Page 1: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Indonesian Rail Masterplan Market Assessment

The role of rail in the Indonesian transport system

Page 2: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Outline

• Background/setting• The role of rail in transport system• Overview of performance• Strengths of rail• Impact of sector policies

• Implications for market assessment• Java main line passenger• Jabotabek passenger• Java freight• South Sumatra Coal• New coal lines

Page 3: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Approach to Market Assessment

• Key principles– price: impossible to assess demand without considering price

and competition– cost: impossible to consider price without considering cost– Here: economic cost not financial cost. Because point of view

• Government• economic efficiency

• Questions – Strengths of rail: what is role of rail in transport system– demand for rail in the transport markets considering cost and

price

Page 4: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

The role of rail in the transport system

2 approaches to identify role of rail• Performance in market

– By main tasks/lines of business• Based on revenues

– Growth of passenger/km, tonne/km• Comparison of costs for different tasks

– Scenario analysis – Tonne/km cost of rail versus road

Page 5: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Overview of performance

PTKA revenues by main line of business 2008

Line of business % of revenues

Java main line passenger services 45

South Sumatra Coal 27

Jabotabek passenger services 9

Java freight 8

Java local passenger services 4

Other 7

Total 100

Page 6: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Java main line passengerpassenger/km and yield

• Overall decline of 3% p/y since 2000– Traffic declined sharply early 2000s but is recovering since

2004 • Highlights 2000 - 2008

– executive: + 0.7 % and yields and distances are good– business: - 4.4 % and lower yields – economy: -3.8 % low yields are topped up by PSO– local: + 7.2 % low yields are topped up by PSO– Conclusion: loss of market share – except for local

• This requires in-depth analysis – market research– When was high point reached– What was impact of deregulation in competing modes– What was impact of aggressive performance competition– What was impact of economic crisis– Other factors ???

Page 7: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Jabotabek passenger servicespassenger/km and yield

• 1981 – 2008 : – overall steady growth 7.1 % p/y – but 2.8 % since 2000

• Highlights 2000 -2008– economy: slight decline of 0.3 % p/y - very low yield compensated

by PSO– decline compensated by introduction of A/C and commercial– much better yields for commercial and economy A/C– commercial approach by PTKA

• Jabotabek market segment also requires careful analysis– Scope for further service differentiation - higher yields

• Commercial 250 Rp/pass/km compared to 43 Rp/pass/km for economy

– Scope for developing new markets in context of suburban rail transit development integrated with urban development

Page 8: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Java freight services

• Highlights– Java freight = 8 % of PTKA revenues– Peak probably in 1996: 1,440 tonnes/km– Since 1996: traffic - 2.1 % p/y– Traffic composition has changed considerably– Yield per tonne/km: Rp. 254 – Cost per tonne/km: Rp 500 ? Rp 600 ?– Loss per tonne/km: Rp. 250 ? Rp 350 ?

• Question: Which cargo has future– Need for detailed traffic costing– Focus on profitable services– Exit strategies for unprofitable services

Page 9: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

South Sumatra coal traffic

• Highlights– 2008: 10.5 million tonnes – 4.4% p/y since 1991– Coal traffic = 27 % of revenues of PTKA– Coal > than 91 % of freight revenues of SS Railway– yield Rp/tonne/km: Suralaya: 250; Kertapati 313– Haul distance (km): 409 162

• Question: why vertical separation

South Sumatra Freight Revenue

Type of Freight Proportion

(%) Suralaya Coal 81.7 Other Coal 9.7 Petroleum Products 5.4 Other 2.2 Cement/Klinker 1.0 Total 100.0

Page 10: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

New coal railway lines

• Several studies and proposals for new lines• Sumatra:

– objective: to enable increase in production– part of new logistics chain from mine to a vessel loading point– example: new line to transport Bukit Assam coal to new deep

water port at Tanjung Api Api, also involving construction of a bridge across Musi river: 3 major investments !

• Kalimantan:– part of logistics chain for a new mine (or group of new mines)

to a vessel loading point. – example: proposals for Kalimantan lines.

• Feasibility is dependent on outlook in coal markets and ability to obtain firm purchase agreements

• Challenges impeding realization– all elements of logistics chain need to be developed– approvals of many central and local govt agencies

Page 11: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Strengths of rail compared to road Impact of volume and distance

• Rail - total operating costs – Java freight: Rp/t/km ?? – ESS coal: Rp/t/km ??

• Why is cost Java more than 2 times higher ?

