information technology advisory board

11
Information Technology Information Technology Advisory Board Advisory Board Sunflower Project Sunflower Project Kansas Financial Management System Gary Schneider 785.296.2660 [email protected] April 15, 2008

Upload: brenden-landry

Post on 30-Dec-2015

21 views

Category:

Documents


0 download

DESCRIPTION

Information Technology Advisory Board. Sunflower Project Kansas Financial Management System Gary Schneider 785.296.2660 [email protected] April 15, 2008. Today’s Agenda. Project Status Project Governance Structure and Team Project Timelines and Agency Planning. Asset Mgmt. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Information Technology  Advisory Board

Information Technology Information Technology Advisory BoardAdvisory Board

Sunflower ProjectSunflower ProjectKansas Financial Management System

Gary Schneider 785.296.2660

[email protected]

April 15, 2008

Page 2: Information Technology  Advisory Board

2

Today’s AgendaToday’s Agenda

Project Status

Project Governance Structure and Team

Project Timelines and Agency Planning

Page 3: Information Technology  Advisory Board

3

A&R and Most Programmatic Agencies’ Have a Collection of Disparate Systems

A/P

AssetMgmt

CashMgmt

Purchasing

STARS &Other Central

Systems

ReceiptingRevenue

Agency 1’sSystems

A/P

AssetMgmt

CashMgmt

Purchasing

ReceiptingRevenue

Grants/Projects/

Cost Cntrs

Agency 2’sSystems

A/P

AssetMgmt

CashMgmt

Purchasing

ReceiptingRevenue

Grants/Projects/

Cost Cntrs

Agency 4’sSystems

A/P

AssetMgmt

CashMgmt

Purchasing

Agency 4’sSystems

A/P

AssetMgmt

CashMgmtPurchasing

Grants/Projects/

Cost Cntrs

Page 4: Information Technology  Advisory Board

4

FMS Will Consolidate Administrative Systems, Integrate Agency Business Functions and Interface w/ Programmatic Systems

Agency 2Agency 1

Agency 4

Agency 3

GL

Reporting

AssetMgmt

CashMgmt

Purchasing

ReceiptingRevenue

A/P

FMS

DataArchiving

Page 5: Information Technology  Advisory Board

5

AnalysisSummaryof AgencySystems

Agency

Agencies Not Retaining Systems but Whose

Business Needs are Not Being Met by FMS

Agencies Retaining Systems or Implementing New Systems Because Business Needs Not Met by FMS

Agencies' Systems to be Retained or Decommissioned

Agency

Adjutant GeneralCustom systemretained TBD

Custom systemretained 1

Agriculture 4 X X ◘ 3 X X** ◘

3 X*** X**

Corporation Commission 2 X X X ◘Corrections and Correctional Industries

3 X ◘Commerce 4

Education O 2 X

Health and Environment 3 X ◘ ◘Health Policy Authority 2

PurchasingAR System ◘

Highway Patrol 4 X X X

Insurance 2

Juvenile Justice Authority

3

Labor O 2 XLottery O 2 XPublic Employees Retirement System

3

Revenue 2 XSecretary of State

NewSystem

1

SRS 4 XTransportation 3

Treasury 1

4 X X ◘58

Total # of Systems Decommissioned 10 18 22 8 58

Total # of Systems Not De-commissioned 4

Agency system to be de-commissioned

O = Agency accounting system retained due to needed functionality not in FMS

◘ Agencies with key business needs that will not be met with current scope of FMS

* Agency will de-couple accounting functions from a programmatic system and retain programmatic system

** Agency should review need for tracking consummable inventory

*** Agency should review need for AR/billing

Agency

X = Agency system not de-commissioned based on required functionality not in FMS

Wildlife and Parks

Bureau of Investigation

Aging

Blank = Agency does not have a system

Page 6: Information Technology  Advisory Board

6

Project StatusProject Status

Pre-proposal Bidders’ Conference held February 28th

Bids due April 16th

Current Pre-Implementation Activities• Developing demo scripts• Reviewing chart of accounts• Reviewing all sources of vendor information• Building project team

Page 7: Information Technology  Advisory Board

7

Project Governance Structure & TeamProject Governance Structure & Team

Executive SponsorsDuane Goossen

Denise MooreCarol Foreman

Executive SponsorsDuane Goossen

Denise MooreCarol Foreman

Steering CommitteeSteering Committee

Project DirectorKent Olson

Deputy Project DirectorPeggy Hanna

Project DirectorKent Olson

Deputy Project DirectorPeggy Hanna

Implementation Manager

Gary Schneider

Implementation Manager

Gary Schneider

Project Support StaffMuriah Baker

Project Support StaffMuriah Baker

Project Mgmt Office

(+1 staff)

Project Mgmt Office

(+1 staff)

