Independent Environmental Compliance Audit 2019PATRICK PORT BOTANY TERMINALDA 494 (Port Botany Expansion)DA 453 (Patrick Port Botany Terminal Redevelopment)
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 2 of 81
Document History
Revision Date Prepared By Reviewed By Description V0 17/02/2020 B Shannon Client 1st draft report Final 24/02/2020 B Shannon S. Fermio Final audit report
Enquiries Name: Steve Fermio Position: Environmental Auditor Telephone: 0417 170 645 Email: [email protected]
Cover photo: Patrick’s Port Botany Terminal quay line, 22 January 2020.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 3 of 81
Executive Summary
The purpose of this audit was to undertake the independent environmental compliance audit for 2019 of Patrick Stevedore’s Port Botany Terminal operations. These operations are being carried out under two separate development consents, namely DA 494, Port Botany Expansion Project and DA 453, Patrick’s Port Botany Terminal Redevelopment.
Specifically, this audit is required to satisfy Condition 6.7 of DA 453 and Condition C4.5 of DA 494. DA 494 requires an independent operational environmental audit to be carried out every 12 months (for the Port Botany Expansion Project area), whereas DA 453 requires such an audit 12-months after commissioning and then every 3 years. This audit coincides with the 4th anniversary post commissioning of the Port Botany Expansion Project, and Patrick’s Port Botany Redevelopment Project area (4 February 2016).
This report covers the 2019 calendar year and assesses compliance with the operational conditions of both DAs and the effectiveness of implementation of the Patrick Port Botany Terminal’s Operational Environmental Management Plan (OEMP) that applies to all its operations across the Terminal. There was also a focus on the status of previous audit findings covering the 2018 calendar year.
Summary of findings:
One new non-compliance in relation to non-display of stormwater drain signage One new non-compliance in relation to contractor and sub-contractor awareness of the conditions of consent Two reoccurring non-compliances related to the completion of an Energy Efficiency Compliance Report and deficiencies in environmental training
As was noted in the 2018 audit report, a high standard of fuel and chemical storage procedures were in place within the facility, a high standard was also seen during the inspection on 22 January 2020. This was observed during the site inspection in various areas of the Terminal and demonstrated during discussions with key onsite staff.
As outlined in the 2018 audit the Patrick Terminal (comprising the redeveloped of Patrick’s existing terminal area, and as part of the Port Expansion Project - The Knuckle (Berth 6) and Ramp D) is now operated as a single integrated site. Having two planning approvals applying to the same area creates a complex compliance regime, particularly when there are inconsistencies between approval conditions covering the same aspects, or conditions having been superseded by changes to the site over the last decade. In addition to the two approvals is an EPL, which is more up to date with current operating conditions. As a result, the current EPL is also inconsistent with several approval conditions.
Accordingly, it is recommended that the regulatory conditions under the two approvals and EPL be reviewed at the earliest opportunity for consistency and relevance to current operations and facilities at the Patrick Terminal. It is understood there may be such an opportunity to revisit the planning approvals after the upgrade of the terminal’s rail infrastructure which would potentially trigger the need for a modification to the approval/s.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 4 of 81
Some further work is required regarding the availability of the site induction resources for staff and contractors, however evidence of this work in progress was observed on the day of the audit. As a result, the majority of the audit findings from 2018 have been closed out or are scheduled to be closed out within the first quarter of this year.
Only four compliance related findings were made as a result of the 2019 audit and positive demonstrations of environmental performance were observed throughout the site, with the presentation and condition of the site being excellent in all respects. The auditee should be commended for these outcomes.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 5 of 81
Table of Contents
1.0 Introduction................................................................................................................................................... 6
1.1 The works ......................................................................................................................................................... 6 1.2 Approval requirements ................................................................................................................................ 8 1.3 Purpose ............................................................................................................................................................. 9 1.4 Scope................................................................................................................................................................. 9 1.5 Methodology ................................................................................................................................................ 10
2.0 Audit Findings............................................................................................................................................. 11
2.1 Compliance Status ....................................................................................................................................... 11 2.2 Observations & Corrective Action Requests........................................................................................ 11 2.3 Effectiveness of environmental management & mitigation measures ........................................ 11 2.4 Environmental performance of the development .............................................................................. 11
3.0 Audit Conclusions...................................................................................................................................... 14
Appendix A. PROJECT APPROVAL CONDITIONS DA 494 – PORT BOTANY EXPANSION
Appendix B. PROJECT APPROVAL CONDITIONS DA 453 – PATRICK PORT BOTANY REDEVELOPMENT
Appendix C. Audit Attendee List
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 6 of 81
1.0 Introduction 1.1 The works
Patrick Stevedores Operations Pty Ltd (Patrick) operates an international shipping container terminal (the Terminal) on land at Brotherson Dock, Port Botany leased from NSW Ports. The Terminal loads and unloads containers from ships berthed at the dock and has temporary container storage capabilities for its customers. The Terminal facilitates the transfer of goods between land and sea. Road and rail access to the site enables trucks and trains to transport containers to and from the Terminal, where the containers are transferred to and from ships.
As part of the Port Botany (PB) Expansion Project the Terminal underwent a major redevelopment, including the development and incorporation of the ‘Knuckle’ area and ‘Ramp D’ into operations, as well as the procurement of Auto StradsTM (Automated Straddle Carriers) and associated infrastructure. The redevelopment has increased the total area, quay line and Twenty-Foot Equivalent Unit (TEU) capacity of the Patrick Port Botany Terminal.
The Terminal operations are covered by two separate development consents. The development of Patrick’s the Knuckle (Berth 6) and Ramp D were completed in accordance with development consent Port Botany Expansion (DA 494) for which NSW Ports was the applicant and was issued to the Sydney Ports Corporation (subsequently transferred to NSW Ports). The existing area of the Patrick PB Terminal was redeveloped under a separate development consent and was specific to Patrick’s existing PB Terminal (DA 453) excluding the terminal areas covered by DA 494. The main features of the Terminal are:
62 hectares of land; 1400 metres of quay line; 4 vessel berths; 9 quay cranes; 47 Auto Strads; 4 reach stackers; and 1.49 kilometres of rail siding (2 parallel lines of 745 metres each)
A general overview of the Port Botany Terminal is presented in Figures 1 & 2.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 7 of 81
Figure 1: Terminal locations at Port Botany
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 8 of 81
Figure 2: Patrick Stevedores site at Port Botany showing areas covered by DA 453 (original terminal) & DA 494 (The Knuckle)
1.2 Approval requirements
Project Approval for DA 494 (Port Botany Expansion) was granted by the Minister for Planning on 10 October 2005 pursuant to section 80 (4) and (5) of the Environmental Planning and Assessment Act 1979 subject to a number of Minister’s Conditions of Approval (CoA). This audit is being carried out in accordance with the annual requirements of CoA C4.5.
In addition to the above, Project Approval for DA 543 (Patrick Port Botany Redevelopment) was granted by the Minister for Planning under the Act on 27 October 2003, subject to a number of CoA. This audit is being carried out under that approval in accordance with the requirements of CoA 6.7 (as the 4th year audit).
DA 494 - CoA C4.5 – Environmental Auditing requires that:
“Within one year of the commencement of operations and every year thereafter, the Applicant shall fund a full independent environmental audit. The audit must be undertaken by a suitably qualified person/team approved by the Director-General”. The audits would be made publicly available and would:
be carried out in accordance with ISO 14010 – Guidelines and General Principles for Environmental Auditing and ISO14011 – Procedures for Environmental Auditing; Assess compliance with the requirement of this consent, other licences/ approvals that apply to the Development;
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 9 of 81
Assess the construction against the predictions made and conclusions drawn in the development application, EIS, additional information and Commission of Inquiry material and: Review the effectiveness of environmental management of the development, including any environmental impact mitigation works.
DA 453 - CoA 6.7- Independent Environmental Audit requires that:
“Within 12 months of commissioning the development and every three years thereafter, unless the Director-General directs otherwise, the Applicant must commission and pay the full cost of an Independent Environmental Audit. The Independent Environmental Audit shall:
a) Be conducted by a suitably qualified, experienced, and independent person whose appointment has been endorsed by the Director-General;
b) Be consistent with ISO 14010 – Guidelines and General Principles for Environmental Auditing, and ISO 14011 – Procedures for Environmental Auditing, or updated versions of these guidelines/manuals;
c) Assess the environmental performance of the development, and its effects on the surrounding d) environment; e) Assess whether the development is complying with the relevant standards, performance
measures, and statutory requirements; f) Review the adequacy of the Applicant’s Environmental Management Plan, and Environmental
Monitoring Program; and, if necessary g) Recommend measures or actions to improve the environmental performance of the plant,
and/or the environmental management and monitoring systems”
1.3 Purpose
The purpose of this audit was to undertake the necessary assessment and review of compliance with approvals to assess the effectiveness of environmental management of Patrick’s operations at its Port Botany Terminal.
1.4 Scope
The scope of this audit included DA 494 and DA 453 and excluded Patrick’s Environment Protection Licence (EPL) No 6962 and its OEMP for the Port Botany Terminal. Construction related CoA are not included in this audit. Commonwealth Approval – EPBC 2002/543 is relevant to NSW Ports but generally not applicable to Patrick’s operations at Terminal 3.
CoA C4.5 (3rd bullet point) refers to an assessment of construction against predictions made and conclusions drawn in the development application, EIS (Environmental Impact Statement), additional information and Commission of Inquiry material. A review of this particular requirement has not been included in the audit as construction of The Knuckle was completed in February 2015 as evidenced in the Construction Completion Compliance Report, Patrick Terminal Port Botany Redevelopment Project, and The Knuckle December 2015 (WolfPeak).
Verifying the on-ground implementation of specific site-based conditions and mitigation measures in the DA’s was undertaken during a site inspection of the Terminal on 22 January 2020. Publicly
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 10 of 81
available information on the Patrick’s website, site-based records and information provided by Patrick before and after the site inspection were also used to verify compliance.
1.5 Methodology
This audit was conducted in accordance with ISO 19011 - which replaces ISO 14010 and ISO 14011 (the latter two standards are referred to in the Project Approvals). The audit was undertaken by Steve Fermio, an Exemplar certified environmental auditor, approved by the Department of Planning and Environment in correspondence dated 13 October 2017, and assisted by Brendan Shannon, Senior Environmental Consultant (WolfPeak).
This audit included an on-site inspection and interviews with Patrick’s management and environmental personnel on 22 January 2020. The audit attendee lists for the opening and closing meetings of the audit are attached at Appendix C.
The checklists in Appendices A and B were used to assess compliance against the:
Operational CoA for DA 494 (Appendix A); and Operational CoA for DA 453 (Appendix B).
A review of Patrick’s Environmental Incident and Community Complaints Registers, along with publicly available information on Patrick’s website, site-based records and observations made during the site inspection on 22 January 2020 have been used to verify compliance with the DA 494 and DA 453.
In relation to findings against conditions:
Compliant: Complies with all requirements of the condition(s). Observation: A situation observed during the audit that provides an opportunity for improvement, requires further consideration or could lead to a non-compliance or environmental impact if not addressed. Corrective Action Request: Observation warranting the issue of a Corrective Action Request as a result of the finding. Non-compliance: Does not fully comply with all requirements of the condition. These are categorised as minor or major, depending on the severity of the non-compliance. Not Applicable: There were either no compliance issues related to the condition, is a future required action, was not applicable at the time of the audit or was not related to a Patrick responsibility.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 11 of 81
2.0 Audit Findings
Table 1 provides a summary of the findings of this audit and actions proposed or completed in response to the findings.
The Audit Checklists provided in Appendices A & B include details of all the evidence collected, observed and provided in support of compliance, publicly available information on NSW Ports or Patrick’s websites.
2.1 Compliance Status
There were two new non-compliances with the Conditions of the Project Approval DA 453 (Item 1/2019, 2/2019 in Table 1 below).
There is one ongoing non-compliance from the 2018 audit (Item 3/2019 below) and one ongoing non-compliance from the 2017 audit still pending close out (Item 18/2017) as detailed in Table 1 below.
It is understood that all of these non-compliances will have been addressed by the end of March 2020.
2.2 Observations & Corrective Action Requests
No observations or corrective action requests were identified.
2.3 Effectiveness of environmental management & mitigation measures
Evidence observed during the site inspection on 22 January 2020 (see Plates 1 to 16) indicate a high level of site environmental controls and management are in place. It was also evident from interviews with key management personnel during the site inspection and opening / closing meetings of the audit that there is a high level of senior management buy in and support for ensuring good environmental practice. This was also evidenced by the technical onsite knowledge and incident management protocols of Patrick staff across various areas of the facility.
2.4 Environmental performance of the development
There was no evidence available that would suggest that during the reporting period (2019) the environmental performance of the Patrick Terminal at Port Botany was having a detrimental impact on the surrounding environment. The draft Annual Environmental Monitoring Report for 2019 was made available during the audit and the following entries in relation to environmental performance monitoring were noted:
No visible dust emissions were reported during 2019 Near misses (predominately minor spills) were reported throughout 2019 demonstrating a positive reporting culture Other than a potential minor discharge of oil to Brotherson Dock on 14 July 2019 (see below), there were no other uncontrolled discharges or spills to waters during 2019
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 12 of 81
The above statements are also consistent with our observations made during the site inspection on 22 January 2020 during which a very clean and well-kept site was observed.
We also reviewed the noise monitoring reports prepared by Rodney Stevens Acoustics in May and November 2019 which indicate that Patrick’s operations are considered to comply with the EPL’s day, evening and night-time noise limits.
There were 98 incidents classified by Patrick’s as ‘environmental’ in nature during 2019, of which 8 were reported to the EPA, DPIE and NSW Ports. On the 12 July 2019, a waterside gantry rail clamp leaked hydraulic oil onto the sealed ground of the wharf area and crane trench. Maintenance attended the site immediately and cleaned the affected area using oil absorbent materials and mats. As a precautionary measure, as it was unclear if any oil had entered the bay, absorbent boom socks/pillows were secured by rope to skim the surface of the water. The faulty clamp was repaired before use and the incident was reported to EPA, DPIE and NSW Ports.
The second incident occurred on 14 July 2019 was caused by center twist locks on the crane spreader not locking which caused the 2 containers to dislodge from the center twist locks over the hold of the vessel. This caused damage to containers and liquid contents to leak on top of the containers beneath and into the hold. Maintenance attended the site and cleaned up the liquids with absorbent materials and the sealed wharf area was cleaned. The incident was reported to the EPA, DPIE and NSW Ports. A formal warning letter was received from the EPA on 12 December 2019 under Section 148 (2) of the NSW Protection of the Environment Operations Act 1997 given that ‘several’ hours had elapsed between the incident and the self-report to the EPA.
The remaining incidents were contained within the terminal area and cleaned up without any potential discharge to the environment and have been classified by Patrick as ‘near miss’ events.
There was one environmental related complaint from the community during 2019 regarding low tonal noise emanating from the Port. A vessel at berth 9 was unable to sail due to an electrical fault with its backup generator, the vessel was unable to turn off the generator as it had refrigerated cargo onboard. Patrick liaised with the shipping agent to rectify the issue and discussed the matter with NSW Ports, and EPA. The vessel was moved to Hutchinson Ports while repairs were being arranged. NSW Ports held a debriefing meeting with AMSA, the shipping agent, Patrick and Hutchison Ports.
In summary, considering:
Two environmental incidents with minor offsite impacts Other than a single warning letter there were no other regulatory actions by environmental agencies against Patrick Stevedores’ Port Botany operations Independent noise monitoring results indicating compliance with EPL noise limits The draft 2019 AEMR indicating no dust emissions offsite Only one environmental related complaint which could not be attributed to Patrick’s operation
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 13 of 81
the available objective evidence indicates that the environmental performance of the Patrick Port Botany development was very good during the 2019 period. Accordingly, this audit has not made any findings in relation to Patrick’s environmental performance at Port Botany during 2019.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 14 of 81
3.0 Audit Conclusions
This 2019 Audit has made the following findings:
One ongoing non-compliance in relation to the conditions of the DA 453 (related to energy efficiency compliance report, (this finding was previously noted in Patrick’s AMER 2017/2018) and an ongoing non-compliance with DA 494 regarding environmental training. One new non-compliance in relation to the conditions of DA 453 (related to insufficient environmental requirements in site induction which is contrary to the contractor induction). One new non-compliance in relation to the conditions of DA 453 (related to drainage signage not being present at all required locations).
It is noted that there were considerably less non conformances or observations found since previous audits, a positive trend which can be seen over the last three annual audits periods. There were also positive processes, controls and technical site knowledge demonstrated by the site team regarding incident management.
As noted in previous audit reports the Patrick Port Botany Terminal (comprising the redeveloped terminal area, and as part of the Port Expansion Project - The Knuckle and Ramp D) is now operated as a single integrated site. Having two planning approvals applying to the same area creates a complex compliance regime, particularly when there are inconsistencies between approval conditions covering the same aspects, or conditions having been superseded by changes to the site over the last decade. In addition to the approvals is an EPL, which is more up to date with current operating conditions. As a result, the current EPL is also inconsistent with several approval conditions.
I reiterate my previous audit recommendation of the desirability of having the conditions of the approvals (and EPL) being made more consistent and relevant to current operations at the Patrick Terminal. I understand there may be an opportunity to revisit the planning approvals after the upgrade of Patrick’s rail infrastructure which would potentially trigger the need for a modification to the approval/s.
I note the auditee has made a significant effort in the 12 months since the last audit to enhance the systems and processes regarding fuel and chemical storage and site education. As a result, the majority of the audit findings from 2018 have been closed out or are scheduled to be closed out within the first quarter of this year.
Only four compliance related findings were made as a result of this audit and no new findings related to environmental performance made. The presentation and condition of the site being excellent in all respects. The auditee should be commended for these outcomes.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 15 of 81
Plate 1: Vermin control boxes found throughout the Terminal.
Plate 2: Trafficable spill containment bunds were present in high risk areas e.g. fuel storage area.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 16 of 81
Plate 3: Drainage signage alerting site personnel of pit type (stormwater), and durable lock off valve in the event of a spill.
Plate 4: Oils and chemicals stored on plastic spill pallets.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 17 of 81
Plate 5: Example of a chemical storage cabinet.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 18 of 81
Plate 6: Enclosed hose fitting box and drip tray in the base.
Plate 7: Portable spill bund in place for equipment during maintenance and storage.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 19 of 81
Plate 8: Control station for drainage shut off system, to be activated in the event of a spill to contain liquids.
Plate 9: Centreline drainage channel which direct stormwater to the underground stormwater treatment system.
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 20 of 81
Plate 10: Recycled plastic stringers used to replace wooden stringers on the quay line
Plate 11: Litter bins provided throughout site
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 21 of 81
Plate 12: ‘The Knuckle’ (Berth 6) looking south
Plate 13: Bunded waste oil storage for recycling
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 22 of 81
Plate 14: Spill kits located throughout the site.
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
23of
81
Tabl
e 1:
AU
DIT
ACT
ION
LIS
T
Item
N
o Co
nd.
No
Det
ails
of C
ondi
tion
/ Re
quire
men
t Co
mm
ents
, obs
erva
tions
, dis
cuss
ion,
ev
iden
ce, s
uppo
rtin
g do
cum
enta
tion
Type
Pr
opos
ed o
r Com
plet
ed A
ctio
n W
ho B
y W
hen
DA
453
– PA
TRIC
K PO
RT B
OTA
NY
RED
EVEL
OPM
ENT
APPR
OVA
L: 2
019
Find
ings
1/
2019
1.
9 Th
e Ap
plica
nt sh
all e
nsur
e th
at a
ll em
ploy
ees,
cont
ract
ors a
nd su
b-co
ntra
ctor
s are
aw
are
of, a
nd
com
ply
with
, the
con
ditio
ns o
f thi
s co
nsen
t.
The
site
indu
ctio
n w
as re
cent
ly u
pdat
ed
and
does
not
app
ear t
o co
ntai
n ap
prop
riate
refe
renc
es to
env
ironm
enta
l re
quire
men
ts.
Obs
erva
tion:
ESC
nee
ds to
be
inclu
ded
as
part
of th
e ch
ange
man
agem
ent p
roce
ss
for a
ppro
val o
f ind
uctio
ns
NC
Revi
sion
of si
te in
duct
ion
to in
clude
app
ropr
iate
en
viro
nmen
tal r
equi
rem
ents
. ES
C M
gr,
M. G
ibbs
31
-Mar
-20
2/20
19
7.19
Si
gns s
hall
be d
ispla
yed
adja
cent
to
all s
torm
wat
er d
rain
s on
the
prem
ises i
ndica
ting
that
onl
y cle
an
wat
er is
allo
wed
to e
nter
thes
e dr
ains
. Exa
mpl
es o
f pos
sible
sig
nage
inclu
de: ‘
Cle
an R
ainw
ater
O
nly’,
‘Cle
an w
ater
onl
y - N
O w
aste
’ or
‘H2O
only
’.
Som
e st
orm
wat
er d
rain
s hav
e th
is sig
nage
in
stal
led
but n
ot in
all
inst
ance
s. N
C Si
gnag
e or
gro
und
sten
cils t
o be
inst
alle
d at
the
rem
aind
er o
f sto
rmw
ater
dra
ins.
ESC
Mgr
, M
. Gib
bs
31-M
ar-2
0
3/20
19
7.25
An
Ene
rgy
Effic
ienc
y Co
mpl
ianc
e Re
port
shal
l be
prep
ared
with
in 1
5 m
onth
s of t
he is
suin
g of
the
occu
patio
n ce
rtific
ate.
The
Rep
ort
shal
l cer
tify
that
ene
rgy
effic
ienc
y m
easu
res h
ave
been
inst
alle
d an
d ve
rify
that
the
build
ing’
s ene
rgy
perfo
rman
ce c
ompl
ies w
ith C
ounc
ils
Ener
gy E
fficie
ncy
DCP.
A c
opy
of th
e Re
port
shal
l be
mad
e av
aila
ble
to
Coun
cil o
n re
ques
t.
In P
atric
k’s 2
019
AEM
R it
was
obs
erve
d th
at a
cop
y of
the
Ener
gy E
fficie
ncy
Repo
rt co
uld
not b
e lo
cate
d. A
n ac
tion
has b
een
assig
ned
to h
ave
the
Repo
rt ei
ther
loca
ted
or re
peat
ed/u
nder
take
n.
NC
Repo
rt to
be
subm
itted
by
Mar
ch 2
020.
O
ccup
atio
n ce
rtific
ate
obta
ined
in M
ay 2
018
so re
port
due
in S
epte
mbe
r 201
9. E
xten
sion
to ti
mef
ram
e pr
ovid
ed b
y La
ura
Papo
ulia
s DPI
E vi
a em
ail o
n 7/
11/1
9 to
31/
1/20
20.
GHD
ener
gy c
onsu
ltant
insp
ecte
d sit
e on
14/
15
Janu
ary
2020
.
ESC
Mgr
, M
. Gib
bs
29-F
eb-2
0
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
24of
81
DA
494
– PO
RT B
OTA
NY
EXPA
NSI
ON
APP
ROVA
L: 2
019
Find
ings
TH
ERE
WER
E N
O F
IND
INGS
MAD
E AG
AIN
ST T
HE
CON
DIT
ION
S O
F D
A 49
4 D
URI
NG
THIS
AU
DIT
DA
453
– PA
TRIC
K PO
RT B
OTA
NY
RED
EVEL
OPM
ENT
APPR
OVA
L: 2
018
Find
ings
1/
2018
3.
33
Exce
pt a
s may
be
expr
essly
pro
vide
d by
a
licen
ce is
sued
und
er th
e Pr
otec
tion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997
in re
latio
n of
th
e de
velo
pmen
t, se
ctio
n 12
0 of
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7 sh
all
be c
ompl
ied
with
and
in c
onne
ctio
n w
ith th
e ca
rryin
g ou
t of t
he d
evel
opm
ent.
A m
inor
wat
er p
ollu
tion
incid
ent o
n 9
Sept
embe
r 201
8 w
as re
porte
d to
the
EPA
and
DPE.
It is
und
erst
ood
that
the
EPA
has n
ot y
et ta
ken
any
regu
lato
ry a
ctio
n in
re
spon
se to
this
incid
ent.
NB:
I ha
ve re
cord
ed th
is as
a n
on-
com
plia
nce
agai
nst C
ondi
tion
L1.1
of t
he
EPL
(Item
3/2
018
belo
w) h
ence
hav
e no
t du
plica
ted
as a
n N
C ag
ains
t DA
cond
ition
s
O
For n
otin
g, n
o fu
rther
act
ion
requ
ired
NA
CLO
SED
2/20
18
7.25
An
Ene
rgy
Effic
ienc
y Co
mpl
ianc
e Re
port
shal
l be
pre
pare
d w
ithin
15
mon
ths o
f the
issu
ing
of
the
occu
patio
n ce
rtific
ate.
The
Rep
ort s
hall
certi
fy th
at e
nerg
y ef
ficie
ncy
mea
sure
s hav
e be
en in
stal
led
and
verif
y th
at th
e bu
ildin
g’s
ener
gy p
erfo
rman
ce c
ompl
ies w
ith C
ounc
ils
Ener
gy E
fficie
ncy
DCP.
A c
opy
of th
e Re
port
shal
l be
mad
e av
aila
ble
to C
ounc
il on
requ
est.
In P
atric
k’s 2
017
AEM
R it
was
obs
erve
d th
at a
cop
y of
the
Ener
gy E
fficie
ncy
Repo
rt co
uld
not b
e lo
cate
d. A
n ac
tion
has b
een
assig
ned
to h
ave
the
Repo
rt ei
ther
loca
ted
or re
peat
ed/u
nder
take
n (e
mai
l evi
denc
e sig
hted
) by
31 M
ar 2
019.
NC
Repo
rt to
be
loca
ted
or re
peat
ed /
unde
rtake
n by
31
Mar
201
9.
ESC
Mgr
, M
. Gib
bs
29-F
eb-2
0
DA
494
– PO
RT B
OTA
NY
EXPA
NSI
ON
APP
ROVA
L: 2
018
Find
ings
TH
ERE
WER
E N
O F
IND
INGS
MAD
E AG
AIN
ST T
HE
CON
DIT
ION
S O
F D
A 49
4 D
URI
NG
THIS
AU
DIT
D
A 45
3 –
PATR
ICK
PORT
BO
TAN
Y RE
DEV
ELO
PMEN
T AP
PRO
VAL:
201
7 Fi
ndin
gs
1/20
17
1.9
The
Appl
icant
shal
l ens
ure
that
all
empl
oyee
s, co
ntra
ctor
s and
sub-
cont
ract
ors a
re a
war
e of
, an
d co
mpl
y w
ith, t
he c
ondi
tions
of t
his
cons
ent.
The
Site
Indu
ctio
n co
ntai
ns o
nly
a br
ief
envi
ronm
enta
l com
pone
nt a
nd d
oes n
ot
addr
ess t
his r
equi
rem
ent s
pecif
ically
NC
Revi
sed
indu
ctio
n da
ted
June
201
8 ad
dres
ses
this
findi
ng.
ESC
Mgr
, M
. Gib
bs
CLO
SED
2/20
17
3.23
N
o pa
rkin
g sh
all b
e pe
rmitt
ed o
n th
e in
tern
al
road
way
s and
out
side
the
desig
nate
d pa
rkin
g ar
eas.
Truc
ks o
bser
ved
park
ed o
n Ra
mp
D du
ring
audi
t ins
pect
ion.
O
Ag
reed
with
aud
itee
that
this
findi
ng is
not
re
leva
nt to
DA
453
as R
amp
D is
cove
red
by
the
Port
Bota
ny E
xpan
sion
appr
oval
whi
ch
perm
its su
ch p
arki
ng
ESC
Mgr
, M
. Gib
bs
CLO
SED
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
25of
81
3/20
17
3.33
Ex
cept
as m
ay b
e ex
pres
sly p
rovi
ded
by a
lic
ence
issu
ed u
nder
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7 in
rela
tion
of
the
deve
lopm
ent,
sect
ion
120
of th
e Pr
otec
tion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997
shal
l be
com
plie
d w
ith a
nd in
con
nect
ion
with
the
carry
ing
out o
f the
dev
elop
men
t.
The
stor
mw
ater
col
lect
ion
and
treat
men
t sy
stem
serv
ing
the
Patri
ck T
erm
inal
nee
ds
to b
e be
tter d
ocum
ente
d an
d th
e ca
pabi
lity
of c
ritica
l con
trols
(e.g
. Dra
in
Safe
, Pur
acep
tor,
GPT
etc.)
bet
ter
unde
rsto
od. I
t is r
ecom
men
ded
that
a
figur
e / p
lan
of th
e sy
stem
be
prep
ared
, an
d ke
y pe
rson
nel i
nduc
ted
into
the
wor
king
of t
he sy
stem
.
O
Stor
mw
ater
Man
agem
ent P
lan
curre
ntly
be
ing
upda
ted.
Sig
hted
dra
ft pl
an w
ith
upda
tes i
n pr
ogre
ss.
Plan
now
inte
grat
ed a
s par
t of r
evise
d O
EMP
date
d 5/
7/19
and
inclu
des i
mpr
oved
pla
n of
st
orm
wat
er sy
stem
ESC
Mgr
, M
. Gib
bs
31-M
ar-1
9 CL
OSE
D
4/20
17
3.40
Th
e qu
antit
y of
haz
ardo
us a
nd/o
r ind
ustri
al
and/
or G
roup
A w
aste
gen
erat
ed o
n th
e pr
emise
s sha
ll no
t exc
eed
200
tonn
es p
er y
ear.
No
reco
rds w
ere
avai
labl
e in
rela
tion
to
this
requ
irem
ent a
lthou
gh it
is n
oted
the
EPL
does
not
set a
ny si
mila
r lim
it on
such
w
aste
s
O
Sigh
ted
Was
te M
anag
emen
t Reg
ister
. Re
cord
s of w
aste
oil
(like
ly m
ain
haza
rdou
s w
aste
gen
erat
ed fr
om si
te) k
ept i
n re
gist
er
and
tota
l am
ount
gen
erat
ed fo
r 201
8 w
as
appr
oxim
atel
y 40
tonn
es
Audi
tor
CLO
SED
5/20
17
3.41
T
he q
uant
ity o
f haz
ardo
us a
nd/o
r ind
ustri
al
and/
or G
roup
A w
aste
stor
ed o
n th
e pr
emise
s sh
all n
ot e
xcee
d 70
tonn
es a
t any
one
tim
e.
