Page 1: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

Income Restoration Program

March 2013

VIE: Central Mekong Delta Connectivity Project

Can Tho City

Prepared by Ministry of Transport, Cuu Long Corporation for Investment, Development and

Project Management of Infrastructure for the Asian Development Bank.

Page 2: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

NOTE

In this report, "$" refers to US dollars

This income restoration program is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

FINAL RESETTLEMENT PLANCAN THO CITY

APPENDIX 9 - INCOMERESTORATION PROGRAM

MINISTRY OF TRANSPORT

Cuu Long Corporation forInvestment, Development and

Project Management of Infrastructure(Cuulong CIPM)

Central Mekong Delta RegionConnectivity Project (CMDCP)

Detailed Design, Procurement and Implementation Support ServicesTA 7822-VIE

Page 4: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

n

Central Mekong Delta RegionConnectivity Project (CMDCP)

Detailed Design, Procurement and Implementation Support ServicesTA 7822-VIE

FINAL RESETTLEMENT PLANCAN THO CITY

APPENDIX 9 - INCOMERESTORATION PROGRAM

March, 2013

Page 5: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

i

LIST OF ABBREVIATIONS

ADB - Asian Development Bank

AEC - Agricultural Extension Center

AP - Affected Person

CIPM - Corporation for Investment, Development and Project

Management of Infrastructure

CMDCP - Central Mekong Delta Connectivity Project

DARD - Department of Agriculture and Rural Development

DDIS - Detailed Design and Implementation Support

DMS - Detailed Measurement Survey

DNA - Detailed Needs AssessmentDOLISA - Department of Labor, Invalids and Social Assistance

FU - Farmers’ Union

GOV - Government of Vietnam

HH - Households

IRP - Income Restoration Program

MOT - Ministry of Transport

MOU - Memorandum of Understanding

ROW - Right-of-way

RP - Resettlement Plan

SAVH - Severely Affected and Vulnerable Households

SES - Socio-economic survey

USD - United States Dollar

VND - Vietnamese dong

VS - Veterinary Services

VTC - Vocational Training Center

WU - Women’s Union

CURRENCY EQUIVALENTS

For this report, the rate of $1 USD: VND 20,850 has been used.

Page 6: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

ii

TABLE OF CONTENT

1. INTRODUCTION...................................................................................................................12. PROJECT AFFECTED HOUSEHOLDS .......................................................................................23. IMPACTS AND RISKS TO LIVELIHOODS .................................................................................33.1 General Risks Associated with Loss of Livelihoods in the Project Area ..................................... 33.2 Specific Risks for Women and other Vulnerable HH................................................................. 34. NATIONAL AND LOCAL TRAINING PROGRAMS.....................................................................54.1 Program 1956.......................................................................................................................... 54.1.1 Main Characteristics of the Program .......................................................................... 54.1.2 Implementation of the Program in Can Tho City ........................................................ 64.2 Training Program in Can Tho City............................................................................................. 74.3 Main Differences between IRP Program and Existing Programs............................................... 75. PROJECT’S INCOME RESTORATION PROGRAM.....................................................................85.1 Need for an Income Restoration Program for the CMCDP ....................................................... 85.2 Income Restoration Measures as per Resettlement Plan ......................................................... 95.3 Consultations with various stakeholders ................................................................................. 95.3.1 Consultation during PPTA........................................................................................... 95.3.2 Consultation during Detailed Design Phase .............................................................. 105.4 Needs Assessment ......................................................................................................... 115.4.1 Results of the Sample Needs Assessment ...................................................................... 115.4.2 Planning of the Detailed Needs Assessment .................................................................. 12

6. SPECIFIC IRP ACTIVITIES OF THE PROJECT ..........................................................................136.1 Agricultural Activities ..................................................................................................... 13

6.1.1 Agriculture Models .................................................................................................... 136.1.2 Management Issues ................................................................................................... 146.1.3 Staff Required for the Implementation ...................................................................... 166.1.4 Beneficiaries’ Commitment........................................................................................ 16

6.2 VOCATIONAL TRAINING AND OPERATING SMALL-SCALE BUSINESS .................................................. 176.2.1 Vocational Training .................................................................................................... 176.2.2 Small scale business/Service ...................................................................................... 186.2.3 Implementation Issues............................................................................................... 186.2.4 Staff Required for the Implementation ...................................................................... 206.2.5 Beneficiaries’ Commitment........................................................................................ 21

7. IRP RISKS AND MITIGATION MEASURES ............................................................................228. IMPLEMENTATION ARRANGEMENTS.................................................................................258.1 Implementation Roles ........................................................................................................... 258.2 Other Implementation Issues ................................................................................................ 269. IRP IMPLEMENTATION SCHEDULE .....................................................................................2710. MONITORING AND EVALUATION.......................................................................................30

Page 7: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

iii

11. BUDGET… .........................................................................................................................3311.1 AHs Entitled to Income restoration Program.................................................................. 3311.2 Total Cost Estimates ...................................................................................................... 33

LIST OF TABLES

Table 2-1: Estimated Number of IRP Beneficiaries...........................................................................2Table 2-2: Communes Covered by the IRP.......................................................................................2Table 4.3-1: Differences between Proposed IRP Activities and Existing National and Local TrainingActivities .........................................................................................................................................8Table 5.3.2-1. Meeting with Various Stakeholders in Can Tho City ................................................11Table 5.3.2-2: Choice of Surveyed Beneficiaries ............................................................................12Table 5.3.2-3: Sample used for the Need Assessment ...................................................................12Table 5.3.2-4: Ages and Sex of Surveyed HH..................................................................................12Table 5.3.2-5: Main Occupation of Respondents ...........................................................................12Table 6-1: Type of Agriculture Activities Chosen............................................................................14Table 6-2: Proposed Staff Requirement for Management .............................................................16Table 6-3: Type of Handicraft Activities Provided by WU ...............................................................20Table 6-3: Proposed Staff Requirement for Management .............................................................21Table 7-1: Risks and Mitigations ....................................................................................................24Table 11-1. Monitoring indicators of IRP’s activities ......................................................................32Table 12-1: Estimated Number of Type of Activities Chosen by HH ...............................................33Table 12-2: Summary of Costs Estimates to Implement the Income Restoration Program.............33

LIST OF FIGURES

Figure 6-1: Organization Chart for the Implementation of Agriculture Activities ...........................17Figure 6-2: Organization Chart for Vocational Training and Small Businesses ................................21Figure 10-1: Proposed Schedule for the Implementation of Agriculture Activities .........................28Figure 10-2: Proposed Schedule for the Implementation of Training and Small Scale Business......29

LIST OF APPENDICES

Appendix 1: Draft Memorandum of Understanding for Training and Small Business .......................1Appendix 2: Draft Memorandum of Understanding for Agriculture Activities .................................4Appendix 3: Memorandum of Understanding with Women’s Union ...............................................7Appendix 4: Detailed Cost Estimates .............................................................................................10Appendix 5: Needs Assessment Form for Agriculture Activities .....................................................28Appendix 6: Needs Assessment for Vocational Training and Small Business .................................30

Page 8: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 1 of 33

1. INTRODUCTION

1. The Central Mekong Delta Connectivity Project (CMDCP) aims to promotesustained and equitable economic development by constructing high class transportinfrastructure traversing the Mekong Delta Provinces of Dong Thap, Can Tho and AnGiang.

2. The proposed project consists of 3 components with a total length of 29 km andincludes the construction of two large bridges to traverse the Tien and Hau Rivers whichare major branches of the Mekong River system and inter connecting road.

3. In Can Tho City, a detailed measurement survey (DMS) was carried out from Aprilto September 2012 covering the ROW, the construction yard and the 1.5 km link to NH80.The project will acquire 54.8 hectares (ha) of land (mainly agricultural land) and will affect219 households (HHs). A total of 134 HHs will be affected through loss of productive land(101 HHs through loss of agriculture land and 33 HHs through loss of garden land). It isestimated that 80.0% of the 134 HHs (107 HHs) will lose 10% or more of their productiveland.

4. A Resettlement Plan (RP) for Can Tho City has been prepared based on DMS data.This IRP is also based on DMS data. Therefore, the project area will not change and theaffected households have been identified through DMS.

5. The objective of the income restoration program is to stabilize, if not improve, thelivelihood and income of severely affected and vulnerable households entitled to theProgram. This objective will be achieved through a number of programs and activities: Improving the productivity of the remaining land through provision of

agricultural/husbandry training courses for affected households. Developing household economies through provision of support for inputs to

establish small businesses, agricultural or husbandry activities. Improving skills and employment opportunities through provision of vocational

training courses and vocational support

6. The AHs entitled to the IRP are the following: Severely affected HHs (SAHs). (i) HHs who are losing 10% or more of their productive

land1 and their main source of income is from agriculture (107 HH) and (ii) HHs whoconduct business or any other income generating activity in their house and the HHshave to be relocated (44 HH).

Vulnerable Households: People on account of their position in society and/or theirphysical and economic situation are less capable of re-establishing themselves thanthe others and, therefore, face greater risks of hardship or impoverishment (20 HH).

1 Productive land refers to the definition of agriculture land in the 2003 Land Law (Art. 13 Classification ofLand), which includes: a) Land for cultivating annual crops, including rice cultivation land, and for breeding,and land for cultivating other annual crops; b) Land for planting perennial trees; c) Production forestry land;d) Protective forestry land; e) Specialized forestry land; e) Land for aqua cultural cultivation and breeding; g)Land for salt production; h) Other agricultural land as may be stipulated by the Government.

Page 9: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 2 of 33

7. SAH who are losing more than 50% of their total land holding and who have 3family members in the labour age or more will be entitled to additional support, as follow: Entitlement to agricultural activities and vocational training; or Entitled to 2 agricultural activities; or Entitlement to 1 agricultural activity but with additional inputs;

2. PROJECT AFFECTED HOUSEHOLDS

8. Based on DMS data for the right-of-way and the construction yard, the number ofHH losing productive land (agriculture and garden land) is 134 HH (101 HH losingagriculture land and 33 losing garden land mainly fruit trees). Among the 134 HH, 80% willlose 10% or more of their productive land (107 HH). The number of relocated businessand vulnerable HH is respectively 44 and 20. Therefore, the number of potentialbeneficiaries of the IRP is 171.

Type of Beneficiaries Number of HHHH Losing ≥ 10% of their productive land 107Relocated business 44Vulnerable 20

TOTAL 171

Table 2-1: Estimated Number of IRP Beneficiaries

9. The IRP will cover the 1 ward and 1 commune affected by the CMDCP in Can ThoCity as presented in the Table below.

District Commune/Ward Estimated numberof participants

Thot Not Thoi Thuan 115

Vinh Thanh Vinh Trinh 56

Total Can Tho City 171

Table 2-2: Communes Covered by the IRP

Page 10: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 3 of 33

3. IMPACTS AND RISKS TO LIVELIHOODS

3.1 General Risks Associated with Loss of Livelihoods in theProject Area

10. Resettlement presents risks to livelihood. The adverse impact on income is one ofthe most significant effects of resettlement for men and women, the effects of which canbe long lasting with inter-generational consequences. For linear impact projects losses ofincome commonly result from either having to physically relocate (e.g. causing loss ofcommercial, farming or other livelihood operation site) or significant reduction inlivelihood base (as in partial loss of farming land).

