uttar Pradesh State Highways Authority (UPSHA)U.P. State Highways Authority is constituted for the development, maintenance and management of state highways . It also develops models for bringing in private & institutional (including international ) funding to the road sector and to raise institutional resources for undertaking the maintenance & upgradation of these highways. UPSIDC is the premier industrial promotion and infrastructure development undertaking of the state government. It

has so far developed over 150 industrial areas . More than 11300 units have been set up with an estimated investment of over INR 20375 crore in UPSIDC estates.

Uttar Pradesh State Industrial Development Corporation (UPSIDC)

Page 7: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Major State Highway upgradation projects in progress by UPSHA

Road projects by UPSHA currently in pipeline

Major UPSIDC Industrial Infrastructure Projects

Upcoming UPSIDC Projects

S.No. Name of Road SH No. Length Project Cost Concessionaire Expected Date (km) (INR crore) of Completion

1. Delhi-Saharanpur- 57 206.09 1718.35 M/s SEW-PRASAD 16-09-2014Yamunotri Road Consortium, Hyderabad

2. Bareilly- Almora 37 54.00 354.07 M/s PNC Infratech 18-08-2015Road(up to Limited, Agrauttarakhand border)

3. Varanasi- Shaktinagar 5A 115 1211.96 M/s Apco-Chetak-Patel 18-09-2015Road (up to Hathinala Consortium, Lucknowjunction)

4. Meerut-Karnal road 82 87.16 583.23 M/s Abhijeet Roads 01-04-2015Ltd., Nagpur

Total 462.25 3867.61

S.No. Name of Road SH No. Length Project Cost Stage(km) (INR crore)

1. Shahjahanpur-Hardoi-Lucknow Road 25 162.4 1288.6 RFQ

2. Basti-Mehndawal-Kaptanganj- 64 166.12 328.49 RFQ

3. Akbarpur-Jaunpur-Mirzapur-Dudhi Road 5 207.47 1865 RFQ

4. Gorakhpur-Maharajganj road 81 53.16 586.91 RFQ

5. Balrampur-Gonda-Jarwal Road 1A 88 765 RFQ

6. Aligarh-Mathura Road 80 38.96 424.39 RFQ

7. Etah-Tundla Road 31 57.16 186.61 RFQ

8. Etah-Sikohabad Road 85 51.42 358.21 RFQ

9. Varanasi-Bhadohi-Gopiganj Road 87 60.12 362.70 RFQ

10. Tarighat-Bara Road 99 39.2 188.93 RFQ

11. Muzaffarnagar-Saharanpur via Deoband Road 59 52.7 773.8 RFQ

12. Bahraich-Gonda- Faizabad Road (may be extended 30 190 2100 Feasibility up to Ambedkarnagar)

13. Bareilly-Badaun-Kasganj-Hathras Road (may be extended 33 232 2552 Feasibilityup to Rajasthan Border Via Mathura)

14. Bharwari-Manjhanpur-Chitrakoot Road 94 &MDR-26B 78 858 Feasibility

15. Sitapur-Lakhimpur Kheri road (may 21 45 495 Feasibilitybe extended upto Palia and Dudhwa)

16. Pilibhit-Farukhabad-Bewar Road 29 214 2354 Feasibility

17. Windhamganj-Kon-Kota-Chopan Road ODR 59.3 416 Feasibility

Total 1795.01 15,903.64

Project Description

Mandhna-Bhaunti Integrated 960 acre Integrated industrial township in Kanpur on NH 24Township

Leather Park , Agra 283 acre located 17 km from Agra

Dedicated STP proposed in the scheme

Greater Mathura Knowledge City 453 acre located at Agra-Delhi National Highway near Kosi

Engineering & medical colleges , IT education centre planned

Plastic City , Dibiyapur(Auraiya) 100 acre at Auraiya district

First Plastic City project of UP , to be developed in PPP model

MoU signed with GAIL for smooth supply of raw material

200 MW power plant being built adjacent to the site

Trans Ganga Hi-tech City , Kanpur 1151 acre located on bank of river Ganga on other side of Kanpur city

IT, electronics and software industries will be priority sectors

Automobile hub planned with modern Auto expo mart

l

l

l

l

l

l

l

l

l

l

l

l

Project Description

Moradabad Special Economic Zone 467 acres of land, 160 km from New Delhi

Infrastructure facilities in accordance with GoI SEZ norms

Tronica City , Ghaziabad Industrial township over 1975 acres, 2.5 km from Delhi border

Presently 750 medium size industries are operational in the area

EPIP at Greater Noida and Agra 200 acres at Gautam Buddh Nagar and 100 acre at Agra

Developed to promote exports

High quality infrastructure facilities like concrete road, earth station etc.