Finance TeamMgr

Annette

Finance TeamMgr

Annette

Business Intelligence/DW

Lead

Business Intelligence/DW

Lead

ProcurementLead - Angela

(+3 SMEs)

ProcurementLead - Angela

(+3 SMEs)

A/PLead

(+2 SMEs)

A/PLead

(+2 SMEs)

Asset MgmtLead

(+1 SME)

Asset MgmtLead

(+1 SME)

Projects/Grants

Lead (+2 SMEs)

Projects/Grants

Lead (+2 SMEs)

General LedgerLead

(+2 SMEs)

General LedgerLead

(+2 SMEs)

BudgetIntegration

Lead (+1 SME)

BudgetIntegration

Lead (+1 SME)

SHARP Integration

Lead (+1 SME)

SHARP Integration

Lead (+1 SME)

Central AgencyIntegration

Lead

Central AgencyIntegration

Lead

Agency/RegentsIntegration

Lead (+3staff)

Agency/RegentsIntegration

Lead (+3staff)

Set-off & Treasury

Integration

Set-off & Treasury

Integration

Data Warehouse

SME

Data Warehouse

SME

FMS Project Organizational Chart

QA/TestLead

(+2 staff)

QA/TestLead

(+2 staff)

DevelopmentLead (+3 staff)DevelopmentLead (+3 staff)

SecurityLead

(+2 staff)

SecurityLead

(+2 staff)

Data ConversionCoordinator

Data ConversionCoordinator

Sys Admin &Build Team

(+2 staff)

Sys Admin &Build Team

(+2 staff)

Reports Development

Lead (+2 staff)

Reports Development

Lead (+2 staff)

StakeholderInput

Positions Filled

Positions Posted

Positions to-be Filled

Change Mgmt, Training,Communications &

Help Desk Team MgrTBD (+5 staff)

Change Mgmt, Training,Communications &

Help Desk Team MgrTBD (+5 staff)

Technical TeamManager

TBD

Technical TeamManager

TBD

Page 8: Information Technology  Advisory Board

8

Agencies PerformImpact AssessmentAgencies Perform

Impact Assessment

CompleteVendor Selection

& Develop DetailedProject Plan

CompleteVendor Selection

& Develop DetailedProject Plan

AgenciesDevelop/Submit

Project Plans

AgenciesDevelop/Submit

Project Plans

Agency Liaisons Assist Agencies& Monitor Plans

Agency Liaisons Assist Agencies& Monitor Plans

May 12th – June 13th Aug – Oct Oct – Nov On-going

Project Timelines and Agency PlanningProject Timelines and Agency Planning

Page 9: Information Technology  Advisory Board

9

Propo

sals

Due

April 16th

“Stra

wman

Chart

of A

ccou

nts

Provid

ed to

Age

ncies

May 12th June 13th

Agenc

ies S

ubm

it Im

pact

Asses

smen

t

Revise

d Offe

rs D

ue

June 30th

3rd R

ound

Scorin

g Com

plete

July 9th

Begin

Contra

ct

Negot

iation

s

July 15th

}Using a template provided, agencies

perform impact assessment of:1) Systems to be interfaced2) Systems to be de-commissioned

Begin

Projec

t

Plannin

g

August 15th

Project Timelines and Agency PlanningProject Timelines and Agency Planning

Page 10: Information Technology  Advisory Board

10

Objectives of Impact Assessment:

Ensure that agencies have adequately analyzed/sized the effort to: • modify systems to be interfaced; and/or • de-commission systems and convert data

Identify any resource constraints (personnel, test environments, etc.) in time to remedy

Identify and resolve any conflicting agency initiatives

Identify and resolve any impediments agencies may have in meeting the approx 8-month time window and work with agencies to modify existing systems

Project Timelines and Agency PlanningProject Timelines and Agency Planning

Page 11: Information Technology  Advisory Board

11

Planning Design Configuration/Development/Testing Integration Acceptance Testing Testing

Kick-off

Complete design of chart of accounts & publish interface

standards to agencies

Agency interface development, modifications to existing systems and initial data conversion/loading complete

8-10 month timeframe for agencies to:1. Set-up development & test environments2. Attend technical training3. Modify systems4. Develop interfaces (as required)5. Extract and clean-up data and validate data loading6. Develop agency-specific reports (75% of reports

through central reporting portal)7. Develop testing plans and prepare for integration

testing

8-10 month timeframe for agencies to:1. Set-up development & test environments2. Attend technical training3. Modify systems4. Develop interfaces (as required)5. Extract and clean-up data and validate data loading6. Develop agency-specific reports (75% of reports

through central reporting portal)7. Develop testing plans and prepare for integration

testing

10/08 01/09 03/09 01/10 03/10 07/10Expected critical path

Go-Live07/01/10

Project Timelines and Agency PlanningProject Timelines and Agency Planning