11. In some cases the challenge is to re-establish pre-existing livelihoods in a newlocation while for others it may have to adopt new income generating practices. Thelatter often includes farmers who either need to diversify income generating activities(e.g. adopt small scale trade to supplement farming)or intensify productivity on reducedareas of land.

12. Restoration of income is one of the greatest challenges to successful post-resettlement rehabilitation. The success of resettlement planning in restoring livingconditions is thus inextricably bound to income restoration and effective incomerestoration in turn necessitates a clear understanding of livelihoods, capacities and risksfaced by those displaced.

13. In Can Tho City, the project area is under urbanization and industrialization andagriculture land is scarce. Employment opportunities exist in the nearby Thot NotIndustrial Park. In Vinh Thanh District, it is easy to buy replacement land for APs tocontinue their livelihood activities. However due to the number of new projects in thearea, demand for replacement land has increased and availability has become scarce ormore expensive due to the high demand.

14. In Vinh Trinh commune, the most severely impacted category of livelihoods arefarming, representing 56.1% of the AHs followed by small business (11.9%). In Thoi Thuanthe most severely impacted category of livelihoods are respectively, hired labour,agriculture and small businesses with respectively 28.5%, 26.9% and 22.3% of the AH.

3.2 Specific Risks for Women and other Vulnerable HH

15. The crucial role that women’s productive work plays in the socio-economicwellbeing of the household can often be overlooked when AH livelihoods are onlyexamined at the household level. The nature of women’s work can often be quitedifferent to that of men. The implications for resettlement are that contrasts in thegeneral characteristics in productive work means that women can experience differentrisks and impacts on livelihoods compared to men.

16. Work located in close proximity to the home tends to be the income sources most

Page 11: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 4 of 33

severely affected by resettlement impacts. Women’s separate incomes, while generallylower than those of men, are an important element for empowerment within thehousehold and make a significant contribution to household wellbeing. Overall lostincomes for women poses significant risks in terms of increased time poverty,disempowerment within the family as well as impoverishment of households.

17. The level of women’s participation in remunerated work is lower to that of men inmost the project area. There is a higher representation of women as non-working(meaning not actively seeking paid work) reflecting women’s lower retirement age fromthe formal sector (55 years compared to 60 years for men) and decision by women orhouseholds for women to tend to the care of small children or care of aged parentsinstead of engaging in paid work.

18. There were 31 female headed households identified through the census. One FHHis also poor. The rate poverty is not higher among WHH than among the total AH(respectively 3.2% and 3.8%).

19. Vulnerable HH face greater risks of impoverishment. They might also use theirfinancial resources (i.e. compensation and allowances) for non-livelihood relatedexpenses.

20. Vulnerable HH are also likely to have lower level of education. Choice of suitablerestoration activities adapted to their education background is essential.

21. As per project policy, agreed by the Prime Minister and included in the RP,vulnerable HHs include: (i) households that are headed by women with dependents, (ii)household heads with disabilities, (iii) households falling under the generally acceptedindicator for poverty, (iv) landless households and (v) households who benefit ofgovernment social policy.

Page 12: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 5 of 33

4. NATIONAL AND LOCAL TRAINING PROGRAMS

22. The Project wants to avoid any duplicity of programs and that the Project will beable to link Government and local programs that already exist in the area. The nationaland local programs have been identified. Information on the various programs, status,progress are presented below.

4.1 Program 1956

4.1.1 Main Characteristics of the Program

23. On 27 November 2009, the Prime Minister approved the project 1956/QD-TTg forvocational training for rural workers.

24. The general objective of the Program 1956 is to provide vocational training forrural workers until 2020 to prepare them for industrialization, agricultural modernization,and to ensure that equalization of access to training programs for most people, whopreviously did not have access to vocational skills development.

25. The specific objectives of the decision are twofold. Firstly, it provides vocational training for rural workers (the budget allocation

for this accounts for 95% of the total financial resources). Secondly, it enhances capacity building and improves management skills for

communes’ leaders and staff.

26. According to a recent report2, Decision 1956 aims at annually providing training onagriculture and non-agriculture skills for one million rural workers that are considered tobe above the minimum age for active participation in the labour force until 2020.

27. Program 1956 explicitly envisages the development of a more industrializedeconomic structure than the one currently in place (where agriculture still dominates) andhence Program 1956 places explicit targets on non-agriculture training in relation toagricultural training.

28. This ratio of non-agricultural training is expected to increase from 65% of the totaltraining provided during the period 2011-2015 to 75% for the period from 2016 to 2020.

29. Program1956 first sought to create jobs for rural workers in their own localitiesbefore training workers who wanted to work in other localities or overseas. Program 1956targets to secure jobs for at least 70 per cent of trainees. Training courses are divided infour major groups of occupations:a) Cultivating techniques, animal husbandry, forestry, and salt-production.b) Processing agricultural, forestry, and aquatic products.c) Irrigation management, water supplies, and rural environment sanitation.d) Agricultural management and services.

30. According to a report prepared by OECD3, to implement the program a Central

2NEU & NIVT (June 2012) Improving vocational training for Vietnamese rural workers.3 OECD (20120 Skills Development Pathways in Asia: Chapter 9 Measures for skills development andemployment in Viet Nam by Hoang Ngoc Vinhhttp://www.oecd.org/cfe/leedprogrammelocaleconomicandemploymentdevelopment/Skills%20Development%20Pathways%20in%20Asia_FINAL%20VERSION.pdf

Page 13: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 6 of 33

Steering Committee has been established with the participation of key ministries as wellas similar steering committees at local provincial, district and commune levels. Each levelof the administration has to develop a plan to implement the program.

31. The program has mobilized participation from Communist Party organizations, alllevels of government, political and social agencies such as the Farmers’ Union, Women’sUnion, and Youth Union. Skills training are provided using a voucher system. There aredifferent types of vouchers depending on the priority of the subject. Trainees are givenvouchers and use them to enroll in vocational training courses according to their needs.The state pays the training institutions for the number of vouchers obtained. Higherquality vocational training institutions and ones which meet the needs of many learnerswill receive higher revenue. The state voucher system has created competition amongtraining institutions for quality and efficiency, thereby giving trainees more options andmaking them more accountable for their own training.

32. According to a recent article4 in the first six month of 2012, only 135,397 ruralworkers received vocational training, accounting for 28.4 percent of the annual plan. Thatnumber was too small to match with the expectations. The project aimed to train 500,000rural workers and 100,000 commune officials this year. However 82% of the trained founda related employment which is a positive result.

33. Other problems identified were delay in the funding which was hindering theimplementation of the project and lacks of contracted teachers and curriculums. It wasalso mentioned in the report that a lot of rural workers attended training courses just toget subsidies from the project and were not eager to learn a trade.

4.1.2 Implementation of the Program in Can Tho City

34. In Can Tho City, implementation of Program 1956 on vocational training for ruralworkers began in October 2010 and will be implemented until 2020. The total number oftrainees since the start of the Program is 9,035. For the first 6 months of 2012, thenumber of rural workers trained was 3,112.

35. According to the Can Tho Vocational Training Center, after receiving training (non-agriculture training) 75% of trainees could find a job. For special training course linked tospecific demand from factories or companies, 100% of trainees got a job after training.

36. According to the VTC, in 2010, training was given to 3,750 persons; among them2,789 (74.3 %) find a job after training. In 2011, training was given to 5.320 persons,(5,180 for short-term vocational training 140 for long term training). After training, 4,144trainees (77.89%) could find a job. From January to July 2012, among the 3,112 trainees,there was 379 students and after completion of the training course, 305 students(80.47%) were employed.

37. Most of the trainees chose non agriculture vocational training. Among the totalnumber of trainees since 2010 (12,182 trainees) 1,795 trainees (14.73%) followedagriculture training and 10,387 people (85.27%) followed non-agricultural vocationaltraining.

4 See in particular http://talkvietnam.com/2012/09/project-1956-suffers-deficiencies/#.ULcOUqy6c7k

Page 14: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 7 of 33

38. The total budget planned until 2020 is 48,73 billion (2.34 M USD). The centralGovernment part is 24 billion VND (49%) and Can Tho City part is 24,73 billion VND (51%).

39. The Can Tho VTC is satisfied with the results of the Program in term of number ofpersons trained and % of trainees who could find a job.

4.2 Training Program in Can Tho City

40. Can Tho City Peoples Committee Decision 12/2010/QD-UBND. Can Tho Cityissued Decision 12/2010/QD-UBND dated 4 February 2010(on Compensation, Supportand Resettlement when the Government recovers land in Can Tho City. Article 30 of thisdecision is related to: Support for occupational change and job creation. In this Article thefollowing support measures are proposed:

a. Cash allowance corresponding to 1.5 to 3 times the compensation rate foragricultural land for HH engaged in agriculture production;

b. Affected farmers are entitled to vocational training in the city and are exemptfrom tuition fees for a training course (including training levels: primary level,intermediate level and vocational colleges).

41. In Thot Not and Vinh Thanh District, both affected by the project, the level ofallowance chosen was 3 times the compensation rates for agriculture land.

4.3 Main Differences between IRP Program and Existing Programs

42. The main differences between the existing national and city training programsand the proposed IRP are:

- City training programs cover farmers only.- Existing national and city training programs proposes training or allowance only;- The existing national and city training programs are implemented through existing

staff;- No input (animals, equipment, material) is provided to trainees by the National

and City Programs;- The existing program have no specific gender approach;- The Vocational Training Centers which implement the program have to assist

trainees to find a job. This is done through job announcement and job fair.

43. The activities are specific to training only. There are no follow-ups to gauge thesuccess of the program.

44. The proposed IRP covers a larger number of HH (not only farmers. The proposedIRP also propose inputs to implement agriculture activities or small scale businesses whichare not parts of the existing national and city programs.

45. The following table presents a comparison between existing programs and theproposed IRP activities.

Page 15: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 8 of 33

46. To avoid any duplication with vocational training under Project 1956 or othertraining program proposed by local authorities, it is suggested that HH who participate inthe IRP for the CCMDP Project will not be entitled to the one proposed under Project1956 or to any other training program.

Table 4.3-1: Differences between Proposed IRP Activities and Existing National andLocal Training Activities

5. PROJECT’S INCOME RESTORATION PROGRAM

5.1 Need for an Income Restoration Program for the CMCDP

47. Given the limitation of the existing programs mentioned above and in line with theoverall objective to restore, if not improve, the livelihood activities and sources of incomeof HH who are severely affected and vulnerable, an income restoration program, focusingon diversified activities to bring immediate income such that they will be able to producefor their basic needs and long-term livelihood management capacity has been prepared.

48. The IRP aims to (a) maximize the use of remaining productive lands for foodproduction; (b) create career opportunities through vocational trainings and job creatingactivities; (c) provide technical advice or/and small business/service models for those whowant to venture into business.