No
reco
rds w
ere
avai
labl
e in
rela
tion
to
this
requ
irem
ent a
lthou
gh it
is n
oted
the
EPL
does
not
set a
ny si
mila
r lim
it on
such
w
aste
s
O
Acco
rdin
g to
Was
te R
egist
er th
e m
ost w
aste
oi
l sto
red
on si
te w
as a
ppro
ximat
ely
11
tonn
es in
Mar
ch 2
018
whi
ch is
wel
l und
er th
e lim
it
Audi
tor
CLO
SED
6/20
17
3.44
Th
e Ap
plica
nt sh
all b
e re
spon
sible
for i
nvol
ving
and
enco
urag
ing
empl
oyee
s and
con
tract
ors
to m
inim
ise d
omes
tic w
aste
pro
duct
ion
on si
te
and
to re
use/
recy
cle w
here
pos
sible
.
Site
Indu
ctio
n do
es n
ot a
ddre
ss re
cycli
ng
how
ever
site
insp
ectio
n in
dica
tes
prac
tical
impl
emen
tatio
n of
this
requ
irem
ent i
s bei
ng a
chie
ved
on si
te
(Pla
te 9
)
O
This
is co
vere
d in
revi
sed
June
201
8 in
duct
ion
ESC
Mgr
, M
. Gib
bs
CLO
SED
7/20
17
3.49
Th
e Ap
plica
nt sh
all n
ot st
ore
or h
andl
e Da
nger
ous G
oods
of C
lass
2.3
, tox
ic co
mpr
esse
d or
liqu
efie
d ga
ses a
bove
the
quan
titie
s sto
red
or h
andl
ed in
199
5/96
exc
ept
in a
ccor
danc
e w
ith re
com
men
datio
ns 1
.1 a
nd
1.2
in th
e Po
rt Bo
tany
Lan
d Us
e Sa
fety
Stu
dy
(199
6).
Com
plia
nce
with
this
cond
ition
is d
ifficu
lt to
ass
ess a
nd ro
le o
f Por
ts A
utho
rity
is al
so u
ncle
ar.
O
From
Sep
201
7 to
Aug
201
8 th
ere
wer
e 25
3 to
nnes
of D
G tra
nsite
d th
roug
h Pa
trick
’s te
rmin
al w
hich
is w
ell u
nder
the
825-
tonn
e lim
it re
quire
d un
der t
his c
ondi
tion
ESC
Mgr
, M
. Gib
bs
CLO
SED
8/20
17
3.52
W
ithin
24
hour
s of a
ny in
ciden
t or p
oten
tial
incid
ent w
ith a
ctua
l or p
oten
tial s
igni
fican
t off-
site
impa
cts o
n pe
ople
or t
he b
ioph
ysica
l en
viro
nmen
t, a
repo
rt sh
all b
e su
pplie
d to
the
Depa
rtmen
t out
linin
g th
e ba
sic fa
cts…
Incid
ents
on
23 F
ebru
ary
2018
and
30
Sept
embe
r 201
8 re
porte
d to
EPA
but
not
DP
E in
acc
orda
nce
with
this
cond
ition
NC
Envi
ro In
ciden
t Reg
ister
sigh
ted
inclu
des
deta
ils o
f inc
iden
ts o
n 24
Jan
2018
and
9 S
ep
2018
that
wer
e re
porte
d (a
mon
g ot
hers
) to
DPE.
Inte
rnal
com
mun
icatio
ns s
ight
ed
ESC
Mgr
, M
. Gib
bs
CLO
SED
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
26of
81
indi
cate
that
dai
ly in
ciden
t rep
orts
are
mad
e by
ESC
Mgr
to m
anag
emen
t 9/
2017
3.
60
The
Appl
icant
shal
l ins
tall,
oper
ate
and
mai
ntai
n an
irrig
atio
n sy
stem
thro
ugho
ut a
ll la
ndsc
aped
are
as w
ith n
o ov
ersp
ray
onto
har
d su
rface
s. De
tails
of t
he ir
rigat
ion
syst
em
prop
osed
shal
l be
inclu
ded
in th
e Ve
geta
tion
Man
agem
ent P
lan
requ
ired
unde
r con
ditio
n 6.
4(b)
of t
his c
onse
nt. T
he sy
stem
shal
l com
ply
with
all
rele
vant
Aus
tralia
n St
anda
rds.
Not
e: It
is
reco
gnise
d th
at so
me
irrig
atio
n is
nece
ssar
y, ho
wev
er, t
he A
pplic
ant i
s enc
oura
ged
to
redu
ce th
e de
pend
ence
on
irrig
atio
n by
pl
antin
g tre
es a
nd sh
rubs
that
are
end
emic
to
the
area
and
cap
able
of w
ithst
andi
ng lo
w le
vels
of w
ater
as r
efle
cted
in c
ondi
tion
3.60
of
this
cons
ent.
Land
scap
ing
unde
r Ram
p D
need
s re
juve
natio
n an
d po
ssib
ly ir
rigat
ion
to
mai
ntai
n its
via
bilit
y ov
er th
e lo
ng te
rm
(Pla
te 1
0)
O
The
area
of l
and
unde
r Ram
p D
(also
kno
wn
as T
he U
nder
crof
t) ha
s bee
n tra
nsfe
rred
from
Pa
trick
s to
NSW
Por
ts a
nd is
now
und
er th
e la
tter o
rgan
isatio
n’s c
ontro
l
ESC
Mgr
, M
. Gib
bs
CLO
SED
10/2
017
3.62
Th
e de
velo
pmen
t’s st
aff i
nduc
tion
prog
ram
sh
all i
ncor
pora
te sp
ecia
l ins
truct
ions
rela
ting
to
noise
con
trol a
nd re
late
d “o
n th
e jo
b” tr
aini
ng,
as d
eem
ed a
ppro
pria
te. S
uch
train
ing
shal
l en
sure
that
all
staf
f inv
olve
d in
the
oper
atio
n of
the
term
inal
’s m
obile
equ
ipm
ent,
such
as
the
stra
ddle
car
riers
, rea
ch st
acke
rs a
nd fo
rklif
t tru
cks,
and
the
gant
ry c
rane
s and
qua
y cr
anes
, ar
e aw
are
of th
e ne
ed to
…
The
Site
Indu
ctio
n do
es n
ot in
clude
sp
ecia
l noi
se c
ontro
l tra
inin
g.
NC
Revi
sed
site
indu
ctio
n da
ted
June
201
8 no
w
inclu
des n
oise
con
trol m
easu
res
ESC
Mgr
, M
. Gib
bs
CLO
SED
11/2
017
5.7
With
in 6
mon
ths o
f con
sent
bei
ng g
rant
ed a
nd
ever
y 6
mon
ths t
here
afte
r, th
e Ap
plica
nt sh
all
subm
it a
repo
rt to
the
EPA
cont
aini
ng th
e fo
llow
ing
info
rmat
ion:
(a) A
pol
luta
nt in
vent
ory
that
qua
lifie
s wat
ers d
ischa
rged
from
the
site.
Th
is sh
all i
nclu
de id
entif
icatio
n of
all
wat
er
pollu
tant
s lik
ely
to b
e di
scha
rged
from
eac
h fin
al st
orm
wat
er p
it on
the
11 st
orm
wat
er li
nes
serv
ing
the
cont
aine
r han
dlin
g op
erat
ion
area
w
ithin
the
site.
The
wat
er p
ollu
tant
s sha
ll in
clude
but
are
not
lim
ited
to: t
otal
phe
nolic
s, po
lycy
clic
arom
atic
hydr
ocar
bons
, oil
and
This
and
othe
r red
unda
nt c
ondi
tions
of
the
appr
oval
s sho
uld
be re
mov
ed if
po
ssib
le. T
his w
ould
ben
efit
and
assis
t th
e co
mpl
ianc
e ta
sk b
y sim
plify
ing
and
stre
amlin
ing
the
cond
ition
s tha
t rea
lly
mat
ter t
o pr
otec
ting
the
envi
ronm
ent
and
com
mun
ity fr
om w
hat i
s now
an
inte
grat
ed T
erm
inal
ope
ratio
n.
O
Mod
ifica
tion
disc
usse
d in
tern
ally
and
in b
rief
with
NSW
Por
ts a
nd D
PE. P
atric
k ha
s pr
epar
ed a
dra
ft pr
opos
ed c
onso
lidat
ion
docu
men
t and
is n
ow w
aitin
g fo
r det
ails
of
pote
ntia
l maj
or u
pgra
de to
rail
area
whi
ch
may
nec
essit
ate
mod
ifica
tion
to a
ppro
val
cond
ition
s tha
t cou
ld a
lso a
ddre
ss th
is fin
ding
in a
con
solid
ated
man
ner.
Stat
us u
ncha
nged
ESC
Mgr
, M
. Gib
bs
Ong
oing
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
27of
81
grea
se, t
otal
pet
role
um h
ydro
carb
ons,
tota
l or
gani
c ca
rbon
, bio
chem
ical o
xyge
n de
man
d,
chem
ical o
xyge
n de
man
d, p
H, z
inc,
copp
er,
lead
, cob
alt,
chro
miu
m, m
anga
nese
, cob
alt,
nick
el a
nd ir
on…
.. 12
/201
7 6.
7 W
ithin
12
mon
ths o
f com
miss
ioni
ng th
e de
velo
pmen
t and
eve
ry th
ree
year
s the
reaf
ter,
unle
ss th
e Di
rect
or-G
ener
al d
irect
s oth
erw
ise,
the
Appl
icant
mus
t com
miss
ion
and
pay
the
full
cost
of a
n In
depe
nden
t Env
ironm
enta
l Au
dit…
This
audi
t rep
ort w
as fi
nalis
ed in
Mar
ch
2018
but
as i
t was
due
to b
e co
mm
issio
ned
in F
eb 2
018
the
proj
ect
was
non
-com
plia
nt w
ith th
is re
quire
men
t fo
r the
repo
rting
per
iod
NC
Clos
ed w
ith su
bmiss
ion
of th
e au
dit r
epor
t Au
dito
r CL
OSE
D M
ar 1
8
13/2
017
7.4
The
stor
age
and
hand
ling
of fl
amm
able
and
co
mbu
stib
le li
quid
s for
use
on
the
site
(oth
er
than
ship
ping
con
tain
ers)
shal
l be
in
acco
rdan
ce w
ith A
ustra
lian
Stan
dard
AS1
940-
1993
The
Sto
rage
and
Han
dlin
g of
Fla
mm
able
an
d Co
mbu
stib
le L
iqui
ds.
Site
insp
ectio
n id
entif
ied
inco
nsist
encie
s in
the
stor
age
of c
hem
icals
and
fuel
s –
som
etim
es in
bun
ded
area
s, so
met
imes
no
t (Pl
ates
1-5
)
O
Appr
opria
te b
undi
ng o
f liq
uids
obs
erve
d du
ring
site
insp
ectio
n on
17
Jan
2019
(Pla
te
1).
ESC
Mgr
, M
. Gib
bs
CLO
SED
14/2
017
7.5
Was
te o
il sh
all b
e st
ored
in a
cov
ered
and
bu
nded
are
a pr
ior t
o of
fsite
recy
cling
/disp
osal
. Co
pies
of r
ecei
pts f
or th
e re
cycli
ng o
f oil
shal
l be
kep
t ons
ite a
nd m
ade
avai
labl
e to
Cou
ncil
on re
ques
t.
see
7.4
abov
e (P
late
5)
O
Oil
and
othe
r che
mica
ls st
ored
in T
he
Unde
rcro
ft ha
ve b
een
rem
oved
and
this
area
ha
nded
bac
k to
NSW
Por
ts.
ESC
Mgr
, M
. Gib
bs
CLO
SED
15/2
017
7.19
Si
gns s
hall
be d
ispla
yed
adja
cent
to a
ll st
orm
wat
er d
rain
s on
the
prem
ises i
ndica
ting
that
onl
y cle
an w
ater
is a
llowe
d to
ent
er th
ese
drai
ns. E
xam
ples
of p
ossib
le si
gnag
e in
clude
: ‘C
lean
Rai
nwat
er O
nly’,
‘Cle
an w
ater
onl
y - N
O
was
te’ o
r ‘H2
O o
nly’.
This
requ
irem
ent w
as n
ot e
vide
nt d
urin
g th
e 30
Janu
ary
2018
site
insp
ectio
n.
Patri
ck h
as tr
ialle
d va
rious
opt
ions
but
du
e to
veh
icles
/mob
ile p
lant
mov
ing
over
th
e ar
ea p
aint
is w
orn
off a
nd ra
ised
signs
ca
n ca
use
dam
age
to ty
res e
tc.
NC
Tria
l of s
tenc
il sig
nage
is c
urre
ntly
und
erw
ay
(see
Pla
te 3
).
ESC
Mgr
, M
. Gib
bs
CLO
SED
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
28of
81
16/2
017
C2.1
4 Ex
cept
as m
ay b
e ex
pres
sly p
erm
itted
by
a lic
ence
und
er
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7 in
rela
tion
to th
e de
velo
pmen
t, se
ctio
n 12
0 of
that
Act
(p
rohi
bitio
n of
the
pollu
tion
of w
ater
s) sh
all b
e co
mpl
ied
with
in c
onne
ctio
n to
the
deve
lopm
ent.
The
stor
mw
ater
col
lect
ion
and
treat
men
t sy
stem
serv
ing
the
Patri
ck T
erm
inal
nee
ds
to b
e be
tter d
ocum
ente
d an
d th
e ca
pabi
lity
of c
ritica
l con
trols
(e.g
. Dra
in S
afe,
Pu
race
ptor
, GPT
etc
.) be
tter u
nder
stoo
d by
ke
y pe
rson
nel.
It is
reco
mm
ende
d th
at a
fig
ure
/ pla
n of
the
syst
em b
e pr
epar
ed,
and
key
pers
onne
l ind
ucte
d in
to th
e w
orki
ng o
f the
syst
em
O
Stor
mw
ater
Man
agem
ent P
lan
curre
ntly
bei
ng u
pdat
ed.
Sigh
ted
draf
t pla
n w
ith
upda
tes i
n pr
ogre
ss.
Plan
now
inte
grat
ed a
s par
t of
revi
sed
OEM
P da
ted
5/7/
19
and
inclu
des i
mpr
oved
pla
n of
st
orm
wat
er sy
stem
ESC
Mgr
, M
. Gib
bs
31-M
ar-
19
CLO
SED
17/2
017
C4.1
Th
e Di
rect
or-G
ener
al sh
all b
e no
tifie
d of
any
incid
ent
with
act
ual o
r pot
entia
l sig
nific
ant o
ff-sit
e im
pact
s on
peop
le o
r the
bio
phys
ical e
nviro
nmen
t with
in 1
2 ho
urs o
f th
e Ap
plica
nt, o
r oth
er re
leva
nt p
arty
und
erta
king
the
deve
lopm
ent,
beco
min
g aw
are
of th
e in
ciden
t. Fu
ll w
ritte
n de
tails
of t
he in
ciden
t sha
ll be
pro
vided
to th
e Di
rect
or-G
ener
al w
ithin
seve
n da
ys o
f the
dat
e on
whi
ch
the
incid
ent o
ccur
red.
The
Dire
ctor
-Gen
eral
may
requ
ire
addi
tiona
l mea
sure
s to
be im
plem
ente
d to
add
ress
the
caus
e or
impa
ct o
f any
incid
ent,
as it
rela
tes t
o th
is co
nsen
t, re
porte
d in
acc
orda
nce
with
this
cond
ition
, w
ithin
such
per
iod
as th
e Di
rect
or-G
ener
al m
ay re
quire
Incid
ents
on
23 F
ebru
ary
2018
and
30
Sept
embe
r 201
8 re
porte
d to
EPA
but
not
DP
E in
acc
orda
nce
with
this
cond
ition
NC
Addr
esse
d as
per
item
8 a
bove
ES
C M
gr,
M. G
ibbs
CL
OSE
D
18/2
017
C4.4
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tions
an
Envi
ronm
enta
l Tra
inin
g Pr
ogra
m sh
all b
e de
velo
ped
and
impl
emen
ted
to e
stab
lish
a fra
mew
ork
in w
hich
rele
vant
em
ploy
ees w
ill b
e tra
ined
in e
nviro
nmen
tal m
anag
emen
t an
d th
e op
erat
ion
of p
lant
and
equ
ipm
ent,
inclu
ding
po
llutio
n co
ntro
l equ
ipm
ent,
whe
re re
leva
nt. T
he
Prog
ram
shal
l inc
lude
, but
not
nec
essa
rily
be li
mite
d to
:
Envi
ronm
enta
l man
agem
ent i
s cov
ered
onl
y ve
ry b
riefly
in th
e Si
te In
duct
ion.
No
evid
ence
was
pro
vide
d of
mor
e sp
ecifi
c en
viro
nmen
tal t
rain
ing,
tool
box
talk
s or
simila
r cov
erin
g to
pics
such
as b
undi
ng,
spill
resp
onse
, noi
se m
itiga
tion
etc.
NC
Site
indu
ctio
n ha
s bee
n sig
nific
antly
revi
sed
in Ju
ne
2018
and
dra
ft To
olbo
x Tr
aini
ng T
alks
cov
erin
g ke
y iss
ues s
uch
as n
oise
, litt
erin
g an
d sp
ills w
ere
sight
ed. T
hese
Ta
lks a
re to
be
rolle
d ou
t in
Feb
2019
ESC
Mgr
, M
. Gib
bs
31/3
/20
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
29of
81
App
endi
x A
.PR
OJE
CT A
PPRO
VAL
CON
DIT
ION
S D
A 4
94 –
PO
RT B
OTA
NY
EXPA
NSI
ON
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
30of
81
DEVE
LOPM
ENT
CONS
ENT
COND
ITIO
NS: D
A-49
4-11
-200
3-i–
Sydn
ey P
orts
Cor
pora
tion
(Por
t Bot
any
Expa
nsio
n)
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
SCH
EDU
LE A
: OVE
RALL
SCO
PE O
F D
EVEL
OPM
ENT
WO
RKS
AND
GEN
ERAL
PRO
VISI
ON
S
A1
GE
NER
AL
Scop
e of
Dev
elop
men
t
A1.1
The
appr
oved
asp
ects
of t
he d
evel
opm
ent s
hall
be c
arrie
d ou
t gen
eral
ly in
ac
cord
ance
with
:
a) D
evel
opm
ent A
pplic
atio
n DA
-494
-11-
2003
-i, lo
dged
with
the
Depa
rtmen
t on
26
Nov
embe
r 200
3.
b) P
ort B
otan
y Ex
pans
ion:
Env
ironm
enta
l Im
pact
Sta
tem
ent (
ten
volu
mes
), pr
epar
ed b
y UR
S Pt
y Lt
d an
d da
ted
Nov
embe
r 200
3;
c) P
ort B
otan
y Ex
pans
ion
Com
miss
ion
of In
quiry
– P
rimar
y Su
bmiss
ion
d) P
ort B
otan
y Ex
pans
ion
Com
miss
ion
of In
quiry
– S
uppl
emen
tary
Sub
miss
ion
to
Envi
ronm
enta
l Im
pact
Sta
tem
ent,
prep
ared
by
URS
Pty
e) P
ort B
otan
y Ex
pans
ion
Envi
ronm
enta
l Im
pact
Sta
tem
ent –
Sup
plem
enta
ry
Subm
issio
n (tw
o vo
lum
es),
prep
ared
by
URS
Pty
Ltd
and
date
d O
ctob
er 2
004;
and
, an
d
f) m
odifi
catio
n ap
plica
tion
MO
D-10
7-9-
2006
-i, a
ccom
pani
ed b
y Po
rt Bo
tany
Ex
pans
ion,
Sec
tion
96(1
A) A
pplic
atio
n: M
odifi
catio
n of
Con
sent
g) m
odifi
catio
n ap
plica
tion
MO
D-13
4-11
-200
6-i,
acco
mpa
nied
by
Port
Bota
ny
Expa
nsio
n, S
ectio
n 96
(1A)
Mod
ifica
tion
– W
harf
Stru
ctur
e De
sign,
pre
pare
d by
Syd
ney
Ports
Cor
pora
tion
and
date
d N
ovem
ber N
SW G
over
nmen
t Dep
artm
ent o
f Pla
nnin
g
h) m
odifi
catio
n ap
plica
tion
MO
D-14
9-12
-200
6-i,
acco
mpa
nied
by
Port
Bota
ny
Expa
nsio
n, S
ectio
n 96
(1A)
Mod
ifica
tion
– Ap
plica
tion
to M
odify
Con
ditio
ns B
2.9
and
B2.2
2 of
the
Port
Bota
ny C
onse
nt, p
repa
red
by
Com
plia
nce
with
thes
e re
quire
men
ts is
ver
ified
th
roug
h th
is in
depe
nden
t aud
it pr
oces
s, co
mpl
ianc
e re
ports
etc
.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
31of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
i) m
odifi
catio
n ap
plica
tion
MO
D-78
-9-2
007-
i, ac
com
pani
ed b
y Po
rt Bo
tany
Exp
ansio
n –
Mod
ifica
tion
of C
ondi
tions
C2.
20 &
C2.
25, p
repa
red
by
j) m
odifi
catio
n ap
plica
tion
MO
D-60
-9-2
008,
acc
ompa
nied
by
Port
Bota
ny E
xpan
sion
– M
odifi
catio
n of
Con
ditio
ns B
2.46
and
C2.
25, p
repa
red
by
k) m
odifi
catio
n ap
plica
tion
MO
D-68
-12-
2008
, acc
ompa
nied
by
a le
tter f
rom
l) m
odifi
catio
n ap
plica
tion
MO
D-08
-03-
2009
, acc
ompa
nied
by
a le
tter f
rom
Syd
ney
Ports
Cor
pora
tion
date
d 16
Feb
ruar
y 20
09 a
nd a
sses
smen
t rep
ort t
itled
Por
t Bot
any
Expa
nsio
n –
Rail
Ope
ratio
ns S
ectio
n 96
(1A)
m) m
odifi
catio
n ap
plica
tion
494-
11-2
003-
I MO
D 8,
acc
ompa
nied
by
an a
sses
smen
t re
port
title
d “P
ort B
otan
y Ex
pans
ion
– Sh
ip T
urni
ng A
rea
n) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 9,
acc
ompa
nied
by
an
asse
ssm
ent r
epor
t titl
ed “P
ort B
otan
y Ex
pans
ion
– Ad
ditio
nal H
igh
Spot
Dre
dgin
g of
f M
olin
eux
Poin
t Sec
tion
96(1
A) M
odifi
catio
n” d
ated
May
o) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 10
, acc
ompa
nied
by
an
asse
ssm
ent w
ithin
lette
r titl
ed “P
ort B
otan
y Ex
pans
ion
– Se
ctio
n 96
(1A)
Mod
ifica
tion
– Ad
ditio
nal S
hip
Turn
ing
Area
Dre
dgin
g” d
ated
8 Ju
ly
p) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 11
, acc
ompa
nied
by
an
asse
ssm
ent r
epor
t titl
ed “S
ydne
y Po
rt Bo
tany
Ter
min
al N
o. 3
PKG
-17.
1 Pl
anni
ng
Sect
ion
75W
Mod
ifica
tion
Ope
ratio
ns B
uild
ing
and
q) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 12
, acc
ompa
nied
by
an
asse
ssm
ent r
epor
t titl
ed “S
ydne
y Po
rt Bo
tany
Ter
min
al N
o. 3
PKG
-17.
1 Pl
anni
ng
Sect
ion
75W
Mod
ifica
tion
to S
torm
wat
er F
irst F
lush
Sys
tem
” dat
ed 1
5 Fe
brua
ry 2
012
and
supp
lem
enta
ry a
dvice
pro
vided
on
6 Ju
ne
r) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 13
, acc
ompa
nied
by
an
asse
ssm
ent r
epor
t titl
ed “P
roje
ct N
o. 2
3165
8 Se
ctio
n 75
W M
odifi
catio
n to
Sto
rmw
ater
M
anag
emen
t Sys
tem
for S
outh
ern
Expa
nsio
n Ar
ea” d
ated
31
Oct
ober
201
2;
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
32of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
s) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 14
, acc
ompa
nied
by
asse
ssm
ent
repo
rts ti
tled
“Por
t Bot
any
Expa
nsio
n –
Sect
ion
75W
Mod
ifica
tion
14 to
DA-
494-
11-
2003
i for
Tem
pora
ry U
ses a
t nor
ther
n tip
of H
ayes
Doc
k”, d
ated
Janu
ary
2013
; and
“P
ort B
otan
y Ex
pans
ion,
Cum
ulat
ive
Cons
truct
ion
Traf
fic Im
pact
Ass
essm
ent,
Term
inal
O
pera
tions
Infra
stru
ctur
e (M
arch
201
3 –
Mar
ch 2
014)
”, da
ted
April
t) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-i
MO
D 15
, acc
ompa
nied
by
asse
ssm
ent
repo
rt tit
led
‘SICT
L Q
uay
Cran
e O
pera
tions
’, pr
epar
ed b
y HP
H an
d da
ted
20 M
arch
20
13;
u) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-I
MO
D 16
, acc
ompa
nied
by
asse
ssm
ent
repo
rt tit
led
‘Por
t Bot
any
Expa
nsio
n M
odifi
catio
n Ap
plica
tion
16 to
DA-
494-
11-2
003i
Pe
rman
ent U
ses H
ayes
Doc
k Se
rvice
s Are
a an
d ad
min
istra
tive
Chan
ges t
o So
me
Cond
ition
s’, p
repa
red
by L
endl
ease
and
dat
ed S
epte
mbe
r 201
6;
v) m
odifi
catio
n ap
plica
tion
DA-4
94-1
1-20
03-I
MO
D 17
, acc
ompa
nied
by
lette
r titl
ed
‘ Por
t Bot
any
Expa
nsio
n s4
.55(
1) M
odifi
catio
n Ap
plica
tion
to D
A-49
4-11
-200
3i –
Ad
min
istra
tive
Upda
te to
Con
ditio
ns o
f App
rova
l’, pr
epar
ed b
y N
SW P
orts
and
dat
ed
16 O
ctob
er 2
018;
and
w) t
he c
ondi
tions
of t
his c
onse
nt.
Inso
far a
s the
y re
late
to th
e ap
prov
ed d
evel
opm
ent.
A1.2
A1.2
In th
e ev
ent o
f an
inco
nsist
ency
bet
wee
n:
a) th
e co
nditi
ons o
f thi
s con
sent
and
any
doc
umen
t list
ed fr
om c
ondi
tion
A.1.
1a) t
o w
) inc
lusiv
e, th
e co
nditi
ons o
f thi
s con
sent
shal
l pre
vail
to th
e ex
tent
of t
he
inco
nsist
ency
; and
b) a
ny d
ocum
ent l
isted
from
con
ditio
n A1
.1 a
) to
w) i
nclu
sive,
the
mos
t rec
ent
docu
men
t sha
ll pr
evai
l to
the
exte
nt o
f the
inco
nsist
ency
.
Not
ed.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
33of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
Stat
utor
y Re
quire
men
ts
A1.3
N
SW P
orts
/
Patri
ck
Stev
edor
es
All l
icenc
es, p
erm
its a
nd a
ppro
vals
shal
l be
obta
ined
and
mai
ntai
ned
as re
quire
d th
roug
hout
the
life
of th
e de
velo
pmen
t. N
o co
nditi
on o
f thi
s con
sent
rem
oves
the
oblig
atio
n to
obt
ain,
rene
w o
r com
ply
with
such
lice
nces
, per
mits
or a
ppro
vals.
The
Fede
ral E
PBC
Appr
oval
200
2/54
3 an
d EP
L 69
62re
mai
n va
lid. S
ydne
y W
ater
Tra
de W
aste
Co
nsen
t No.
249
90 is
curr
ent.
A nu
mbe
r of o
ther
pe
rmits
, lice
nces
and
app
rova
ls, a
s iss
ued
by v
ario
us
gove
rnm
ent a
utho
ritie
s, ha
ve b
een
obta
ined
for t
he
oper
atio
n of
the
term
inal
and
are
list
ed in
Sec
tion
2.3
of th
e O
EMP
whi
ch is
ava
ilabl
e on
the
Patri
ck
web
site:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
C
A1.4
N
SW P
orts
/
Patri
ck
Stev
edor
es
Port
thro
ughp
ut c
apac
ity g
ener
ated
by
oper
atio
ns in
acc
orda
nce
with
this
cons
ent
shal
l be
cons
isten
t with
the
limits
spec
ified
in th
e EI
S, th
at is
, a m
axim
um th
roug
hput
ca
pacit
y at
the
term
inal
of 1
.6 m
illio
n TE
Us p
er a
nnum
and
a to
tal t
hrou
ghpu
t at P
ort
Bota
ny o
f 3.2
mill
ion
TEUs
. The
se li
mits
may
not
be
exce
eded
by
the
deve
lopm
ent
with
out f
urth
er e
nviro
nmen
tal a
sses
smen
t and
app
rova
l. Sy
dney
Por
ts C
orpo
ratio
n sh
all p
repa
re, o
r hav
e pr
epar
ed o
n its
beh
alf,
such
furth
er e
nviro
nmen
tal a
sses
smen
t fo
r the
det
erm
inat
ion
of th
e M
inist
er
Trad
e bu
lletin
s pub
lishe
d on
NSW
Por
ts w
ebsit
e in
dica
te th
ese
limits
are
not
bei
ng e
xcee
ded
at
pres
ent.
C
SCH
EDU
LE C
: TER
MIN
AL O
PERA
TIO
NS
C1
GE
NER
AL
Appl
icatio
n of
Sch
edul
e
C1.1
Pa
trick
St
eved
ores
The
cond
ition
s in
this
Sche
dule
of t
he c
onse
nt re
late
to a
ll th
e de
velo
pmen
t and
ac
tiviti
es a
ssoc
iate
d w
ith th
e op
erat
ion
of th
e co
ntai
ner t
erm
inal
and
ass
ocia
ted
infra
stru
ctur
e
Not
ed. S
ee d
etai
led
inpu
t bel
ow
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
34of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
C1.2
Pa
trick
St
eved
ores
The
cond
ition
s in
this
sub-
sche
dule
of t
he c
onse
nt m
ust b
e co
mpl
ied
with
by
the
Appl
icant
, or a
ny p
arty
und
erta
king
the
activ
ities
and
wor
ks re
ferre
d to
und
er
cond
ition
C1.
1, w
ith th
e ex
cept
ion
of th
e un
derta
king
of T
empo
rary
Use
s, w
hich
ar
e su
bjec
t to
cond
ition
C1.