Apparel Parks Tronica and Rooma Located at Tronica city and Rooma , Kanpur

Textile training centre set up by ATDC operational at both parks

Growth Centres 385 acres at Jhansi , 300 acres at Jainpur and 330 acres at Shahjahnpur

Self sustainable integrated townships for industrial development

Leather Technology Park 232 acres of land at Banthar Unnao on NH 25

CETP in operation on PPP

Institute for Saddlery and Footwear Training operational in the area

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Uttar Pradesh State Highways Authority (UPSHA)U.P. State Highways Authority is constituted for the development, maintenance and management of state highways . It also develops models for bringing in private & institutional (including international ) funding to the road sector and to raise institutional resources for undertaking the maintenance & upgradation of these highways. UPSIDC is the premier industrial promotion and infrastructure development undertaking of the state government. It

has so far developed over 150 industrial areas . More than 11300 units have been set up with an estimated investment of over INR 20375 crore in UPSIDC estates.

Uttar Pradesh State Industrial Development Corporation (UPSIDC)

Page 8: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Agra to Lucknow Access Controlled Expressway Project

lUPEIDA has been nominated as the nodal agency for development of this project

lThe expressway will start from proposed Agra Ring Road and end at proposed Lucknow Ring Road

lConcept report has been prepared and RFQ/RFP will be floated by middle of 2013

lIt will reduce the distance between Lucknow and Agra to 270 km from the current 335 km

lThe expressway is proposed to be linked through Link expressways from existing and potential commercial/agricultural hubs such as Firozabad, Shikohabad, Etawah, Kannauj & Malihabad

Salient FeaturesTotal Length 269.68 Km

Project Cost INR 13087 Crore

Design Speed 120 kmph

Width 110 metres

Carriageway 6 lane

Growth Centres 4

Infrastructure

Industry Hub

Medical University

Heliport

Night Safari

Boraki Railway Station

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Greater Noida city is located at the intersection of the Western and Eastern Dedicated Freight Corridors. It is also the gateway to theDelhi-Mumbai Industrial Corridor (DMIC).

Important expressways originate from this city, namely the Yamuna Expressway from Greater Noida to Agra

An eight-lane, 25 km-long expressway connects Greater Noida directly to Delhi

Greater Noida is the only city in North India with privatized power distribution, which ensures efficient power supply.

Eastern Peripheral Expressway, under development, will take off at Kundli and will join NH2 at Faridabad via Ghaziabad and Greater Noida. The Howrah-Delhi main railway line passes through the area.

With a large number of automobile and automobile component manufacturers located here, Greater Noida is increasingly being referred to as he Detroit of India

Industrial majors such as Asian Paints, Bharat Petroleum, Delphi Automotive Systems, Yamaha Motors, Honda Siel, LG Electronics, New Holland Tractors, Pepsi, Hindustan Times and Moser Baer India have all chosen Greater Noida as their preferred industrial an operational base.

A Medical University is proposed to be developed with state-of-the-art facilities near Gautam Budh University in a total area of 50 acres

Estimated cost of construction of this multi-pecialityhospital is INR 939 crore

Medical University is proposed to offer facilities for courses in MBBS, BDS, MD and MDS

A heliport is proposed to be developed in Greater Noida which will provide a vertical gateway to New Delhi, Agra and Jaipur

Covering an area of about 222.36 hectare, Greater Noida's proposed Night Safari is the fourth such project of its kind in the world, after Thailand, China and Singapore.

The state-of-the-art Boraki railway station is to serve the Noida-Greater Noida-Sikandrabad-Bulandshahar hinterland

It is projected to cost INR 132.49 crore of which INR 26.12 crore is to be borne by Indian Railways on railway infrastructure, and the balance INR 106.37 crore by the Greater Noida Industrial Development Authority, including land cost of INR 24.60 crore at prevailing rates

Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) UPEIDA has been set up by the state government under UP Industrial Area Development Act 1976.It is engaged in the development of Green Field Expressway Projects on PPP mode.