Project 1956 City Program Proposed IRPBeneficiaries - Rural workers - HH engaged in agriculture

production- HH losing 10% or more of their productive land;- Relocated HH business;- Vulnerable HH;

Allowance - Voucher forvocationaltraining

- 3 times the compensationrate for agriculture landfor career change

- 3 times the compensation rate for agricultureland (included in agreed compensation policyunder the Resettlement Plan);

Activities - Vocationaltraining

- Vocational training (neverimplemented)

- Vocational training;- Agriculture activities- Operating small scale business;

Staff toimplementthe program

- Existing stafffrom relevantagencies

- N/A - Provide new staff to relevant agencies specific tothe IRP implementation;

Inputs - No input - No input - Input for agriculture activities (animals)- Input for operating small business (basic

equipment)Follow-up - Assistance to

find a job- No follow-up - Individual follow-up for trainees to find a job;

- Individual follow-up for HH involved in agricultureactivities and in operating small business;

Vulnerable - No specificapproach

- Allowance for poor - Specific concerns and approach for poor andother vulnerable HH

Gender - No specificapproach

- - Specific concerns and approach for gender issues

Other - Evaluation workshop;- Study tours;

Page 16: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 9 of 33

49. Based on the consultations carried out with various stakeholders and needsassessment, the specific activities of the IRP are to (i) provide funds and appropriatetechnique for entitled HH whose remaining land are still viable to implement agriculturalextension models (ii) organize training courses which are suitable to APs’ capacity;provide supplementary trainings, consultations, allowance and other supports toparticipants attending the courses; and (iii) provide technical advice, models on smallbusiness/services and training courses, study tours on efficient economic enterprises.

5.2 Income Restoration Measures as per Resettlement Plan

50. As mentioned in the RP, severely affected HH will receive, in addition tocompensation for lost assets the following cash assistance:

Severely affected Farmers will receive:- 3 times the compensation rates for agriculture land per m2;

Relocated business will receive:- Transport allowance (3 to 7 M VND/HH);- Business stabilization allowance (0,8 to 2M VND/HH);

Vulnerable HH will receive:- Poor HH will receive 2,4 M VND/Year/HH for 3 years;- Women Head of HH with dependent will receive 2 M VND/HH- Landless an disabled head of HH will receive 2,4 M VND/HH

51. Cash assistance, as described above, does not necessarily lead to stabilization ofAHs due to situation mentioned above (e.g. high demand for land in the area, increasecost of land etc.) Therefore the IRP aims to provide supplemental assistance to severelyaffected HH and vulnerable, enhancing opportunities for them to improve incomesthrough training and provision of inputs. Risks to SAHs have been envisaged, as stated insection 3 of the report.

52. Given the other programs implemented in Viet Nam which resulted to somesuccess (Loan No. 2451-VIE:Ho Chi Minh City-Long Thanh-Dau Giay Expressway Project,ADB Funded) it is essential that the Project designs a suitable and sustainable IRP for theAHs.

53. As AHs, the IRP participants can also use the grievance process identified in theagreed RP.

5.3 Consultations with various stakeholders

5.3.1 Consultation during PPTA

54. Consultations during PPTA consisted of: 1 consultation meeting with the Can Tho People’s Committee May 2010; 1 consultation meeting with Thot Not District People’s Committee May 2010; 1 consultation meetings with AHs in Thoi Thuan June 2010;

Page 17: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 10 of 33

Separate discussions with key Can Tho City departments(Dept Transport, Dept ofAgriculture &Rural Development, Centre for Land and Housing Development), theWomen’s Union and Commune People’s Committees during the preparation of theresettlement planning document

55. During these consultations incomes restoration measures have beendiscussed.Programs identified which are considered to be suitable were discussed as earlyas 2010. Short term vocational training course (up to 6 months) managed by DOLISA andmicro-finance fund (small loans from VND 5 - 10 million) for productive purposes from theSocial Policy Bank at low interest rate were proposed during PPTA.

5.3.2 Consultation during Detailed Design Phase

56. During Detailed Design, 2 public consultations, one in each of the affectedcommune/ward, were conducted. During these consultation meetings, the IRP wasexplained by the DDIS Consultant. A sample need assessment was also conducted afterthese explanations.

57. Extensive discussion was also conducted from June to July 2012 with variousstakeholders as presented in the Table below.

Date Agencies involved Purpose

20 June,8h00 am

- Department of Labor Invalidsand Social Affairs(DOLISA) ofCan Tho City

o Representatives of vocational(or employment centers)

o Staff in charge of HIV/AIDS andHuman Trafficking Prevention

- Present the proposed Income Restoration Program (IRP) andthe needs for training;

- Discuss the existing programs implemented by DOLISA fortraining;

- Discuss the services offered by the District vocational centers;- Discuss existing program for HIV/AIDS and Human Trafficking- Identify partners to implement the IRP;

20June,2h00pm

- Department of Agriculture andRural Development (DARD) ofCan Tho City

- Present the proposed Income Restoration Program (IRP);- Discuss type of agriculture activities that can help farmers to

restore their income;- Discuss the existing programs implemented by DARD- Identify partners to implement the IRP;

21 June,8h00 am

- Women’s Union of Can Tho City- Representatives of Women’s

Union of Thot Not and VinhThanh Districts

- Present the gender strategy to the participants;- Identify training programs implemented by Women’s Union at

various levels;- Discuss partnerships to implement the IRP and other

resettlement activities;

21 June,2h00 pm

- Farmer’s Union of Can Tho City- Representatives of Farmers’

Union of: Thot Not and VinhThanh Districts.

- Present the proposed Income Restoration Program (IRP);- Discuss type of agriculture activities that can help farmers to

restore their income;- Discuss possible partnership to implement the IRP;

26 July8h30 am

- Department of Labor Invalidsand Social Affairs (DOLISA) ofCan Tho City

- Vocational Training Center ofCan Tho City

- Introduction of the Income Restoration Program (training andsmall businesses activities)

- Propose organization chart- Present detailed tasks for every agency- Identify different steps to be conducted

Page 18: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 11 of 33

Date Agencies involved Purpose- Discuss type of training that can help affected households to

restore their income- Identify preliminary costs for activities and management- Discuss draft Memorandum of Understanding

26 July

2 pm

- Department of Agriculture andRural Development (DARD) ofCan Tho City

- Agriculture Extension ServiceCenter of Can Tho City

- Farmer’s Union of Can Tho CityRepresentatives of Farmers’Union of: Can Tho City; ThotNot and Vinh Thanh Districts.

- Introduction of the Income Restoration Program (agricultureactivities)

- Propose organization chart- Present detailed tasks for every agency- Identify different steps to be conducted- Discuss type of agriculture activities that can help farmers to

restore their income- Identify preliminary costs for activities and management- Discuss draft Memorandum of Understanding

27 July8h30 am

- Women’s Union of Can Tho City- Representatives of Women’s

Union of Thot Not and VinhThanh Districts

- Introduction of the Gender Strategy- Propose organization chart- Present detailed tasks to be conducted by the WU- Identify different steps to be conducted- Identify preliminary costs for activities and management- Discuss draft Memorandum of Understanding

Table 5.3.2-1. Meeting with Various Stakeholders in Can Tho City

5.4 Needs Assessment58. The programs identified by the local authorities cannot be imposed to the HHs.Participation of APs is crucial in the success of any given IRP. To identify the needs andpreferences of APs in the IRP, a sample need assessment, using a structured questionaire,was conducted in Thoi Thuan ward and Vinh Trinh Commune in September 2012.

59. A detailed needs assessment will be conducted once the IRP will be approved.Section 5.6 presents the purpose and main steps of the needs assessment. This detailedneeds assessment will be conducted by the DDIS Consultant, in collaboration withpartners, from March to May 2013.

5.4.1 Results of the Sample Needs Assessment

60. The survey covers 172 HHs: (i) 37.8% of respondents are losing 10% or more oftheir productive land and 61.0% will have to be relocated; 34 HH (19.8%) were alsoidentified as poor. We should note that the sample includes HH located in the former CYarea (larger than the one finally approved). In the former area, a large number of HH wereincluded.

61. Agriculture activities is the main activity chosen by the participants wiyj 45.4% ofthe choice followed by business venture (37.2%) and vocational training (17.4%). Basedon these %, and extrapolated to the total number of estimated beneficairies (171), theestimated number of HH choosing agriculture activities in Can Tho City is 117; theestimated number of HH choosing vocational training and small business is respectively44 and 96.

Page 19: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 12 of 33

Agriculturalactivities

Vocationaltraining

Smallbusiness

Total

N (sample needs assessment) 78 30 64 172% (sample needs assessment) 45.4 17.4 37.2 100.0Estimated HH for Can Tho City5 78 29 64 171

Table 5.3.2-2: Choice of Surveyed Beneficiaries

62. Information and profile of respondents are presented in the tables below.

Commune/Ward TotalThoi Thuan (Thot Not District) 130Vinh Trinh (Vinh Thanh Commune) 42Total 172

Table 5.3.2-3: Sample used for the Needs Assessment

Class of AgeGender

Male FemaleN Col % N Col %

From 26 to 35 13 11.0% 5 9.3%From 36 to 45 24 20.3% 12 22.3%From 46 to 55 38 32.2% 19 35.2%From 56 to 65 23 19.5% 8 14.8%> 66 20 16.9% 10 18.5%

118 100.0% 54 100.0%

Table 5.3.2-4: Ages and Sex of Surveyed HH

Main Occupation Nb %Farmers 59 34,3%Hired labours 41 23,8%Small Business 34 19,8%Workers (private) 14 8,1%Government Employee 7 4,1%Not working 17 9,9%Total 172 100,0%

Table 5.3.2-5: Main Occupation of Respondents

5.4.2 Planning of the Detailed Needs Assessment

63. The purpose of the Detailed Needs Assessment (DNA) is first to establishhouseholds preference for income restoration activities. The type of training, of

5 The number of AHs has been reduced significantly with the reduction of the CY where a lot of houses willfinally not be affected.

Page 20: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 13 of 33

agriculture activities and small business will be determined for each HH. The results willconstitute the basis for the implementation of the IRP. These results will also be used tofinalize the budget. In addition, the detailed needs assessment will provide baseline formonitoring and evaluation purpose.

Organization of the Detailed Needs Assessment

64. Agriculture Extension Centers, Farmer’s Union, Women’ Union and VocationalTraining Center will be first met to plan the DNA. Every organization will have to prepareinformation on the activities to be proposed to the beneficiaries.

65. For agriculture activities in particular, proposed activities should be with minimumrisk (favourable market conditions, few risk of disease etc.) and with short generatingincome (1 or 2 years maximum). Training will also be job oriented and consistent with HHeducation background to ensure the best work opportunities. Therefore it will be madeclear that HH will have a limited choice for agriculture activities and training to minimizethe risks.

66. In parallel, CIPM and the DDIS, in collaboration with each CLFD, will prepare thelist of beneficiaries in each commune.

67. Once the activities to be proposed to the beneficiaries chosen and the list ofbeneficiaries known, workshops with beneficiaries will be organized at commune levelwith the support of AEC, Farmer’s Union, Vocational Training Centers and Women’sUnion. During these meeting, the types of activities proposed will be explained.Beneficiaries will have to fill a needs assessment form (see Appendix 5 and 6).Beneficiaries will receive assistance to fill the form.

68. Those who couldn’t join the workshop will be met individually and asssited to fillthe forms.

Results of the Detailed Needs Assessment

69. Following the detailed needs assessment the choice of each APs will be reviewedand a recommendation will be made for every HH. Following agreement between thebeneficiary and all stakeholders on the IRP activity choice, a database of beneficiaries willbe prepared by the DDIS. This database will include HHs’ choice and baseline data. Thisdatabase will be regularly updated and will be made available for the external monitor.