2A. S
houl
d m
ore
than
one
term
inal
ope
rato
r un
derta
ke o
pera
tions
with
in th
e te
rmin
al a
rea,
com
plia
nce
with
the
cond
ition
s of
this
Sche
dule
may
be
unde
rtake
n in
divi
dual
ly b
y op
erat
ors,
or c
olle
ctiv
ely
Not
ed. P
atric
k St
eved
ores
is a
Ter
min
al o
pera
tor a
nd
has c
omm
issio
ned
this
Audi
t to
asse
ss c
ompl
ianc
e ag
ains
t the
se c
ondi
tions
with
resp
ect t
o its
ow
n op
erat
ions
Inte
rim U
ses
Port
, Mar
itim
e an
d W
ater
way
Rel
ated
Use
s- H
ayes
Doc
k Se
rvic
e Ar
ea
C1.2
A
C1.2
A Th
e co
nditi
ons i
n th
is su
b-sc
hedu
le o
f the
con
sent
mus
t be
com
plie
d w
ith b
y th
e Ap
plica
nt, o
r any
par
ty u
nder
taki
ng a
ctiv
ities
and
wor
ks a
ssoc
iate
d w
ith P
ort,
Mar
itim
e an
d W
ater
way
Rela
ted
Uses
Inte
rim U
ses,
exce
pt c
ondi
tions
C1.
3, C
1.4
C1.5
, C2.
5, C
2.12
, C2.
16, C
2.17
, C2.
18, C
2.20
, C2.
25, C
3.1,
C3.
2, C
3.3,
C4.
2, C
4.3,
C4
.4 a
nd C
4.5.
Not
ed.
C
Ope
ratio
n En
viro
nmen
tal M
anag
emen
t Pla
n-Po
rt, M
ariti
me
and
Wat
erw
ay
Rela
ted
Inte
rim U
ses
Hay
es D
ock
Serv
ices
Are
a
C1.2
B
C1.2
B Th
e Ap
plica
nt sh
all p
repa
re a
n O
pera
tion
Envi
ronm
enta
l Man
agem
ent P
lan
(OEM
P) –
Por
t, M
ariti
me
and
Wat
erw
ay R
elat
ed In
terim
Use
s prio
r to
the
com
men
cem
ent o
f Por
t, M
ariti
me
and
Wat
erw
ay R
elat
ed In
terim
Use
s on
the
site.
Th
e Pl
an sh
all i
nclu
de d
etai
ls of
how
env
ironm
enta
l per
form
ance
wou
ld b
e m
anag
ed a
nd m
onito
red
to m
eet a
ccep
tabl
e en
viro
nmen
tal o
utco
mes
, inc
ludi
ng
wha
t act
ions
will
be ta
ken
to a
ddre
ss p
oten
tial a
dver
se e
nviro
nmen
tal i
mpa
cts.
In
parti
cula
r, th
e fo
llow
ing
envi
ronm
enta
l iss
ues s
hall
be a
ddre
ssed
in th
e Pl
an:
- Odo
ur a
nd A
ir Q
ualit
y;
- Noi
se M
anag
emen
t;
- Was
te M
anag
emen
t;
This
cond
ition
is n
ot a
pplic
able
to P
atric
k’s
oper
atio
n.
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
35of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
- Wat
er a
nd W
aste
wat
er M
anag
emen
t;
- Haz
ard
and
Risk
Man
agem
ent;
- Am
enity
, inc
ludi
ng li
ghtin
g; a
nd
- Inc
iden
t Rep
ortin
g.
The
OEM
P sh
all a
lso a
ddre
ss:
- det
ails
of o
pera
tion
activ
ities
inclu
ding
key
noi
se a
nd/o
r vib
ratio
n ge
nera
ting
activ
ities
and
mac
hine
ry th
at h
ave
the
pote
ntia
l to
gene
rate
noi
se a
nd/o
r vi
brat
ion
impa
cts o
n su
rroun
ding
sens
itive
rece
iver
s;
- Ide
ntifi
catio
n of
feas
ible
and
reas
onab
le m
easu
res p
ropo
sed
to b
e im
plem
ente
d to
m
inim
ise a
nd m
anag
e op
erat
ion
noise
and
vib
ratio
n im
pact
s, es
pecia
lly d
urin
g sle
ep d
istur
banc
e;
- A d
escr
iptio
n of
how
the
effe
ctiv
enes
s of m
itiga
tion
and
man
agem
ent m
easu
res
wou
ld b
e m
aint
aine
d.
Noi
se M
anag
emen
t sha
ll in
clude
:
- hou
rs in
whi
ch p
artic
ular
ly a
ctivi
ties a
re u
nder
take
n;
- use
of s
hore
pow
er w
here
ava
ilabl
e;
- res
trict
ions
on
nota
bly
noisy
veh
icles
and
ves
sel f
rom
the
site;
- use
of b
uild
ing
and
vehi
cle a
larm
s and
/or a
ltern
ativ
es a
vaila
ble.
The
Plan
shal
l also
- ide
ntify
all
stat
utor
y ob
ligat
ions
that
the
appl
icant
is re
quire
d to
fulfi
l in
rela
tion
to
oper
atio
n of
the
deve
lopm
ent,
inclu
ding
all
cons
ents
, lice
nces
, app
rova
ls an
d co
nsul
tatio
ns;
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
36of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
- inc
lude
a d
escr
iptio
n of
the
role
s and
resp
onsib
ilitie
s for
all
key
empl
oyee
s inv
olve
d in
the
oper
atio
n of
the
deve
lopm
ent;
and
- inc
lude
ove
rall
envi
ronm
ent p
olici
es a
nd p
rincip
les t
o be
app
lied
to th
e op
erat
ion
of
the
facil
ity.
A co
py o
f the
upd
ated
OEM
P sh
all b
e su
bmitt
ed fo
r app
rova
l by
the
Secr
etar
y w
ithin
(3
) mon
ths o
f the
dat
e of
app
rova
l of M
odifi
catio
n 16
, unl
ess
othe
rwise
agr
eed
by
the
Secr
etar
y.
Noi
se M
anag
emen
t Pla
n- In
terim
Use
s H
ayes
Doc
k Se
rvic
es A
rea
Ope
ratio
n
C1.2
C
The
noise
man
agem
ent p
lan
shal
l inc
lude
, but
not
nec
essa
rily
be li
mite
d to
:
- com
plia
nce
stan
dard
s,
- com
mun
ity c
onsu
ltatio
n,
- com
plai
nt h
andl
ing
mon
itorin
g sy
stem
,
- site
con
tact
per
son
to fo
llow
up
com
plai
nts,
- miti
gatio
n m
easu
res,
- the
des
ign/
orie
ntat
ion
of th
e pr
opos
ed m
itiga
tion
met
hods
dem
onst
ratin
g be
st
prac
tice,
- ope
ratio
n tim
es,
- con
tinge
ncy
mea
sure
s whe
re n
oise
com
plai
nts a
re re
ceiv
ed, a
nd
- mon
itorin
g m
etho
ds a
nd p
rogr
am.
This
cond
ition
is n
ot a
pplic
able
to P
atric
k’s
oper
atio
n.
Ope
ratio
n En
viro
nmen
tal M
anag
emen
t Pla
n
C1.3
Pa
trick
St
eved
ores
The
Appl
icant
shal
l pre
pare
an
Ope
ratio
n En
viron
men
tal M
anag
emen
t Pla
n (O
EMP)
w
hich
mus
t be
appr
oved
by
the
Dire
ctor
-Gen
eral
prio
r to
com
men
cem
ent o
f any
op
erat
ions
at t
he te
rmin
al. T
he O
EMP
mus
t:
The
‘Pat
rick
Port
Bota
ny T
erm
inal
Ope
ratio
nal
Envir
onm
enta
l Man
agem
ent P
lan’
(OEM
P) –
Ver
sion
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
37of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
-id
entif
y al
l sta
tuto
ry o
blig
atio
ns th
at th
e Ap
plica
nt is
requ
ired
to fu
lfil i
n re
latio
n to
ope
ratio
n of
the
deve
lopm
ent,
inclu
ding
all
cons
ents
, lice
nces
, app
rova
ls an
d co
nsul
tatio
ns;
-de
scrib
e an
y re
leva
nt s
tagi
ng o
r ph
asin
g of
the
com
men
cem
ent
of o
pera
tions
w
ithin
the
term
inal
env
elop
e an
d an
y re
leva
nt ti
mef
ram
es;
-cle
arly
out
line
wha
t as
pect
s of
env
ironm
enta
l m
anag
emen
t, m
onito
ring
and
repo
rting
wou
ld b
e un
derta
ken
by th
e Ap
plica
nt o
r jo
intly
with
oth
er o
pera
tors
w
ithin
the
term
inal
are
a;
-in
clude
a d
escr
iptio
n of
the
rol
es a
nd r
espo
nsib
ilitie
s fo
r al
l ke
y em
ploy
ees
invo
lved
in th
e op
erat
ion
of th
e de
velo
pmen
t; -
inclu
de o
vera
ll en
viro
nmen
t pol
icies
and
prin
ciple
s to
be a
pplie
d to
the
oper
atio
n of
the
facil
ity;
-in
clude
spe
cific
cons
ider
atio
n of
mea
sure
s to
add
ress
any
requ
irem
ents
of D
PIE,
DEC,
and
the
Coun
cil d
urin
g op
erat
ion;
-
deta
il st
anda
rds
and
perfo
rman
ce m
easu
res
to b
e ap
plie
d to
the
deve
lopm
ent,
and
a m
eans
by
whi
ch e
nviro
nmen
tal p
erfo
rman
ce c
an b
e pe
riodi
cally
revi
ewed
an
d im
prov
ed, w
here
app
ropr
iate
; -
deta
il m
anag
emen
t pol
icies
to e
nsur
e th
at e
nviro
nmen
tal p
erfo
rman
ce g
oals
are
met
and
to c
ompl
y w
ith th
e co
nditi
ons o
f thi
s con
sent
; -
inclu
de th
e M
anag
emen
t Pla
ns re
leva
nt to
ope
ratio
n, in
clude
the
envi
ronm
enta
l m
onito
ring
requ
irem
ents
rele
vant
to o
pera
tion;
and
-
be m
ade
avai
labl
e fo
r pub
lic in
spec
tion
afte
r app
rova
l of t
he D
irect
or G
ener
al.
2 (5
-Jul
-201
9) h
as b
een
prep
ared
to sa
tisfy
this
cond
ition
and
is a
vaila
ble
on th
e O
pera
tors
web
site:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
Com
plia
nce
Cert
ifica
tion
C1.4
Pa
trick
St
eved
ores
Pr
ior t
o ea
ch o
f the
eve
nts l
isted
from
a) t
o b)
bel
ow, o
r with
in su
ch p
erio
d ot
herw
ise
agre
ed b
y th
e Di
rect
or-G
ener
al, d
ocum
enta
tion
certi
fyin
g th
at a
ll co
nditi
ons o
f thi
s co
nsen
t app
licab
le p
rior t
o th
at e
vent
hav
e be
en c
ompl
ied
with
shal
l be
subm
itted
to
the
satis
fact
ion
of th
e Di
rect
or-G
ener
al. W
here
an
even
t is t
o be
und
erta
ken
in
stag
es, s
ubm
issio
n of
com
plia
nce
certi
ficat
ion
may
be
stag
ed c
onsis
tent
with
the
The
Pre-
Ope
ratio
nal C
ompl
ianc
e Re
port
for t
he
Patri
ck P
ort B
otan
y ‘K
nuck
le’ a
nd R
amp
D (d
ated
De
cem
ber 2
015)
was
app
rove
d by
the
Dire
ctor
-Ge
nera
l on
4 Fe
brua
ry 2
016
(refe
r to
lette
r fro
m M
s Ka
ren
Harra
gon,
NSW
Dep
artm
ent o
f Pla
nnin
g &
En
viron
men
t to
Mr T
revo
r Bro
wn,
NSW
Por
ts).
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
38of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
stag
ing
of a
ctiv
ities
rela
ting
to th
at e
vent
, sub
ject
to th
e pr
ior a
gree
men
t of t
he
Dire
ctor
-Gen
eral
.
a)
com
men
cem
ent o
f any
ope
ratio
ns w
ithin
the
term
inal
are
a; a
nd
b)
com
men
cem
ent o
f eac
h st
age
or p
hase
of o
pera
tions
C1.5
N
SW P
orts
/
Patri
ck
Stev
edor
es
Not
with
stan
ding
con
ditio
n C1
.4 o
f thi
s con
sent
, the
Dire
ctor
-Gen
eral
may
requ
ire a
n up
date
repo
rt on
com
plia
nce
with
all,
or a
ny p
art,
of th
e co
nditi
ons o
f thi
s con
sent
. An
y su
ch u
pdat
e sh
all m
eet t
he re
quire
men
ts o
f the
Dire
ctor
-Gen
eral
and
be
subm
itted
with
in su
ch p
erio
d as
the
Dire
ctor
-Gen
eral
may
agr
ee
The
Depa
rtmen
t of P
lann
ing
& E
nviro
nmen
t (DP
&E)
re
ques
ted
(22
Dece
mbe
r 201
7) a
cop
y of
the
Actio
n Pl
an a
ddre
ssin
g th
e fin
ding
s det
aile
d in
Pat
rick’
s 20
16 A
nnua
l Env
ironm
enta
l Man
agem
ent R
epor
t (s
ectio
n 7)
. Th
is w
as p
rovi
ded
to th
e DP
&E
on 5
Ja
nuar
y 20
18.
C
Air q
ualit
y m
anag
emen
t
C2.1
Pa
trick
St
eved
ores
Th
e de
velo
pmen
t sha
ll be
und
erta
ken
so a
s not
to p
erm
it an
y of
fens
ive
odou
r, as
de
fined
und
er se
ctio
n 12
9 of
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7,
to b
e em
itted
bey
ond
the
boun
dary
of t
he si
te
No
offe
nsiv
e od
ours
wer
e de
tect
ed d
urin
g th
e au
dit
site
insp
ectio
n on
22
Janu
ary
2020
and
no
com
plai
nts f
rom
par
ties e
xter
nal t
o th
e sit
e re
gard
ing
odou
rs h
ave
been
rece
ived
dur
ing
the
repo
rting
per
iod.
C
C2.2
Pa
trick
St
eved
ores
Al
l act
iviti
es sh
all b
e un
derta
ken
in a
man
ner t
hat m
inim
ises o
r pre
vent
s dus
t em
issio
ns fr
om th
e sit
e, in
cludi
ng w
ind -
blow
n an
d tra
ffic-
gene
rate
d du
st. A
ll ac
tiviti
es
unde
rtake
n on
the
site
shal
l be
unde
rtake
n w
ith th
e ob
ject
ive
of p
reve
ntin
g vi
sible
em
issio
ns o
f dus
t fro
m th
e sit
e. S
houl
d su
ch v
isibl
e du
st e
miss
ions
occ
ur a
t any
tim
e,
all p
ract
icabl
e du
st m
itiga
tion
mea
sure
s, in
cludi
ng c
essa
tion
of re
leva
nt w
orks
, as
appr
opria
te, s
hall
be id
entif
ied
and
impl
ante
d su
ch th
at e
miss
ions
of v
isibl
e du
st
ceas
e
No
dust
em
issio
ns w
ere
dete
cted
dur
ing
the
audi
t sit
e in
spec
tion
on 2
2 Ja
nuar
y 20
20 a
nd n
o co
mpl
aint
s fro
m p
artie
s ext
erna
l to
the
site
rega
rdin
g du
st e
miss
ions
hav
e be
en re
ceive
d du
ring
the
repo
rting
per
iod.
C
C2.3
Pa
trick
St
eved
ores
Al
l tra
ffica
ble
and
vehi
cle m
anoe
uvrin
g ar
eas s
hall
be m
aint
aine
d at
all
times
in a
co
nditi
on th
at m
inim
ises t
he g
ener
atio
n an
d em
issio
n of
dus
t Su
rface
s are
pav
ed a
nd n
o lo
ose
mat
eria
ls w
ere
note
d du
ring
site
insp
ectio
n C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
39of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
C2.4
Pa
trick
St
eved
ores
Al
l veh
icles
ent
erin
g or
leav
ing
the
site
carry
ing
a lo
ad m
ust b
e co
vere
d or
oth
erw
ise
enclo
sed
at a
ll tim
es, e
xcep
t dur
ing
load
ing
and
unlo
adin
g, to
min
imise
the
gene
ratio
n an
d em
issio
n of
dus
t
Vast
maj
ority
of v
ehicl
es e
nter
ing
or le
avin
g sit
e ar
e ca
rryin
g sh
ippi
ng c
onta
iner
s whi
ch a
re se
aled
C
Noi
se M
anag
emen
t
C2.5
Pa
trick
St
eved
ores
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tions
, the
App
lican
t mus
t pre
pare
an
Ope
ratio
n N
oise
Man
agem
ent P
lan
in c
onsu
ltatio
n w
ith D
EC, D
PIE,
Bot
any
and
Rand
wick
Co
uncil
s. Th
e Pl
an sh
all i
nclu
de n
oise
man
agem
ent,
miti
gatio
n m
onito
ring
and
repo
rting
to e
nsur
e th
at lo
cal a
cous
tic a
men
ity is
not
adv
erse
ly im
pact
ed. I
n ad
ditio
n,
the
Ope
ratio
nal N
oise
Man
agem
ent P
lan
mus
t:
- id
entif
y ge
nera
l act
iviti
es th
at w
ill be
car
ried
out a
nd a
ssoc
iate
d no
ise
sour
ces;
- as
sess
ope
ratio
n no
ise im
pact
s at t
he re
leva
nt re
ceiv
ers;
- a
prim
ary
obje
ctiv
e of
ach
ievi
ng th
e op
erat
iona
l noi
se li
mits
out
lined
in th
is co
nsen
t;
- pr
ovid
e de
tails
of o
vera
ll m
anag
emen
t met
hods
and
pro
cedu
res t
hat w
ill b
e im
plem
ente
d to
con
trol n
oise
from
the
deve
lopm
ent;
- in
clude
a p
ro-a
ctiv
e an
d re
activ
e st
rate
gy fo
r dea
ling
with
com
plai
nts
inclu
ding
ach
ievi
ng th
e op
erat
ion
noise
lim
its, p
artic
ular
ly w
ith re
gard
to v
erba
l and
w
ritte
n re
spon
ses;
- de
tail
noise
mon
itorin
g, re
porti
ng a
nd re
spon
se p
roce
dure
s con
siste
nt w
ith
the
requ
irem
ents
of D
EC;
- pr
ovid
e fo
r int
erna
l aud
its o
f com
plia
nce
of a
ll pl
ant a
nd e
quip
men
t;
- in
dica
te si
te e
stab
lishm
ent t
imet
ablin
g to
min
imise
noi
se im
pact
s;
- in
clude
pro
cedu
res f
or n
otify
ing
resid
ents
of o
pera
tion
activ
ities
like
ly to
af
fect
thei
r noi
se a
men
ity;
Plan
ava
ilabl
e as
par
t of O
EMP
on w
ebsit
e.
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t -su
stai
nabi
lity
The
Ope
ratio
nal N
oise
Man
agem
ent P
lan
(OEM
P,
V2, 2
019
– Se
ctio
n 6.
6) h
as b
een
prep
ared
in
cons
ulta
tion
with
the
rele
vant
stak
ehol
ders
and
ad
dres
ses t
he re
quire
men
ts o
f thi
s con
ditio
n.
Bian
nual
Noi
se C
ompl
ianc
e M
onito
ring
Repo
rts
have
bee
n co
mpl
eted
for M
ay a
nd N
ovem
ber 2
019
a nd
are
avai
labl
e on
the
Patri
ck w
ebsit
e at
:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-m
onito
ring-
repo
rting
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
40of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
- ad
dres
s the
requ
irem
ents
of D
EC;
- a
stra
tegy
to id
entif
y op
erat
iona
l pra
ctice
s and
noi
se c
ontro
ls th
at c
an
min
imise
/or r
educ
e no
ise le
vels
from
con
tain
er im
pact
s, au
dibl
e al
arm
s and
oth
er
shor
t dur
atio
n hi
gh le
vel n
oise
eve
nts;
- id
entif
y op
portu
nitie
s to
redu
ce o
pera
tiona
l noi
se le
vels
inclu
ding
, but
not
ne
cess
arily
lim
ited
to, s
elec
tion
of e
quip
men
t, en
gine
erin
g no
ise c
ontro
ls an
d sh
ore-
base
d po
wer
; and
,
- be
app
rove
d by
the
Dire
ctor
-Gen
eral
prio
r to
the
com
men
cem
ent o
f op
erat
ion
C2.6
Pa
trick
St
eved
ores
N
oise
from
the
prem
ises m
ust n
ot e
xcee
d th
e so
und
pres
sure
leve
l (no
ise) l
imits
pr
esen
ted
in th
e Ta
ble
belo
w. N
ote
the
limits
repr
esen
t the
soun
d pr
essu
re le
vel
(noi
se) c
ontri
butio
n, a
t the
nom
inat
ed re
ceiv
er lo
catio
ns in
the
tabl
e.
Mos
t affe
cted
re
siden
tial
Loca
tion
Day
Even
ing
Nig
ht
LAeq
(15
min
ute)
LA
eq (1
5 m
inut
e)
LAeq
(15
min
ute)
LA
eq,9
hrs
LA1(
1 m
inut
e)
Chel
msf
ord
Av
enue
s 40
40
40
38
53
Dent
Stre
et
45
45
45
43
59
Jenn
ings
St
reet
36
36
36
35
55
Bota
ny R
d (n
th
of g
olf c
lub)
47
47
47
45
59
Bian
nual
noi
se m
onito
ring
repo
rts a
re a
vaila
ble
on
Patri
ck S
teve
dore
s web
site.
Eac
h re
port
has b
een
prep
ared
by
Rodn
ey S
teve
ns A
cous
tics.
The
repo
rts
conc
lude
that
‘ope
ratio
nal n
oise
is c
onsid
ered
to
com
ply
with
EPL
696
2, d
ay, e
veni
ng a
nd n
ight
-tim
e no
ise li
mits
.
It is
note
d th
at n
oise
lim
its w
ithin
the
EPL
are
equa
l to
or m
ore
strin
gent
than
thos
e qu
oted
in th
is Co
nditi
on.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
41of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
Aust
ralia
Ave
35
35
35
35
57
Mili
tary
Roa
d 42
42
42
40
60
For t
he p
urpo
se o
f thi
s con
ditio
n;
· Da
y is
defin
ed a
s the
per
iod
from
7am
to 6
pm M
onda
y to
Sat
urda
y an
d 8a
m
to 6
pm S
unda
ys a
nd P
ublic
Hol
iday
s,
· Ev
enin
g is
defin
ed a
s the
per
iod
from
6pm
to 1
0pm
· N
ight
is d
efin
ed a
s the
per
iod
from
10p
m to
7am
Mon
day
to S
atur
day
and
10pm
to 8
am S
unda
ys a
nd P
ublic
Hol
iday
s
C2.7
Pa
trick
St
eved
ores
N
oise
from
the
prem
ises i
s to
be m
easu
red
at th
e m
ost a
ffect
ed p
oint
with
in th
e re
siden
tial b
ound
ary,
or a
t the
mos
t affe
cted
poi
nt w
ithin
30
met
res o
f the
dw
ellin
g w
here
the
dwel
ling
is m
ore
than
30
met
res f
rom
the
boun
dary
, to
dete
rmin
e co
mpl
ianc
e w
ith th
e no
ise le
vel l
imits
in C
ondi
tion
C2.6
unl
ess o
ther
wise
stat
ed
Noi
se re
ports
refe
rred
to a
bove
satis
fy th
is re
quire
men
t C
C2.8
Pa
trick
St
eved
ores
N
oise
from
the
prem
ises i
s to
be m
easu
red
at 1
m fr
om th
e dw
ellin
g fa
çade
to
dete
rmin
e co
mpl
ianc
e w
ith th
e LA
1 (1
min
ute)
noi
se le
vel i
n Co
nditi
on C
2.6
As a
bove
C
C2.9
Pa
trick
St
eved
ores
W
here
it c
an b
e de
mon
stra
ted
that
dire
ct m
easu
rem
ent o
f noi
se fr
om th
e pr
emise
s is
impr
actic
al, t
he D
EC m
ay a
ccep
t alte
rnat
ive
mea
ns o
f det
erm
inin
g co
mpl
ianc
e. S
ee
Chap
ter 1
1 of
the
NSW
Indu
stria
l Noi
se P
olicy
Refe
r C2.
7 &
2.8
abo
ve
C
C2.1
0 Pa
trick
St
eved
ores
Th
e m
odifi
catio
n fa
ctor
s pre
sent
ed in
Sec
tion
4 of
the
NSW
Indu
stria
l Noi
se P
olicy
sh
all a
lso b
e ap
plie
d to
the
mea
sure
d no
ise le
vels
whe
re a
pplic
able
N
oise
repo
rt re
ferre
d to
abo
ve sa
tisfie
s thi
s re
quire
men
t C
C2.1
1 Pa
trick
St
eved
ores
Th
e no
ise e
miss
ion
limits
iden
tifie
d in
Con
ditio
n C2
.6 a
pply
und
er m
eteo
rolo
gica
l co
nditi
ons o
f win
d sp
eed
up to
3 m
etre
s per
seco
nd a
t 10
met
res a
bove
gro
und
leve
l, an
d te
mpe
ratu
re in
vers
ion
cond
ition
s up
to 1
.50C
/100
m p
ositi
ve la
pse
rate
Noi
se re
ports
refe
rred
to a
bove
satis
fies t
his
requ
irem
ent
C
Ope
ratio
nal T
raff
ic M
anag
emen
t Pla
n
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
42of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
C2.1
2 Pa
trick
St
eved
ores
Pr
ior t
o th
e co
mm
ence
men
t of t
erm
inal
ope
ratio
ns, t
he a
pplic
ant m
ust p
repa
re a
n O
pera
tiona
l Tra
ffic
Man
agem
ent P
lan
in c
onsu
ltatio
n w
ith T
fNSW
(RM
S), D
PIE,
Bot
any
and
Rand
wick
Cou
ncils
and
SSR
OC.
The
App
lican
t sha
ll ad
dres
s the
requ
irem
ents
of
thes
e or
gani
satio
ns in
the
Plan
. The
App
lican
t sha
ll al
so c
onsu
lt w
ith th
e Co
mm
unity
Co
nsul
tativ
e Co
mm
ittee
in p
repa
ratio
n of
the
Plan
. The
pla
n m
ust i
nclu
de, b
ut n
ot b
e co
nfin
ed to
, miti
gatio
n m
easu
res i
dent
ified
in E
IS su
ch a
s:
- id
entif
icatio
n of
pre
ferre
d ro
utes
to m
inim
ise n
oise
impa
cts o
n th
e su
rroun
ding
com
mun
ity;
- ph
ysica
l and
ope
ratio
nal m
easu
res (
inclu
ding
sign
age)
to m
itiga
te n
oise
im
pact
s fro
m v
ehicl
es a
cces
sing
and
leav
ing
the
term
inal
;
- m
easu
res t
o lim
it th
e im
pact
of t
raffi
c no
ise o
n Fo
resh
ore
Road
and
Bot
any
Road
;
- dr
iver
edu
catio
n an
d in
form
atio
n to
pro
mot
e dr
iver
hab
its to
min
imise
no
ise; a
nd
- tim
etab
ling,
sche
dulin
g an
d de
tails
of v
ehicl
e bo
okin
g sy
stem
s.
The
plan
mus
t be
subm
itted
and
app
rove
d by
the
Dire
ctor
-Gen
eral
prio
r to
the
com
men
cem
ent o
f ope
ratio
ns
Plan
ava
ilabl
e as
par
t of O
EMP
on th
e Pa
trick
w
ebsit
e. h
ttp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y
The
Ope
ratio
nal T
raffi
c M
anag
emen
t Pla
n (O
EMP,
V 2
, 201
9 –
Sect
ion
6.7)
has
bee
n pr
epar
ed in
co
nsul
tatio
n w
ith th
e re
leva
nt st
akeh
olde
rs a
nd
addr
esse
s the
requ
irem
ents
of t
his c
ondi
tion.
C
Was
te M
anag
emen
t on
Site
C2.1
3 Pa
trick
St
eved
ores
M
anag
emen
t of w
aste
mus
t be
in a
ccor
danc
e w
ith th
e en
viro
nmen
t pro
tect
ion
licen
ce is
sued
by
EPA
unde
r the
Pro
tect
ion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997
A W
aste
Man
agem
ent P
lan
(OEM
P, V
2, 2
019
– se
ctio
n 6.
4 ) o
n th
e Pa
trick
web
site.
ht
tp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y
EPL
6962
Con
ditio
n L2
allo
ws P
atric
k St
eved
ores
to
rece
ive
type
s of w
aste
at t
he p
rem
ises.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
43of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
C2.1
3A
Patri
ck
Stev
edor
es
The
man
agem
ent o
f was
te fo
r use
s and
act
iviti
es n
ot su
bjec
t to
an E
nviro
nmen
tal
Prot
ectio
n lic
ence
, sha
ll be
man
aged
and
disp
osed
of i
n ac
cord
ance
with
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tion
(Was
te) R
egul
atio
n 20
05 a
nd th
e W
aste
Cl
assif
icatio
n Gu
idel
ines
(DEC
CW 2
009)
, or a
ny fu
ture
gui
delin
e th
at m
ay su
pers
ede
that
doc
umen
t. Al
l was
te m
ater
ials
rem
oved
from
the
site
shal
l onl
y be
dire
cted
to a
w
aste
man
agem
ent f
acili
ty la
wfu
lly p
erm
itted
to a
ccep
t the
mat
eria
ls
Reco
rds o
f was
te o
ils a
nd fi
lters
, tra
nspo
rters
and
w
aste
oil
rece
ival
loca
tions
are
mai
ntai
ned
in a
W
aste
Reg
ister
.
C
Wat
er a
nd W
aste
wat
er M
anag
emen
t
C2.1
4 Pa
trick
St
eved
ores
Ex
cept
as m
ay b
e ex
pres
sly p
erm
itted
by
a lic
ence
und
er th
e Pr
otec
tion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997
in re
latio
n to
the
deve
lopm
ent,
sect
ion
120
of th
at
Act (
proh
ibiti
on o
f the
pol
lutio
n of
wat
ers)
shal
l be
com
plie
d w
ith in
con
nect
ion
to
the
deve
lopm
ent.
No
wat
er q
ualit
y m
onito
ring
is re
quire
d by
the
EPL
(696
2) a
nd th
ere
are
no li
cenc
ed d
ischa
rge
poin
ts.