GNIDA is responsible for developing international-standard infrastructure in Greater Noida. Greater Noida is strategically located close to four important industrial hubs: Noida ,Ghaziabad , Faridabad (35 kms away) and Meerut (75 kms). This region boasts of the single largest direct investment by transnational companies.

Greater Noida Industrial Development Authority (GNIDA)

Page 9: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Agra to Lucknow Access Controlled Expressway Project

lUPEIDA has been nominated as the nodal agency for development of this project

lThe expressway will start from proposed Agra Ring Road and end at proposed Lucknow Ring Road

lConcept report has been prepared and RFQ/RFP will be floated by middle of 2013

lIt will reduce the distance between Lucknow and Agra to 270 km from the current 335 km

lThe expressway is proposed to be linked through Link expressways from existing and potential commercial/agricultural hubs such as Firozabad, Shikohabad, Etawah, Kannauj & Malihabad

Salient FeaturesTotal Length 269.68 Km

Project Cost INR 13087 Crore

Design Speed 120 kmph

Width 110 metres

Carriageway 6 lane

Growth Centres 4

Infrastructure

Industry Hub

Medical University

Heliport

Night Safari

Boraki Railway Station

l

l

l

l

l

l

l

l

l

l

l

l

l

l

Greater Noida city is located at the intersection of the Western and Eastern Dedicated Freight Corridors. It is also the gateway to theDelhi-Mumbai Industrial Corridor (DMIC).

Important expressways originate from this city, namely the Yamuna Expressway from Greater Noida to Agra

An eight-lane, 25 km-long expressway connects Greater Noida directly to Delhi

Greater Noida is the only city in North India with privatized power distribution, which ensures efficient power supply.

Eastern Peripheral Expressway, under development, will take off at Kundli and will join NH2 at Faridabad via Ghaziabad and Greater Noida. The Howrah-Delhi main railway line passes through the area.

With a large number of automobile and automobile component manufacturers located here, Greater Noida is increasingly being referred to as he Detroit of India

Industrial majors such as Asian Paints, Bharat Petroleum, Delphi Automotive Systems, Yamaha Motors, Honda Siel, LG Electronics, New Holland Tractors, Pepsi, Hindustan Times and Moser Baer India have all chosen Greater Noida as their preferred industrial an operational base.

A Medical University is proposed to be developed with state-of-the-art facilities near Gautam Budh University in a total area of 50 acres

Estimated cost of construction of this multi-pecialityhospital is INR 939 crore

Medical University is proposed to offer facilities for courses in MBBS, BDS, MD and MDS

A heliport is proposed to be developed in Greater Noida which will provide a vertical gateway to New Delhi, Agra and Jaipur

Covering an area of about 222.36 hectare, Greater Noida's proposed Night Safari is the fourth such project of its kind in the world, after Thailand, China and Singapore.

The state-of-the-art Boraki railway station is to serve the Noida-Greater Noida-Sikandrabad-Bulandshahar hinterland

It is projected to cost INR 132.49 crore of which INR 26.12 crore is to be borne by Indian Railways on railway infrastructure, and the balance INR 106.37 crore by the Greater Noida Industrial Development Authority, including land cost of INR 24.60 crore at prevailing rates

Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) UPEIDA has been set up by the state government under UP Industrial Area Development Act 1976.It is engaged in the development of Green Field Expressway Projects on PPP mode.

GNIDA is responsible for developing international-standard infrastructure in Greater Noida. Greater Noida is strategically located close to four important industrial hubs: Noida ,Ghaziabad , Faridabad (35 kms away) and Meerut (75 kms). This region boasts of the single largest direct investment by transnational companies.

Greater Noida Industrial Development Authority (GNIDA)

Page 10: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

About Udyog Bandhu

Success Stories

'Udyog Bandhu' is an IS/ISO 9001:2008 certified agency of Government of Uttar Pradesh to facilitate industrial and infrastructure investment in the State.

It works as a bridge between the entrepreneurs and government by providing advisory services to entrepreneurs desirous of investing in Uttar Pradesh. 'Udyog Bandhu' is a proactive contributor in policy formulation for creating congenial business environment leading to industrial growth. It helps different industry related departments to simplify and deregulate their processes of clearance.

To ensure effective and timely resolution of issues of entrepreneurs, 'Udyog Bandhu' organises Tripartite Meetings involving entrepreneurs and government departments concerned. It works at three tiers of district, division and State to redress the grievances of industries.