Total volume(Million tonnes 2008)

Hauling distance

(km)

Java (mix of general cargo)

4.3 258

Suralaya coal(block train)

8.5 405

Page 12: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

500 Kilometer Haul – Siding to Siding Versus Pickup And Delivery Costs

0

200

400

600

800

1000

1200

1400

1600

1 million tons 3 million tons 5 million tons

Rp

/to

n/k

m

Rail New Inf rastructure - pick up and delivery

Rail New Inf rastructure -siding to siding

Road New Inf rastructure

Road Existing

Page 13: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Rail versus road - impact of volume 500 km haul - Rp/tonne/km

• Scenario analysis – rail versus road– Road is lower cost at low volumes– As volume increases, unit cost of rail declines

• Rail: siding to siding – rail is only lower cost than new road at 5 million tonnes

• Rail: pick up and delivery cost– road remains lower cost even at 5 million tonnes

Page 14: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

250 Km Haul - Siding to Siding Versus Pickup And Delivery Costs

0

200

400

600

800

1000

1200

1400

1600

1800

1 million tons 3 million tons 5 million tons

Rp

/to

n/k

m

Rail New Infrastructure -pick up and delivery

Rail New Infrastructure -siding to siding

Road New Infrastructure

Road Existing

Page 15: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Road versus rail - impact of distance 250 km haul - Rp/tonne/km

• Scenario analysis – When pick up and delivery costs

rail can not compete with road at 5 million tonnes

• Java freight – typical conditions– 250 km typical hauling distance – total volume < 5 million tonnes – and mixed cargo !

– large proportion of cargo requires pick up and delivery• Outlook for rail ? ?

– need to be very selective

Page 16: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Theory and realitywhy is rail carrying traffic that would be lower cost by road ?

Combination of factors• No charging for infrastructure

– rail and road are competing on basis of their operating costs – higher rail infrastructure cost are not recovered

• No detailed traffic costing– rail may not be fully aware of the real costs of some traffics -

multi-product enterprise – depreciation on basis of historical cost– Govt. contributions in kind in the past

• business as usual – legacy of past • is not sustainable. • “above rail” costs are probably not recovered

Page 17: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

How to ensure that rail plays its roleperforms the tasks for which it is best suited

• Context - market economy• Private sector firms in other modes constantly innovate and

reduce costs • passengers and cargo owners make choices

• Easiest if prices/tariffs reflect economic costs• Including external costs

• Ultimately largely an issue of sector policies • Infrastructure investment• Infrastructure pricing – level playing field• Price/tariff regulations• Entry and exit regulations - all modes

• Policies affect modal shares

Page 18: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system
Page 19: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system
Page 20: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system
Page 21: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Information about shipment    

Ship Carrier: UPS

Tracking Number: 1ZY3759X0359299933

Status: Delivered

Location: Porch

Order #:

104-7638357-7363431

Shipment Date: December 5, 2009

Destination: BETHESDA, MD, US

Track your package    

Date Time Location Event Details

December 8, 2009

05:12:00 PM Burtonsville - Montg MD US

Delivered

December 8, 2009

01:56:00 AM Burtonsville MD US Arrival Scan

December 8, 2009

01:46:00 AM Laurel MD US Out for delivery

December 8, 2009

01:46:00 AM Burtonsville MD US Arrival Scan

December 7, 2009

09:32:00 PM Laurel MD US Arrival Scan

December 7, 2009

07:42:00 PM Harrisburg PA US Departure Scan

December 6, 2009

01:42:00 PM Harrisburg PA US Shipment received by carrier

December 5, 2009

01:12:27 PM Lewisberry PA US Shipment has left seller facility and is in transit

Page 22: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Java commercial passenger services

• Approach to forecasting demand - micro– market by market – service by service – OD– what is competition doing– relative prices – quality of service – elasticity measures– understanding shifts in demand

• Implications– Lead role – PTKA/train operator– Need for accurate cost data for business unit/service– Need for coordination between infrastructure and

operations – Focus on capacity requirements at the level of facility

and corridor

Page 23: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

PARIS – LYON 2 DAYS BEFORE DEPARTURE - FIRST CLASS

Leaving on Tuesday 15/12 between 08h54 and 11h54 - total price for 1 passenger Leaving at 08h54 09h54 09h54 10h53 10h53 11h54 11h54

Best price 112.70 € 112.70 € 112.70 € 112.70 € 112.70 € 112.70 € 39.90 €

J ourney time 01h57 02h03 02h15 01h58 02h10 01h57 01h57

Travel with

11h54 - PARIS GARE DE LYON

13h51 - 13h51> via LYON PART DIEU

02937 1st class Reservation required

J ourney time 01h57

39.90 € 1st class : Exchanged, subject to conditions, with a charge of 10€. Non-refundable. Pay on line. Print your own ticket. Exclusive Internet price.

Cancel

11h54 - PARIS GARE DE LYON

13h51 - 13h51> via LYON PART DIEU

06613 1st class Off peak - Reservation required

J ourney time 01h57

112.70 € TGV Loisir : Ticket can be exchanged and refunded (administrative charge applies) before departure and cannot be exchanged or refunded after departure.

119.00 € TGV PRO 1ère : Exchange and refund service free of charge up until departure, and subject to conditions after departure. Warning, starting on 2 February 2010, these conditions are changing. Contact your nearest sales outlet for further information.See conditions.