70. A work plan and a final budget will be prepared following the DNA. Staffing foreach stakeholders will also be reconfirmed. A contract will then be prepared with the AEC,DOLISA and WU.

6. SPECIFIC IRP ACTIVITIES OF THE PROJECT

6.1 Agricultural Activities

6.1.1 Agriculture Models

71. A number of agricultural extension models were designed in collaboration withthe Farmers’ Associations, Agricultural Extension Centers:

Page 21: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 14 of 33

a) Cow-raising, pig-breeding, frog-raising, duck/chicken-raising;b) Planting: sesame; soybean; vegetablec) Aquaculture: shrimp; fish; eel

72. In order to reduce risk of failure for affected household, only agricultural activitieswith great chance of success has been proposed. Experiences from other projects6 showscow and pig breeding were found relatively easy to implement and generating goodincome. Chicken and duck raising were also found generating quick and good income.These activities are also suitable with local conditions, being practiced by some localresidents and there is available market to sell the produce.

73. Beneficiaries will receive input in kind only (i.e. animals); no cash will be given tobeneficiaries. Responsibilities of beneficiaries are detailed in section 6.1.4.

74. Based on the sample needs assessment conducted in September 2012, thenumber of surveyed beneficiaries who opted for agricultural activities representing 45.4 %of the total of surveyed HH. Chicken/duck raising was the choice of 29.5% of beneficiarieswho choose agriculture activities while 35.9% wanted to raise pig and cow; 19.2% optedfor pig and cow breeding.

Table 6-1: Type of Agriculture Activities Chosen

6.1.2 Management Issues

75. Working Group. A working group will be set-upto manage the agricultureactivities. The working group will be formed by representatives of CIPM, DDIS Consultant,DARD and Women’s Union. The roles of the Working Group are to: i) take an active partin the IRP implementation, management and monitoring; and ii) take part in findingsolutions for issue arising during IRP implementation.

76. Agricultural Extension Center The Agriculture Extension Center (AEC) and theVeterinary Services (VS) was chosen to be in charge of the implementation of theagricultural demonstration program. AEC is present at the district level and providestraining and veterinary services to farmers. AEC is under the Department of Agricultureand Rural Development. Under the project, AEC provides the technical follow-up ofparticipants. VS are required when necessary. All these services are free of charge for theparticipants. AEC are a key organization for the technical follow-up of the participants and

6 Especially the Income Restoration Program for the Ho Chi Minh Long Thanh DauGiay Expressway Project(ADB Loan 2374-VIE) which started to be implemented in April 2011.

Agricultural activities N % Total Can Tho CityChicken/duck raising 23 29,5% 23Pig/cow raising 28 35,9% 28Pig/cow breeding 12 15,4% 12Others (*) 15 19,2% 14Total 78 100,0% 77

Page 22: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 15 of 33

the success of the agricultural models. Therefore technical assistance is needed from theCenter for Agriculture extension services. Detailed tasks are presented below:

Participate in the needs assessment Provide training to SAVHs Provide veterinary services (for the animals provided under the IRP); Provide inputs (animals, plants etc. to beneficiaries in Districts; Provide technical advices for SAVHs; Organize monitoring and evaluation workshop Implement agriculture models for SAVHs (designed with the assistance of the

concerned Farmers’ Associations, Women’s Unions, and affected households)such as cow/pig-raising, cow/pig-breeding, frog-raising, duck-raising, raising localvariety chicken, raising eels, raising shrimps, planting sesame; soybean andvegetable;

Organize study tours for SAVHs members who will visit other livelihood modelswithin or outside Can Tho City as part of their training.

Provide continuous support through technical training courses, and closemonitoring of projects activities to allow timely resolution of constraints andproblems encountered during implementation

77. Farmers’ Union The Farmers Union (FU) is one of the largest mass organizations inVietnam with a central office in Hanoi and branches in all provinces, districts andcommunes. At the district level, FU has only 4 staff and at the commune level, 2 staff. FUis a key mass organization for the development and education of farmers. However, FUstaff has no technical skills. The FU will assist the AEC to provide information tobeneficiaries. Detailed tasks are presented below:

Provide information from the project to SAVHs Assist participant during the needs assessment; Assist AEC and District Level in the follow-up Assist SAVHs in all activities; Report activities and result to AEC timely

78. Women’s Union (WU) at various levels will work with the AEC and FU for thefollow-up of women involved in agriculture activities. WU will also provide expertise ongender during the implementation of agriculture activities.

79. The Center for Housing and Land Fund Development (CHFLD) as representative ofthe Project sub-owner will be part of the working group. They knowledge and experienceon affected people and their status (tenure, socioeconomic status etc.) will be useful forthe implementation of IRP.

80. Drafts Memorandum of Understanding (MoU) have been prepared and agreedwith DARD, AEC and FU (see Appendix 2) and the WU (see Appendix 3). These MoUidentified the main tasks of each partner. These MoU will be signed between CIPM/DDISConsultant and DOLISA when the IRP will be agreed by both the MOT and ADB.

Page 23: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 16 of 33

81. Figure 6.1 presents the organization for the management of agriculture activities.

6.1.3 Staff Required for the Implementation

82. In order to implement and manage the IRP, staff from the DARD, AgricultureExtension Center (AEC) and Farmer’s Union (FU) will be hired for a period of 24 months.The need for staff has been discussed and agreed with relevant agencies and is presentedin the Table below. The need for staff will be however reassessed following the DetailedNeeds Assessment.

Agency Technical staffDARD/AEC City level 1 expert for 24 monthsAEC Thot Not District 1 expert half time for 24 months)AEC Vinh Thanh District 1 expert for 24 months)FU Can Tho City 1 staff for 24 monthsFU Thot Not District 1 staff half time for 24 monthsFU Vinh Thanh District 1 staff for 24 monthsWU Can Tho City7 1 staff for 24 monthsWU Thot Not District 1 staff for 24 monthsWU Vinh Thanh District 1 staff for 24 monthsWU Thoi Thuan ward 1 staff for 24 monthsWU Vinh Trinh Commune 1 staff for 24 months

Table 6-2: Proposed Staff Requirement for Management

6.1.4 Beneficiaries’ Commitment

83. The Project will not require any return of investment from the beneficiaries to theAEC. However, each beneficiary will sign a contract with the AEC. In this contract thefollowing items will be mentioned:

Information on the beneficiary The duration of the IRP; The type of inputs received and the cost equivalent; The date of receiving the inputs (it will serve as the starting date of the IRP for

each HH); The services provided to the HH (veterinary services, follow-up etc.) A commitment that the HH will not sell the inputs during the duration of the IRP

and will take adequate care of the inputs provided; In case the HH is selling inputs the program will have no obligation to provide any

further follow-up assistance

7 WU staff will cover both the agriculture and the training and small business programs

Page 24: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 17 of 33

Figure6-1: Organization Chart for the Implementation of Agriculture Activities

6.2 Vocational Training and Operating Small Scale Business

6.2.1 Vocational Training

84. In Can Tho City each district has its own Employment Resource Center (VTC) toprovide training. The trainees are less than 30 years old. Most of the trainings are short-term training (3 to 6 months). To open a training course a minimum of 20 persons isnecessary. The cost of one course is 3.6 M VND for short term training and 7.2 M VND forintermediate training course. If the beneficiaries cannot find a job within six months,refresh training will be provided to them by the AEC. Based on the sample needsassessment, 17.4% wants to follow vocational training course (29 persons).

85. In parallel with the finalization on the type of training courses and participants,various activities will also be undertaken:

Creation of database of interested affected households to reflect qualifications, jobexperience, skills and desired occupation.

Executing Agency MOT, CAN THO CITY PC

WORKING GROUPCIPM

DDIS ConsultantDepartment of Agriculture and Rural Development of Can Tho City

Women's Union at City LevelFarmer's Union

Centre for Land Fund Development (CHFLD)

Agriculture Extension Center

Beneficiaries

Farmer’s Union

Page 25: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 18 of 33

Establish and maintain linkages with the management of construction projects;commercial, industrial and institutional establishments within the City with theintention of identifying their manpower requirements (i.e. number, qualification,schedule of deployment, etc.) and securing agreements (quota for hiring) fordeployment of qualified SAH members to fill job vacancies.

Establish a program to provide information to the affected communes on theavailability of jobs through posting of job vacancies in the commune offices andthrough commune’s local radio.

Close coordination and establish linkages with the project contractors andconsultants to recruit local labors, specially the affected households, on a prioritybasis. Labor standards will be maintained and will incorporate applicableworkplace occupational safety norms. There will be no differentiation betweenmen and women on payment for work of equal value, and no child labor will beused for construction and maintenance.

Conduct job fairs and providing consultation.

6.2.2 Small scale business/Service

86. There are households who wish to venture into small business or services. It caneither be shops to sell their own products, groceries or service stalls (beauty shop, tailor,motorbike repair). Households will also be made aware of what to look into such as theright products, market situation, competition, amount of investments and potentialprofit, and risks involved. Based on the sample needs assessment, it is estimated that 44will choose this activity.

87. The IRP will provide HH with basic equipment. Equipment will be chosen incollaboration with HH. No cash will be given to AHs. Responsibilities of beneficiaries aredetailed in section 6.2.5.

6.2.3 Implementation Issues

88. Working Group. As per agriculture activities, a working group will be set-uptomanage the training and small-scale business activities. The working group will be formedby representatives of CIPM, DDIS Consultant, DOLISA and Women’s Union. The roles ofthe Working Group are to: i) take an active part in the IRP implementation, managementand monitoring; and ii) take part in finding solutions for issue arising during IRPimplementation.

89. Department of Labour Invalids and Social Affairs (DOLISA) of Can Tho City incharge of the implementation of the training and small business. Detailed tasks forDOLISA are presented below: Disburse budget in a planned way according to guideline of DDIS Consultant to the

District/City Vocational Training Centers; Store and maintain accounting documents for auditing; Closed monitor the training and small business activities of SAVHs members and

report to Cuu Long CIPM timely;

Page 26: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 19 of 33

Establish and maintain linkages with the management of construction projects; Organize the monitoring and evaluation workshop

90. Vocational Training Center (VTC) in each district /city (Cao Lanh District, Cao LanhCity, Lap Vo District) are responsible for conducting occupational training, industrialextension models, consultation and job introduction. Detailed tasks are presented below:

Participate to the needs assessment (presentation of training options and smallbusiness component)

Conduct training course suitable with trainees; Establish a program to provide information to the affected communes on the

availability of jobs through posting of job vacancies in the commune offices andthrough commune’s local radio (with the assistance of DDIS Consultant);

Coordinate with Cuu Long CIPM/Consultant to conduct job fairs and providing jobconsultation for SAVHs.

Provide advice and conduct specific training courses on entrepreneurship.Households will be made aware of what to look into such as the right products,market situation, competition, amount of investments and potential profit, andrisks involved;

Establish and maintain linkages with the management of construction projects; Coordinate with commercial, industrial and institutional establishments within

the City with the intention of identifying their manpower requirements (i.e.number, qualification, schedule of deployment, etc.) and securing agreements(quota for hiring) for deployment of qualified SAH members to fill job vacancies.

