dss advisory board
DESCRIPTION
DSS Advisory Board. Current Status for DSS Good progress on software Database interface is advancing Installation Schedules Review of DSS project could be made in May Installation of first prototype DSS in 3 rd Quarter Experimental requirements? Necessary services for DSS operation - PowerPoint PPT PresentationTRANSCRIPT
20 January 2003 1
DSS Advisory Board
• Current Status for DSS– Good progress on software– Database interface is advancing
• Installation Schedules– Review of DSS project could be made in May– Installation of first prototype DSS in 3rd Quarter– Experimental requirements?
• Necessary services for DSS operation– Status for electricity, networking, etc?
• Sensors for DSS– Who provides which sensors?
AEVAlarmEvaluation
DINDigitalInputs
AINAnalogInputs
VAINVirtual AINs
ALMAlarms
A2AAlarm toAction
relations
ACTActions
History(only DIN,VAIN,ALM,ACT)
Receive
Boundary violationAccess Error
DSS Status PLC Status
Warm/ColdstartsPS
ModulesI/O Access
RedundancyCPU MemoryCPU TimingDSS Code
CPU StatusModule StatusCom. StatusPLC Status
• Standard LEP rack 56U (52U used)
56U
(25
6cm
)
• 4U: UPS (APC.com ?)• 1U: OPC Server PC• 2U: Local Display
• 7U: CPU (left, only in CPU racks ;-)• 7U: PS (right)• 12U: External crates (max. 2)• 1U: Sliding table
• 25U: patch panelWAGO modules (some including
relais / optocoupler)
• maybe OPC Server PC behind patch panel Racks accessible from behind ?