C
Pollu
tant
Con
cent
ratio
n Li
mits
C2.1
5 Pa
trick
St
eved
ores
Fo
r eac
h m
onito
ring/
disc
harg
e po
int o
r util
isatio
n ar
ea, t
he c
once
ntra
tion
of a
ny
pollu
tant
disc
harg
ed a
t tha
t poi
nt, o
r app
lied
to th
at a
rea,
mus
t not
exc
eed
conc
entra
tion
limits
spec
ified
in th
e re
leva
nt e
nviro
nmen
t pro
tect
ion
licen
ce
No
disc
harg
e po
ints
in E
PL.
N
A
Haz
ards
and
Ris
k M
anag
emen
t- H
ayes
Doc
k In
terim
Use
s
C2.1
5A
Po
rt, m
ariti
me
and
wat
erwa
y re
late
d w
ith in
Hay
es u
ses D
ock
may
invo
lve
the
load
ing,
unl
oadi
ng a
nd st
orag
e of
min
or v
olum
es o
f dan
gero
us g
oods
(DGs
) for
the
sole
pur
pose
of m
inor
site
mai
nten
ance
; lin
e bo
at, b
arge
and
tug
mai
nten
ance
; re
late
d se
rvice
act
iviti
es a
nd b
oat r
efue
lling
.
This
cond
ition
is n
ot a
pplic
able
to P
atric
k’s
oper
atio
n.
Haz
ards
and
Ris
k M
anag
emen
t
C2.1
6 Pa
trick
St
eved
ores
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tion,
the
Appl
icant
shal
l dev
elop
man
agem
ent
mea
sure
s in
cons
ulta
tion
with
the
Maj
or H
azar
ds U
nit o
f DPI
E re
gard
ing
the
use
of
The
Emer
genc
y M
anag
emen
t Pla
n an
d Em
erge
ncy
Resp
onse
Pla
n, lo
cate
d on
the
Patri
ck w
ebsit
e ht
tp://
ww
w.p
atric
k.co
m.a
u/en
viro
nmen
t-m
anag
emen
t was
dev
elop
ed to
mee
t the
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
44of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
the
new
term
inal
for l
oadi
ng, u
nloa
ding
and
stor
age
of d
ange
rous
goo
ds o
f Cla
sses
2.
3 an
d 6
expe
ctat
ion
of th
e DP
&E’
s Maj
or H
azar
ds U
nit i
.e. t
o en
sure
the
actio
ns o
f Pat
rick
whe
n de
alin
g w
ith a
n em
erge
ncy
invo
lvin
g Cl
ass 2
.3 o
r Cla
ss 6
dan
gero
us
good
s did
not
incr
ease
the
off-
site
risk
desc
ribed
in
the
Prel
imin
ary
Haza
rd A
naly
sis.
Haz
ards
and
Ris
k M
anag
emen
t- S
tora
ge a
nd H
andl
ing
of D
ange
rous
Goo
ds
C2.1
7 N
SW P
orts
Patri
ck
Stev
edor
es
The
Appl
icant
shal
l ens
ure
that
the
thro
ughp
ut o
f dan
gero
us g
oods
of e
ach
Clas
s and
th
e un
it siz
e sh
all n
ot e
xcee
d th
ose
liste
d in
tabl
e 6.
8 of
the
Prel
imin
ary
Haza
rd
Anal
ysis
(Rev
ision
7, J
une
2004
) and
is re
quire
d to
subm
it pe
riodi
c re
ports
to th
e Di
rect
or-G
ener
al d
etai
ling
info
rmat
ion
on th
e ac
tual
tonn
ages
, num
bers
of T
EUs a
nd
pack
age
sizes
for e
ach
class
of d
ange
rous
goo
ds h
andl
ed in
the
prev
ious
five
yea
rs
for a
ll po
rt te
rmin
als
The
Port
Bota
ny E
xpan
sion
(DA
494-
11-2
003-
i) An
nual
Dan
gero
us G
oods
Rep
ort w
as se
nt b
y N
SW
Ports
(app
lican
t) to
DPI
E on
30
Sept
embe
r 201
9 Re
port
findi
ngs c
onclu
ded
the
annu
al th
resh
old
limits
for t
his r
epor
ting
perio
d w
ere
not e
xcee
ded.
C
C2.1
7
Twel
ve m
onth
s afte
r the
det
erm
inat
ion
of D
A 49
4-11
-200
3-i M
OD
16, t
he A
pplic
ant
shal
l sub
mit
an a
nnua
l rep
ort t
o th
e Se
cret
ary
whi
ch p
rovid
es d
etai
ls on
act
ual
Dang
erou
s Goo
ds m
ovem
ents
list
ed in
the
Tabl
e 1
prov
ided
in S
ched
ule
4.
Shou
ld th
e th
resh
old
limits
list
ed in
Tab
le 2
in S
ched
ule
4 be
exc
eede
d fo
r thr
ee
cons
ecut
ive
annu
al re
porti
ng y
ears
, or i
f the
max
imum
lim
its a
re re
ache
d in
a si
ngle
12
-mon
th re
porti
ng p
erio
d, th
e Ap
plica
nt sh
all p
repa
re a
n up
date
d ha
zard
ana
lysis
for t
he P
BE o
pera
tions
. The
haz
ards
ana
lysis
shal
l:
- Be
prep
ared
in c
onsu
ltatio
n w
ith th
e De
partm
ent.
- Be
prep
ared
in a
ccor
danc
e w
ith H
azar
dous
Indu
stry
Plan
ning
Pap
er N
o. 6
, ‘Haz
ard
Anal
ysis’
;
- Ass
ess c
ompl
ianc
e ag
ains
t the
land
use
safe
ty p
lann
ing
risk
crite
ria
The
Por
t Bot
any
Expa
nsio
n (D
A 49
4-11
-200
3-i)
Annu
al D
ange
rous
Goo
ds R
epor
t was
sent
by
NSW
Po
rts (a
pplic
ant)
to D
PIE
on 3
0 Se
ptem
ber 2
019
Repo
rt fin
ding
s con
clude
d th
e an
nual
thre
shol
d lim
its fo
r thi
s rep
ortin
g pe
riod
wer
e no
t exc
eede
d.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
45of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
(inclu
ding
indi
vidu
al fa
talit
y ris
k, in
jury
/irrit
atio
n ris
k an
d so
cieta
l risk
), as
out
line
in
Haza
rdou
s Ind
ustry
Pla
nnin
g Ad
viso
ry P
aper
No.
4, ‘R
isk C
riter
ia fo
r Lan
d Us
e Sa
fety
Pl
anni
ng’; a
nd
- Ass
ess w
heth
er th
e ris
ks fr
om P
BE o
pera
tions
will
sign
ifica
ntly
impa
ct o
n th
e cu
mul
ativ
e ris
k co
ntou
r of 1
x 1
0-6
per a
nnum
, con
tain
ed in
Fig
ure
2 of
the
Port
Bota
ny L
and
Use
Safe
ty S
tudy
Ove
rvie
w Re
port
1996
, or a
ny o
ther
revi
sed
land
use
sa
fety
stud
y fo
r the
Por
t tha
t sup
erse
des t
he 1
996
stud
y.
The
repo
rt sh
all b
e pr
epar
ed to
the
satis
fact
ion
of th
e Se
cret
ary.
The
haza
rd
anal
ysis
is to
be
subm
itted
to th
e Se
cret
ary
with
in 6
mon
ths o
f an
iden
tifie
d th
resh
old
exce
edan
ce, o
r as a
gree
d to
by
the
Secr
etar
y
.
C2.1
8 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all n
ot st
ore
or h
andl
e or
per
mit
to b
e st
ored
or h
andl
ed, d
ange
rous
go
ods o
f Cla
ss 2
.3, t
oxic
com
pres
sed
or li
quef
ied
gase
s abo
ve th
e qu
antit
ies s
tore
d or
han
dled
in 1
995/
96 e
xcep
t in
acco
rdan
ce w
ith re
com
men
datio
ns 1
.1 a
nd 1
.2 in
the
Port
Bota
ny L
and
Use
safe
ty S
tudy
(199
6).
As p
er c
ondi
tion
C2.1
7 th
e An
nual
Dan
gero
us G
oods
Re
port
findi
ngs c
onclu
ded
the
annu
al th
resh
old
limits
for t
his r
epor
ting
perio
d w
ere
not e
xcee
ded.
C
Emer
genc
y In
cide
nt M
anag
emen
t
C2.2
0 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all d
evel
op a
n Em
erge
ncy
Resp
onse
and
Incid
ent M
anag
emen
t Pla
n in
con
sulta
tion
with
DEC
, DPI
E, C
ounc
il an
d th
e Co
mm
unity
Con
sulta
tive
Com
mitt
ee.
The
Plan
mus
t be
appr
oved
by
the
Dire
ctor
-Gen
eral
prio
r to
the
com
men
cem
ent o
f op
erat
ions
and
shal
l det
ail:
- te
rmin
al se
curit
y an
d pu
blic
safe
ty is
sues
;
- ef
fect
ive
spill
con
tain
men
t and
man
agem
ent;
- ef
fect
ive
firef
ight
ing
capa
bilit
ies;
- ef
fect
ive
resp
onse
to e
mer
genc
ies a
nd c
ritica
l inc
iden
ts; a
nd
The
Emer
genc
y M
anag
emen
t Pla
n (V
ersio
n 12
, 201
9)
is av
aila
ble
on th
e Pa
trick
web
site
http
://w
ww
.pat
rick.
com
.au/
envi
ronm
ent-
man
agem
ent.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
46of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
a sin
gle
set o
f em
erge
ncy
proc
edur
es, c
onsis
tent
with
the
exist
ing
Port
Bota
ny
Emer
genc
y Pl
an, s
houl
d be
dev
elop
ed th
at b
e sc
aled
as a
ppro
pria
te fo
r any
incid
ent
or e
mer
genc
y.
Avia
tion
Ope
ratio
nal I
mpa
cts
C2.2
1 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all e
nsur
e th
at th
e lo
catio
n of
fixe
d te
rmin
al o
pera
ting
infra
stru
ctur
e ad
equa
tely
take
s int
o ac
coun
t the
requ
ired
late
ral s
epar
atio
n di
stan
ces t
o m
inim
ise
the
inte
rfere
nce
to S
ydne
y Ai
rpor
t rad
ar a
nd n
avig
atio
nal s
yste
ms
Patri
ck h
as o
btai
ned
appr
oval
und
er th
e Ai
rpor
ts
(Pro
tect
ion
of A
irspa
ce)
Regu
latio
ns 1
996
(APA
R) (R
ef: 1
2/50
83) f
or th
e in
trusio
n of
thre
e qu
ay c
rane
s int
o pr
escr
ibed
ai
rspa
ce fo
r Syd
ney
Airp
ort.
Appr
oval
was
gra
nted
by
Fly
safe
Aer
odro
me
Prec
inct
s, Av
iatio
n an
d Ai
rpor
ts D
ivisi
on o
f the
Dep
artm
ent o
f Inf
rast
ruct
ure
and
Tran
spor
t on
12 D
ecem
ber2
012.
C
C2.2
2 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all e
nsur
e th
at a
ll op
erat
ion
equi
pmen
t is b
elow
the
obst
acle
lim
itatio
n su
rface
, unl
ess o
ther
wise
per
mitt
ed b
y an
app
rova
l und
er th
e Ai
rpor
ts A
ct
1999
and
Airp
orts
(Pro
tect
ion
of A
irspa
ce) R
egul
atio
n 19
66
As a
bove
C
C2.2
3 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all e
nsur
e de
sign
spec
ifica
tions
of t
he te
rmin
al li
ghtin
g co
nfor
m to
th
e re
quire
men
ts o
f Reg
ulat
ion
94 o
f the
Civ
il Av
iatio
n re
gula
tions
198
8 Pa
trick
has
obt
aine
d ap
prov
al u
nder
the
Airp
orts
(P
rote
ctio
n of
Airs
pace
)
Regu
latio
ns 1
996
(APA
R) (R
ef: 1
2/50
83) f
or th
e in
trusio
n of
thre
e qu
ay c
rane
s int
o pr
escr
ibed
ai
rspa
ce fo
r Syd
ney
Airp
ort.
Appr
oval
was
gra
nted
by
Fly
safe
Aer
odro
me
Prec
inct
s, Av
iatio
n an
d Ai
rpor
ts D
ivisi
on o
f the
Dep
artm
ent o
f Inf
rast
ruct
ure
and
Tran
spor
t on
12 D
ecem
ber2
012.
C
C2.2
4 Pa
trick
St
eved
ores
Th
e Ap
plica
nt sh
all a
dopt
mea
sure
s to
ensu
re th
at th
ere
is m
inim
al li
ght s
pill
from
sh
ips w
hich
may
cau
se d
istra
ctio
n, c
onfu
sion
or g
lare
to p
ilots
. The
se m
ay in
clude
: M
ariti
me
Ord
er 3
2 Sc
hedu
le 1
(2) l
ight
ing
requ
ires
adeq
uate
ligh
ting
durin
g lo
adin
g or
unl
oadi
ng
activ
ities
. Whe
n ve
ssel
s are
load
ed a
nd u
nloa
ded
at
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
47of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
- m
inim
ising
ship
boar
d lig
htin
g w
hile
ber
thed
;
- or
ient
atin
g sh
ips i
n a
spec
ific
dire
ctio
n; a
nd o
r
- pr
ovid
ing
tem
pora
ry sh
ield
ing
on th
e sh
ip m
ount
ed fl
oodl
ight
s whi
le
dock
ed
nigh
t and
suffi
cient
ligh
ting
will
be
requ
ired
to
unde
rtake
load
ing
or d
ischa
rge
oper
atio
ns. N
ote:
Th
e Pr
e-O
pera
tiona
l Com
plia
nce
Repo
rt fo
r the
Pa
trick
Por
t Bot
any
‘Knu
ckle
and
Ram
p D’
(dat
ed
Dece
mbe
r 201
5) li
sts t
he st
atus
of t
his c
ondi
tion
as
“ope
n” w
ith c
omm
ents
abo
ut c
onsu
ltatio
n w
ith
rele
vant
par
ties .
Addi
tiona
lly, L
ED li
ghts
are
bei
ng p
rogr
essiv
ely
inst
alle
d th
roug
hout
the
berth
6 a
reas
to fu
rther
re
duce
ligh
t spi
ll.
C2.2
5 Pa
trick
St
eved
ores
Pr
ior t
o op
erat
ions
, the
App
lican
t sha
ll de
velo
p a
Bird
Haz
ard
Man
agem
ent P
lan
to
min
imise
the
attra
ctio
n of
bird
spec
ies t
hat p
ose
a ris
k to
airc
raft
mov
emen
ts. T
he
Plan
is to
be
prep
ared
in c
onsu
ltatio
n w
ith th
e De
partm
ent o
f Tra
nspo
rt an
d Re
gion
al
Serv
ices,
Sydn
ey A
irpor
t Cor
pora
tion
and
Bota
ny a
nd R
andw
ick C
ounc
ils. T
he P
lan
mus
t be
appr
oved
by
the
Dire
ctor
-Gen
eral
prio
r to
the
com
men
cem
ent o
f ope
ratio
ns
The
Bird
Haz
ard
Man
agem
ent P
lan
is av
aila
ble
as
part
of O
EMP
(V2,
201
9 –
Sect
ion
6.9)
on
web
site.
ht
tp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y
C
COM
MU
NIT
Y IN
FORM
ATIO
N, I
NVO
LVEM
ENT
AND
CO
NSU
LTAT
ION
C3.1
Pa
trick
St
eved
ores
Th
e Ap
plica
nt m
ust m
eet t
he fo
llow
ing
requ
irem
ents
in re
latio
n to
com
mun
ity
cons
ulta
tion
and
com
plai
nts m
anag
emen
t:
- al
l mon
itorin
g, m
anag
emen
t and
repo
rting
doc
umen
ts re
quire
d un
der t
he
deve
lopm
ent c
onse
nt sh
all b
e m
ade
publ
icly
avai
labl
e;
- pr
ovid
e m
eans
by
whi
ch p
ublic
com
men
ts, i
nqui
ries a
nd c
ompl
aint
s can
be
rece
ived
, and
ens
ure
that
thos
e m
eans
are
ade
quat
ely
publ
icise
d; a
nd
- in
clude
s det
ails
of a
regi
ster
to b
e ke
pt o
f all
com
men
ts, i
nqui
ries a
nd
com
plai
nts r
ecei
ved
by th
e ab
ove
mea
ns, i
nclu
ding
the
follo
win
g re
gist
er fi
elds
:
- th
e da
te a
nd ti
me,
whe
re re
leva
nt, o
f the
com
men
t, in
quiry
or c
ompl
aint
;
Docu
men
tatio
n in
cludi
ng m
anag
emen
t pla
ns a
nd
mon
itorin
g re
ports
are
ava
ilabl
e on
the
Patri
ck
web
site.
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-m
onito
ring-
repo
rting
Cont
act d
etai
ls an
d co
mpl
aint
s lin
e ar
e av
aila
ble
at:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
48of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
- th
e m
eans
by
whi
ch th
e co
mm
ent,
inqu
iry o
r com
plai
nt w
as m
ade
(tele
phon
e, fa
x, m
ail,
emai
l or i
n pe
rson
);
- an
y pe
rson
al d
etai
ls of
the
com
men
ter,
inqu
irer o
r com
plai
nant
that
wer
e pr
ovid
ed, o
r if n
o de
tails
wer
e pr
ovid
ed, a
not
e to
that
effe
ct;
- th
e na
ture
of t
he c
ompl
aint
;
- an
y ac
tion(
s) ta
ken
by th
e Ap
plica
nt in
rela
tion
to th
e co
mm
ent,
inqu
iry o
r co
mpl
aint
, inc
ludi
ng a
ny fo
llow
-up
cont
act w
ith th
e co
mm
ente
r, in
quire
r or
com
plai
nant
; and
if n
o ac
tion
was
take
n by
the
Appl
icant
in re
latio
n to
the
com
men
t, in
quiry
or c
ompl
aint
, the
reas
on(s
) why
no
actio
n w
as ta
ken.
-P
rovi
de q
uarte
rly re
ports
to th
e De
partm
ent a
nd D
EC, w
here
rele
vant
, ou
tlini
ng d
etai
ls of
com
plai
nts r
ecei
ved
Patri
ck P
ort B
otan
y Q
uarte
rly C
omm
unity
Fee
dbac
k Re
ports
are
ava
ilabl
e on
Pat
rick’
s web
site
http
://w
ww
.pat
rick.
com
.au/
envi
ronm
ent-m
onito
ring-
repo
rtin
g and
con
tain
the
info
rmat
ion
and
deta
ils
requ
ired
by th
is co
nditi
on.
The
up to
dat
e co
mpl
aint
s reg
ister
was
sigh
ted
on
22 Ja
nuar
y 20
20.
C3.2
N
SW P
orts
Patri
ck
Stev
edor
es
At le
ast 6
mon
ths p
rior t
o co
mm
ence
men
t of o
pera
tions
, the
App
lican
t sha
ll es
tabl
ish
a Co
mm
unity
Con
sulta
tive
Com
mitt
ee to
ove
rsee
the
envi
ronm
enta
l per
form
ance
of
the
deve
lopm
ent.
This
com
mitt
ee sh
all:
(a)
be c
ompr
ised
of:
· 2
repr
esen
tativ
es fr
om th
e Ap
plica
nt, i
nclu
ding
the
pers
on re
spon
sible
for
envi
ronm
enta
l man
agem
ent;
· 1
repr
esen
tativ
e fro
m B
otan
y Ba
y Ci
ty C
ounc
il; an
d
· at
leas
t 3 re
pres
enta
tives
from
the
loca
l com
mun
ity,
who
se a
ppoi
ntm
ent h
as b
een
appr
oved
by
the
Dire
ctor
-Gen
eral
in
cons
ulta
tion
with
the
Coun
cil;
(b)
be c
haire
d by
an
inde
pend
ent p
arty
app
rove
d by
the
Dire
ctor
-Gen
eral
;
(c)
mee
t at l
east
four
tim
es a
yea
r, or
as o
ther
wise
agr
eed
by th
e CC
C;
Min
utes
of t
he m
eetin
gs a
re o
n N
SW P
orts
web
site
at:
PB C
CC
Mee
tings
hav
e be
en a
ttend
ed b
y Pa
trick
’s Po
rt Bo
tany
repr
esen
tativ
es.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
49of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
(d)
revi
ew a
nd p
rovi
de a
dvice
on
the
envi
ronm
enta
l per
form
ance
of t
he
deve
lopm
ent,
inclu
ding
any
con
stru
ctio
n or
env
ironm
enta
l man
agem
ent p
lans
, m
onito
ring
resu
lts, a
udit
repo
rts, o
r com
plai
nts;
and
Not
e: T
he A
pplic
ant m
ay, w
ith th
e ap
prov
al o
f the
Dire
ctor
-Gen
eral
, com
bine
the
func
tion
of th
is CC
C w
ith th
e fu
nctio
n of
oth
er e
xistin
g Co
mm
unity
Con
sulta
tive
mec
hani
sms t
he a
rea,
inclu
ding
the
c ons
truct
ion
phas
e CC
C (C
ondi
tion
B3.2
) ho
wev
er, i
f it d
oes t
his i
t mus
t ens
ure
that
the
abov
e ob
ligat
ions
are
fully
met
in th
e co
mbi
ned
proc
ess
C3.3
N
SW P
orts
Patri
ck
Stev
edor
es
The
Appl
icant
shal
l, at
its o
wn
expe
nse:
(a)
ensu
re th
at 2
of i
ts re
pres
enta
tives
atte
nd th
e Co
mm
ittee
’s m
eetin
gs;
(b)
prov
ide
the
Com
mitt
ee w
ith re
gula
r inf
orm
atio
n on
the
envi
ronm
enta
l pe
rform
ance
and
man
agem
ent o
f the
dev
elop
men
t;
(c)
prov
ide
mee
ting
facil
ities
for t
he C
omm
ittee
;
(d)
arra
nge
site
insp
ectio
ns fo
r the
Com
mitt
ee, i
f nec
essa
ry;
(e)
take
min
utes
of t
he C
omm
ittee
’s m
eetin
gs;
(f)
mak
e th
ese
min
utes
ava
ilabl
e on
the
Appl
icant
’s w
ebsit
e w
ithin
14
days
of
the
Com
mitt
ee m
eetin
g, o
r as a
gree
d to
by
the
Com
mitt
ee;
(g)
resp
ond
to a
ny a
dvice
or r
ecom
men
datio
ns th
e Co
mm
ittee
may
hav
e in
re
latio
n to
the
envi
ronm
enta
l man
agem
ent o
r per
form
ance
of t
he d
evel
opm
ent;
and
(h)
forw
ard
a co
py o
f the
min
utes
of e
ach
Com
mitt
ee m
eetin
g, a
nd a
ny
resp
onse
s to
the
Com
mitt
ee’s
reco
mm
enda
tions
to th
e Di
rect
or-G
ener
al w
ithin
a
mon
th o
f the
Com
mitt
ee m
eetin
g
As a
bove
.
C
ENVI
RON
MEN
TAL
MO
NIT
ORI
NG
AND
AU
DIT
ING
C4.1
Pa
trick
St
eved
ores
Th
e Di
rect
or-G
ener
al sh
all b
e no
tifie
d of
any
incid
ent w
ith a
ctua
l or p
oten
tial
signi
fican
t off-
site
impa
cts o
n pe
ople
or t
he b
ioph
ysica
l env
ironm
ent w
ithin
12
hour
s En
viro
nmen
tal I
ncid
ent R
egist
er si
ghte
d in
clude
s de
tails
of i
ncid
ents
on
12 Ju
ly 2
019
and
14 J
uly
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
50of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
of th
e Ap
plica
nt, o
r oth
er re
leva
nt p
arty
und
erta
king
the
deve
lopm
ent,
beco
min
g aw
are
of th
e in
ciden
t. Fu
ll w
ritte
n de
tails
of t
he in
ciden
t sha
ll be
pro
vided
to th
e Di
rect
or-G
ener
al w
ithin
seve
n da
ys o
f the
dat
e on
whi
ch th
e in
ciden
t occ
urre
d. T
he
Dire
ctor
-Gen
eral
may
requ
ire a
dditi
onal
mea
sure
s to
be im
plem
ente
d to
add
ress
the
caus
e or
impa
ct o
f any
incid
ent,
as it
rela
tes t
o th
is co
nsen
t, re
porte
d in
acc
orda
nce
with
this
cond
ition
, with
in su
ch p
erio
d as
the
Dire
ctor
-Gen
eral
may
requ
ire
2019
that
wer
e re
porte
d (a
mon
g ot
hers
) to
DPIE
. In
tern
al c
omm
unica
tions
sigh
ted
indi
cate
that
dai
ly
incid
ent r
epor
ts a
re m
ade
by E
SC M
gr to
m
anag
emen
t.
C4.2
Pa
trick
St
eved
ores
Th
e Ap
plica
nt m
ust p
repa
re a
n An
nual
Env
ironm
enta
l Man
agem
ent R
epor
t for
the
deve
lopm
ent.
The
Annu
al E
nviro
nmen
tal M
anag
emen
t Rep
ort m
ust:
- de
tail
com
plia
nce
with
the
cond
ition
s of t
his c
onse
nt;
- co
ntai
n a
copy
of t
he C
ompl
aint
s Reg
ister
(for
the
prec
edin
g tw
elve
-mon
th
perio
d, e
xclu
sive
of p
erso
nal d
etai
ls) a
nd d
etai
ls of
how
thes
e co
mpl
aint
s wer
e ad
dres
sed
and
reso
lved
;
- in
clude
a c
ompa
rison
of t
he e
nviro
nmen
tal i
mpa
cts a
nd p
erfo
rman
ce
pred
icted
in th
e EI
S an
d ad
ditio
nal i
nfor
mat
ion
docu
men
ts p
rovid
ed to
the
Depa
rtmen
t and
Com
miss
ion
of In
quiry
;
- de
tail
resu
lts o
f all
envi
ronm
enta
l mon
itorin
g re
quire
d un
der t
he
deve
lopm
ent c
onse
nt a
nd o
ther
app
rova
ls, in
cludi
ng in
terp
reta
tions
and
disc
ussio
n by
a su
itabl
y qu
alifi
ed p
erso
n;
- co
ntai
n a
list o
f all
occa
sions
in th
e pr
eced
ing
twel
ve-m
onth
per
iod
whe
n en
viro
nmen
tal p
erfo
rman
ce g
oals
have
not
bee
n ac
hiev
ed, i
ndica
ting
the
reas
on fo
r fa
ilure
to m
eet t
he g
oals
and
the
actio
n ta
ken
to p
reve
nt re
curre
nce
of th
at ty
pe o
f in
ciden
t;
- be
pre
pare
d w
ithin
twel
ve m
onth
s of t
he c
omm
ence
men
t of o
pera
tion,
and
ev
ery
twel
ve m
onth
s the
reaf
ter;
- be
app
rove
d by
the
Dire
ctor
-Gen
eral
eac
h ye
ar; a
nd
- be
mad
e av
aila
ble
for p
ublic
insp
ectio
n
2018
AEM
R on
web
site
.
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
2019
AEM
R cu
rrent
ly in
pre
para
tion
and
due
to b
e su
bmitt
ed to
NSW
Por
ts a
nd D
PE b
y 28
Feb
ruar
y 20
20.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
51of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
C4.3
Pa
trick
St
eved
ores
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tions
, a su
itabl
y qu
alifi
ed a
nd e
xper
ienc
ed
Envi
ronm
enta
l Rep
rese
ntat
ive(
s) sh
all b
e no
min
ated
to a
nd a
ppro
ved
by th
e Di
rect
or-
Gene
ral.
The
Envi
ronm
enta
l Rep
rese
ntat
ive(
s) sh
all b
e em
ploy
ed fo
r the
dur
atio
n of
op
erat
ions
, or a
s oth
erw
ise a
gree
d by
the
Dire
ctor
-Gen
eral
. The
Env
ironm
enta
l Re
pres
enta
tive
shal
l be:
- th
e pr
imar
y co
ntac
t poi
nt in
rela
tion
to th
e en
viro
nmen
tal p
erfo
rman
ce o
f th
e te
rmin
al o
pera
tions
;
- re
spon
sible
for a
ll M
anag
emen
t Pla
ns a
nd M
onito
ring
Prog
ram
s req
uire
d un
der t
his c
onse
nt, i
n re
latio
n to
the
term
inal
ope
ratio
ns;
- re
spon
sible
for c
onsid
erin
g an
d ad
visin
g on
mat
ters
spec
ified
in th
e co
nditi
ons o
f thi
s con
sent
, and
all
othe
r lice
nces
and
app
rova
ls re
latin
g to
the
envi
ronm
enta
l per
form
ance
and
impa
cts o
f the
term
inal
ope
ratio
ns;
- re
spon
sible
for t
he m
anag
emen
t of p
roce
dure
s and
pra
ctice
s for
rece
ivin
g an
d re
spon
ding
to c
ompl
aint
s and
inqu
iries
in re
latio
n to
the
envi
ronm
enta
l pe
rform
ance
of t
he te
rmin
al o
pera
tions
;
- re
quire
d to
facil
itate
an
indu
ctio
n an
d tra
inin
g pr
ogra
m fo
r rel
evan
t per
sons
in
volv
ed w
ith th
e te
rmin
al o
pera
tions
; and
- gi
ven
the
auth
ority
and
inde
pend
ence
to re
quire
reas
onab
le st
eps b
e ta
ken
to a
void
or m
inim
ise u
nint
ende
d or
adv
erse
env
ironm
enta
l im
pact
s, an
d fa
iling
the
effe
ctive
ness
of s
uch
step
s, to
dire
ct th
at re
leva
nt a
ctio
ns b
e ce
ased
imm
edia
tely
sh
ould
an
adve
rse
impa
ct o
n th
e en
viro
nmen
t be
likel
y to
occ
ur.
Patri
ck’s
Envi
ronm
ent,
Sust
aina
bilit
y &
Com
plia
nce
Man
ager
, Mar
ie G
ibbs
, has
bee
n ap
prov
ed b
y DP
E on
3 O
ctob
er 2
017
as th
e ER
.