Provide follow-up to beneficiaries in order to assist and supporttraining/operating small business through regular visits;

Collaborate with Women’s Union for the follow up of beneficiaries;

91. Women’s Union (WU) at various levels will be involved in the selection ofappropriate affected persons who have ability for training in small business. Duringimplementation, they will collaborate with the vocational training centers, which are stillresponsible for conducting vocational trainings and for providing equipment for HHsconducting business. Specific tasks of WU are described in section 5.

92. Detailed activities of the WU are indicated in the Social Impact Assessment(Gender Strategy). The budget included in the Social Action Plan (SAP) covers alsoactivities related to the IRP.

93. Specific to the IRP, the WU will provide locally marketable skills training forwomen who choose this activity during needs assessment. Type of training is presented inTable 6.3. Outputs (material, basic equipment) will also be provided to participants by theWU.

94. The WU will work with the Farmers’ Union and the Agriculture Extension ServiceCenters in the monitoring and follow-up for women participants to verify if their incomehas been restored.

Page 27: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 20 of 33

Skill trainingMat weaving by handMat weaving by machinePlastic chair weavingPlastic bag weavingGlass bead knit: bag, key hanger…Flower sheafFeather dusterWater hyacinth weaving (hat, bag, flower vase , carpet)Bamboo basket weavingFamily sewingIndustrial weavingMake dry flowerBall sawingHammock weavingEmbroidery

Table 6-3: Type of Handicraft Activities Provided by WU

95. The Center for Land Fund Development (CFLD) as representative of the Projectsub-owner will be part of the working group. They knowledge and experience on affectedpeople and their database regarding APs status (tenure, socioeconomic status etc.) will beuseful for the implementation of the IRP.

96. Drafts Memorandum of Understanding (MoU) have been prepared and agreedwith DOLISA and the vocational training center (see Appendix 1) and the WU (seeAppendix 3). These MoU identified the main task of each partner. These MoU will besigned between CIPM/DDIS Consultant and DOLISA when the IRP will be agreed by boththe MOT and ADB.

6.2.4 Staff Required for the Implementation

97. The need for staff has been discussed and agreed with relevant agencies and ispresented in the Table below. We should note that for WU, the staff involved in the IRPwill also be involved in other resettlement activities (not specific to the IRP) as describedin the Social Action Plan. Staffing and budget for WU are covered by the SAP. The need forstaff will be however reassessed following the Detailed Needs Assessment.

Agency Technical staffDOLISA City level 1 team leader for 24 monthsVTC Thot Not District 1 expert half time for 24 months)VTC Vinh Thanh District 1 expert for 24 months)

Page 28: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 21 of 33

WU Can Tho City8 1 staff for 24 monthsWU Thot Not District 1 staff for 24 monthsWU Vinh Thanh District 1 staff for 24 monthsWU Thoi Thuan ward 1 staff for 24 monthsWU Vinh Trinh Commune 1 staff for 24 months

Table 6-4: Proposed Staff Requirement for Management

Figure 6-2: Organization Chart for Vocational Training and Small Businesses

6.2.5 Beneficiaries’ Commitment

98. The Project will not require any return of investment from the beneficiaries toDOLISA. However, each beneficiary will sign a contract with DOLISA. In this contract thefollowing items will be mentioned:

Information on the beneficiary The duration of the IRP;

8 WU staff will cover both the agriculture and the training and small business programs

Executing Agency: MOT, CAN THO CITY PC

WORKING GROUPCIPM

DDIS ConsultantDepartment of Labour, Invalids and Social Affairs of Can Tho City

Women's Union City LevelCenter for Land Fund Development

Vocational Training Centers

(Thot Not and Vinh Thanh Districts)

Beneficiaries

Women’s UnionDistrict and Commune Level

Page 29: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 22 of 33

The type of equipment received and the cost equivalent (a price ceiling will bedetermined by the working group; for budget purpose, it has been fixed at 15 MVND (720 USD);

The date of receiving the equipment (it will serve as the starting date of the IRPfor each HH);

The services provided to the HH (follow-up etc.) A commitment that the HH will not sell the equipment during the duration of the

IRP and will take adequate care of the equipment provided; In case the HH is selling the equipment, the program will have no obligation to

provide any further follow-up assistance;

7. IRP RISKS AND MITIGATION MEASURES

99. The objective of the IRP is to provide opportunities for severely affectedhouseholds and vulnerable to improve, or at least restore, their incomes and livingstandards. The support to households provided in the IRP supplements the compensationfor assets, allowances, and other forms of support included in the Resettlement Plan.

100. The IRP recognizes that there are many variables that can influence theeffectiveness of income restoration measures. Some relate to the attitudes, skills andcapacities of the affected persons themselves. Many others relate to changes in marketconditions in which the program must operate, which may be unanticipated at the time ofprogram design.

101. The IRP incorporates features to encourage program flexibility, to ensure that risksto effective income improvement (or restoration) are identified, and that resources areavailable to formulate mid-program adjustments in response to changing conditions. Adetailed needs assessment will be conducted prior to initiation of program activities, bothto establish baseline data on incomes and livelihoods against which program effectivenesscan be measured, and to establish household preferences and priorities for participatingin program activities (see section 5.6). This will result in preparation of a work plan andagreements with supporting agencies. An evaluation workshop will be conducted prior tothe second year of program operation, culminating in adjustments to work plans for thesecond year as may be relevant. To ensure that resources are available for programadaptation, a minimum of 25% of the IRP budget will be withheld for allocation only afterthe evaluation workshop.

102. It has to be recognized that the ultimate implementers of the IRP are thehouseholds themselves; they must be active and responsible participants if their incomesare to be improved. The roles of CIPM, consultants and concerned government agenciesand organizations are supportive in nature.

103. Proper monitoring and timely guidance is just as important as provision ofmaterial assistance for the successful implementation of the IRP.

Page 30: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 23 of 33

Risk Description Mitigation Responsible1. Affectedhouseholds usefinancial resources(e.g., compensation,allowances orloans) for non-livelihood relatedexpenses

Severely affected households oftenare tempted to use financial supportfor expenses not related tolivelihood improvement (i.e. purchaseof motorcycle, purchase of householdappliances, payment of debts, etc.)

- Advise households to refrain fromusing their money for non-livelihood related expendituresthrough public meetings, groupconsultations.

- WU will counsel HH in budgetmanagement (see See Section 1.1,Component 1, Activity 1).

WU,

CIPM/DDIS

2. Affectedhouseholds sellprogram-suppliedinputs (e.g.,livestock,equipment), or useinputsinappropriately.

Severely affected households may betempted to sell inputs/equipmentthey receive through the program toraise cash for other purposes.Program inputs also may not beoperated or maintained in anappropriate manner. Pests or diseasemay affect provided livestock.

- Recipient households must signstatements that they will not sellprogram inputs.

- Agencies providing inputs alsoprovide training on proper use andmaintenance, and veterinaryservices available for livestock.

- Program monitoring includesassessment of input use.

AEC, FU,Dolisa,CIPM/DDIS

3. Affected personsreceivingagricultural trainingfail to improveproductivity asplanned.

Agricultural training may be largelytechnical in nature, but changes inmarket conditions may undermineimprovements to income. It ispossible that prices of productioninputs (i.e. feeds, veterinarymedicine, breeder stock, etc.) at thetime of purchase are higher thanexpected, and farm products get soldat the time prices are low. This willresult in higher production cost, lowersales and therefore lower or evennegative net income.

- Agricultural training to includeemphasis on evaluating marketconditions

- Program monitoring and follow-upsupport to include provision ofmarket information, includingchanges in supply of, and demandfor, market commodities.

AEC, FU,CIPM/DDIS

4. Affected personsreceiving vocationaltraining fail to findemployment asplanned.

Vocational training may prepareaffected persons for skills that are notin demand, or for jobs that may be indecline under future labor marketconditions. . Local laborers are notgiven priority or not aware ofrecruitment process.

- Selection of vocational trainingbased on assessment of labormarket demand.

- Establish and maintain linkageswith companies and contractors toprioritize local labor.

- Establish program to provideinformation to affected communeson the availability of jobs throughposting of job vacancies in the wardoffices and through commune'slocal radio.

- Trainees who are unable to findjobs within first year of programare eligible for retraining in second

VTC, WU,CIPM/DDIS,IndustrialZoneManagement Board(Thot NotDistrict)

Page 31: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 24 of 33

Table 7-1: Risks and Mitigations

year.

Risk Description Mitigation Responsible5. Affected personsreceiving supportfor establishingsmall business failto operatesuccessfully.

Affected person may lackentrepreneurial skills or attitudes, ormay find lack of demand for productsor services to be offered within localarea.

- Affected person to be assisted informulation of small business plan,including site assessment anddemand assessment in local area.

- Program monitoring to includereview of small business start-upand profit potential.

- Alternative vocational trainingmade available in second year ofprogram operation for thosedeemed unlikely to succeed insmall business operation.

VTC, WU,CIPM/DDIS

6. Untimely andinsufficientavailability offinancial andsupport servicesfrom programagencies that cancompromise successof livelihoodprojects.

Program resources may not besufficient to provide all programservices for all eligible affectedpersons. Or program resources maybe misallocated or misdirected, sothat insufficient resources areavailable to adapt to changingcircumstances during theimplementation phase.

- Contingency funds (5% of programtotal budget) available to meetunanticipated expenses.

- Timely provision of funds to begiven to agencies or organizationsproviding training and support

- Periodic monitoring and mid-implementation evaluationworkshop assess sufficiency andtimeliness of technical support.

- Partial withholding of programfunds until second year ofoperation, to encourage adaptableuse of resources.

CIPM/DDIS

7. WU, AEC, FU,VTC do not providesufficient oreffective manpowerin support of IRPimplementation.

Successful implementation of IRPdepends on the quality of support,guidance, monitoring that thegovernment and concerned groupscan provide to affected households.

- Training of trainers to allowaffected households to participatein training other households.

- Participating agencies have agreedto include experienced staff inprogram implementation,especially in start-up phase.

- Program budget provides supportfor hiring and training new staff forparticipating agencies, for two-yearperiod of program implementation.

AEC, FU,WU, VTC,CIPM/DDIS

Page 32: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 25 of 33

8. IMPLEMENTATION ARRANGEMENTS

104. The Income Restoration Program (IRP) will be funded under the current DDIS TA7822-VIE through a variation order to the DDIS Consultant’s contract. The IRP will beimplemented over two years, and is designed to be implemented in a flexible manner dueto the number of contextual variables that can impede effectiveness.

105. The implementation arrangements may be revised during the Detailed NeedsAssessment following discussion and agreement between MOT, CIPM, ADB, AusAID andlocal authorities.

106. A work plan will be prepared for the first year based on the results of the detailedneeds assessment. This work plan will serve as a basis for the preparation of the contractThis work plan will include the following components:

Identification of each activity with number and type of inputs;

Number of beneficiaries for all type of activities;

Assessment of number of staff needed for each stakeholder;

Budget for each type of activity and for each stakeholder;

Frequency and content of follow-up;

Content and purpose of the evaluation workshop to be conducted at the end of thefirst year;

Schedule to start the IRP implementation (transfer of fund, recruitment of staff,contract signing, purchase of inputs);

107. An evaluation workshop will be organized at the end of the first year. The purposeof the workshop is to assess difficulties and problems met during the first year; to shareinformation and lessons learnt; and to identify any additional assistance needed to meetproject objectives.