State level Udyog Bandhu is headed by Hon'ble Chief Minister and an Empowered Committee has been constituted under the Chairmanship of Chief Secretary to decide on policy matters and coordination of interdepartmental issues for facilitating the investment in the State.

'Udyog Bandhu' has implemented 'Nivesh Mitra' - a web-based seamless interface to facilitate investment in Uttar Pradesh. 'Nivesh Mitra' is an online single window clearance facility available 24x7 to investors willing to apply for setting up industry or enterprise in the State.

Application through 'Nivesh Mitra' is mandatory for establishing all kinds of enterprises except for micro enterprises. Facility of online payment of relevant fee is also available through this web portal. 'Nivesh Mitra' is currently providing services of 12 departments concerned with industries, it works as a single point mechanism for timely issuance of approvals and clearances required for setting up enterprise anywhere in the State.

Progress of PPP projects under Housing and Urban Planning Department

Industry Hub

l

KRIBHCO, HUDCO,FCI,ICMR, Mothersons,Minda, Flex and Phoenix have established a major base here

IT/ITeS DestinationlTheNasscom region is home to many prestigious companies such as IBM, TCS, Adobe International, HCL,, Birlasoft, Wipro, Polaris,

Cadence, Convergys, ST Microelectronics, Moser Baer,Xansa etc.lBesides there are dozens of special economic zones and software technology parks spread over an area of more than 1000 acreslThe annual exports have exceeded INR 20000 crore and growing steadily

Film ProductionlHost to a large number of studios and news channels including ZEE TV, Aajtak, Times Now, E-24, IBN 7 , CNN IBN, India TV , Eagle

Films, Marwah Studios and T-series

MedicinelDistrict hospital being developed and upgraded in Sector 39 lAn integrated pediatric institute is coming up with 24 departments dedicated to different childhood diseaseslMultispeciality hospitals like Fortis, Max, Apollo, Kailash, Metro Heart Institute, Noida Medicare Centre also present

Metro RaillExcellent connectivity with DelhilNew metro line from botanical garden will provide excellent connectivity with Indira Gandhi International Airportl6 km metro line will connect Greater Noida west with Delhi via Noida

Industrial giants such as BHEL , Panasonic, Samsung, BPL-Sanyo, Eveready, Honda, GAIL, IOC, NTPC, Pawan Hans, FDDI, IBP,

Project Name Description

Development of International Lucknow Development Authority is the nodal agency for implementing this project

Standard Cricket Estimated project cost is Rs 400 crore

M/s Innovest Advisory services has been selected as the new consultant for remodelling and bid process management

Targeted completion date is June 2015

Stadium cum Sports Complex in Lucknow

Development of Northern Ghaziabad Development Authority is the nodal agency to develop this project

Peripheral Road in Ghaziabad Feedback infrastructure and Services Pvt. Ltd. has been selected as consultant for this project

The expected project cost is INR 450 Crore and approximate length is 20 km

Targeted completion date is June 2015

Development of Inner Agra Development Authority is the nodal agency for implementation of this project

Ring Road in Agra Estimated project cost is INR 1100 crore and length is approximately 24.5 km .

Casta Engineers has been appointed as the consultant for remodelling developer selection

Targeted completion date is Dec 2015

l

l

l

l

l

l

l

l

l

l

l

l

l

New Okhla Industrial Development Authority (NOIDA)Created by the UP Industrial Area Development Act 1976 on 17th April 1976, NOIDA has succeeded in creating a 21st century landmark in urban development . It is a planned, integrated industrial city well connected to Delhi. All this is supported by a reliable power supply , abundant ground water with Gangajal,outstanding residential, educational and medical facilities and presence of highly skilled and semi-skilled manpower.

Page 11: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

About Udyog Bandhu

Success Stories

'Udyog Bandhu' is an IS/ISO 9001:2008 certified agency of Government of Uttar Pradesh to facilitate industrial and infrastructure investment in the State.

It works as a bridge between the entrepreneurs and government by providing advisory services to entrepreneurs desirous of investing in Uttar Pradesh. 'Udyog Bandhu' is a proactive contributor in policy formulation for creating congenial business environment leading to industrial growth. It helps different industry related departments to simplify and deregulate their processes of clearance.

To ensure effective and timely resolution of issues of entrepreneurs, 'Udyog Bandhu' organises Tripartite Meetings involving entrepreneurs and government departments concerned. It works at three tiers of district, division and State to redress the grievances of industries.