Evid
ence
-inc
ludi
ng e
mai
ls, m
anag
emen
t upd
ates
an
d br
iefin
gs th
at w
ere
sight
ed -
indi
cate
that
Mar
ie
Gibb
s is p
erfo
rmin
g th
e ro
le o
f the
ER
as re
quire
d un
der t
his c
ondi
tion
C
C4.4
Pa
trick
St
eved
ores
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tions
an
Envi
ronm
enta
l Tra
inin
g Pr
ogra
m sh
all
be d
evel
oped
and
impl
emen
ted
to e
stab
lish
a fra
mew
ork
in w
hich
rele
vant
em
ploy
ees w
ill be
trai
ned
in e
nviro
nmen
tal m
anag
emen
t and
the
oper
atio
n of
pla
nt
and
equi
pmen
t, in
cludi
ng p
ollu
tion
cont
rol e
quip
men
t, w
here
rele
vant
. The
Pro
gram
sh
all i
nclu
de, b
ut n
ot n
eces
saril
y be
lim
ited
to:
Tool
box
Trai
ning
Tal
ks c
over
ing
key
issue
s suc
h as
no
ise, l
itter
ing
and
spill
s wer
e sig
hted
. The
se T
alks
w
ere
rolle
d ou
t in
Febr
uary
201
9.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
52of
81
CoA
No
Audi
tee
NSW
Por
ts/
Patr
ick
Stev
edor
es
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e*
See
foot
er fo
r key
C O
N
C N
A
a)
iden
tifica
tion
of re
leva
nt e
mpl
oym
ent p
ositi
ons a
ssoc
iate
d w
ith th
e de
velo
pmen
t tha
t hav
e an
ope
ratio
nal o
r man
agem
ent r
ole
rela
ted
to e
nviro
nmen
tal
perfo
rman
ce;
b)
deta
ils o
f app
ropr
iate
trai
ning
requ
irem
ents
for r
elev
ant e
mpl
oyee
s
c)
a pr
ogra
m fo
r tra
inin
g re
leva
nt e
mpl
oyee
s in
oper
atio
nal a
nd/ o
r m
anag
emen
t iss
ues a
ssoc
iate
d w
ith e
nviro
nmen
tal p
erfo
rman
ce; a
nd
d)
a pr
ogra
m to
con
firm
and
upd
ate
envi
ronm
enta
l tra
inin
g an
d kn
owle
dge
durin
g em
ploy
men
t of r
elev
ant p
erso
ns
The
e-le
arni
ng tr
aini
ng p
acka
ges a
re c
urre
ntly
bei
ng
deve
lope
d w
ith in
itial
mod
ules
to in
clude
: Inc
iden
t es
cala
tion
and
repo
rting
, ini
tial l
eak
resp
onse
and
le
gisla
tive
requ
irem
ent t
rain
ing.
C4.5
Pa
trick
St
eved
ores
W
ithin
one
yea
r of t
he c
omm
ence
men
t of o
pera
tions
and
eve
ry y
ear t
here
afte
r, th
e Ap
plica
nt sh
all f
und
a fu
ll in
depe
nden
t env
ironm
enta
l aud
it. T
he a
udit
mus
t be
unde
rtake
n by
a su
itabl
y qu
alifi
ed p
erso
n/te
am a
ppro
ved
by th
e Di
rect
or-G
ener
al.
The
audi
ts w
ould
be
mad
e pu
blicl
y av
aila
ble
and
wou
ld:
- be
car
ried
out i
n ac
cord
ance
with
ISO
140
10 –
Gui
delin
es a
nd G
ener
al
Prin
ciple
s for
Env
ironm
enta
l Aud
iting
and
ISO
140
11 –
Pro
cedu
res f
or E
nviro
nmen
tal
Audi
ting;
- as
sess
com
plia
nce
with
the
requ
irem
ents
of t
his c
onse
nt, a
nd o
ther
lice
nces
an
d ap
prov
als t
hat a
pply
to th
e de
velo
pmen
t;
- as
sess
the
cons
truct
ion
agai
nst t
he p
redi
ctio
ns m
ade
and
conc
lusio
ns d
raw
n in
the
deve
lopm
ent a
pplic
atio
n, E
IS, a
dditi
onal
info
rmat
ion
and
Com
miss
ion
of
Inqu
iry m
ater
ial;
and
- re
view
the
effe
ctiv
enes
s of t
he e
nviro
nmen
tal m
anag
emen
t of t
he
deve
lopm
ent,
inclu
ding
any
env
ironm
enta
l im
pact
miti
gatio
n w
orks
.
Not
e: A
n in
depe
nden
t and
tran
spar
ent e
nviro
nmen
tal a
udit
can
verif
y co
mpl
ianc
e (o
r ot
herw
ise) w
ith th
e M
inist
er’s
cons
ent a
nd v
ario
us a
ppro
vals.
Aud
iting
also
pro
vide
s an
opp
ortu
nity
for c
ontin
ued
impr
ovem
ent i
n en
viro
nmen
tal p
erfo
rman
ce
A pe
r thi
s aud
it.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
53of
81
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
54of
81
App
endi
x B.
PRO
JECT
APP
ROVA
L CO
ND
ITIO
NS
DA
453
– P
ATR
ICK
PORT
BO
TAN
Y RE
DEV
ELO
PMEN
T
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
55of
81
DEVE
LOPM
ENT
CONS
ENT
COND
ITIO
NS: D
A-45
3-12
-200
2-i–
Patri
ck S
teve
dore
s Op
erat
ions
Pty
Ltd
(Pat
rick
Port
Bota
ny R
edev
elop
men
t)Co
A N
o Co
nditi
on o
f App
rova
l Req
uire
men
t Co
mm
ents
, obs
erva
tions
, dis
cuss
ion,
evi
denc
e,
supp
ortin
g do
cum
enta
tion
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
1.GE
NER
AL
Obl
igat
ion
to M
inim
ise H
arm
to th
e En
viro
nmen
t
1.1
The
Appl
icant
shal
l im
plem
ent a
ll pr
actic
able
mea
sure
s to
prev
ent o
r min
imise
any
har
m to
the
envi
ronm
ent t
hat m
ay re
sult
from
the
cons
truct
ion
and
oper
atio
n of
the
deve
lopm
ent.
The
‘Pat
rick
Port
Bota
ny T
erm
inal
Ope
ratio
nal
Envi
ronm
enta
l Man
agem
ent P
lan’
(OEM
P) –
Ver
sion
2,
2019
) has
bee
n pr
epar
ed to
doc
umen
t man
agem
ent
mea
sure
s and
is a
vaila
ble
on P
atric
k’s w
ebsit
e:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
Deta
ils re
gard
ing
the
impl
emen
tatio
n of
the
OEM
P ar
e pr
ovid
ed in
Sec
tion
1.3
of th
e pl
an.
On-
site
insp
ectio
n no
ted
pollu
tion
cont
rol m
easu
res i
n pl
ace
thro
ugho
ut th
e sit
e an
d ev
iden
ce p
rovi
ded
belo
w.
C
Scop
e of
Dev
elop
men
t
1.2
1 The
App
lican
t sha
ll ca
rry o
ut th
e de
velo
pmen
t gen
eral
ly in
acc
orda
nce
with
: a)
Deve
lopm
ent a
pplic
atio
n DA
-453
-12-
2002
-I lo
dged
with
the
Depa
rtmen
t on
16 D
ecem
ber
2002
, acc
ompa
nied
Pat
rick
Port
Bota
ny C
onta
iner
Ter
min
al U
pgra
de, E
nviro
nmen
tal I
mpa
ct
Stat
emen
t (th
ree
volu
mes
), da
ted
Nov
embe
r 202
2 an
d pr
epar
ed b
y Pa
rson
s Brin
cker
hoff;
b)
Addi
tiona
l inf
orm
atio
n pr
ovid
ed in
resp
ect o
f dev
elop
men
t app
licat
ion
DA-4
53-1
2-22
02-I,
in
cludi
ng:
i) th
e le
tter f
rom
Par
sons
Brin
cker
hoff
to P
lann
ing
NSW
dat
ed 1
7 Ap
ril 2
003
title
d Pa
trick
Po
rt Bo
tany
EIS
– R
espo
nse
to H
azar
d an
d Ri
sk Is
sues
;
Com
plia
nce
with
thes
e re
quire
men
ts is
ver
ified
thro
ugh
this
inde
pend
ent a
udit
proc
ess,
com
plia
nce
repo
rts e
tc.
C
1 In
corp
orat
es E
PA G
ener
al T
erm
s of A
ppro
val –
A 1
.1
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
56of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A ii)
Upg
rade
of P
ort B
otan
y Co
ntai
ner T
erm
inal
, Rev
ised
Noi
se A
sses
smen
t, da
ted
May
200
3 an
d pr
epar
ed b
y W
ilkin
son
Mur
ray
Pty
Ltd;
iii
) Sup
plem
enta
ry A
vifa
una
Surv
ey &
Ass
essm
ent o
f Im
pact
s, da
ted
26 M
ay 2
003
and
prep
ared
by
AMBS
Con
sulti
ng;
iv) t
he m
emor
andu
m fr
om P
atric
ks B
rinck
erho
ff da
ted
30 M
ay 2
003
and
title
d Pa
trick
W
ater
Qua
lity
Asse
ssm
ent;
v) th
e am
ende
d de
velo
pmen
t app
licat
ion
subm
itted
to th
e De
partm
ent o
n 30
May
200
3 an
d as
socia
ted
draw
ings
; vi
) the
lette
r fro
m P
atric
k Te
rmin
als t
o Pl
anni
ng N
SW d
ated
11
June
200
3 tit
led
Patri
ck P
ort
Bota
ny E
IS;
vii)
the
mem
oran
dum
from
Fie
lder
s Eng
inee
rs P
ty L
td to
Par
sons
Brin
cker
hoff
date
d 20
Ju
ne 2
003
title
d Tr
ansp
ort N
SW’s
Com
men
ts;
viii)
the
lette
r fro
m Q
est C
onsu
lting
Gro
up to
Par
sons
Brin
cker
hoff
date
d 3
July
200
3 tit
led
Prel
imin
ary
Haza
rd A
naly
sis fo
r Pat
rick
Stev
edor
es;
c)m
odifi
catio
n ap
plica
tion
MO
D-56
-6-2
004-
I, lo
dged
with
the
Depa
rtmen
t on
28 M
ay 2
004
and
acco
mpa
nied
by
the
supp
lem
enta
ry d
ocum
ent t
itled
App
licat
ion
to M
odify
De
velo
pmen
t Con
sent
, dat
ed 1
9 M
ay 2
004;
d)
mod
ifica
tion
appl
icatio
n M
OD-
83-8
-200
4-i,
lodg
ed w
ith th
e De
partm
ent o
n 16
Aug
ust
2004
, acc
ompa
nied
by
four
pla
ns ti
tled
Prop
osed
Sta
ff Am
eniti
es (J
ob N
o. 0
4001
07,
Revi
sion
C) n
umbe
red
01 to
04
resp
ectiv
ely;
e)m
odifi
catio
n ap
plica
tion
MO
D-15
6-10
-200
5-I,
lodg
ed w
ith th
e De
partm
ent o
n 6
Oct
ober
20
05, a
ccom
pani
ed c
orre
spon
denc
e da
ted
6 O
ctob
er 2
005
and
title
d S9
6(1A
) App
licat
ion:
Pa
trick
Cor
pora
tion
– Po
rt Bo
tany
Ter
min
al a
nd p
lan
title
d Pr
opos
ed A
dmin
istra
tion
Build
ing
(Job
No.
PDS
-06-
38, R
evisi
on A
); f)
mod
ifica
tion
appl
icatio
n M
OD-
38-3
-200
6-i,
lodg
ed w
ith th
e De
partm
ent o
n 2
Mar
ch 2
006,
ac
com
pani
ed c
orre
spon
denc
e da
ted
1 M
arch
200
6 an
d tit
led
S96(
1A) A
pplic
atio
n: P
atric
k Co
rpor
atio
n –
Port
Bota
ny T
erm
inal
, and
pla
ns ti
tled
Prop
osed
Adm
inist
ratio
n Bu
ildin
g (Jo
b N
o. P
DS-0
6-38
, Rev
ision
D);
g)m
odifi
catio
n ap
plica
tion
MO
D-38
-4-2
007-
i, lo
dged
with
the
Depa
rtmen
t on
11 A
pril
2007
, ac
com
pani
ed c
orre
spon
denc
e da
ted
10 A
pril
2007
and
title
d S.9
6(1A
) App
licat
ion,
Pat
rick
Corp
orat
ion
– Po
rt Bo
tany
Ter
min
al, a
nd p
lans
title
d Pr
opos
ed A
dditi
onal
Sta
ff Am
eniti
es
(Job
No.
PDS
-07-
81, I
ssue
E);
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
57of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
h)m
odifi
catio
n ap
plica
tion
MO
D-76
-9-2
007-
i, lo
dged
with
the
Depa
rtmen
t on
24 A
ugus
t 20
07, a
ccom
pani
ed c
orre
spon
denc
e 19
June
200
7 an
d 5
Nov
embe
r 200
7 tit
led
S.96(
1A)
Appl
icatio
n, P
atric
k Co
rpor
atio
n - P
ort B
otan
y Te
rmin
al, a
nd th
e fo
llow
ing
plan
s: i)
Prop
osed
Cam
co T
raffi
cgat
e (Jo
b N
o. P
DS-0
7-84
, Iss
ue B
, Drg
. No.
: 01)
; ii)
Pro
pose
d Ca
mco
Tra
fficg
ate
(Job
No.
PDS
-07-
84, I
ssue
B, D
rg .
No.
: 02)
; iii
) Pro
pose
d Ca
mco
Tra
fficg
ate
(Job
No.
PDS
-07-
84, I
ssue
B, D
rg .
No.
: 03)
; iv
) Tru
ck P
orta
l Gat
e Fr
ame
Arra
ngem
ent a
nd D
etai
ls (P
roje
ct N
o. S
Y070
313,
Dw
g N
o.
S5.0
0, Is
sue
A);
v) T
rain
Por
tal G
ate
Fram
e Ar
rang
emen
t and
Det
ails
(Pro
ject
No.
SY0
7031
3, D
wg
No.
S4.
00,
Issue
E);
vi) T
rain
Por
tal G
ate
Fram
e Fo
otin
g Pl
an a
nd D
etai
ls (P
roje
ct N
o. S
Y070
313,
Dw
g N
o. S
4.00
, Iss
ue D
); vi
i) St
ruct
ural
Not
es (P
roje
ct N
o. S
Y070
313,
Dw
g N
o.S1
.00,
Issu
e D)
;
i)m
odifi
catio
n ap
plica
tion
DA-4
53-1
2-20
02-i
MO
D 7,
acco
mpa
nied
by
an a
sses
smen
t rep
ort
title
d Se
ctio
n 75
W M
odifi
catio
n Po
rt Bo
tany
Con
tain
er T
erm
inal
Env
ironm
enta
l Ass
essm
ent
prep
ared
by
GHD
and
date
d Ju
ne 2
013;
and
j)
the
cond
ition
s of t
his c
onse
nt.
In th
e ev
ent o
f an
inco
nsist
ency
bet
wee
n a
cond
ition
of t
his
cons
ent a
nd th
e do
cum
ents
list
ed
unde
r (a)
to (i
) abo
ve, t
he c
ondi
tions
of c
onse
nt sh
all p
reva
il to
the
exte
nt o
f the
inco
nsist
ency
.
Stag
ed D
evel
opm
ent
1.3
Unde
r Sec
tion
80(4
) of t
he A
ct, t
his c
onse
nt a
pplie
s to
the
deve
lopm
ent,
as d
escr
ibed
in S
ched
ule
1,
only.
N
oted
.
C
Prov
isio
n of
Doc
umen
ts
1.6
Whe
re p
ract
icabl
e, th
e Ap
plica
nt sh
all p
rovi
de a
ll do
cum
ents
and
repo
rts re
quire
d to
be
subm
itted
to
the
Dire
ctor
-Gen
eral
und
er th
is co
nsen
t in
an a
ppro
pria
te e
lect
roni
c fo
rmat
. Pro
visio
n of
do
cum
ents
and
repo
rts to
oth
er p
artie
s, as
requ
ired
unde
r thi
s con
sent
, sha
ll be
in a
form
at
acce
ptab
le to
thos
e pa
rties
and
shal
l aim
to m
inim
ise re
sour
ce c
onsu
mpt
ion.
N
ote:
At t
he d
ate
of th
is co
nsen
t, an
app
ropr
iate
ele
ctro
nic
form
at fo
r sub
miss
ion
to th
e Di
rect
or-
Gene
ral i
n th
e “p
orta
ble
docu
men
t for
mat
” (pd
f) or
ano
ther
form
at th
at m
ay b
e re
adily
con
verte
d to
pd
f.
Not
ed.
C
Stat
utor
y Re
quire
men
ts
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
58of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
1.7
The
Appl
icant
shal
l ens
ure
that
all
licen
ces,
perm
its a
nd a
ppro
vals
are
obta
ined
and
kep
t up-
to-d
ate
as re
quire
d th
roug
hout
the
life
of th
e de
velo
pmen
t. N
o co
nditi
on o
f thi
s co
nsen
t rem
oves
the
oblig
atio
n fo
r the
App
lican
t to
obta
in, r
enew
or c
ompl
y w
ith su
ch li
cenc
es, p
erm
its o
r app
rova
ls.
The
Fede
ral E
PBC
Appr
oval
200
2/54
3 an
d EP
L 69
62
rem
ain
valid
. Syd
ney
Wat
er T
rade
Was
te C
onse
nt N
o.
2499
0 is
curre
nt. A
num
ber o
f oth
er p
erm
its, l
icenc
es a
nd
appr
oval
s, as
issu
ed b
y va
rious
gov
ernm
ent a
utho
ritie
s, ha
ve b
een
obta
ined
for t
he o
pera
tion
of th
e te
rmin
al a
nd
are
liste
d in
Sec
tion
2.3
of th
e O
EMP
whi
ch is
ava
ilabl
e on
the
Patri
ck w
ebsit
e.
Trad
e W
aste
wat
er D
ischa
rge
Sche
dule
Per
mit
No
4011
0 iss
ued
by S
ydne
y W
ater
for g
reas
e ar
rest
or a
t can
teen
. ht
tp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y
C
Com
plia
nce
1.9
The
Appl
icant
shal
l ens
ure
that
all
empl
oyee
s, co
ntra
ctor
s and
sub-
cont
ract
ors a
re a
war
e of
, and
co
mpl
y w
ith, t
he c
ondi
tions
of t
his c
onse
nt.
The
site
indu
ctio
n w
as re
cent
ly u
pdat
ed a
nd d
oes n
ot
appe
ar to
con
tain
app
ropr
iate
refe
renc
es to
en
viro
nmen
tal r
equi
rem
ents
. O
bser
vatio
n: E
SC M
anag
er n
eeds
to b
e in
clude
d as
par
t of
the
chan
ge m
anag
emen
t pro
cess
for a
ppro
val o
f ch
ange
s to
the
site
and
cont
ract
or in
duct
ions
NC
1.10
Th
e Ap
plica
nt sh
all b
e re
spon
sible
for t
he e
nviro
nmen
tal i
mpa
cts r
esul
ting
from
the
actio
ns o
f all
pers
ons o
n th
e sit
e, in
cludi
ng a
ny v
isito
rs.
Not
ed.
C
1.12
Pr
ior t
o th
e co
mm
ence
men
t of o
pera
tion
of th
e de
velo
pmen
t, th
e Ap
plica
nt sh
all c
ertif
y in
writ
ing,
to
the
satis
fact
ion
of th
e Di
rect
or-G
ener
al th
at it
has
obt
aine
d al
l the
nec
essa
ry st
atut
ory
appr
oval
s fo
r ope
ratio
ns, a
nd c
ompl
ied
with
all
rele
vant
con
ditio
ns o
f thi
s con
sent
and
/or a
ny o
ther
stat
utor
y re
quire
men
ts fo
r thi
s dev
elop
men
t.
The
Pre-
Ope
ratio
nal C
ompl
ianc
e Re
port
for t
he P
atric
k Po
rt Bo
tany
‘Knu
ckle
’ and
Ram
p D
(dat
ed D
ecem
ber
2015
) was
app
rove
d by
the
Dire
ctor
-Gen
eral
on
4 Fe
brua
ry 2
016
(refe
r to
lette
r fro
m M
s Kar
en H
arra
gon,
N
SW D
epar
tmen
t of P
lann
ing
& E
nviro
nmen
t to
Mr
Trev
or B
row
n, N
SW P
orts
).
C
1.13
N
otw
ithst
andi
ng c
ondi
tions
1.1
1 an
d 1.
12 o
f thi
s con
sent
, the
Dire
ctor
-Gen
eral
may
requ
ire a
n up
date
on
com
plia
nce
with
all,
or a
ny p
art,
of th
e co
nditi
ons o
f thi
s con
sent
. Any
such
upd
ate
shal
l 20
19 A
nnua
l Env
ironm
enta
l Man
agem
ent R
epor
t to
be
subm
itted
to D
PIE
by 2
9 Fe
brua
ry 2
020.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
59of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A m
eet t
he re
ason
able
requ
irem
ents
of t
he D
irect
or-G
ener
al a
nd b
e su
bmitt
ed w
ithin
such
per
iod
as
the
Dire
ctor
-Gen
eral
may
agr
ee.
An a
ctio
n pl
an to
be
subm
itted
to D
PIE
with
the
2019
AE
MR
by 2
9 Fe
brua
ry 2
020.
1.14
Th
e Ap
plica
nt sh
all m
eet t
he re
quire
men
ts o
f the
Dire
ctor
-Gen
eral
in re
spec
t of t
he im
plem
enta
tion
of a
ny m
easu
re n
eces
sary
to e
nsur
e co
mpl
ianc
e w
ith th
e co
nditi
ons o
f thi
s co
nsen
t, an
d ge
nera
l co
nsist
ency
with
the
EIS
and
thos
e do
cum
ents
list
ed u
nder
con
ditio
n 1.
2 of
this
cons
ent.
The
Dire
ctor
-Gen
eral
may
dire
ct th
at su
ch a
mea
sure
be
impl
emen
ted
in re
spon
se to
the
info
rmat
ion
cont
aine
d w
ithin
any
repo
rt, p
lan,
cor
resp
onde
nce
or o
ther
doc
umen
t sub
mitt
ed in
acc
orda
nce
with
th
e co
nditi
ons o
f thi
s con
sent
, with
in su
ch ti
me
as th
e Di
rect
or-G
ener
al m
ay a
gree
.
2019
Ann
ual E
nviro
nmen
tal M
anag
emen
t Rep
ort t
o be
su
bmitt
ed to
DPI
E by
29
Febr
uary
202
0.
An a
ctio
n pl
an to
be
subm
itted
to D
PIE
as p
art o
f the
20
19 A
EMR
by 2
9 Fe
brua
ry 2
020.
C
Dis
pute
Res
olut
ion
1.15
In
the
even
t tha
t a d
isput
e ar
ises b
etw
een
the
Appl
icant
and
Cou
ncil
or a
pub
lic a
utho
rity
othe
r th
an th
e De
partm
ent,
in re
latio
n to
a sp
ecifi
catio
n or
requ
irem
ent a
pplic
able
und
er th
is co
nsen
t, th
e m
atte
r sha
ll be
refe
rred
by e
ither
par
ty to
the
Dire
ctor
-Gen
eral
, or i
f not
reso
lved
, to
the
Min
ister
, w
hose
det
erm
inat
ion
of th
e di
sput
e sh
all b
e fin
al a
nd b
indi
ng o
n al
l par
ties.
For t
he p
urpo
se o
f thi
s co
nditi
on, "
publ
ic au
thor
ity" h
as th
e sa
me
mea
ning
as p
rovid
ed u
nder
Sec
tion
4 of
the
Act.
Not
e: S
ectio
n 12
1 of
the
Envi
ronm
enta
l Pla
nnin
g an
d As
sess
men
t Act
197
9 pr
ovid
es m
echa
nism
s fo
r res
olut
ion
of d
isput
es b
etw
een
the
Depa
rtmen
t, th
e Di
rect
or-G
ener
al, c
ounc
ils a
nd p
ublic
au
thor
ities
.
Ther
e ha
ve b
een
no k
now
n di
sput
es in
rela
tion
to th
is co
nditi
on.
N
A
2.EN
VIRO
NM
ENTA
L PE
RFO
RMAN
CE
Noi
se L
imits
3.3
2 Noi
se g
ener
ated
by
the
deve
lopm
ent s
hall
not e
xcee
d th
e no
ise li
mits
pre
sent
ed in
the
tabl
e be
low
, unl
ess o
ther
wise
agr
eed
by th
e Di
rect
or-G
ener
al:
Loca
tion
Da
y
L Aeq
(15
min
ute)
L A1 (
1 m
inut
e)
Even
ing
L Aeq
(15
min
ute)
L A1 (
1 m
inut
e)
Nig
ht
L Aeq
(1
5 m
inut
e)
L A1 (
1 m
inut
e)
Bian
nual
noi
se m
onito
ring
repo
rts (M
ay a
nd N
ovem
ber
2019
) are
ava
ilabl
e on
Pat
rick
Stev
edor
es w
ebsit
e. E
ach
repo
rt ha
s bee
n pr
epar
ed b
y Ro
dney
Ste
vens
Aco
ustic
s.
The
repo
rts c
onclu
de th
at ‘o
pera
tiona
l noi
se is
co
nsid
ered
to c
ompl
y w
ith E
PL 6
962
day,
even
ing
and
nigh
t-tim
e no
ise li
mits
.
C
2 E
PA G
ener
al T
erm
s of A
ppro
val –
L 6.
1
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
60of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
Mos
t af
fect
ed
resid
entia
l pr
emise
s
55
55
43
55
43
55
It is
note
d It
is no
ted
that
noi
se li
mits
with
in th
e EP
L ar
e eq
ual t
o or
mor
e st
ringe
nt th
an th
ose
quot
ed h
ere
and
in th
e Po
rt Bo
tany
Con
sent
.
3.4
3 For
the
purp
ose
of c
ondi
tion
3.3
of th
is co
nsen
t: (a
) Day
is d
efin
ed a
s the
per
iod
from
7.0
0am
to 6
.00p
mM
onda
y to
Sat
urda
y an
d 8.
00am
to 6
.00p
m
Sund
ays a
nd P
ublic
Hol
iday
s; (b
) Eve
ning
is d
efin
ed a
s the
per
iod
from
6.0
0pm
to 1
0.00
pm;a
nd
(c) N
ight
is d
efin
ed a
s the
per
iod
from
10.
00pm
to 7
.00a
m
Mon
day
to S
atur
day
and
10.0
0pm
to 8
.00a
m S
unda
ys a
nd
Publ
ic Ho
liday
s.
Not
ed.
C
Noi
se A
sses
smen
t Rep
ort
3.6
4 Noi
se fr
om th
e sit
e sh
all b
e m
easu
red
at th
e m
ost a
ffect
ed p
oint
on
or w
ithin
the
resid
entia
l bo
unda
ry, t
o de
term
ine
com
plia
nce
with
the
noise
lim
its in
con
ditio
n 3.
3 of
this
cons
ent.
Whe
re it
can
be
dem
onst
rate
d th
at d
irect
mea
sure
men
t of n
oise
from
the
site
is im
prac
tical
, the
EP
A m
ay a
ccep
t alte
rnat
ive
mea
ns o
f det
erm
inin
g co
mpl
ianc
e. S
ee C
hapt
er 1
1 of
the
NSW
In
dust
rial N
oise
Pol
icy.
The
mod
ifica
tion
fact
ors p
rovid
ed in
Sec
tion
4 of
the
NSW
Indu
stria
l Noi
se P
olicy
shal
l be
appl
ied
to th
e m
easu
red
noise
leve
ls w
here
app
licab
le.
Noi
se re
ports
refe
rred
to in
con
ditio
n 3.
3 sa
tisfie
s thi
s re
quire
men
t. C
3.7
5 Noi
se fr
om th
e sit
e sh
all b
e m
easu
red
at 1
met
re fr
om th
e be
droo
m w
indo
w to
det
erm
ine
com
plia
nce
with
the
L A1 (
1 m
inut
e) a
nd L
A M
AX n
oise
lim
its in
con
ditio
n 3.
3 of
this
cons
ent.
As a
bove
C
3.8
6 The
noi
se e
miss
ion
limits
iden
tifie
d in
con
ditio
n 3.
3 of
this
cons
ent a
pply
und
er m
eteo
rolo
gica
l co
nditi
ons o
f: (a
) win
d sp
eeds
of u
p to
3 m
/s a
t 10
met
res a
bove
gro
und
leve
l; an
d (b
) tem
pera
ture
inve
rsio
n co
nditi
ons o
f up
to 3
o C/1
00 m
etre
s.
Noi
se re
ports
refe
rred
to in
con
ditio
n 3.
3 sa
tisfie
s thi
s re
quire
men
t. C
3 E
PA G
ener
al T
erm
s of A
ppro
val –
L 6.
2 4 E
PA G
ener
al T
erm
s of A
ppro
val –
L 6.
3 5 E
PA G
ener
al T
erm
s of A
ppro
val –
L 6.
4 6 E
PA G
ener
al T
erm
s of A
ppro
val –
L 6.
5
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
61of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
3.22
Ve
hicle
s ass
ocia
ted
with
the
deve
lopm
ent a
re n
ot p
erm
itted
to p
ark,
queu
e or
stan
d on
Pen
rhyn
Ro
ad, F
ores
hore
Roa
d or
the
boat
ram
p ca
r par
k an
d ac
cess
road
at a
ny ti
me.
Th
is w
as o
bser
ved
durin
g au
dit i
nspe
ctio
n.
C
3.23
N
o pa
rkin
g sh
all b
e pe
rmitt
ed o
n th
e in
tern
al ro
adwa
ys a
nd o
utsid
e th
e de
signa
ted
park
ing
area
s. Co
mpl
ianc
e ob
serv
ed d
urin
g au
dit i
nspe
ctio
n.
C
3.24
Al
l tru
cks e
nter
ing
the
deve
lopm
ent s
hall
be w
holly
con
tain
ed w
ithin
the
site
befo
re b
eing
requ
ired
to st
op.
This
was
obs
erve
d du
ring
audi
t ins
pect
ion.
C
3.25
Th
e us
e of
land
scap
ing
shal
l not
affe
ct d
river
sigh
t dist
ance
for v
ehicl
es e
nter
ing
and
exiti
ng th
e sit
e.
This
was
obs
erve
d du
ring
audi
t ins
pect
ion.