108. Based on the results of the first year evaluation workshop, a second year workplan will be prepared. This second work plan will identify all the changes to the IRP with areevaluation of the staffing and budget.

8.1 Implementation Roles

109. ADB and AusAID. To supervise activities and provide advice to CIPM and DDISconsultants.

110. Can Tho City PC; According to Vietnamese regulations, Can Tho City People’sCommittee is the sub project’s owner and is responsible for the implementation ofresettlement activities. Therefore, implementation of the RP, including implementation ofthe IRP, is part of their responsibilities. The CFLD as representative of the sub project’sowner will be part of the Working Group. The IRP will need approval from Can Tho CityPC.

Page 33: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 26 of 33

111. MOT is the executing agency (EA) and will oversee all subproject activitiesincluding RPs and IRP and approval of consulting services. Cuu Long CIPM is keeping theoverall responsibility in the implementation and supervision of the IRP. Its role is to:

Sign contract with implementing agencies (together with DDIS Consultant); Closely collaborate with local authorities, mass organizations and IRP Team during

the IRP implementation; and Prepare quarterly monitoring reports to be submitted to the ADB.

112. Detailed Design and Implementation Support (DDIS) Consultant. The DDISresettlement and livelihood specialists are in charge of the supervision and guidance forthe implementation of the IRP. Detailed tasks of CIPM/DDIS Consultant are presentedbelow:

Prepare list of beneficiaries; Organize the needs assessment meeting in each affected commune; Prepare detailed cost estimate; Sign contract with implementing agencies Transfer money timely (will be mentioned in the cooperation contract); Details on

the type of account and the transfer procedures will be discussed during FFMission.

Store and maintain accounting documents; Prepare regular disbursement reports; Create the database of interested affected households to reflect qualifications,

job experience, skills and desired occupation; Supervise and monitor the organizations of trainings, workshops, ending and

evaluation workshop for vocational trainings, job introductions in the scope ofCan Tho IRP;

Receive and assist DOLISA CT to resolve the comments, feedback from SAVHsabout the vocational trainings, workshops;

8.2 Other Implementation Issues

113. As the implementation of the IRP has to start as soon as possible, and thereforebefore the start of the support phase (planned by the third quarter of 2013), there is aneed to provide a new budget for implementation for the DDIS Consultant. Thisimplementation budget intends to cover the period between the end of the detaileddesign and the start of the implementation phase which is estimated at 1 year.

114. The cost of implementation for Can Tho City is included in the budget prepared forDong Thap province.

115. An office will be set-up in Can Tho City (Thot Not) District to implement the IRP. Allpermanent staff mobilized for the implementation of the IRP will be located at this office.All documents related to the IRP will also be gathered at the same place. This will ensure abetter efficiency and coordination for the implementation of the IRP.

Page 34: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 27 of 33

9. IRP IMPLEMENTATION SCHEDULE

116. The IRP will be implemented for a period of 2 years. The schedule provided belowis designed for one production cycle to be implemented within 2 years. The DDISConsultants will assist in the continuous implementation of the IRP and will provide back-stop support as and when necessary.

117. The proposed schedule for both agriculture activities and vocational trainingoperating small business is presented in the Figures below. The IRP is expected to start inMarch 2013. The tasks and schedule have been discussed and agreed with DARD, DOLISA,AEC, FU, VTC and WU during several meetings from May to August 2012.

Page 35: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Income Restoration Program – Can Tho City

Page 28 of 33

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8Approval of IRP by ADB/MOTIdentify nb of beneficiariesIdentify agricultural activitiesApproval of budget for Detailed Needs AssessmentSign MOU with stakeholdersConduct detailed need assessmentPrepare work plan for first yearApproval of budget by CIPM and MOT/ADBSign contract with AECTransfer of fund to AECConduct training to beneficiariesProvide inputs to beneficiariesImplementation and Follow-upOrganize first year evaluation workshopPrepare work plan for second yearFinal evaluation workshop

2013 2014 2015

Figure 9-1: Proposed Schedule for the Implementation of Agriculture Activities

Page 36: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Income Restoration Program – Can Tho City

Page 29 of 33

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 81 Approval of IRP by ADB/MOT2 Identify nb of beneficiaries3 Identify training activities & small businesses4 Approval of budget for Detailed Needs Assessment5 Sign MOU with stakeholders6 Conduct detailed need assessment7 Prepare work plan for first year8 Approval of budget by CIPM and MOT/ADB9 Sign contract with DOLISA

10 Transfer of fund to DOLISA11 Conduct training to beneficiaries12 Provide inputs for small businesses13 Implementation and Follow-up14 Organize first year evaluation workshop15 Prepare work plan for second year16 Final evaluation workshop

2013 2014 2015

Figure 9-2: Proposed Schedule for the Implementation of Training and Small Scale Business

Page 37: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Income Restoration Program – Can Tho City

Page 30 of 33

10. MONITORING AND EVALUATION

118. Internal Monitoring. The DDIS consultant will hold a series of meetings with theparticipants and develop a set of monitoring indicators at the beginning of the IRPimplementation. Monitoring forms will be developed accordingly. The Responsibleorganizations (AEC, DOLISA) together with the affected communes will prepare quarterlyprogress report on IRP implementation based on their respective coverage areas.

119. Issues identified for immediate action will immediately be referred to theconcerned office. Modifications in the various programs based on the monitoring,evaluation and lessons learned in the course of IRP implementation and additional fundsto cover additional activities and support to vulnerable households will be provided asand when necessary. MOT/CIPM will carry out its own monitoring and submit progressreports to ADB.

120. Contingencies have been set aside in any case that additional funds may beneeded as a result of changes in the various programs as per results of Monitoring &Evaluation.

121. The monitoring and evaluation will continue for each activity of the IRP as well asits outputs and impacts on socioeconomic and environment.

122. Activity Monitoring: Activity monitoring oversees the progress of scheduledactivities, one by one, and is usually highly quantitative (amount of participated people,extent of area, increase of income, etc.).

123. Outputs Monitoring: monitoring at the output level relates directly to the“product” of a given activity e.g. number of courses conducted, meetings held, livelihoodrestored, research conducted etc. Such data will often be collected anyway, as part ofroutine administration. As the outputs are linked closely to the activities, aspects ofbudget performance will form part of output monitoring (i.e. assessing the link betweenmoney spent and outputs achieved).

124. Goal/Impact Monitoring: In this program, goal/Impact refers to the project’sobjectives which the activity is designed to contribute to increased incomes and improvedlivelihood status.

125. Monitoring indicators are presented in Table 6.1.All monitoring indicators will begender-disaggregated when possible.

126. External monitoring. An Independent Resettlement Monitor will be hired duringthe first quarter of 2013. The detailed TOR for external monitoring are presented in theRP.

127. External monitoring will assess changes in: household income (sources andamounts) and expenditures, expenditure composition patterns, primary and secondaryoccupations, borrowing amounts and debt patterns, material conditions and possession

Page 38: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Income Restoration Program – Can Tho City

Page 31 of 33

of consumer items, land area and tenure arrangements, school attendance of children,health, and distances to public services and infrastructure. Separate meetings will be heldwith women and vulnerable households.

128. The external monitor is also expected to participate in two IRP evaluationworkshops, to be scheduled within the two-year IRP implementation period. Monitoringand evaluation period will be from Q1 2013 to Q4 2016.

Page 39: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 32 of 33

No. Activity Description Indicator Verification (Monitoring tools)1 Vocational trainings - Improve knowledge and skills

- Support to find new alternative job- No. of participants- Skills after training and capability in

finding job- No. of trainees who found new job- Income generating from the new job

- List of participants- Report from VTC and discuss with

trainees- Work contract with recruiting

companies- Interview with trainees

2 Consultations: Jobcreating andintroduction

- Affected persons are expected to finda new job or have orientation of theirfuture career.

- No. of consultations and no. oftrainees participating

- No. of participants who areintroduced new job

- List of participants- Report from DOLISA- Interview APs

3 Smallbusiness/servicemodel

- Providing a sustainable livelihoodalternative to SAVHs who havesufficient conditions and motivationfor conducting this model

- Other SAVHs will be benefited thanksto the replication of the model.

- Economic efficiency: added incomeper remained land, Profit/cost,

- No. of HH’s member involve- Successfulness of the model

(increased income, implementationskills and experience)

- Survey, interview with APs

- Workshops and HHs surveys

4 AgricultureExtension Models

- Providing a sustainable livelihoodalternative to HHs who havesufficient conditions and motivationfor conducting the models;

- Improving income of the agriculture-based HHs who have viable land;

- Creating immediate works toagriculture-based HHs;

- Economic efficiency: added incomeper remained land, profit/cost,

- Income/month; save cost (in cases offinding other job)

- No. of HH’s member involved,- Successfulness of the model

(increased income, implementationskills and lessons-learned)

- Survey, interview with APs

- Survey, interview with APs

- Workshops and HHs surveys

5 Technical trainingsand outputs ofagricultural models

- Providing HHs with technicaltrainings to conduct agricultureextension models successfully;

- Supporting HHs to find outputs foragricultural products

- No. of trainings, workshops/meetings,No. of participants;

- Skills of participated HHs- Number and/or quantity of outputs

sold by the HHs

- Review by Agriculture ExtensionCenter and Minutes of meetings,

- Participating training courses asobserver and interview the HHs;

Table 10-1. Monitoring indicators of IRP’s activities

Page 40: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Final Income Restoration Program – Can Tho City

Page 33 of 33

11. BUDGET

11.1 AHs Entitled to Income restoration Program

129. The budget is based on the results of the sample needs assessment extrapolated to thetotal number of entitled HH. It is estimated that a maximum of 171 HH will be entitled to incomerestoration measures in Can Tho City. Following the detailed needs assessment and the finalchoice of HH, the budget will be revised. The budgetary allocation will be based on the revisedbudget following detailed needs assessment. In addition, following the first year evaluationworkshop and the second-year work plan, the budget may be adjusted as required.

Agriculturalactivities

Vocationaltraining

Smallbusiness Total

N (sample need assessment) 78 30 64 172% (sample need assessment) 45.4 17.4 37.2 100.0Estimated HH Can Tho City 78 29 64 171

Table 11-1: Estimated Number of Type of Activities Chosen by HH

11.2 Total Cost Estimates

130. The total cost estimate for the Income Restoration Program in Can Tho City is 7 698870 900 VND equivalent to 369 250 USD as presented in the Table below. Appendix 4 presentsthe detailed cost estimate for each type of activity. As already mentioned, this budget will beupdated following the detailed need assessment.

131. We should note that most of the implementation costs (Consultant’s fees and expenses)are covered by the IRP prepared for Dong Thap Province. Implementation costs presented in thetable below cover only the renting and expenses of an office to manage the IRP.

No. Activity Amount in VND Equivalent to USD1 Agriculture Activities 2 567 086 000 123 1222 Training and Operate Small Business 3 391 044 000 162 6403 Support from Women's Union 975 761 000 46 7994 Support from CFLD 64 897 000 3 1135 Workshop for Needs Assessment 83 270 000 3 994

6 Implementation (DDIS Consultant) 250 200 000 12 000

7 Sub-Total 7 332 258 000 351 6678 CONTINGENCY : 5 % of Total Cost 366 612 900 17 583

9 TOTAL COST (6+7) 7 698 870 900 369 250

Table 11-2: Summary of Costs Estimates to Implement the Income Restoration Programin Can Tho City

Page 41: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 1 Draft MoU with DOLISA

Page 1 of 31

Appendix 1: Draft Memorandum of Understanding for Training and SmallBusiness

Between

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)

And

Department of Labor Invalids and Social Affairs of Can Tho City(DOLISA CT)

Regarding

The implementation of training and small-scale business for Severely Affected and VulnerableHouseholds (SAVHs) of the Central Mekong Delta Connectivity Project (CMDCP) in Can Tho City.