Cancel

Page 24: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

PARIS – LYON 2 MONTHS BEFORE DEPARTURE – FIRST CLASS – MID-DAY DEPARTURE

Leaving on Monday 15/02 between 11h54 and 14h52 - total price for 1 passenger Leaving at 11h54 11h54 11h54 12h54 13h54 13h54 14h52

Best price 34.00 € 29.00 € 29.00 € 34.00 € 34.00 € 34.00 € 34.00 €

J ourney time 01h57 01h57 02h09 01h57 02h03 02h15 01h59

Travel with

11h54 - PARIS GARE DE LYON

13h51 - 13h51> via LYON PART DIEU

02937 1st class Reservation required

29.00 € 1st class : Exchanged, subject to conditions, with a charge of 10€. Non-refundable. Pay on line. Print your own ticket. Exclusive Internet price.

Hurry, last seats available!

11h54 - PARIS GARE DE LYON

13h51 - 13h51> via LYON PART DIEU

06613 1st class Off peak - Reservation required

J ourney time 01h57

34.00 € TGV Prem's : Ticket may not be changed nor refunded.

Hurry, last seats available!

58.00 € TGV Loisir : Ticket can be exchanged and refunded (administrative charge applies) before departure and cannot be exchanged or refunded after departure.

119.00 € TGV PRO 1ère : Exchange and refund service free of charge up until departure, and subject to conditions after departure. Warning, starting on 2 February 2010, these conditions are changing. Contact your nearest sales outlet for further information.See conditions.

Page 25: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Java economy passenger services

• Approach to forecasting demand - micro– BUT– Demand depends on fare – Fare depends on cost and PSO subsidy

• Implications– Need for stable agreement between government and

PTKA/train operator on level of subsidy (PSO)– Need for traffic costing data by business unit/service– Government/MOT to develop concept of: (i) target

population; (ii) level of support justified; (iii) mechanism for PSO delivery

– Need for coordination between infrastructure and operations

– Focus on capacity at level of facility & corridor

Page 26: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Java freight services

• Approach to forecasting demand - micro– market by market, service by service, OD– knowledge of: competition, door-to-door costs, quality of

service, initiatives by competition– changing industrial location

• Implications– Lead role – PTKA/train operator– Need for accurate cost data by business unit/service to

support decision to produce & pricing strategy– Need for coordination between infrastructure and train

operations – Focus on capacity requirements at the level of facility

and corridor – eliminate bottlenecks

Page 27: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Jabotabek passenger servicessuburban commuter rail

• Requirements for efficient metropolitan transport

• integrated multimodal system

• based on complementarity between modes

• need for metropolitan entity

(1) prepare a coordinated metropolitan transport plan; (2) deliver integrated system; (3) providing integrated services

• Role of Jabotabek rail in metropolitan transport

providing high volume suburban commuter transport

• Issues

• Commuter rail is very costly – how to optimize its role

• experience shows that fare box can not cover operating costs

Financing has to be supplemented with other metropolitan income ideally from those who benefit from the economies of agglomeration

Page 28: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Jabotabek passenger services

• Approach to forecasting demand• Identify role of suburban rail in overall transportation system

• based on relative costs of modes

• Macro modeling approach • based on O-D and modal split is preferred

• Planning work has already been done• The Study on Integrated Transportation Masterplan for Jabodetabek• detailed recommendations on investments & actions

• Implications – need for separate business unit for Jabotabek train operations –

operational and financial autonomy– client of business unit = metropolitan transport entity– strong focus on traffic costing to underpin level of subsidy– stable pool of funds from various sources/modes

Page 29: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Integrated land use and transport planning

Goal

to enhance the role of rail in metropolitan transportation

How – Transit oriented urban/suburban development– Central concept: ACCESSIBILITY – Promotion of public transport

In practice (Jabotabek Masterplan Study)– Improve quality of rail services– Upgrade railway stations & intermodal connections– High density real estate development in vicinity of railway

stations

Page 30: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Concept for railway catchment area

Page 31: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

South Sumatra coal

Approach to forecasting – institutional status quo• Long term - only one major client

• ideally: long term contract• BUT: credibility of off-take commitments by mining company

• Medium term – coordination/synchronization• Production planning of the mine• Transport capacity planning of railway• Agreement between 3 parties on

• Volumes• Operating procedures at transhipment points• Operating indicators• Cost sharing on rolling stock

Page 32: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

Kalimantan new (coal) railway lines (1)

• Obstacles to implementation in past– short distances– collaboration between mining companies for minimum

volumes – coordinated development of ENTIRE logistics chain:

challenge– lack of legal and regulatory framework for private sector

financing• Principles

– integral part of mining scheme (mining permit includes transport)

– mining company fully responsible for• identifying least cost logistics chain• developing, financing and operating all elements of the

logistics chain– Government = facilitator

Page 33: Indonesian Rail Masterplan Market Assessment The role of rail in the Indonesian transport system

New (coal) railway lines (2)

• Outlook has now improved– Minimum volumes (5-10 million tonnes)

• available in principle in Kalimantan• In Sumatra if major increase in output at existing location

– Legal framework available

• Remaining issues/challenges– Implementing regulations to be developed– Collaboration for minimum off-take commitments– Government facilitation and coordination during

development stage• One stop shop