C
Wat
er Q
ualit
y Im
pact
s
Pollu
tion
of W
ater
s
3.33
7 E
xcep
t as m
ay b
e ex
pres
sly p
rovi
ded
by a
lice
nce
issue
d un
der t
he P
rote
ctio
n of
the
Envi
ronm
ent
Ope
ratio
ns A
ct 1
997i
n re
latio
n of
the
deve
lopm
ent,
sect
ion
120
of th
e Pr
otec
tion
of th
e En
viron
men
t O
pera
tions
Act
199
7 sh
all b
e co
mpl
ied
with
and
in c
onne
ctio
n w
ith th
e ca
rryin
g ou
t of t
he
deve
lopm
ent.
No
wat
er q
ualit
y m
onito
ring
is re
quire
d by
the
EPL
(696
2) a
nd th
ere
are
no li
cens
ed d
ischa
rge
poin
ts.
C
Conc
entr
atio
n Li
mits
3.34
8 Th
e co
ncen
tratio
n lim
it of
a p
ollu
tant
disc
harg
ed a
t Poi
nt 1
of t
he e
xistin
g lic
ence
, sha
ll no
t exc
eed
the
conc
entra
tion
limits
spec
ified
for t
hat p
ollu
tant
in th
e ta
ble
in c
ondi
tion
3.36
of t
his
cons
ent.
Curre
nt E
PL h
as n
o lic
ense
d di
scha
rge
poin
ts.
N
A
3.35
9 W
here
a p
H qu
antit
y lim
it is
spec
ified
in th
e ta
ble
in c
ondi
tion
3.36
of t
his c
onse
nt, t
he sp
ecifi
ed
perc
enta
ge o
f sam
ples
shal
l be
with
in th
e sp
ecifi
ed ra
nges
.
As a
bove
.
NA
3.36
10
To a
void
any
dou
bt, t
his c
ondi
tion
does
not
aut
horis
e th
e di
scha
rge
of e
miss
ion
of a
ny o
ther
po
lluta
nts.
Dis
char
ge L
ocat
ion
- Poi
nt 1
This
disc
harg
e po
int w
as m
ade
redu
ndan
t by
the
cons
truct
ion
of th
e co
vere
d w
orks
hop
area
. A T
rade
W
aste
Agr
eem
ent i
s now
in p
lace
with
Syd
ney
Wat
er fo
r di
scha
rges
from
this
area
.
N
A
7 E
PA G
ener
al T
erm
s of A
ppro
val –
L 1.
1 an
d A
2.1
8 EPA
Gen
eral
Ter
ms o
f App
rova
l – L
3.1
9 EPA
Gen
eral
Ter
ms o
f App
rova
l – L
3.2
10 E
PA G
ener
al T
erm
s of A
ppro
val –
L 3.
3
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
62of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
POLL
UTAN
T
UNIT
OF
MEA
SURE
10
0% C
ON
CEN
TRAT
ION
LI
MIT
O
il an
d Gr
ease
m
g/L
10
To
tal S
uspe
nded
Sol
ids
mg/
L
30
pH
pH
6.5-
8.5
Was
te M
anag
emen
t
3.38
11
The
Appl
icant
shal
l not
cau
se, p
erm
it, o
r allo
w an
y w
aste
gen
erat
ed o
utsid
e th
e pr
emise
s to
be
rece
ived
at t
he p
rem
ises f
or st
orag
e, tr
eatm
ent,
proc
essin
g, re
proc
essin
g, o
r disp
osal
; or a
ny w
aste
ge
nera
ted
at th
e pr
emise
s to
be d
ispos
ed a
t the
pre
mise
s, ex
cept
as e
xpre
ssly
per
mitt
ed b
y a
licen
ce is
sued
by
the
EPA
unde
r the
Pro
tect
ion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997.
Th
is co
nditi
on o
nly
appl
ies t
o th
e st
orag
e, tr
eatm
ent,
proc
essin
g, re
proc
essin
g, o
r disp
osal
; or a
ny
was
te g
ener
ated
at t
he p
rem
ises i
f it r
equi
res a
n en
viro
nmen
t pro
tect
ion
licen
ce u
nder
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7.
A W
aste
Man
agem
ent P
lan
is av
aila
ble
as p
art o
f OEM
P (V
2, 2
019
– Se
ctio
n 6.
4) o
n w
ebsit
e.
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
EPL
6962
Con
ditio
n L2
allo
ws P
atric
k St
eved
ores
to
rece
ive ty
pes o
f was
te a
t the
pre
mise
s.
Reco
rds o
f was
te o
ils a
nd fi
lters
, tra
nspo
rters
and
was
te
oil r
ecei
val l
ocat
ions
are
mai
ntai
ned
in a
Was
te R
egist
er.
Now
inclu
ded
with
revis
ed O
EMP .
W
aste
Reg
ister
sigh
ted
inclu
des w
aste
oil,
filte
rs a
nd
rags
, pap
er a
nd c
ardb
oard
, bat
terie
s and
scra
p m
etal
ca
tego
ries.
Upda
ted
in O
ctob
er 2
019.
C
3.39
12
Exce
pt a
s exp
ress
ly p
erm
itted
by
a lic
ence
issu
ed b
y th
e EP
A un
der t
he P
rote
ctio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7, o
nly
the
haza
rdou
s and
/or i
ndus
trial
and
/or G
roup
A w
aste
list
ed
belo
w m
ay b
e ge
nera
ted
and/
or st
ored
at t
he p
rem
ises:
(a
)w
aste
oil/
wat
er, h
ydro
carb
ons/
wat
er m
ixtur
es o
r em
ulsio
ns; a
nd g
reas
e tra
p w
aste
Site
reco
rds a
nd o
bser
vatio
ns m
ade
durin
g th
e au
dit
insp
ectio
n ar
e co
nsist
ent w
ith th
is re
quire
men
t. C
3.40
13
The
quan
tity
of h
azar
dous
and
/or i
ndus
trial
and
/or G
roup
A w
aste
gen
erat
ed o
n th
e pr
emise
s sh
all n
ot e
xcee
d 20
0 to
nnes
per
yea
r. Si
ghte
d W
aste
Man
agem
ent R
egist
er. R
ecor
ds o
f was
te
oil (
likel
y m
ain
haza
rdou
s was
te g
ener
ated
from
site
) ke
pt in
regi
ster
and
tota
l am
ount
gen
erat
ed fo
r 201
9 w
as
appr
oxim
atel
y 40
tonn
es.
C
11
EPA
Gen
eral
Ter
ms o
f App
rova
l – L
5.1
and
L 5.2
12
EPA
Gen
eral
Ter
ms o
f App
rova
l – L
5.3
13 E
PA G
ener
al T
erm
s of A
ppro
val –
L 5.
4
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
63of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
3.41
14
The
quan
tity
of h
azar
dous
and
/or i
ndus
trial
and
/or G
roup
A w
aste
stor
ed o
n th
e pr
emise
s sha
ll no
t exc
eed
70 to
nnes
at a
ny o
ne ti
me.
Es
timat
e m
ade
durin
g sit
e in
spec
tion
on 2
2 Ja
nuar
y 20
20
indi
cate
d le
ss th
an 1
0 to
nnes
of w
aste
oil
bein
g st
ored
. C
3.42
A
desig
nate
d ar
ea fo
r the
stor
age
and
colle
ctio
n of
was
te a
nd re
cycla
ble
mat
eria
ls sh
all b
e pr
ovid
ed
on th
e sit
e. D
etai
ls of
this
shal
l be
prov
ided
in th
e W
aste
Man
agem
ent P
lan
requ
ired
unde
r co
nditi
on 6
.4 (d
) of t
his c
onse
nt.
Was
te st
ream
s hav
e be
en id
entif
ied
in th
e W
MP
refe
renc
ed in
Con
ditio
n 3.
38.
Impl
emen
tatio
n of
was
te re
cycli
ng e
vide
nt d
urin
g sit
e in
spec
tion.
C
3.43
Al
l was
tes a
nd m
ater
ial g
ener
ated
on
the
site
durin
g co
nstru
ctio
n an
d op
erat
ion
shal
l be
class
ified
in
acc
orda
nce
with
the
EPA’
s Env
ironm
enta
l Gui
delin
es: A
sses
smen
t, Cl
assif
icatio
n an
d M
anag
emen
t of
Liq
uid
and
Non
-Liq
uid
Was
tes a
nd b
e di
spos
ed o
f to
a fa
cility
that
may
law
fully
acc
ept t
he w
aste
.
Was
te st
ream
s hav
e be
en id
entif
ied
in th
e W
MP
refe
renc
ed in
Con
ditio
n 3.
38.
Reco
rds o
f was
te o
ils a
nd fi
lters
, tra
nspo
rters
and
was
te
oil r
ecei
val l
ocat
ions
are
mai
ntai
ned
in a
Was
te R
egist
er.
C
3.44
Th
e Ap
plica
nt sh
all b
e re
spon
sible
for i
nvol
ving
and
enc
oura
ging
em
ploy
ees a
nd c
ontra
ctor
s to
min
imise
dom
estic
was
te p
rodu
ctio
n on
site
and
to re
use/
recy
cle w
here
pos
sible
. Pa
per a
nd c
ardb
oard
, prin
ter c
artri
dges
recy
cled.
St
orm
wat
er c
olle
cted
and
use
d fo
r flu
shin
g to
ilets
. C
Air Q
ualit
y Im
pact
s
Dus
t Em
issi
ons
3.45
15
The
Appl
icant
shal
l des
ign,
con
stru
ct, o
pera
te a
nd m
aint
ain
the
deve
lopm
ent i
n a
man
ner w
hich
m
inim
ises o
r pre
vent
s the
em
issio
n of
dus
t fro
m th
e sit
e.
Envi
ronm
enta
l Man
agem
ent M
easu
res a
re d
ocum
ente
d in
Sec
tion
6.1
of th
e O
EMP
(V2,
201
9).
Stoc
kpile
of s
poil
on n
eigh
bour
ing
site
whi
ch h
as
gene
rate
d du
st in
the
past
is in
the
proc
ess o
f bei
ng
rem
oved
. N
o du
st e
miss
ions
wer
e de
tect
ed d
urin
g th
e au
dit s
ite
insp
ectio
n on
22
Janu
ary
2020
and
no
com
plai
nts f
rom
pa
rties
ext
erna
l to
the
site
rega
rdin
g du
st e
miss
ions
hav
e be
en re
ceive
d
C
14
EPA
Gen
eral
Ter
ms o
f App
rova
l – L
5.5
15 E
PA G
ener
al T
erm
s of A
ppro
val –
O 3
.1
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
64of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
3.46
Al
l tra
ffica
ble
area
s and
veh
icle
man
oeuv
ring
area
s in
or o
n th
e pr
emise
s sha
ll be
mai
ntai
ned,
at a
ll tim
es, i
n a
cond
ition
that
will
min
imise
the
gene
ratio
n or
em
issio
n fro
m th
e pr
emise
s, of
win
dblo
wn
or tr
affic
gen
erat
ed d
ust.
Envi
ronm
enta
l Man
agem
ent M
easu
res a
re d
ocum
ente
d in
Sec
tion
6.1
of th
e O
EMP
(V2,
201
9).
Surfa
ces a
re p
aved
and
no
loos
e m
ater
ials
wer
e no
ted
durin
g sit
e in
spec
tion.
C
Vent
ilatio
n
Haz
ards
and
Ris
k Im
pact
s
3.49
Th
e Ap
plica
nt sh
all n
ot st
ore
or h
andl
e Da
nger
ous G
oods
of C
lass
2.3
, tox
ic co
mpr
esse
d or
liqu
efie
d ga
ses a
bove
the
quan
titie
s sto
red
or h
andl
ed in
199
5/96
exc
ept i
n ac
cord
ance
with
re
com
men
datio
ns 1
.1 a
nd 1
.2 in
the
Port
Bota
ny L
and
Use
Safe
ty S
tudy
(199
6).
From
Sep
201
8 to
Aug
201
9 th
ere
wer
e 21
8.5
tonn
es o
f DG
tran
sited
thro
ugh
Patri
ck’s
term
inal
(Ber
th 7
, 8 &
9)
whi
ch is
wel
l und
er th
e 82
5-to
nne
limit
requ
ired
unde
r th
is co
nditi
on.
C
Inci
dent
Rep
ort
3.52
W
ithin
24
hour
s of a
ny in
ciden
t or p
oten
tial i
ncid
ent w
ith a
ctua
l or p
oten
tial s
igni
fican
t off-
site
impa
cts o
n pe
ople
or t
he b
ioph
ysica
l env
ironm
ent,
a re
port
shal
l be
supp
lied
to th
e De
partm
ent
outli
ning
the
basic
fact
s. A
furth
er d
etai
led
repo
rt sh
all b
e pr
epar
ed a
nd su
bmitt
ed fo
llow
ing
inve
stig
atio
ns o
f the
cau
ses a
nd id
entif
icatio
n of
nec
essa
ry a
dditi
onal
pre
vent
ive
mea
sure
s. Th
at
repo
rt m
ust b
e su
bmitt
ed to
the
Dire
ctor
-Gen
eral
no
late
r tha
n 14
day
s afte
r the
incid
ent o
r po
tent
ial i
ncid
ent.
The
Appl
icant
shal
l mai
ntai
n a
regi
ster
of a
ccid
ents
, inc
iden
ts a
nd p
oten
tial
incid
ents
. The
regi
ster
shal
l be
mad
e av
aila
ble
for i
nspe
ctio
n at
any
tim
e by
the
inde
pend
ent h
azar
d au
dito
r, th
e Di
rect
or-G
ener
al a
nd C
ounc
il.
Envi
ronm
enta
l Inc
iden
t Reg
ister
sigh
ted
inclu
des d
etai
ls of
incid
ents
on
14 Ju
ly 2
019
and
30 D
ecem
ber 2
019
that
w
ere
repo
rted
(am
ong
othe
rs n
ot re
quiri
ng re
porti
ng) t
o DP
E. In
tern
al c
omm
unica
tions
sig
hted
indi
cate
that
dai
ly
incid
ent r
epor
ts a
re m
ade
by E
SC M
gr to
man
agem
ent.
C
Haz
ard
Audi
t
3.53
Tw
elve
mon
ths a
fter t
he c
omm
ence
men
t of o
pera
tions
of t
he p
ropo
sed
deve
lopm
ent o
r with
in
such
furth
er p
erio
d as
the
Dire
ctor
-Gen
eral
may
agr
ee, t
he A
pplic
ant s
hall
carry
out
a
com
preh
ensiv
e ha
zard
aud
it of
the
prop
osed
dev
elop
men
t and
with
in o
ne m
onth
of t
he a
udit
subm
it a
repo
rt to
the
Dire
ctor
-Gen
eral
. The
aud
it sh
all b
e ca
rried
out
at t
he A
pplic
ant’s
exp
ense
by
a du
ly q
ualif
ied
inde
pend
ent p
erso
n or
team
app
rove
d by
the
Dire
ctor
-Gen
eral
prio
r to
com
men
cem
ent o
f the
aud
it. F
urth
er a
udits
shal
l be
carri
ed o
ut e
very
thre
e ye
ars o
r as d
eter
min
ed
by th
e Di
rect
or-G
ener
al a
nd a
repo
rt of
eac
h au
dit s
hall
be su
bmitt
ed to
the
Dire
ctor
-Gen
eral
with
in
one
mon
th o
f the
aud
it. H
azar
d au
dits
shal
l be
carri
ed o
ut in
acc
orda
nce
with
the
Depa
rtmen
t’s
Haza
rd A
udit
Of P
atric
k Po
rt Bo
tany
Ter
min
al, N
SW
unde
rtake
n by
Pla
nage
r in
Oct
ober
201
9. R
epor
t is d
ue
to D
PIE
by F
ebru
ary
2020
.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
65of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A Ha
zard
ous I
ndus
try P
lann
ing
Advi
sory
Pap
er N
o. 5
, “Ha
zard
Aud
it Gu
idel
ines
”. Th
e au
dit s
hall
inclu
de
a re
view
of a
ll en
tries
mad
e in
the
incid
ent r
egist
er si
nce
the
prev
ious
aud
it.
Furt
her R
equi
rem
ents
3.54
Th
e Ap
plica
nt sh
all c
ompl
y w
ith a
ll re
ason
able
requ
irem
ents
of t
he D
irect
or-G
ener
al in
resp
ect o
f th
e im
plem
enta
tion
of a
ny m
easu
res a
risin
g fro
m th
e re
ports
subm
itted
in re
spec
t of c
ondi
tions
3.
50 (a
) to
(d) i
nclu
sive,
with
in su
ch ti
me
as th
e Di
rect
or-G
ener
al m
ay a
gree
.
No
requ
irem
ents
app
ly
N
A
Land
scap
ing
3.57
16
A Ve
geta
tion
Man
agem
ent P
lan
shal
l be
prep
ared
in a
ccor
danc
e w
ith c
ondi
tion
6.4
(b) o
f thi
s co
nsen
t. Th
e Pl
an sh
all d
etai
l the
pro
pose
d m
etho
ds to
be
used
to m
aint
ain
the
reve
geta
ted
area
s af
ter c
ompl
etio
n of
the
wor
ks. T
he P
lan
shal
l be
subm
itted
to th
e W
ater
ways
Aut
horit
y pr
ior t
o a
Part
3A P
erm
it be
ing
issue
d.
The
Vege
tatio
n M
anag
emen
t Pla
n is
avai
labl
e as
par
t of
OEM
P (V
2, 2
019
– Se
ctio
n 6.
10) o
n Pa
trick
’s w
ebsit
e.
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
C
3.58
Al
l nox
ious
wee
ds, a
s list
ed u
nder
the
NSW
Nox
ious
Wee
d Ac
t 199
3, o
n sit
e sh
all b
e re
mov
ed d
urin
g co
nstru
ctio
n an
d op
erat
ion
of th
e de
velo
pmen
t. Re
fer t
o Co
nditi
on 3
.57
C
3.59
Ap
prop
riate
wee
d m
anag
emen
t for
the
site,
esp
ecia
lly la
ndsc
aped
are
as, s
hall
be u
nder
take
n fo
r the
lif
e of
the
deve
lopm
ent.
Deta
ils o
f thi
s sha
ll be
inclu
ded
in th
e Ve
geta
tion
Man
agem
ent P
lan
requ
ired
unde
r con
ditio
n 6.
4 (b
).
Refe
r to
Cond
ition
3.5
7 C
3.60
Th
e Ap
plica
nt sh
all i
nsta
ll, op
erat
e an
d m
aint
ain
an ir
rigat
ion
syst
em th
roug
hout
all
land
scap
ed
area
s with
no
over
spra
y on
to h
ard
surfa
ces.
Deta
ils o
f the
irrig
atio
n sy
stem
pro
pose
d sh
all b
e in
clude
d in
the
Vege
tatio
n M
anag
emen
t Pla
n re
quire
d un
der c
ondi
tion
6.4(
b) o
f thi
s con
sent
. The
sy
stem
shal
l com
ply
with
all
rele
vant
Aus
tralia
n St
anda
rds.
Not
e: It
is re
cogn
ised
that
som
e irr
igat
ion
is ne
cess
ary,
how
ever
, the
App
lican
t is e
ncou
rage
d to
re
duce
the
depe
nden
ce o
n irr
igat
ion
by p
lant
ing
trees
and
shru
bs th
at a
re e
ndem
ic to
the
area
and
ca
pabl
e of
with
stan
ding
low
leve
ls of
wat
er a
s ref
lect
ed in
con
ditio
n 3.
60 o
f thi
s con
sent
.
The
area
of l
and
unde
r Ram
p D
(also
kno
wn
as T
he
Unde
rcro
ft) h
as b
een
trans
ferre
d fro
m P
atric
ks to
NSW
Po
rts a
nd is
now
und
er th
e la
tter o
rgan
isatio
n’s c
ontro
l.
N
A
Ligh
ting
3.61
Th
e Ap
plica
nt m
ust e
nsur
e th
at a
ll ex
tern
al li
ghtin
g as
socia
ted
with
the
deve
lopm
ent i
s mou
nted
, sc
reen
ed, a
nd d
irect
ed in
such
a m
anne
r so
as n
ot to
cre
ate
a nu
isanc
e to
surro
undi
ng p
rope
rties
or
No
com
plai
nts a
re k
now
n to
hav
e be
en re
ceiv
ed b
y th
e sit
e in
rela
tion
to li
ghtin
g. T
here
are
no
near
by
C
16
Wat
erw
ays A
utho
rity
Gene
ral T
erm
s of A
ppro
val
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
66of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A ro
adwa
ys. T
he li
ghtin
g sh
all b
e th
e m
inim
um le
vel o
f illu
min
atio
n ne
cess
ary
and
shal
l com
ply
with
AS
428
2 19
97 –
Con
trol o
f the
Obt
rusiv
e Ef
fect
s of O
utdo
or L
ight
ing.
re
siden
ces a
nd th
e sit
e is
not l
ocat
ed c
lose
to a
pub
lic
road
whe
re li
ghtin
g m
ay b
e a
nuisa
nce
issue
.
Staf
f Ind
uctio
n Pr
ogra
m
3.62
Th
e de
velo
pmen
t’s st
aff i
nduc
tion
prog
ram
shal
l inc
orpo
rate
spec
ial i
nstru
ctio
ns re
latin
g to
noi
se
cont
rol a
nd re
late
d “o
n th
e jo
b” tr
aini
ng, a
s dee
med
app
ropr
iate
. Suc
h tra
inin
g sh
all e
nsur
e th
at a
ll st
aff i
nvol
ved
in th
e op
erat
ion
of th
e te
rmin
al’s
mob
ile e
quip
men
t, su
ch a
s the
stra
ddle
car
riers
, re
ach
stac
kers
and
fork
lift t
ruck
s, an
d th
e ga
ntry
cra
nes a
nd q
uay
cran
es, a
re a
war
e of
the
need
to
ensu
re t h
e fo
llow
ing:
a)
The
corre
ct p
lace
men
t and
/or l
ower
ing
of c
onta
iner
s to
min
imise
pot
entia
l adv
erse
noi
se
impa
cts a
nd sp
ecifi
cally
the
cont
rol o
f tra
nsie
nt im
pact
noi
se;
b)Th
e sit
e’s e
nviro
nmen
t offi
cer s
hall
carry
out
rout
ine
insp
ectio
ns d
urin
g th
e da
y, ev
enin
g an
d ni
ght.
Indi
vidua
l ope
ratio
ns st
aff s
hall
be a
sses
sed
to d
eter
min
e th
e pe
rform
ance
ra
ting
on e
ach
staf
f mem
ber a
nd h
is or
her
dut
ies;
and
That
eac
h em
ploy
ee is
mad
e aw
are
that
one
of t
he c
ondi
tions
of h
is or
her
con
tinue
d em
ploy
men
t sh
all b
e co
mpl
ianc
e w
ith th
e sit
e’s n
oise
em
issio
n go
als a
nd g
uide
lines
rela
ting
to th
e op
erat
iona
l im
pact
noi
se re
duct
ion.
Tho
se d
ocum
ente
d co
nditi
ons w
ill fo
rm a
n in
tegr
al p
art o
f the
pro
ject
’s En
viro
nmen
tal Q
ualit
y As
sura
nce
Prog
ram
.
Revi
sed
site
indu
ctio
n da
ted
June
201
8 in
clude
s noi
se
cont
rol m
easu
res.
The
staf
f ind
uctio
n pr
ogra
m w
ith e
nviro
nmen
tal c
onte
nt
inclu
de te
rmin
al, t
erm
inal
rail
and
empl
oyee
indu
ctio
ns.
C
Tele
phon
e H
otlin
e
3.63
Pr
ior t
o th
e co
mm
ence
men
t of c
onst
ruct
ion,
the
Appl
icant
shal
l est
ablis
h an
d lis
t with
the
tele
phon
e co
mpa
ny a
24-
hour
free
cal
l com
plai
nts c
onta
ct te
leph
one
num
ber.
The
Appl
icant
shal
l pr
ovid
e th
e te
leph
one
num
ber t
o th
e De
partm
ent,
EPA
and
Coun
cil a
nd w
ritte
n no
tifica
tion
shal
l be
give
n to
the
surro
undi
ng re
siden
ts.
The
aim
of t
he c
ompl
aint
s lin
e is
to e
nabl
e an
y m
embe
r of t
he p
ublic
to re
ach
a pe
rson
who
can
ar
rang
e ap
prop
riate
cor
rect
ive
actio
n to
the
com
plai
nt w
ithin
two
hour
s, 24
hou
rs p
er d
ay fo
r the
du
ratio
n of
con
stru
ctio
n an
d op
erat
ion
of th
e de
velo
pmen
t.
This
info
rmat
ion
is av
aila
ble
on th
e Pa
trick
web
site.
Co
mpl
aint
s num
ber t
este
d an
d ca
ll w
as a
nsw
ered
by
Patri
ck’s
Envi
ronm
ent M
anag
er
C
Com
plai
nts R
egis
ter
3.64
Th
e Ap
plica
nt sh
all r
ecor
d de
tails
of a
ll co
mpl
aint
s rec
eive
d in
an
up-t
o-da
te C
ompl
aint
s Reg
ister
. Th
e Re
gist
er sh
all r
ecor
d, b
ut n
ot n
eces
saril
y be
lim
ited
to:
a)th
e da
te a
nd ti
me
of th
e co
mpl
aint
; b)
the
mea
ns b
y w
hich
the
com
plai
nt w
as m
ade;
c)
any
pers
onal
det
ails
of th
e co
mpl
aina
nt th
at w
ere
prov
ided
, or i
f not
, det
ails
wer
e pr
ovid
ed, a
not
e to
that
effe
ct;
Cont
act d
etai
ls an
d co
mpl
aint
s lin
e ar
e av
aila
ble
at:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
Com
plai
nts R
egist
er si
ghte
d.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
67of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A d)
the
natu
re o
f the
com
plai
nts;
e)an
y ac
tion(
s) ta
ken
by th
e Ap
plica
nt in
rela
tion
to th
e co
mpl
iant
, inc
ludi
ng a
ny fo
llow
-up
cont
act w
ith th
e co
mpl
aina
nt; a
nd
f)if
no a
ctio
n w
as ta
ken
by th
e Ap
plica
nt in
rela
tion
to th
e co
mpl
aint
, the
reas
on(s
) why
no
actio
n w
as ta
ken.
Th
e Co
mpl
aint
s Reg
ister
shal
l be
mad
e av
aila
ble
for i
nspe
ctio
n by
the
Dire
ctor
-Gen
eral
, EPA
and
Co
uncil
upo
n re
ques
t. Th
e Ap
plica
nt sh
all a
lso m
ake
sum
mar
ies o
f the
regi
ster
, with
out d
etai
ls of
th
e co
mpl
aina
nts,
avai
labl
e fo
r pub
lic in
spec
tion.
Patri
ck’s
Qua
rterly
Com
mun
ity F
eedb
ack
Repo
rts a
re
avai
labl
e on
Pat
rick’
s web
site
and
cont
ain
the
info
rmat
ion
and
deta
ils re
quire
d by
this
cond
ition
. 4th
Qua
rter 2
019
com
plai
nts s
umm
ary
sent
to D
PIE,
EPA
, N
SW P
orts
. Sig
hted
em
ail w
ith su
mm
ary
date
d 15
/1/2
020.
The
se a
re a
lso p
oste
d on
the
Patri
ck w
ebsit
e.
5 EN
VIRO
NM
ENTA
L M
ON
ITO
RIN
G
Gene
ral M
onito
ring
Requ
irem
ents
5.1
17Th
e re
sults
of a
ny m
onito
ring
requ
ired
to b
e co
nduc
ted
by th
e EP
A’s g
ener
al te
rms o
f app
rova
l, or
a
licen
ce u
nder
the
Prot
ectio
n of
the
Envi
ronm
ent O
pera
tions
Act
199
7, in
rela
tion
to th
e de
velo
pmen
t or i
n or
der t
o co
mpl
y w
ith th
e lo
ad c
alcu
latio
n pr
otoc
ol sh
all b
e re
cord
ed a
nd
reta
ined
as s
et o
ut in
con
ditio
ns 5
.2 a
nd 5
.3 o
f thi
s con
sent
.
Noi
se m
onito
ring
carri
ed o
ut a
s per
3.3
abo
ve
C
5.2
18Al
l rec
ords
requ
ired
to b
e ke
pt b
y th
e lic
ence
shal
l be:
(a
) In
a le
gibl
e fo
rm, o
r in
a fo
rm th
at c
an re
adily
be
redu
ced
to a
legi
ble
form
(b
) Kep
t for
at l
east
four
yea
rs a
fter t
he m
onito
ring
or e
vent
to w
hich
they
rela
te to
ok p
lace
; and
(c
) Pro
duce
d in
a le
gibl
e fo
rm to
any
aut
horis
ed o
ffice
r of t
he E
PA w
ho a
sks t
o se
e th
em.
Bian
nual
Noi
se C
ompl
ianc
e M
onito
ring
Repo
rts h
ave
been
com
plet
ed fo
r May
and
Nov
embe
r 201
9 an
d ar
e av
aila
ble
on th
e Pa
trick
web
site
at:
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-m
onito
ring-
repo
rting
Th
e re
ports
mee
t the
requ
irem
ents
of t
his c
ondi
tion.
C
5.3
19Th
e fo
llow
ing
reco
rds s
hall
be k
ept i
n re
spec
t of a
ny sa
mpl
es re
quire
d to
be
colle
cted
: (a
) The
dat
e(s)
on
whi
ch th
e sa
mpl
e w
as c
olle
cted
; (b
) The
tim
e(s)
at w
hich
the
sam
ple
was
col
lect
ed;
Refe
r Con
ditio
n 5.
2 C
17
EPA
Gen
eral
Ter
ms o
f App
rova
l – M
1.1
18
EPA
Gen
eral
Ter
ms o
f App
rova
l – M
1.2
19
EPA
Gen
eral
Ter
ms o
f App
rova
l – M
1.3
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
68of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A (c
) The
poi
nt a
t whi
ch th
e sa
mpl
e w
as ta
ken;
and
(d
) The
nam
e of
the
pers
on w
ho c
olle
cted
the
sam
ple.
Requ
irem
ent t
o M
onito
r Con
cent
ratio
ns o
f Pol
luta
nts D
isch
arge
d
5.4
The
Appl
icant
shal
l mon
itor t
he d
ischa
rge
of p
ollu
tant
s at m
onito
ring
loca
tion
Poin
t 2. T
he
Appl
icant
shal
l mon
itor (
by sa
mpl
ing
and
obta
inin
g re
sults
by
anal
ysis)
the
conc
entra
tion
of e
ach
pollu
tant
spec
ified
in c
olum
n 1
of th
e Ta
ble
belo
w. T
he A
pplic
ant s
hall
use
the
sam
plin
g m
etho
ds,
units
of m
easu
re, a
nd sa
mpl
e at
the
frequ
ency
, spe
cifie
d in
the
colu
mns
of t
he T
able
bel
ow.