Based on the need for cooperation between Cuu Long Corporation for Investment, Developmentand Project Management of Infrastructure (Cuu Long CIPM) and Can Tho DOLISA (hereinafterrefer as Parties) to implement the IRP for SAVHs in Can Tho City.

We are under signing and having full legal ability to be responsible for our actions ourselves:

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)127B Dinh Thien Hoang Street, Ward 3, Binh Thanh District, HCMCRepresentative: Mr. Duong Tuan Minh – General Director of Tel: (08) 35103153 Hereinafter refersas Cuu Long CIPM.

And

Can Tho DOLISA30/4 Street, #18Ward 1, Cao Lanh City, Can Tho CityRepresentative: Mr. Do Minh Triet, Deputy Director Tel: 067 3859755Hereinafter refers as DOLISA CT

After discussions, both Parties agreed to sign the MOU as below:

Page 42: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 1 Draft MoU with DOLISA

Page 2 of 31

1. Purpose

Cuu Long CIPM (with the assistance and representative of DDIS Consultant) cooperateswith DOLISA CT to implement the training and small business activities for SAVHs ofCCMDP Project in Thot Not and Vinh Thanh Districts.

2. Working agreement

2.1 Purpose of IRP for training and operating small scale business The IRP aims to (a) create career opportunities through vocational trainings and job

creating activities; (b) provide technical advice or/and small business/service modelsfor those who want to venture into business

2.2 Responsibilities of Parties

A. Cuu Long CIPM/DDIS will: Prepare detailed cost estimate in order that DOLISA CT can disburse for the job and

vocational training activities of SAVHs on time; Transfer money timely (will be mentioned in the cooperation contract); Create the database of interested affected households to reflect qualifications, job

experience, skills and desired occupation; Supervise and monitor the organizations of trainings, workshops, ending and

evaluation workshop for vocational trainings, job introductions in the scope of CanTho IRP;

Receive and assist DOLISA CT to resolve the comments, feedback from SAVHs aboutthe vocational trainings, workshops;

Disclose and promote other cooperation activities (if any).

B. DOLISA CT will: Implement the vocational training and small scale business component for SAVHs of

CCMDP project in in Thot Not and Vinh Thanh Districts Disburse budget in a planned way according to guideline of DDIS Consultant to the

District/City Vocational Training Centers; Store and maintain accounting documents for auditing; Closed monitor the training and small business activities of SAVHs members and

report to Cuu Long CIPM timely; Establish and maintain linkages with the management of construction projects; Organize the monitoring and evaluation workshop

Page 43: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 1 Draft MoU with DOLISA

Page 3 of 31

C. District Vocational Training Centers will: Conduct training course suitable with trainees; Establish a program to provide information to the affected communes on the

availability of jobs through posting of job vacancies in the commune offices andthrough commune’s local radio (with the assistance of DDIS Consultant);

Coordinate with Cuu Long CIPM Consultant to conduct job fairs and providing jobconsultation for SAVHs.

Provide advice and conduct specific training courses on entrepreneurship. Householdswill be made aware of what to look into such as the right products, market situation,competition, amount of investments and potential profit, and risks involved;

Establish and maintain linkages with the management of construction projects; Coordinate with commercial, industrial and institutional establishments within the City

with the intention of identifying their manpower requirements (i.e. number,qualification, schedule of deployment, etc.) and securing agreements (quota for hiring)for deployment of qualified SAH members to fill job vacancies.

Provide follow-up to beneficiaries in order to assist and support training/operatingsmall business through regular visits;

Collaborate with Women’s Union for the follow up of beneficiaries;

3. General agreement:

This MOU is the basic requirement in order that the Project Donors, ADB/AusAID andthe owner of the Project (MOT), approve the mechanism to implement the IRP;

This MOU will be replaced by a cooperation contract between both Parties after theresults of the detailed needs assessment.

This contract will be made into 03 Vietnamese copies, each party keeps 01 copy withthe same legal value.

Can Tho, xx/03/ 2013

FOR Cuu Long CIPM

(Signed and sealed)

FOR DDIS Consultant

(Signed and sealed)

FOR DOLISA Can Tho

(Signed and sealed)

Page 44: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 2: Draft MoU with Agriculture Extension Center

Page 4 of 31

Appendix 2: Draft Memorandum of Understanding for Agriculture Activities

Between

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)

And

Agriculture Extension Center of Can Tho City

Regarding

The implementation of agriculture extension activities for Severely Affected and VulnerableHouseholds (SAVHs) of the Central Mekong Delta Connectivity Project (CMDCP) in Can Tho City;

Based on the need for cooperation between Cuu Long Corporation for Investment, Developmentand Project Management of Infrastructure and Agriculture Extension Center of Can Tho City(hereinafter refer as Parties) to implement the IRP for SAVHs in Can Tho City.

We are under signing and having full legal ability to be responsible for our actions ourselves:

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)127B Dinh Thien Hoang Street, Ward 3, Binh Thanh District, HCMCRepresentative: Mr. Duong Tuan Minh – General Director of Tel: (08) 35103153 Hereinafter refersas Cuu Long CIPM.

And

Agriculture Extension Center (AEC) under Department of Agriculture and Rural Development ofCan Tho City (DARD CT)Representative: Mrs. To Thi Bich Loan - Deputy Director161 Nguyen Thi Minh Khai,Ward 1, Cao Lanh City, Can Tho CityHereinafter refers as AECCT

Farmer’s Union of Can Tho City663 Le Dai Hanh, My Phu Ward, Cao Lanh City, Can Tho CityRepresentative: Mr. Pham Van Chuan – Vice PresidentHereinafter refers as FUCT

After discussions, both Parties agreed to sign the MOU as below:

Page 45: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 2: Draft MoU with Agriculture Extension Center

Page 5 of 31

1. Purpose

Cuu Long CIPM (with the assistance and representative of DDIS Consultant) cooperateswith DARD CT and AEC CT to implement the agriculture extension activities for SAVHs ofCCMDP Project in Can Tho City.

2. Working agreement2.1 Purpose of IRP

The IRP aims to maximize the use of remaining productive lands for food production andto develop raising/breeding and other models to stabilize the livelihood activities andsources of income of participants.

2.2 Responsibilities of PartiesA. Cuu Long CIPM/DDIS will:

Prepare detailed cost estimated for AEC CT in order that AEC CT can disburse for theagriculture extension activities of SAVHs on time. Transfer money timely (will bementioned in the cooperation contract);

Manage and monitor the organizations of trainings, workshops, ending and evaluationworkshop for agriculture extension activities in the scope of Can Tho IRP;

Receive and assist AEC CT to resolve the comments, feedback from SAVHs about theagriculture extension activities;

B. DAR CT/AEC CT will: Implement the agriculture extension activities for SAVHs of CMDCP project Can Tho

City; Store and maintain accounting documents; Disburse budget in a planned way (following the guidelines of DDIS Consultant) to AEC

at district level; Manage and monitor IRP’s agriculture extension activities for SAVHs Report results of activities and budget spending to Cuu Long CIPM/DDIS timely.

C. AEC at District/City level Provide training to SAVHs Provide veterinary services (for the animals provided under the IRP); Provide inputs (animals, plants etc.) to beneficiaries; Provide technical advices for SAVHs; Organize monitoring and evaluation workshop Organize the technical workshops related to agriculture extension for pilot SAVHs.

Page 46: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 2: Draft MoU with Agriculture Extension Center

Page 6 of 31

Households selected will be subject to trainings and will also be required to shareexperiences and train other affected households as well;

Implement agriculture models for SAVHs (designed with the assistance of theconcerned Farmers’ Associations, Women’s Unions, and affected households) such ascow/pig-raising, cow/pig-breeding, frog-raising, duck-raising, raising local varietychicken, raising eels, raising shrimps, planting sesame; soybean and vegetable;

Organize study tours for SAVHs members who will visit other livelihood models withinor outside Can Tho City as part of their training. They will also be made aware of therisks involved, for example, disease or death of animals due to lack of or increase inproduction inputs; or sudden drop in prices at the time of marketing and how theserisks can be avoided or mitigated;

Provide continuous support through technical training courses, and close monitoringof pilot projects to allow timely resolution of constraints and problems encounteredduring implementation.

D. Farmer’s Union will Provide information from the project to SAVHs Assist participant during the need assessment; Assist AEC and District and City Level in the follow-up Assist SAVHs in all activities; Report activities and result to AEC timely.

3. General agreement:

This MOU is the basic requirement in order that the Project Donors, ADB/AusAID andthe owner of the Project (MOT), approve the mechanism to implement the IRP;

This MOU will be replaced by a cooperation contract between both Parties after theresults of the detailed need assessment.

This contract will be made into 02 Vietnamese copies; each party keeps 01 copy withthe same legal value.

Can Tho, xx/03/ 2013

FOR Cuu Long CIPM

(Signed and sealed)

FOR DDIS Consultant

(Signed and sealed)

FOR AES

(Signed and sealed)

FOR FU

(Signed and sealed)

Page 47: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 3: Draft MoU with Women’s Union

Page 7 of 31

Appendix 3: Memorandum of Understanding with Women’s Union

Between

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)

And

Can Tho Women’s Union

Regarding

The gender strategy for Central Mekong Delta Connectivity Project (CMDCP); in Can Tho City

Based on the needs for cooperation between Cuu Long Corporation for Investment, Developmentand Project Management of Infrastructure (Cuu Long CIPM) and Can Tho Women’s Union(hereinafter refer as Parties) to implement the gender strategy in Can Tho City.

We are under signing and having full legal ability to be responsible for our actions ourselves:

Cuu Long Corporation for Investment, Development and Project Management of Infrastructure(Cuu Long CIPM)127B Dinh Thien Hoang Street, Ward 3, Binh Thanh District, HCMCRepresentative: Mr. Duong Tuan Minh – General Director of Tel: (08) 35103153 Hereinafter refersas Cuu Long CIPM.

And

Can Tho Women’s UnionNo 31 30/4 StreetWard 1, Cao Lanh City, Can Tho CityRepresentative: Mrs. Nguyen Thi Thu Thuy, Chairman Tel: 0191205056Hereinafter refers as WUCT

After discussions, both Parties agreed to sign the MOU as below:

Purpose

Cuu Long CIPM (with the assistance and representative of DDIS Consultant) cooperateswith CTWU to implement the Project Gender Strategy in Can Tho City : Thot Not District(Thoi Thuan Ward)l Vinh Thanh District (Vinh Trinh Commune)

Page 48: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 3: Draft MoU with Women’s Union

Page 8 of 31

4. Working agreement

2.3 Purpose of the Project Gender Strategy The gender strategy is founded on the recognition that men and women often experience

the impacts of land acquisition and resettlement in different forms and to differentextents by nature of their gendered roles in society;

Women also present certain aspects of vulnerability to infection different to those of menfor HIV/AIDS; Human Trafficking affected also mainly women.

