    REPORT ON GANDHINAGAR THERMAL POWER

    STATION

    Submitted by-

    Kaushalkumar V. Trivedi

    B.E. Mechanical 6th semester

    Roll no:- 26117

    Year 2010

    Department of Mechanical Engineering

  • 8/9/2019 INDUSTRIAL TRAINING AT THERMAL POWER PLANT ,GANDHINAGAR

    2/5

    Acknowledgement

    Natural abilities are like natural plants, they need pruning by study. On

    successful completion of my training at Gandhinagar thermal power station, i would

    like to thank some eminent personalities who have been involved with me right from

    the beginning of my training work.

    I am thankful to chief engineer Mr. J.N. Doshi and executive engineer Mr. A.C.

    Patel of the BMD department who granted the permission to do the project at GTPS.

    I would like to express my profound gratitude to Barot sir & Savani sir for excellent

    cooperation and for giving all kind of needful help.

    Words can never be enough when it comes to expressing gratitude towards

    our head of the department shri P.D. Solanki for inspiring and guiding me for theproject.

    I would also like to thank the administration staff of the GTPS for providing me

    various information regarding the power station and literature on the same along with

    those who have helped me directly or indirectly to make my project a success.

    Finally, I pray the almighty and ask his blessing in my future endeavors.

    Kaushalkumar V. Trivedi

  • 8/9/2019 INDUSTRIAL TRAINING AT THERMAL POWER PLANT ,GANDHINAGAR

    3/5

    ABSTRACT:-

    On the training during G.E.B we get the real practical knowledge of thermal

    engineering and we also know how the actual power plant works rather then

    we study in our book.

    I placed at boiler maintenance during my training period of 15 days .During the

    training I learn the power plant cycle and different components working after

    the assembly and how they works in practical application.

    In the first week of our training I visited the different boiler sections and its

    parts. In the second week of the training I visited and observed the working of

    coal cycle and ash handling systems used at Gandhinagar thermal power

    station.

    After the completion of the training I exactly know the how power plant system

    works and also about the company profile and about the organization of

    Gandhinagar thermal power station.

    So it was a memorable experience for me to take training at this one of the

    most leading power sector of Gujarat.

  • 8/9/2019 INDUSTRIAL TRAINING AT THERMAL POWER PLANT ,GANDHINAGAR

    4/5

    Index

    Aim of the training 1

    Company profile 2

    Introduction 3

    General data of gtps . 4

    General layout . 7

    General description of a layout 8

    Different componenets in this plant . 9

    Boiler .... 10

    Boiler drum 11

    Super heater 11

    Reheater 12

    Economiser .. 12

    Air preheater . 13

    Boiler furnace .. 14

    Condenser .. 14

    Deaerator .. 16

    Cooling tower 17

    Steam turbine &generator ... 18

    Principle & operation of plant 19

    Energy conversation diagram ... 21

    Different cycles

    Coal cycle .. 22

    Air & flue gas cycle .. 28

    Steam cycle 30

  • 8/9/2019 INDUSTRIAL TRAINING AT THERMAL POWER PLANT ,GANDHINAGAR

    5/5

    Condensation cycle 33

    Feed water cycle 33

    Ash cycle 35

    Conclusion . 38