POLL
UTAN
T
UNIT
S O
F M
EASU
RE
FREQ
UEN
CY
SAM
PLIN
G M
ETHO
D O
il an
d Gr
ease
m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
Tota
l Sus
pend
ed
Solid
s m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
Turb
idity
N
TU
Spec
ial F
requ
ency
1
Repr
esen
tativ
e Ch
emica
l O
xyge
n De
man
d m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
Tota
l Org
anic
Carb
on
mg/
L
Spec
ial F
requ
ency
1
Repr
esen
tativ
e
Tota
l Pet
role
um
Hydr
ocar
bons
m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
Lead
m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
Zinc
m
g/L
Sp
ecia
l Fre
quen
cy 1
Re
pres
enta
tive
pH
pH
Spec
ial F
requ
ency
1
Repr
esen
tativ
e Sp
ecia
l Fre
quen
cy 1
mea
ns a
sam
ple
mus
t be
colle
cted
and
ana
lysed
not
mor
e th
an o
ne h
our
befo
re th
e co
mm
ence
men
t of a
ny d
ischa
rge
on a
ny d
ay a
nd a
furth
er sa
mpl
e of
the
was
tes
bein
g di
scha
rged
not
mor
e th
an o
ne h
our a
fter t
he c
omm
ence
men
t of t
he d
ischa
rge
on th
at d
ay.
Not
e: T
he m
onito
ring
resu
lts c
olle
cted
in c
ompl
ianc
e w
ith c
ondi
tion
5.4
for P
oint
2 c
an b
e us
ed to
de
term
ine
com
plia
nce
with
the
conc
entra
tion
limit
spec
ified
in C
ondi
tion
3.36
for d
ischa
rge
from
Po
int 1
.
Cons
truct
ion
rela
ted
mon
itorin
g. C
urre
nt E
PL 6
962
has
no re
quire
men
t for
wat
er q
ualit
y m
onito
ring
Poin
ts.
Cons
truct
ion
of c
over
ed w
orks
hop
has m
ade
this
requ
irem
ent r
edun
dant
.
C
Wat
er Q
ualit
y M
onito
ring
and
Com
plia
nce
Repo
rtin
g
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
69of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
5.7
20W
ithin
6 m
onth
s of c
onse
nt b
eing
gra
nted
and
eve
ry 6
mon
ths t
here
afte
r, th
e Ap
plica
nt sh
all
subm
it a
repo
rt to
the
EPA
cont
aini
ng th
e fo
llow
ing
info
rmat
ion:
(a
) A p
ollu
tant
inve
ntor
y th
at q
ualif
ies w
ater
s disc
harg
ed fr
om th
e sit
e. T
his s
hall
inclu
de
iden
tifica
tion
of a
ll w
ater
pol
luta
nts l
ikel
y to
be
disc
harg
ed fr
om e
ach
final
stor
mw
ater
pit
on th
e 11
st
orm
wat
er li
nes s
erv i
ng th
e co
ntai
ner h
andl
ing
oper
atio
n ar
ea w
ithin
the
site.
The
wat
er p
ollu
tant
s sh
all i
nclu
de b
ut a
re n
ot li
mite
d to
: tot
al p
heno
lics,
poly
cycli
c ar
omat
ic hy
droc
arbo
ns, o
il an
d gr
ease
, tot
al p
etro
leum
hyd
roca
rbon
s, to
tal o
rgan
ic
carb
on, b
ioch
emica
l oxy
gen
dem
and,
che
mica
l oxy
gen
dem
and,
pH,
zin
c, co
pper
, lea
d, c
obal
t, ch
rom
ium
, man
gane
se, c
obal
t, ni
ckel
and
iron
; (b
) Ide
ntify
all
exist
ing
and
pote
ntia
l sou
rces
of w
ater
pol
luta
nts f
rom
the
area
s tha
t dra
in in
to th
e 11
stor
mw
ater
line
s ser
ving
the
cont
aine
r han
dlin
g op
erat
ion
area
with
in th
e sit
e;
(c) Q
uant
ify th
e co
ncen
tratio
n of
pol
luta
nt ty
pes i
dent
ified
as
part
of th
e po
lluta
nt in
vent
ory
as
pres
crib
ed in
subc
laus
e(a)
of t
his c
ondi
tion.
The
qua
ntifi
catio
n of
pol
luta
nts
shal
l be
unde
rtake
n by
co
llect
ing
a gr
ab sa
mpl
e w
ithin
the
first
hou
r of a
disc
harg
e an
d at
hou
rly in
terv
als a
fter t
he
com
men
cem
ent o
f tha
t disc
harg
e fo
r at l
east
thre
e ho
urs
afte
r the
initi
al sa
mpl
e w
as ta
ken;
and
(d
) A st
atem
ent o
f whe
ther
iden
tifica
tion
and
quan
tifica
tion
of p
ollu
tant
s in
stor
mw
ater
disc
harg
es
that
hav
e be
en d
evel
oped
in a
ccor
danc
e w
ith th
e w
ater
qua
lity
obje
ctiv
es a
s spe
cifie
d in
the
Wat
er
Qua
lity
Guid
elin
es fo
r Fre
sh a
nd M
arin
e W
ater
s pub
lishe
d by
Aus
tralia
n an
d N
ew Z
eala
nd
Envi
ronm
ent a
nd C
onse
rvat
ion
Coun
cil.
As re
ferre
d to
in th
e 20
16 A
EMR
refe
renc
e to
this
requ
irem
ent h
as b
een
rem
oved
from
EPL
696
2 pr
imar
ily
beca
use
the
mai
n w
orks
hop
area
has
bee
n co
vere
d an
d a
Trad
e W
aste
Agr
eem
ent i
s in
plac
e w
ith S
ydne
y W
ater
. N
B: A
Mod
ifica
tion
to th
is co
nditi
on h
as b
een
disc
usse
d in
tern
ally
and
with
NSW
Por
ts. P
artie
s are
wai
ting
for
deta
ils o
f the
upg
rade
to ra
il ar
ea w
hich
may
nec
essit
ate
mod
ifica
tion
to a
ppro
val c
ondi
tions
that
coul
d al
so
addr
ess t
his f
indi
ng in
a co
nsol
idat
ed m
anne
r.
C
Noi
se M
onito
ring
and
Com
plia
nce
Repo
rtin
g
5.8
21W
ithin
6 m
onth
s of c
onse
nt b
eing
gra
nted
and
eve
ry 6
mon
ths t
here
afte
r, th
e Ap
plica
nt sh
all
subm
it a
repo
rt to
the
EPA
cont
aini
ng th
e fo
llow
ing
info
rmat
ion:
(a
) Ide
ntifi
catio
n an
d ra
nkin
g by
soun
d po
wer
leve
l (in
1/3
octa
ve b
ands
for a
ny so
urce
with
po
tent
ially
und
esira
ble
noise
cha
ract
er) a
ll sig
nific
ant n
oise
sour
ces o
n sit
e. T
his
is to
inclu
de
cont
aine
r im
pact
noi
se(s
), au
dibl
e al
arm
s, al
l sig
nific
ant p
lant
and
equ
ipm
ent;
(b) I
dent
ifica
tion
of a
ll no
ise se
nsiti
ve re
ceiv
ers t
hat m
ay b
e af
fect
ed b
y th
e op
erat
ion,
and
sele
ct a
n ap
prop
riate
num
ber o
f rep
rese
ntat
ive re
ceiv
er lo
catio
ns to
repr
esen
t all
sens
itive
rece
iver
s; (c
) The
resu
lts o
f all
noise
mea
sure
men
ts u
nder
take
n to
ass
ess c
ompl
ianc
e w
ith c
ondi
tion
3.3
of th
is co
nsen
t; (d
) A st
atem
ent o
f whe
ther
noi
se le
vels
from
all
activ
ities
at t
he si
te c
ompl
y w
ith th
e sp
ecifi
ed n
oise
lim
its a
t the
repr
esen
tativ
e re
ceiv
er lo
catio
ns. T
he st
atem
ent s
hall
take
into
acc
ount
tona
l, im
pulsi
ve
and
shor
t dur
atio
n no
ises o
rigin
atin
g fro
m th
e fa
cility
;
Bian
nual
noi
se m
onito
ring
repo
rts a
re a
vaila
ble
on
Patri
ck’s
web
site.
Eac
h re
port
has b
een
prep
ared
by
Rodn
ey S
teve
ns A
cous
tics.
All r
epor
ts c
onclu
de th
at
‘ope
ratio
nal n
oise
is c
onsid
ered
to c
ompl
y w
ith E
PL 6
962
day,
even
ing
and
nigh
t-tim
e no
ise li
mits
. It
is no
ted
that
noi
se li
mits
with
in th
e EP
L ar
e eq
ual t
o or
m
ore
strin
gent
than
thos
e qu
oted
in th
is Co
nditi
on.
C
20
EPA
Gen
eral
Ter
ms o
f App
rova
l – E
1.1
21
EPA
Gen
eral
Ter
ms o
f App
rova
l – E
1.1
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
70of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A (e
) Whe
re n
oise
leve
ls ha
ve b
een
asse
ssed
to e
xcee
d lic
ence
lim
its, a
stat
emen
t exp
lain
ing
the
reas
on w
hy th
is ha
s tak
en p
lace
; and
(f)
A st
atem
ent o
f wha
t fea
sible
and
reas
onab
le a
dditi
onal
mea
sure
s may
be
impl
emen
ted
to fu
rther
re
duce
noi
se le
vels
belo
w th
at sp
ecifi
ed in
the
licen
ce.
Emai
l sub
mitt
ing
Nov
201
9 su
mm
ary
emai
led
to D
PIE,
EP
A an
d N
SW P
orts
on
18/1
2/19
.
6 EN
VIRO
NM
ENTA
L M
ANAG
EMEN
T
Ope
ratio
n En
viro
nmen
tal M
anag
emen
t Pla
n (O
EMP)
6.3
The
Appl
icant
shal
l pre
pare
and
impl
emen
t an
Ope
ratio
n En
viro
nmen
tal M
anag
emen
t Pla
n (O
EMP)
to d
etai
l an
envi
ronm
enta
l man
agem
ent f
ram
ewor
k, pr
actic
es a
nd p
roce
dure
s to
be
follo
wed
dur
ing
the
oper
atio
n of
the
deve
lopm
ent.
The
Plan
shal
l inc
lude
, but
not
nec
essa
rily
be
limite
d to
: (a
) ide
ntifi
catio
n of
all
stat
utor
y an
d ot
her o
blig
atio
ns th
at th
e Ap
plica
nt is
requ
ired
to fu
lfil i
n re
latio
n to
ope
ratio
n of
the
deve
lopm
ent,
inclu
ding
all
cons
ents
, lice
nces
, app
rova
ls an
d co
nsul
tatio
ns;
(b) a
des
crip
tion
of th
e ro
les a
nd re
spon
sibili
ties f
or a
ll re
leva
nt e
mpl
oyee
s inv
olve
d in
the
oper
atio
n of
the
deve
lopm
ent;
(c) o
vera
ll en
viron
men
tal p
olici
es a
nd p
rincip
les t
o be
app
lied
to th
e op
erat
ion
of th
e de
velo
pmen
t; (d
) sta
ndar
ds a
nd p
erfo
rman
ce m
easu
res t
o be
app
lied
to th
e de
velo
pmen
t, an
d a
mea
ns b
y w
hich
en
viro
nmen
tal p
erfo
rman
ce c
an b
e pe
riodi
cally
revi
ewed
and
impr
oved
; (e
) man
agem
ent p
olici
es to
ens
ure
that
env
ironm
enta
l per
form
ance
goa
ls ar
e m
et a
nd to
com
ply
with
the
cond
ition
s of t
his c
onse
nt;
(f) th
e M
anag
emen
t Pla
ns li
sted
und
er c
ondi
tion
6.4
of th
is co
nsen
t; an
d (g
) the
env
ironm
enta
l mon
itorin
g re
quire
men
ts o
utlin
ed u
nder
sect
ion
5 (E
nviro
nmen
tal
Mon
itorin
g) o
f thi
s con
sent
, inc
lusiv
e.
The
OEM
P sh
all b
e su
bmitt
ed fo
r the
app
rova
l of t
he D
irect
or-G
ener
al n
o la
ter t
han
one
mon
th
prio
r to
the
com
men
cem
ent o
f ope
ratio
n of
the
deve
lopm
ent,
or w
ithin
such
per
iod
as o
ther
wise
ag
reed
by
the
Dire
ctor
-Gen
eral
. Ope
ratio
n sh
all n
ot c
omm
ence
unt
il w
ritte
n ap
prov
al h
as b
een
rece
ived
from
the
Dire
ctor
-Gen
eral
. Upo
n re
ceip
t of t
he D
irect
or-G
ener
al’s
appr
oval
, the
App
lican
t sh
all s
uppl
y a
copy
of t
he O
EMP
to th
e EP
A, W
ater
way
s Au
thor
ity a
nd C
ounc
il as
soon
as
prac
ticab
le.
The
‘Pat
rick
Port
Bota
ny T
erm
inal
Ope
ratio
nal
Envi
ronm
enta
l Man
agem
ent P
lan’
(OEM
P) –
Ver
sion
2 (5
Ju
ly 2
019)
has
bee
n pr
epar
ed to
satis
fy th
is co
nditi
on
and
is av
aila
ble
on th
e Pa
trick
web
site:
ht
tp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y
C
6.4
As p
art o
f the
OEM
P fo
r the
dev
elop
men
t, re
quire
d un
der c
ondi
tion
6.3
of th
is co
nsen
t, th
e Ap
plica
nt sh
all p
repa
re a
nd im
plem
ent t
he fo
llow
ing
Man
agem
ent P
lans
: (a
) a S
torm
wat
er M
anag
emen
t Pla
n to
out
line
envi
ronm
enta
l man
agem
ent p
ract
ices a
nd
proc
edur
es to
be
follo
wed
dur
ing
the
oper
atio
n of
the
deve
lopm
ent i
n or
der t
o co
ntro
l and
The
follo
win
g pl
ans a
re a
vaila
ble
as p
art o
f the
OEM
P on
Pa
trick
Ste
vedo
res w
ebsit
e to
add
ress
the
requ
irem
ents
of
this
cond
ition
: St
orm
wat
er M
anag
emen
t Pla
n (V
2, 2
019)
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
71of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A m
anag
e sit
e dr
aina
ge a
nd st
orm
wat
er. T
he P
lan
shal
l inc
lude
, but
not
nec
essa
rily
be li
mite
d to
: (i)
det
aile
d pl
ans s
how
ing
the
desig
n of
the
stor
mw
ater
con
trol i
nfra
stru
ctur
e;
(ii) d
emon
stra
tion
that
the
stor
mw
ater
con
trol i
nfra
stru
ctur
e w
ill co
nfor
m w
ith, o
r exc
eed
all
rele
vant
Cou
ncil
requ
irem
ents
and
gui
delin
es;
(iii)
desc
riptio
n of
the
proc
edur
es fo
r the
inst
alla
tion,
insp
ectio
n an
d m
aint
enan
ce o
f the
stor
mw
ater
co
ntro
l inf
rast
ruct
ure,
inclu
ding
stor
mw
ater
pol
lutio
n co
ntro
l dev
ices;
and
(iv) d
escr
iptio
n of
the
proc
edur
es to
be
unde
rtake
n if
any
non-
com
plia
nce
is de
tect
ed.
(b) a
Veg
etat
ion
Man
agem
ent P
lan
to o
utlin
e m
easu
res t
o en
sure
app
ropr
iate
dev
elop
men
t and
m
aint
enan
ce o
f lan
dsca
ping
on
the
site
and
reve
geta
tion
in th
e vi
cinity
of t
he b
oat r
amp
acce
ss
road
. The
Pla
n sh
all i
nclu
de, b
ut n
ot n
eces
saril
y be
lim
ited
to:
(i) d
etai
ls of
all
land
scap
ing
to b
e un
derta
ken
on th
e sit
e an
d re
vege
tatio
n in
the
boat
ram
p ac
cess
ro
ad a
rea,
inclu
ding
det
ails
of a
dditi
onal
feat
ures
such
as s
oil a
nd m
ulch
det
ails,
irrig
atio
n de
tails
, re
tain
ing
wal
l det
ails,
fenc
ing
deta
ils, d
etai
ls of
har
d su
rface
s, an
d an
y ot
her l
ands
cape
ele
men
ts in
su
fficie
nt d
etai
l to
fully
des
crib
e th
e pr
opos
ed la
ndsc
ape
wor
ks;
(ii) d
etai
ls of
exis
ting
and
prop
osed
util
ities
, as t
hey
rela
te to
the
deve
lopm
ent;
(iii)
max
imisa
tion
of fl
ora
spec
ies e
ndem
ic to
the
loca
lity
in la
ndsc
apin
g th
e sit
e;
(iv) d
etai
ls of
the
prop
osed
wee
d m
anag
emen
t sys
tem
; (v
) ide
ntifi
catio
n an
d de
tails
of s
taff
recr
eatio
n ar
eas;
(vi)
deta
ils o
f car
par
king
and
mea
sure
s to
prev
ent v
ehicl
e en
croa
chm
ent o
nto
land
scap
ed a
reas
; an
d (v
ii) a
pro
gram
to e
nsur
e th
at a
ll la
ndsc
aped
and
reve
geta
ted
area
s are
mai
ntai
ned
in a
tidy
, hea
lthy
stat
e.
(c) a
Tra
nspo
rt M
anag
emen
t Pla
n to
out
line
man
agem
ent o
f tra
ffic
conf
licts
ass
ocia
ted
with
the
oper
atio
n of
the
deve
lopm
ent.
The
Plan
shal
l inc
lude
, but
not
nec
essa
rily
be li
mite
d to
: (i)
det
ails
of m
easu
res t
hat w
ould
be
impl
emen
ted
to m
inim
ise n
oise
and
am
enity
impa
cts o
n re
siden
tial a
reas
resu
lting
from
hea
vy v
ehicl
e m
ovem
ents
; (ii
) out
lines
the
mon
itorin
g pr
oced
ures
for m
ajor
truc
k ro
utes
inbo
und
and
outb
ound
from
the
site
thro
ugh
the
City
of B
otan
y Ba
y, as
wel
l as d
estin
atio
ns w
ithin
the
City
of B
otan
y Ba
y; (ii
i) pr
oced
ures
for m
onito
ring
the
effe
ctiv
enes
s and
suita
bilit
y of
thes
e m
easu
res,
parti
cula
rly th
e pe
riodi
c an
d ra
ndom
mon
itorin
g of
hea
vy v
ehicl
e ro
utes
; and
(iv
) det
ails
of a
dditi
onal
mea
sure
s tha
t wou
ld b
e im
plem
ente
d sh
ould
be
non-
com
plia
nce
be
dete
cted
. (d
) a W
aste
Man
agem
ent P
lan
to o
utlin
e m
easu
res t
o m
anag
e re
sour
ce c
onsu
mpt
ion
resu
lting
fro
m th
e op
erat
ion
of th
e de
velo
pmen
t. Th
e Pl
an sh
all m
eet t
he re
quire
men
ts o
f Cou
ncil,
shou
ld
ther
e be
any
. The
Pla
n
Vege
tatio
n M
anag
emen
t Pla
n (O
EMP
- V2,
201
9, S
ectio
n 6.
10)
The
Ope
ratio
nal T
raffi
c M
anag
emen
t Pla
n (O
EMP
- V2,
20
19, S
ectio
n 6.
7)
Was
te M
anag
emen
t Pla
n (O
EMP
- V2,
201
9, S
ectio
n 6.
4))
Ope
ratio
nal N
oise
Man
agem
ent P
lan
(OEM
P - V
2, 2
019,
Se
ctio
n 6.
6)
http
://w
ww
.pat
rick.c
om.a
u/en
viro
nmen
t-su
stai
nabi
lity
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
72of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A sh
all i
nclu
de, b
ut n
ot n
eces
saril
y be
lim
ited
to:
(i) id
entif
icatio
n of
the
type
and
qua
ntiti
es o
f was
te th
at w
ould
be
gene
rate
d;
(ii) d
escr
iptio
n of
mea
sure
s and
act
ions
to b
e ta
ken
to m
inim
ise w
aste
gen
erat
ed b
y th
e op
erat
ion
of th
e de
velo
pmen
t; (ii
i) de
scrip
tion
of h
ow w
aste
wou
ld b
e ha
ndle
d an
d st
ored
dur
ing
oper
atio
n, a
nd re
used
, rec
ycle
d an
d, if
nec
essa
ry, a
ppro
pria
tely
trea
ted
and
disp
osed
of i
n ac
cord
ance
with
the
EPA’
s gui
delin
es
Asse
ssm
ent,
Clas
sifica
tion
and
Man
agem
ent o
f Liq
uid
and
Non
-Liq
uid
Was
te; a
nd
(iv) d
etai
ls of
pro
gram
s for
invo
lvin
g an
d en
cour
agin
g em
ploy
ees a
nd c
ontra
ctor
s to
min
imise
do
mes
tic w
aste
pro
duct
ion
on th
e sit
e an
d re
use/
recy
cle w
here
pos
sible
. (e
) an
Ope
ratio
nal N
oise
Man
agem
ent P
lan
to o
utlin
e m
easu
res t
o m
inim
ise im
pact
s fro
m th
e op
erat
ion
of th
e de
velo
pmen
t on
loca
l noi
se le
vels.
The
Pla
n sh
all i
nclu
de, b
ut n
ot n
eces
saril
y be
lim
ited
to:
(i) id
entif
icatio
n of
all
maj
or so
urce
s of n
oise
that
may
be e
mitt
ed a
s a re
sult
of th
e op
erat
ion
of th
e de
velo
pmen
t; (ii
) spe
cifica
tion
of th
e no
ise c
riter
ia a
s it a
pplie
s to
the
parti
cula
r act
ivity
; (ii
i) pr
oced
ures
for t
he m
onito
ring
of n
oise
em
issio
ns;
(iv) p
roto
cols
for t
he m
inim
isatio
n of
noi
se e
miss
ions
; (v
) des
crip
tion
of p
roce
dure
s to
be u
nder
take
n if
any
non-
com
plia
nce
is de
tect
ed;
(vi)
appl
icatio
n of
app
ropr
iate
noi
se c
ontro
l mea
sure
s to
all t
he li
fting
equ
ipm
ent (
gant
ry c
rane
s, fo
rklif
t tru
cks,
etc.)
that
are
pro
pose
d to
be
used
on
the
site;
and
(v
ii) th
e po
wer
ing-
dow
n of
loco
mot
ives
stan
ding
on
the
rail
sidin
gs o
n th
e sit
e un
til su
ch ti
me
as
the
train
is a
bout
to d
epar
t the
site
.
6.5
With
in th
ree
year
s of t
he c
omm
ence
men
t of o
pera
tion,
and
at l
east
eve
ry th
ree
year
s the
reaf
ter,
the
Appl
icant
shal
l und
erta
ke a
form
al re
view
of t
he O
EMP
requ
ired
unde
r con
ditio
n 6.
3 of
this
cons
ent.
The
revie
w sh
all e
nsur
e th
at th
e O
EMP
is up
-to-
date
and
all
chan
ges t
o pr
oced
ures
and
pra
ctice
s sin
ce th
e pr
evio
us re
view
hav
e be
en fu
lly in
corp
orat
ed in
to th
e O
EMP.
The
App
lican
t sha
ll no
tify
the
Dire
ctor
-Gen
eral
of c
ompl
etio
n of
eac
h re
view
and
shal
l sup
ply
a co
py o
f the
upd
ated
OEM
P to
the
Dire
ctor
-Gen
eral
, EPA
, Wat
erw
ays A
utho
rity
and
Coun
cil o
n re
ques
t.
AEM
R 20
16 st
ates
that
4 F
eb 2
016
was
com
men
cem
ent
of o
pera
tions
. Sig
hted
Pat
rick’
s PBT
Env
ironm
enta
l Act
ion
Plan
Cal
enda
r whi
ch in
dica
tes t
his r
evie
w is
targ
eted
to
be c
ompl
eted
by
31 M
arch
201
9. T
he re
view
was
un
derta
ken
and
the
OEM
P w
as re
issue
d on
29
Mar
ch
2019
.
C
Annu
al C
ompl
ianc
e Re
port
6.6
With
in tw
elve
mon
ths o
f the
dat
e of
this
cons
ent,
and
annu
ally
ther
eafte
r, un
less
the
Dire
ctor
-Ge
nera
l dire
cts o
ther
wise
, the
App
lican
t sha
ll su
bmit
a Co
mpl
ianc
e Re
port
to th
e Di
rect
or-G
ener
al.
The
Com
plia
nce
Repo
rt sh
all:
(a) I
dent
ify a
ll th
e st
anda
rds,
perfo
rman
ce m
easu
res,
and
stat
utor
y re
quire
men
ts th
e de
velo
pmen
t is
requ
ired
to c
ompl
y w
ith, i
nclu
ding
the
cond
ition
s of t
his c
onse
nt;
2018
AEM
R da
ted
Febr
uary
201
9 co
verin
g pe
riod
1 Ja
nuar
y to
31
Dece
mbe
r 201
8 is
avai
labl
e on
the
web
site.
ht
tp://
ww
w.p
atric
k.com
.au/
envi
ronm
ent-
sust
aina
bilit
y Si
ghte
d 20
19 A
EMR
in p
repa
ratio
n.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
73of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A (b
) Rev
iew
the
envi
ronm
enta
l per
form
ance
of t
he d
evel
opm
ent t
o de
term
ine
whe
ther
it is
co
mpl
ying
with
thes
e st
anda
rds,
perfo
rman
ce m
easu
res,
and
stat
utor
y re
quire
men
ts.
(c) I
dent
ify a
ll th
e oc
casio
ns d
urin
g th
e pr
evio
us y
ear w
hen
thes
e st
anda
rds,
perfo
rman
ce m
easu
res,
and
stat
utor
y re
quire
men
ts h
ave
not b
een
com
plie
d w
ith;
(d) I
nclu
de a
cop
y of
the
Com
plai
nts R
egist
er fo
r the
pre
cedi
ng tw
elve
mon
th p
erio
d an
d in
dica
te
wha
t act
ions
wer
e ta
ken(
or a
re b
eing
take
n) to
add
ress
com
plai
nts;
(e) I
nclu
de th
e de
taile
d re
porti
ng fr
om a
ny m
onito
ring
requ
irem
ents
, and
iden
tify
any
trend
s in
the
mon
itorin
g ov
er th
e lif
e of
the
proj
ect;
and
(f) W
here
non
-com
plia
nce
is oc
curri
ng, d
escr
ibe
wha
t act
ions
will
be ta
ken
to e
nsur
e co
mpl
ianc
e,
who
will
be
resp
onsib
le fo
r car
ryin
g ou
t the
se a
ctio
ns, a
nd w
hen
thes
e ac
tions
will
be
impl
emen
ted.
Th
e Di
rect
or-G
ener
al m
ay re
quire
the
Appl
icant
to a
ddre
ss c
erta
in m
atte
rs id
entif
ied
in th
e An
nual
Co
mpl
ianc
e Re
port.
Any
act
ion
requ
ired
to b
e un
derta
ken
shal
l be
com
plet
ed w
ithin
such
per
iod
as
the
Dire
ctor
-Gen
eral
may
agr
ee. T
he A
pplic
ant s
hall
prov
ide
a co
py o
f the
Ann
ual C
ompl
ianc
e Re
port
to th
e EP
A an
d Co
uncil
. The
repo
rt sh
all b
e m
ade
avai
labl
e to
the
publ
ic on
requ
est.
NB:
The
AEM
R (re
quire
d un
der D
A 49
4) in
clude
s co
mpl
ianc
e re
quire
men
ts fo
r DA
453.
Inde
pend
ent E
nviro
nmen
tal A
udit
6.7
With
in 1
2 m
onth
s of c
omm
issio
ning
the
deve
lopm
ent a
nd e
very
thre
e ye
ars t
here
afte
r, un
less
the
Dire
ctor
-Gen
eral
dire
cts o
ther
wise
, the
App
lican
t mus
t com
miss
ion
and
pay
the
full
cost
of a
n In
depe
nden
t Env
ironm
enta
l Aud
it. T
he In
depe
nden
t Env
ironm
enta
l Aud
it sh
all:
(a) B
e co
nduc
ted
by a
suita
bly
qual
ified
, exp
erie
nced
, and
inde
pend
ent p
erso
n w
hose
app
oint
men
t ha
s bee
n en
dors
ed b
y th
e Di
rect
or-G
ener
al;
(b) B
e co
nsist
ent w
ith IS
O 1
4010
– G
uide
lines
and
Gen
eral
Prin
ciple
s for
Env
ironm
enta
l Aud
iting
, and
IS
O 1
4011
– P
roce
dure
s for
Env
ironm
enta
l Aud
iting
, or u
pdat
ed v
ersio
ns o
f the
se
guid
elin
es/m
anua
ls;
(c) A
sses
s the
env
ironm
enta
l per
form
ance
of t
he d
evel
opm
ent,
and
its e
ffect
s on
the
surro
undi
ng
envi
ronm
ent;
(d) A
sses
s whe
ther
the
deve
lopm
ent i
s com
plyi
ng w
ith th
e re
leva
nt st
anda
rds,
perfo
rman
ce
mea
sure
s, an
d st
atut
ory
requ
irem
ents
; (e
) Rev
iew
the
adeq
uacy
of t
he A
pplic
ant’s
Env
ironm
enta
l Man
agem
ent P
lan,
and
Env
ironm
enta
l M
onito
ring
Prog
ram
; and
, if n
eces
sary
(f)
Rec
omm
end
mea
sure
s or a
ctio
ns to
impr
ove
the
envi
ronm
enta
l per
form
ance
of t
he p
lant
, and
/or
the
envi
ronm
enta
l man
agem
ent a
nd m
onito
ring
syst
ems.
This
audi
t has
bee
n un
derta
ken
to sa
tisfy
this
requ
irem
ent.
C
6.8
With
in 2
mon
ths o
f com
miss
ioni
ng th
e au
dit,
the
Appl
icant
mus
t sub
mit
a co
py o
f the
aud
it re
port
to th
e Di
rect
or-G
ener
al. A
fter r
evie
win
g th
e re
port,
the
Dire
ctor
-Gen
eral
may
requ
ire th
e Ap
plica
nt
This
repo
rt w
as c
omm
ence
d in
Janu
ary
2020
and
this
repo
rt fin
alise
d in
Feb
ruar
y 20
20 o
r sub
miss
ion.