State level Udyog Bandhu is headed by Hon'ble Chief Minister and an Empowered Committee has been constituted under the Chairmanship of Chief Secretary to decide on policy matters and coordination of interdepartmental issues for facilitating the investment in the State.

'Udyog Bandhu' has implemented 'Nivesh Mitra' - a web-based seamless interface to facilitate investment in Uttar Pradesh. 'Nivesh Mitra' is an online single window clearance facility available 24x7 to investors willing to apply for setting up industry or enterprise in the State.

Application through 'Nivesh Mitra' is mandatory for establishing all kinds of enterprises except for micro enterprises. Facility of online payment of relevant fee is also available through this web portal. 'Nivesh Mitra' is currently providing services of 12 departments concerned with industries, it works as a single point mechanism for timely issuance of approvals and clearances required for setting up enterprise anywhere in the State.

Progress of PPP projects under Housing and Urban Planning Department

Industry Hub

l

KRIBHCO, HUDCO,FCI,ICMR, Mothersons,Minda, Flex and Phoenix have established a major base here

IT/ITeS DestinationlTheNasscom region is home to many prestigious companies such as IBM, TCS, Adobe International, HCL,, Birlasoft, Wipro, Polaris,

Cadence, Convergys, ST Microelectronics, Moser Baer,Xansa etc.lBesides there are dozens of special economic zones and software technology parks spread over an area of more than 1000 acreslThe annual exports have exceeded INR 20000 crore and growing steadily

Film ProductionlHost to a large number of studios and news channels including ZEE TV, Aajtak, Times Now, E-24, IBN 7 , CNN IBN, India TV , Eagle

Films, Marwah Studios and T-series

MedicinelDistrict hospital being developed and upgraded in Sector 39 lAn integrated pediatric institute is coming up with 24 departments dedicated to different childhood diseaseslMultispeciality hospitals like Fortis, Max, Apollo, Kailash, Metro Heart Institute, Noida Medicare Centre also present

Metro RaillExcellent connectivity with DelhilNew metro line from botanical garden will provide excellent connectivity with Indira Gandhi International Airportl6 km metro line will connect Greater Noida west with Delhi via Noida

Industrial giants such as BHEL , Panasonic, Samsung, BPL-Sanyo, Eveready, Honda, GAIL, IOC, NTPC, Pawan Hans, FDDI, IBP,

Project Name Description

Development of International Lucknow Development Authority is the nodal agency for implementing this project

Standard Cricket Estimated project cost is Rs 400 crore

M/s Innovest Advisory services has been selected as the new consultant for remodelling and bid process management

Targeted completion date is June 2015

Stadium cum Sports Complex in Lucknow

Development of Northern Ghaziabad Development Authority is the nodal agency to develop this project

Peripheral Road in Ghaziabad Feedback infrastructure and Services Pvt. Ltd. has been selected as consultant for this project

The expected project cost is INR 450 Crore and approximate length is 20 km

Targeted completion date is June 2015

Development of Inner Agra Development Authority is the nodal agency for implementation of this project

Ring Road in Agra Estimated project cost is INR 1100 crore and length is approximately 24.5 km .

Casta Engineers has been appointed as the consultant for remodelling developer selection

Targeted completion date is Dec 2015

l

l

l

l

l

l

l

l

l

l

l

l

l

New Okhla Industrial Development Authority (NOIDA)Created by the UP Industrial Area Development Act 1976 on 17th April 1976, NOIDA has succeeded in creating a 21st century landmark in urban development . It is a planned, integrated industrial city well connected to Delhi. All this is supported by a reliable power supply , abundant ground water with Gangajal,outstanding residential, educational and medical facilities and presence of highly skilled and semi-skilled manpower.

Page 12: INFRASTRUCTURE - Udyog Bandhu world class infrastructure with a vision of robust growth n n43 National Highways connect it with 9 neighboring states and other parts of India nLargest

Udyog Bandhu

An ISO 9001-2008Certified Organisation

Knowledge Partner

ContactsUdyog BandhuExecutive Director, Udyog Bandhu,12 C Mall Avenue, Lucknow-226001 Government of Uttar PradeshPhone :91-522-2238283 Fax:91-522-2238255Email: [email protected]: www.udyogbandhu.com

Chief Executive Officer UP State Highway Authority 4th Floor, Mandi BhawanVibhuti Khand, Gomti Nagar, Lucknow (U.P.) IndiaTel: 0522-4150377 Fax: 0522-4150377E-mail: [email protected]