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
74of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A to
add
ress
cer
tain
mat
ters
iden
tifie
d in
the
repo
rt. T
he A
pplic
ant m
ust c
ompl
y w
ith a
ny re
ason
able
re
quire
men
ts o
f the
Dire
ctor
-Gen
eral
EPA
Annu
al R
etur
n
6.9
22Th
e Ap
plica
nt sh
all p
rovi
de a
n an
nual
retu
rn to
the
EPA
in re
latio
n to
the
deve
lopm
ent a
s req
uire
d by
any
lice
nce
unde
r the
Pro
tect
ion
of th
e En
viro
nmen
t Ope
ratio
ns A
ct 1
997
in re
latio
n to
the
deve
lopm
ent.
In th
e re
turn
the
Appl
icant
shal
l: a)
repo
rt on
the
annu
al m
onito
ring
unde
rtake
n (w
here
the
activ
ity re
sults
in p
ollu
tant
disc
harg
es);
b) p
rovid
e a
sum
mar
y of
com
plai
nts r
elat
ing
to th
e de
velo
pmen
t; c)
repo
rt on
com
plia
nce
with
lice
nce
cond
ition
s; an
d d)
pro
vide
a c
alcu
latio
n of
lice
nce
fees
(adm
inist
rativ
e fe
es a
nd, w
here
rele
vant
, loa
d ba
sed
fees
) th
at a
re p
ayab
le.
If lo
ad-b
ased
fees
app
ly to
the
activ
ity th
e Ap
plica
nt w
ill b
e re
quire
d to
subm
it lo
ad b
ased
fee
calcu
latio
n w
orks
heet
s with
the
retu
rn.
Annu
al R
etur
n su
bmitt
ed to
EPA
on
8 M
ay 2
019
cove
ring
the
repo
rting
per
iod.
C
6.10
W
here
stan
dard
s, gu
idel
ines
or o
ther
doc
umen
ts a
re re
ferre
d to
in th
e co
nditi
ons,
the
late
st v
ersio
n of
thes
e st
anda
rds,
guid
elin
es o
r doc
umen
ts sh
all a
pply
, unl
ess o
ther
wise
agr
eed
by th
e Di
rect
or-
Gene
ral.
Not
ed.
C
7 RE
QU
IREM
ENTS
OF
BOTA
NY
BAY
COU
NCI
L
Stor
age
of C
hem
ical
s/D
ange
rous
Goo
ds (O
ther
Tha
n Sh
ippi
ng C
onta
iner
s)
7.4
The
stor
age
and
hand
ling
of fl
amm
able
and
com
bust
ible
liqu
ids f
or u
se o
n th
e sit
e (o
ther
than
sh
ippi
ng c
onta
iner
s) sh
all b
e in
acc
orda
nce
with
Aus
tralia
n St
anda
rd A
S194
0-19
93 T
he S
tora
ge a
nd
Hand
ling
of F
lam
mab
le a
nd C
ombu
stibl
e Li
quid
s.
Appr
opria
te b
undi
ng o
f liq
uids
obs
erve
d du
ring
site
insp
ectio
n on
22
Janu
ary
2020
(Pla
te 1
). C
Stor
age
of W
aste
Oil
7.5
Was
te o
il sh
all b
e st
ored
in a
cov
ered
and
bun
ded
area
prio
r to
offs
ite re
cycli
ng/d
ispos
al. C
opie
s of
rece
ipts
for t
he re
cycli
ng o
f oil
shal
l be
kept
ons
ite a
nd m
ade
avai
labl
e to
Cou
ncil
on re
ques
t. Se
e 7.
4 ab
ove
C
Fuel
Tan
ks a
nd F
uel F
illin
g Ar
eas
7.6
The
fuel
tank
and
fuel
fillin
g ar
ea sh
all b
e de
signe
d an
d op
erat
ed in
acc
orda
nce
with
the
Code
of
Prac
tice
for t
he D
esig
n, In
stalla
tion
and
Ope
ratio
n of
Und
ergr
ound
Pet
role
um S
tora
ge S
yste
ms
by th
e Si
te in
spec
tion
on 2
2 Ja
nuar
y 20
20 c
onfir
med
fuel
filli
ng
area
con
siste
nt w
ith th
is re
quire
men
t. C
22
EPA
Gen
eral
Ter
ms o
f App
rova
l – R
1.1
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
75of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A Au
stra
lian
Inst
itute
of P
etro
leum
(CP4
-199
8) a
nd A
S194
0: 1
993
The
Stor
age
and
Hand
ling
of
Flam
mab
le a
nd C
ombu
stibl
e Li
quid
s.
Fuel
Bow
sers
7.7
Fuel
bow
sers
and
serv
ice a
reas
shal
l com
ply
with
the
EPA’
s En
viron
men
tal G
uide
line:
Sur
face
Wat
er
Man
agem
ent O
n Th
e Co
vere
d Fo
reco
urt A
reas
Of S
ervi
ce S
tatio
ns.
As p
er 7
.6 a
bove
C
Bund
ing
– M
ultip
le C
onta
iner
s (E
xclu
ding
Shi
ppin
g Co
ntai
ners
)
7.8
The
area
use
d fo
r the
stor
age
of c
hem
icals/
liqui
ds in
con
tain
ers (
othe
r tha
n sh
ippi
ng c
onta
iner
s)
shal
l be
bund
ed. T
he b
und
(wal
ls an
d flo
or) s
hall
be c
onst
ruct
ed o
f im
perv
ious
mat
eria
ls. T
he b
und
wal
ls sh
all b
e a
min
imum
of 1
00 m
m h
igh
and
be o
f a su
fficie
nt v
olum
e to
con
tain
25%
of t
he
max
imum
vol
ume
of li
quid
s lik
ely
to b
e st
ored
with
in th
e bu
nd. T
he b
und
shal
l be
desig
ned
and
inst
alle
d in
acc
orda
nce
with
AS1
940-
1993
The
Sto
rage
And
Han
dlin
g O
f Fla
mm
able
And
Co
mbu
stib
le L
iqui
ds.
Site
insp
ectio
n on
22
Janu
ary
2020
con
firm
ed c
onta
iner
st
orag
e bu
nd c
onsis
tent
with
this
requ
irem
ent.
C
Bund
ing
– Ta
nk
7.9
The
area
use
d fo
r the
stor
age
of c
hem
icals/
liqui
ds in
tank
s sh
all b
e bu
nded
. The
bun
d (w
alls
and
floor
) sha
ll be
con
stru
cted
of i
mpe
rvio
us m
ater
ials
and
shal
l be
of su
fficie
nt v
olum
e to
con
tain
at
leas
t 110
% o
f the
vol
ume
of th
e ta
nk(s
).The
bun
d sh
all b
e de
signe
d an
d in
stal
led
in a
ccor
danc
e w
ithAS
1940
-199
3 Th
e St
orag
e An
d Ha
ndlin
g O
f Fla
mm
able
And
Com
busti
ble
Liqui
ds.
Site
insp
ectio
n co
nfirm
ed c
onta
iner
stor
age
bund
co
nsist
ent w
ith th
is re
quire
men
t C
Mai
nten
ance
of B
unde
d Ar
ea
7.10
Bu
nded
are
as sh
all b
e pr
oper
ly m
aint
aine
d an
d al
l spi
llage
s and
/or w
aste
s with
in th
e bu
nded
are
as
clean
ed u
p as
soon
as p
ract
icabl
e an
d di
spos
ed o
f in
a m
anne
r tha
t doe
s not
pol
lute
wat
ers.
Site
insp
ectio
n co
nfirm
ed c
ompl
ianc
e w
ith th
is re
quire
men
t C
Traf
fic B
und
7.11
Al
l ser
vice
ent
ries t
o w
orks
hop
area
s sha
ll be
pro
vided
with
a tr
affic
able
bun
d w
ith a
min
imum
he
ight
of 1
00m
m to
pre
vent
any
spill
age
exiti
ng th
e w
orks
hop
area
and
ent
erin
g th
e st
orm
wat
er
syst
em.
Site
insp
ectio
n co
nfirm
ed c
ompl
ianc
e w
ith th
is re
quire
men
t C
Spill
Cle
anup
7.12
Su
fficie
nt su
pplie
s of a
ppro
pria
te a
bsor
bent
mat
eria
ls sh
all b
e ke
pt o
n sit
e to
reco
ver a
ny li
quid
sp
illag
e. L
iqui
d sp
ills s
hall
be c
lean
ed u
p us
ing
dry
met
hods
, by
plac
ing
abso
rben
t mat
eria
l on
the
Site
insp
ectio
n co
nfirm
ed c
ompl
ianc
e w
ith th
is re
quire
men
t (Pl
ate
4)
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
76of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A sp
ill, a
nd sw
eepi
ng o
r sho
velli
ng th
e m
ater
ial i
nto
a se
cure
bin
. Abs
orbe
nt m
ater
ials
used
to c
lean
up
spill
s sha
ll be
disp
osed
of t
o an
app
ropr
iate
ly li
cens
ed w
aste
facil
ity.
Emer
genc
y Sp
ill R
espo
nse
Man
agem
ent P
lan
7.13
Th
e Ap
plica
nt sh
all d
evel
op a
n Em
erge
ncy
Resp
onse
and
Incid
ent M
anag
emen
t Pla
n in
con
sulta
tion
with
the
EPA
and
Coun
cil. T
he P
lan
mus
t be
appr
oved
by
the
Dire
ctor
-Gen
eral
prio
r to
the
com
men
cem
ent o
f ope
ratio
ns a
nd sh
all i
nclu
de th
e fo
llow
ing:
(a
) list
of c
hem
icals
and
max
imum
qua
ntiti
es to
be
stor
ed a
t the
site
; (b
) ide
ntifi
catio
n of
pot
entia
lly h
azar
dous
situ
atio
ns;
(c) p
roce
dure
for i
ncid
ent r
epor
ting;
(d
) det
ails
of sp
ill st
atio
ns a
nd si
gnag
e;
(e) c
onta
inm
ent a
nd c
lean
-up
facil
ities
and
pro
cedu
res;
and
(f) th
e ro
les o
f all
staf
f in
the
Plan
and
det
ails
of st
aff t
rain
ing.
The
Emer
genc
y M
anag
emen
t Pla
n (R
ev 1
2, 2
019)
is
avai
labl
e on
the
Patri
ck w
ebsit
e.
http
://w
ww
.pat
rick.
com
.au/
envi
ronm
ent-m
anag
emen
t
C
AUTO
MO
TIVE
/ W
ORK
SHO
P
7.14
Al
l ser
vicin
g, m
echa
nica
l rep
airs
and
det
ailin
g sh
all b
e co
nduc
ted
in a
cov
ered
, bun
ded
wor
k ar
ea.
All w
ork
area
s, in
cludi
ng w
orks
hops
and
lube
bay
s, sh
all b
e gr
aded
into
col
lect
ion
sum
ps a
nd/o
r gr
ated
dra
ins s
uch
that
surfa
ce e
fflue
nt g
ener
ated
with
in th
e w
orks
hop
area
is d
irect
ed in
to a
de
dica
ted
drai
nage
syst
em a
nd d
ispos
ed o
f to
sew
er in
acc
orda
nce
with
a T
rade
Was
te A
gree
men
t fro
m S
ydne
y W
ater
or c
olle
cted
for r
euse
/disp
osal
by
an E
PA li
cens
ed w
aste
con
tract
or.
Wor
ksho
p un
der c
over
and
bei
ng u
sed
for m
echa
nica
l re
pairs
, ser
vicin
g et
c C
Stor
age
of M
echa
nica
l Par
ts
7.15
Au
tom
otiv
e pa
rts in
con
tact
with
any
aut
omot
ive
fluid
shal
l be
stor
ed in
a c
over
ed, b
unde
d ar
ea
that
is g
rade
d in
to c
olle
ctio
n su
mps
and
/or g
rate
d dr
ains
whi
ch a
re d
irect
ed in
to a
ded
icate
d dr
aina
ge sy
stem
and
disp
osed
to se
wer
in a
ccor
danc
e w
ith a
Tra
de W
aste
Agr
eem
ent f
rom
Syd
ney
Wat
er o
r col
lect
ed fo
r reu
se/d
ispos
al b
y an
EPA
lice
nsed
was
te c
ontra
ctor
.
As p
er 7
.14
abov
e C
Spra
y Pa
intin
g
7.16
Al
l spr
ay p
aint
ing
is to
be
carri
ed o
ut in
a sp
ray
boot
h co
nstru
cted
and
ven
tilat
ed in
acc
orda
nce
with
AS
1668
.2-2
002
– Th
e Us
e of
Mec
hani
cal V
entil
atio
n an
d Ai
r-Co
nditi
onin
g in
Bui
ldin
gs. E
xhau
sts
from
the
spra
y bo
oth
shal
l be
disc
harg
ed th
roug
h a
singl
e st
ack
with
a m
inim
um h
eigh
t of 3
met
res
abov
e th
e rid
ge o
f the
bui
ldin
g. T
he st
ack
shal
l be
loca
ted
not l
ess t
han
6 m
etre
s fro
m a
ny fr
esh
air
inta
ke o
r ope
nabl
e w
indo
w. D
ispos
al o
f was
tew
ater
from
wet
scru
bbin
g sh
all b
e di
spos
ed o
f in
acco
rdan
ce w
ith S
ydne
y W
ater
's Tr
ade
Was
te P
olicy
and
Man
agem
ent P
lan.
As p
er 7
.14
abov
e C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
77of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A
Mai
nten
ance
of F
ilter
s
7.17
Al
l spr
ay b
ooth
filte
rs sh
all b
e re
gula
rly m
aint
aine
d to
ens
ure
emiss
ions
of a
ir po
lluta
nts a
re
min
imise
d.
Not
spec
ifica
lly c
heck
ed
STO
RMW
ATER
Vehi
cle
Was
h Ba
y
7.18
W
ashi
ng o
f veh
icles
shal
l be
cond
ucte
d in
a w
ash
bay
that
is ro
ofed
and
bun
ded
to e
xclu
de
rain
wat
er. T
he w
ash
bay
shal
l be
inst
alle
d in
acc
orda
nce
with
Syd
ney
Wat
er’s
requ
irem
ents
. A
Perm
issio
n to
Disc
harg
e Tr
ade
Was
tew
ater
per
mit
shal
l be
obta
ined
from
Syd
ney
Wat
er b
efor
e di
scha
rge
to se
wer
com
men
ces.
The
was
h ba
y sh
all b
e re
gula
rly c
lean
ed a
nd m
aint
aine
d.
Alte
rnat
ive
wat
er m
anag
emen
t and
disp
osal
opt
ions
may
be
appr
opria
te w
here
wat
er is
recy
cled,
m
inim
ised
or re
-use
d on
the
site.
As p
er 7
.14
abov
e.
C
Sign
age
on S
torm
wat
er D
rain
s
7.19
Si
gns s
hall
be d
ispla
yed
adja
cent
to a
ll st
orm
wat
er d
rain
s on
the
prem
ises i
ndica
ting
that
onl
y cle
an
wat
er is
allo
wed
to e
nter
thes
e dr
ains
. Exa
mpl
es o
f pos
sible
sign
age
inclu
de:‘ C
lean
Rai
nwat
er O
nly’,
‘C
lean
wat
er o
nly
- NO
was
te’ o
r ‘H2
Oon
ly’.
Som
e st
orm
wat
er d
rain
s hav
e th
is sig
nage
(Pla
te 7
) but
no
t in
all i
nsta
nces
.
N
C
Mai
nten
ance
of S
torm
wat
er T
reat
men
t Dev
ices
7.20
Al
l was
tew
ater
and
stor
mw
ater
trea
tmen
t dev
ices (
inclu
ding
dra
inag
e sy
stem
s, su
mps
and
trap
s)
shal
l be
regu
larly
mai
ntai
ned
in o
rder
to re
mai
n ef
fect
ive.
All
solid
and
liqu
id w
aste
s col
lect
ed fr
om
the
devi
ces s
hall
be d
ispos
ed o
f in
a m
anne
r tha
t doe
s not
pol
lute
wat
ers.
Stor
mw
ater
dra
in w
arde
ns a
nd p
urac
epto
r hav
e be
en
inclu
ded
into
the
mai
nten
ance
sche
dulin
g sy
stem
(M
axim
o).
C
Was
tew
ater
Rec
yclin
g Fo
r Veh
icle
Was
hing
7.21
Al
l veh
icle
was
hing
bay
s tha
t rec
ycle
filte
red
and
treat
ed w
aste
wat
er fo
r re-
use
for v
ehicl
e w
ashi
ng
shal
l mee
t the
follo
win
g re
quire
men
ts:
(a) H
ave
an a
ppro
pria
te m
etho
d fo
r the
rem
oval
of c
onta
min
ants
such
as g
reas
e, o
il, se
dim
ent a
nd
clean
ing
agen
ts b
efor
e re
use
of th
e w
aste
wat
er a
nd h
ave
an a
ppro
pria
te m
etho
d fo
r the
disp
osal
of
was
tew
ater
con
tam
inan
ts. H
ave
a flo
or th
at is
seal
ed a
nd g
rade
d to
an
inte
rnal
dra
inag
e po
int,
so
that
all
was
tew
ater
and
surfa
ce sp
illag
e is
dire
cted
and
dra
ins t
o th
e ap
prov
ed tr
eatm
ent p
oint
; (b
) Is r
oofe
d an
d bu
nded
so th
at a
ll un
cont
amin
ated
stor
mw
ater
from
the
roof
are
as a
nd u
ncov
ered
ar
eas,
are
dire
cted
aw
ay fr
om th
e ba
y;
Recy
cled
wat
er h
as n
ot b
een
used
for v
ehicl
e w
ash
bays
.
NA
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
78of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A (c
) At a
min
imum
the
bay
cons
truct
ed w
ith a
min
imum
20m
m b
und
arou
nd th
e pe
rimet
er o
f the
ba
y; (d
) At a
min
imum
the
bay
shou
ld b
e pr
otec
ted
from
the
entry
of e
xter
nal s
urfa
ce w
ater
s, by
eith
er; a
m
inim
um 2
%ch
ange
in g
rade
; or c
ombi
natio
n of
a m
inim
um 2
% g
rade
cha
nge
and
a gr
ated
dr
aina
ge sy
stem
; (e
) At a
min
imum
the
bay
shou
ld h
ave
a ro
of th
at h
as a
min
imum
hei
ght o
f 2.5
m;
(f) A
ll un
cont
amin
ated
stor
mw
ater
/rai
nwat
er m
ust b
e di
rect
ed to
the
dedi
cate
d st
orm
wat
er
drai
nage
syst
ems;
(g) E
nsur
e al
l con
tam
inan
ts re
mov
ed fr
om th
e re
cycle
d w
aste
wat
er a
re d
ispos
ed o
f app
ropr
iate
ly;
(h) H
ave
an a
ppro
pria
tely
des
igne
d w
aste
wat
er/r
ecyc
led
wat
er st
orag
e ta
nk;
(i) A
ll co
ntam
inan
ts a
nd g
ross
solid
s rem
oved
from
the
recy
cled
wat
er a
re d
ispos
ed o
f ap
prop
riate
ly;
(j) E
nsur
e th
at th
e w
aste
wat
er re
cycli
ng sy
stem
is fu
nctio
ning
as i
nten
ded;
and
(k
) Ens
ure
that
all
was
tew
ater
is re
tain
ed w
ithin
the
recy
cling
syst
em.
Rem
oval
Off
-Site
By
An A
utho
rised
Liq
uid
Was
te D
ispo
sal C
ontr
acto
r
7.22
Al
l veh
icle
was
hing
bay
s tha
t will
hav
e al
l was
tew
ater
rem
oved
off
site
shal
l mee
t the
follo
win
g re
quire
men
ts:
(a) H
ave
a flo
or th
at is
seal
ed a
nd g
rade
d to
an
inte
rnal
dra
inag
e po
int,
so th
at a
ll w
aste
wat
er a
nd
surfa
ce sp
illag
e is
dire
cted
and
dra
ins t
o th
e ap
prov
ed tr
eatm
ent a
nd d
ispos
al p
oint
; (b
) Roo
fed
and
bund
ed so
that
all
unco
ntam
inat
ed st
orm
wat
er fr
om th
e ro
of a
reas
and
unc
over
ed
area
s, ar
e di
rect
ed a
way
from
the
bay;
(c) A
t a m
inim
um th
e ba
y sh
ould
be
cons
truct
ed w
ith a
min
imum
20
mm
bun
d ar
ound
the
perim
eter
of t
he b
ay;
(d) A
t a m
inim
um th
e ba
y sh
ould
be
prot
ecte
d fro
m th
e en
try o
f ext
erna
l sur
face
wat
ers,
by e
ither
; a
min
imum
2%
chan
ge in
gra
de; o
r com
bina
tion
of a
min
imum
2%
gra
de c
hang
e an
d a
grat
ed
drai
nage
syst
em;
(e) A
t a m
inim
um th
e ba
y sh
ould
hav
e a
roof
that
has
a m
inim
um h
eigh
t of 2
.5 m
; (f)
All
unco
ntam
inat
ed st
orm
wat
er/r
ainw
ater
mus
t be
dire
cted
to th
e de
dica
ted
stor
mw
ater
dr
aina
ge sy
stem
s; (g
) Hav
e an
app
ropr
iate
cap
acity
stor
age
tank
des
igne
d to
ho
ld a
ll w
aste
wat
er;
(h) K
eep
and
reta
in re
cord
s for
a p
erio
d of
five
yea
rs, o
f whe
n an
d ho
w m
uch
wat
er w
as re
mov
ed b
y th
e au
thor
ised
liqui
d w
aste
disp
osal
con
tract
or w
hen
this
occu
rs, o
n an
ann
ual b
asis.
Pro
vide
a c
opy
of th
e re
cord
s to
Coun
cil o
n re
ques
t; an
d
Was
tew
ater
from
the
two
vehi
cle w
ash
bays
is c
olle
cted
an
d tre
ated
thro
ugh
the
Auto
Bat
ch U
nit a
nd th
e tre
ated
w
ater
disc
harg
ed to
sewe
r und
er th
e Sy
dney
Wat
er T
rade
W
aste
Con
sent
No.
249
90.
The
was
h ba
ys a
re lo
cate
d in
side
the
Mai
nten
ance
W
orks
hop,
whi
ch is
roof
ed a
nd b
unde
d. O
nly
one
of th
e tw
o w
ash
bays
is in
use
as t
he o
ther
is n
ot c
onne
cted
sin
ce it
’s co
nstru
ctio
n. T
he fl
oor i
s sea
led
and
grad
ed
tow
ard
an in
tern
al d
rain
age
poin
t.
N
A
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
79of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A (i)
Tha
t the
wat
er st
orag
e ta
nk is
mai
ntai
ned
so th
at th
ere
are
no le
aks a
nd is
func
tioni
ng a
s int
ende
d
Dis
char
ge T
o Th
e Se
wer
Via
App
ropr
iate
Pre
-Tre
atm
ent
7.23
Al
l veh
icle
was
hing
bay
s tha
t disc
harg
e to
sew
er sh
all m
eet t
he fo
llow
ing
requ
irem
ents
: (a
) Disc
harg
es in
to th
e se
wer
requ
ires a
Per
miss
ion
to D
ischa
rge
Trad
e W
aste
wat
er c
ertif
icate
issu
ed
by S
ydne
y W
ater
; (b
) Hav
e a
floor
that
is se
aled
and
gra
ded
to a
n in
tern
al d
rain
age
poin
t, so
that
all
was
tew
ater
and
su
rface
spill
age
is di
rect
ed a
nd d
rain
s to
the
appr
oved
trea
tmen
t and
disp
osal
poi
nt;
(c) I
s roo
fed
and
bund
ed so
that
all
unco
ntam
inat
ed st
orm
wat
er fr
om th
e ro
of a
reas
and
unc
over
ed
area
s, ar
e di
rect
ed a
way
from
the
bay;
(d) A
t a m
inim
um th
e ba
y sh
ould
hav
e a
roof
that
has
a m
inim
um h
eigh
t of 2
.5 m
; (e
) Hav
e a
roof
that
has
a m
inim
um h
eigh
t of 2
.5 m
; (f)
Be
cons
truct
ed w
ith a
min
imum
20
mm
bun
d ar
ound
the
perim
eter
of t
he b
ay;
(g) B
e pr
otec
ted
from
the
entry
of e
xter
nal s
urfa
ce w
ater
s, by
eith
er; a
min
imum
2%
cha
nge
in
grad
e; o
r com
bina
tion
of a
min
imum
2%
gra
de c
hang
e an
d a
grat
ed d
rain
age
syst
em;
(h) A
ll un
cont
amin
ated
stor
mw
ater
/rai
nwat
er m
ust b
e di
rect
ed to
the
dedi
cate
d st
orm
wat
er
drai
nage
syst
ems;
(i) H
ave
a 10
00 L
gen
eral
pur
pose
pit;
and
(j)
Car
ry o
ut a
ppro
pria
te in
spec
tions
and
mai
nten
ance
of t
he G
ener
al P
urpo
se P
it. T
he th
ickne
ss o
f th
e se
dim
ent a
nd o
il le
vels,
and
out
flow
oil
conc
entra
tions
to b
e lo
gged
qua
rterly
and
subm
itted
to
Coun
cil. T
he p
it is
to b
e pu
mpe
d ou
t at l
east
eve
ry 1
2 m
onth
s or a
t mor
e fre
quen
t int
erva
l as
nom
inat
ed b
y Co
uncil
.
Was
tew
ater
from
the
two
vehi
cle w
ash
bays
is c
olle
cted
an
d tre
ated
thro
ugh
the
Auto
Bat
ch U
nit a
nd th
e tre
ated
w
ater
disc
harg
ed to
sew
er u
nder
the
Sydn
ey W
ater
Tra
de
Was
te C
onse
nt N
o. 2
4990
. Th
e w
ash
bays
are
loca
ted
insid
e th
e M
aint
enan
ce
Wor
ksho
p, w
hich
is ro
ofed
and
bun
ded.
The
floo
r is
seal
ed a
nd g
rade
d to
war
d an
inte
rnal
dra
inag
e po
int
C
Dis
posa
l of W
aste
wat
er T
o La
nd In
corp
orat
ing
Appr
opria
te T
reat
men
t Dev
ices
7.24
Al
l veh
icle
was
hing
bay
s tha
t disc
harg
e w
aste
wat
er sh
all m
eet t
he fo
llow
ing
requ
irem
ents
: (a
) The
App
lican
t sha
ll pr
ove
that
the
envi
ronm
enta
l con
ditio
ns o
f the
site
are
app
ropr
iate
and
pr
ovid
e ap
prop
riate
pro
fess
iona
l site
ass
essm
ent i
nfor
mat
ion
on th
e pr
esen
ce o
f env
ironm
enta
lly
sens
itive
are
as o
n th
e bu
ildin
g sit
e, in
the
adjo
inin
g ar
eas o
r with
in th
e do
wns
tream
cat
chm
ent;
(b) S
oil c
hara
cter
istics
inclu
ding
soil
perm
eabi
lity,
dept
h to
be
rock
/har
dpan
, dep
th to
hig
h ep
isodi
c w
ater
tabl
e, %
coar
se fr
agm
ents
; ele
ctric
al c
ondu
ctiv
ity; s
olid
ity, c
atio
n ex
chan
ge c
apac
ity,
phos
phor
ous a
bsor
ptio
n an
d an
y ot
her C
ounc
il re
quire
men
t; (c
) Site
floo
d po
tent
ial,
expo
sure
to su
n an
d w
ind,
slop
e, e
rosio
n po
tent
ial,
drai
nage
, pla
nt g
row
th
cond
ition
s; (d
) Buf
fer d
istan
ces f
rom
per
man
ent s
urfa
ce w
ater
s, do
mes
tic g
roun
dwat
er w
ells,
oth
er w
ater
s,
Was
tew
ater
from
the
two
vehi
cle w
ash
bays
is c
olle
cted
an
d tre
ated
thro
ugh
the
Auto
Bat
ch U
nit a
nd th
e tre
ated
w
ater
disc
harg
ed to
sew
er u
nder
the
Sydn
ey W
ater
Tra
de
Was
te C
onse
nt N
o. 2
4990
. Th
e w
ash
bays
are
loca
ted
insid
e th
e M
aint
enan
ce
Wor
ksho
p, w
hich
is ro
ofed
and
bun
ded.
Onl
y on
e of
the
two
was
h ba
ys is
in u
se a
s the
oth
er is
not
con
nect
ed
since
it’s
cons
truct
ion.
The
floo
r is s
eale
d an
d gr
aded
to
war
d an
inte
rnal
dra
inag
e po
int
C
Inde
pend
ent E
nviro
nmen
tal C
ompl
iance
Aud
itPA
TRIC
K PO
RT B
OTAN
Y TE
RMIN
AL (2
019)
Note:
Strik
e thr
ough
text
relat
es to
prev
ious v
ersio
n of A
ppro
val C
ondit
ion.
Versi
on: F
inal
Page
80of
81
CoA
No
Cond
ition
of A
ppro
val R
equi
rem
ent
Com
men
ts, o
bser
vatio
ns, d
iscu
ssio
n, e
vide
nce,
su
ppor
ting
docu
men
tatio
n
Audi
t Out
com
e (S
ee
foot
er fo
r key
)
C O
N
C N
A pr
oper
ty b
ound
arie
s, dr
ivew
ays,
swim
min
g po
ols a
nd b
uild
ings
; and
(e
) Oth
er si
te a
sses
smen
t det
ails
as re
quire
d by
Cou
ncil.
Ener
gy E
ffic
ienc
y
Ener
gy E
ffic
ienc
y Co
mpl
ianc
e Re
port
7.25
An
Ene
rgy
Effic
ienc
y Co
mpl
ianc
e Re
port
shal
l be
prep
ared
with
in 1
5 m
onth
s of t
he is
suin
g of
the
occu
patio
n ce
rtific
ate.
The
Rep
ort s
hall
certi
fy th
at e
nerg
y ef
ficie
ncy
mea
sure
s hav
e be
en in
stal
led
and
verif
y th
at th
e bu
ildin
g’s e
nerg
y pe
rform
ance
com
plie
s with
Cou
ncils
Ene
rgy
Effic
ienc
y DC
P. A
co
py o
f the
Rep
ort s
hall
be m
ade
avai
labl
e to
Cou
ncil
on re
ques
t.
See
abov
e C
Independent Environmental Compliance AuditPATRICK PORT BOTANY TERMINAL (2019)
Version: Final Page 81 of 81
Appendix C. Audit Attendee List