The Women’s Union (from Provincial to ward/commune levels) will play an active andongoing role in planning and implementation activities associated with resettlement andother mitigation measures where these are noted to impact disproportionally on womenor where women’s meaningful participation is at risk.

Such roles would include participation in the HAPP/HTPP, resettlement committee, allpublic consultation activities, identification and implementation of livelihoodrestoration activities, counselling of women whose livelihoods are affected.

To this end the Women’s Union is to receive institutional strengthening and capacitybuilding measures from the project to enable their continuous engagement throughoutthe project implementation phase

2.4 Responsibilities of Parties

E. Cuu Long CIPM/DDIS will: Prepare detailed cost estimate in order that WU can disburse for the recruitment of

staff and job and vocational training activities; Transfer money timely (will be mentioned in the cooperation contract); Provide capacity building and training to WU on the Project Gender Strategy; Support and assist WU to resolve the comments, feedback from women about

resettlement activities and HIV/AIDS Human Trafficking Prevention Program;

F. WU will:

i. At provincial level Implement the Project Gender Strategy; Recruit competent staff Provide office space for gender strategy staff Provide support and guidelines to WU at district level: Discuss gender concerns in all project activities; Cooperate with other partners; Prepare monthly report on activities conducted and submit to CIPM;

Page 49: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 3: Draft MoU with Women’s Union

Page 9 of 31

Store and maintain accounting documents;

ii. At District and Commune Level

Support and assist women, especially women at risk of impoverishment, in allresettlement activities through consultation and ;

Discuss gender concerns in all project activities Support and assist women especially women at risk of impoverishment, in income

restoration activities; Provide training and assist women involved in small businesses; Assist consultant for the implementation of the HIV/AIDS and Human Trafficking

Prevention Program; Disseminate information among women;

5. General agreement:

This MOU is the basic requirement in order that the Project Donors, ADB/AusAID andthe owner of the Project (MOT), approve the mechanism to implement the IRP;

This MOU will be replaced by a cooperation contract between both Parties after theofficial approval of the Project Gender Strategy and the results of the detailed needassessment.

This contract will be made into 02 Vietnamese copies, each party keeps 01 copy withthe same legal value.

Can Tho, xx/03/ 2013

FOR Cuu Long CIPM

(Signed and sealed)

FOR DDIS Consultant

(Signed and sealed)

FOR WU

(Signed and sealed)

Page 50: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 10 of 31

Appendix 4: Detailed Cost Estimates1. COST ESTIMATES FOR AGRICULTURE ACTIVITIES

A AGRICULTURE ACTIVITIES

A-1 TRAINING ON AGRICULTURAL ACTIVITIES

A-1-a Cost for Training Course for 1 Trainee

Type of Training Days oftraining course

Unit cost/trainee/course

Admin. Cost(5%) / trainee/

course

Allowance forfood 15000đ &water (10000

đ)/trainee /day

Transportallowance/

trainee /course

Accomo-dation

allowance(60000đ)/

day

Total/Trainee

3+4+(5*2)+6+7

2 3 4 5 6 7 8Raising chicken/ducks 5 269 000 13 000 25 000 200 000 240 000 847 000Raising pig 7 402 000 19 000 25 000 200 000 360 000 1 156 000Breeding cow 7 402 000 19 000 25 000 200 000 360 000 1 156 000Breeding pigs 7 402 000 19 000 25 000 200 000 360 000 1 156 000Fish raising (1000 m2) 7 336 000 16 000 25 000 200 000 360 000 1 087 000Eel raising 6 369 000 18 000 25 000 200 000 300 000 1 037 000

A-1-b Total of detail estimated cost for Training on Agricutural Activities

Type of Training Nb trainee (seeNote 1)

Unit cost/trainee

Amount oftraining(VNĐ)

Equivalent to USD

1 3Raising chicken/ducks 23 847 000 19 481 000 935Raising pig 28 1 156 000 32 368 000 1 553Breeding cow 6 1 156 000 6 936 000 333Breeding pigs 6 1 156 000 6 936 000 333Fish raising (1000 m2) 8 1 087 000 8 696 000 417Eel raising 7 1 037 000 7 259 000 348Total 78 81 676 000 3 919Note 1. Number of HH involved in Agricultural activities; Based on sample need assessment extrapolated to estimated number of beneficiaries(see section 2.1 and 4.1.1, Table 4-2)

Cost for training/ 1 HH ( calculation based on Legal Basis: Decision 693/QD-UBND HC dated 09/08/2010; & decision No 1092/QĐ-UBND-HCdated 30/11/2011 of Dong Thap Province on Cost Level Approval for Vocational Training in Rural Area labour following Decision 1956/QD-TTg ofPrime Minister; Decision No 693/2010 /QĐ-UBND.HC , Dong Thap province

Page 51: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 11 of 31

A-2 INPUT FOR AGRICULTURAL MODELS

A-2-1 TYPE OF INPUTSNumber of animals necessary to implement agriculture models (based on data provided by the Agriculture Extension Centre of Dong Thap Province)

Raisingchicken/

ducks

Raising pig Breeding cow Breeding pigs Fish raising(1000 m2)

Eel raising

ParticIpants 23 28 6 6 8 7Number of animals 500 5 1 2 30 000 24Total animals 11500 140 6 12 240000 168

A-2-2 COST OF INPUTS

1 2 3 4Activities Nb of animals Unit cost

(today price)Amounts

( 3*4)Equivalent to USD

Raising chicken/ducks 11 500 18 000 207 000 000 9 933Raising pig 140 1 715 000 240 100 000 11 521Breeding cow 6 15 000 000 90 000 000 4 319Breeding pigs 12 7 000 000 84 000 000 4 031Fish raising (1000 m2) 240 000 1500 360 000 000 17 274Eel raising 168 60 000 10 080 000 484Total 991 180 000 47 561

Prices for animals to input agriculturalactivities are market prices ,which suppliedtemporary prices by Dong Thap provincecenter for Agricultural Extension and Farmsupplying chicken and pig breeds- Mrs.Giang Tel 0613834929

Legal Basis/Justification5

Page 52: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 12 of 31

B

B-1 NUMBER OF WORKSHOPS AND LOCATIONOrganize: one workshop one in Thot Notone after 1 year and one at the endParticipants number : DARD (1) AES staff (3), FU staff (5), WU Staff (5); beneficiaries (117) total :131

Location Cao Lanh city Lap Vo Town Participantsone time after 1 year 1 1 78one time at the end 1 1 78Total of workshop 2 2 156

B2 DETAILED ESTIMATED COSTS FOR WORKSHOPS

Contents Unit Cost Unit price of1 workshop

Cost for 4workshops

Equivalent to USD

1 2 3 4Renting meeting room 3 500 000 1 7 000 000 336 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Renting Projector ( . . .) 500 000 1 1 000 000 48 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Water for participants 50 000 80 16 000 000 768 Refer to Cir.192/2011/TT-BTC;Art.5(d)Issuance and delivery ofinvitations to HH; 1 day willinvite 15 HHs in commune 150 000 5 1 600 000 77 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Stationary 50 000 80 8 000 000 384 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))

Allowance for participants (for4 workshops) 75 000 78 11 700 000 561 Refer to Cir.192/2011/TT-BTC;Art.5(d)

Allowance for other local staffs(for 4 workshops) 150 000 5 1 500 000 72 Refer to Cir.192/2011/TT-BTC;Art.5(d)

TOTAL 46 800 000 2 246Allowance for participants is 1/2 labor day value ( 150000d/2 =75000 đ)

ORGANIZATION OF EVALUATION WORKSHOP:

5

Legal Basis/Justification

Page 53: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 13 of 31

C-1 BASIS TO CALCULATE WAGES FOR STAFF

Position quality Experiencefor work

Wage Wage levelcoefficient

Province , team leader Main Eng Over 9 years 5,42 5

Project officers Eng Over 4 years 3,66 5

Staffs at commune level cadre over 3 years 2,25 2

C-2

Requested positions Wagecoefficient

Basis Wage ODA projectallowance

cir.192/2011);art2( 1)

Monthly wage( 1*2*3)

1 2 3 4Province , team leader 5,42 1 050 000 1,5 8 536 500Project officers 3,66 1 050 000 2 7 686 000Staffs at commune level 2,25 1 050 000 2 4 725 000

C-3 ALLOWANCES FOR LOCAL STAFFSIt is estimated that local staff will work on the field durng 15 working days/month ( 2/3 month)

Requested positions

Accomodationallowance

(70000d)/trainee/ day*

(( 2/3 month)/ month)

Allowance(1000đ/1km

) about 15km/ month

for traveling

Total of allowances

Province , team leader 1 026 667 220 000 1 246 667Project officers 1 026 667 220 000 1 246 667Staffs at commune level 1 026 667 220 000 1 246 667

Refer to Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Refer to Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

MONTHLY WAGES FOR STAFF

5

Local staffs participate 12 months will be calculated allowances as artice 2 in Circular 192/2011/TT-BTC dated 26/12/2011 ): Coeficient of wageallowance: 1,5 ( 12months); 2 ( 24 months )

Legal Basis/Justification

Refer to Circular 204/2004/NĐ-CP dated 14/12/2004: salaryand wage coeficient ;Decree92/2009/ND-CP dated22/10/2009; for: function,quantity, some policies forcadres and officers incommunes, wards and

Legal Basis/Justification

Refer to Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Legal Basis/Justification

Refer to Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)Refer to Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)Refer to Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)

Page 54: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 14 of 31

C-4

Organization Number ofstaff

Months Monthly Wage Allowances( 2/3 month )

Amount of costin VND

Equivalentto USD

1 5 4 6DARD City level 1 12 8 536 500 1 246 667 117 398 000 5 633AES City level 1 24 7 623 000 1 246 667 212 872 000 10 215AES Thot Not District 1 24 7 623 000 1 246 667 212 872 000 10 215AES Vinh Thanh District 1 24 7 623 000 1 246 667 212 872 000 10 215FU Can Tho City 1 24 7 623 000 1 246 667 212 872 000 10 215FU Thot Not District 1 24 7 623 000 1 246 667 212 872 000 10 215FU Vinh Thanh District 1 24 7 623 000 1 246 667 212 872 000 10 215TOTAL 9 1 394 630 000 66 921

D LOGISTICS FOR IMPLEMENTATION OF IRP

Project Office for IRP Unit( Numberof staffs

Months Unit Cost(hire/month)

Amount in VND Equivalent USD

Office computers will be rent.Renting cost estimated at300.000đ/comp/month x8compu x 24 months)for 8 4 24 300 000 28 800 000 1 382Miscellaneous( fax, internet, etel, photocopy,stationary..) 5 24 200 000 24 000 000 1 152TOTAL 52 800 000 2 534* Price to rent computer and printer : base on information of Sieu thi Vien Thong 18/9/ 2012*Miscellaneous: stationary, telephone…for 24 months including internet etc.according to Circular No 219 /TT- BTC dated 19/11/2009 Ministry of Finance (MoF) Art. 7 (2) & Circular No 192/2011/TT- BTC of MoF Art. 5( d )

E SUB-TOTAL Amount in VND Equivalent USD2 567 086 000 123 122

ESTIMATED COSTS FOR LOCAL STAFFs

Page 55: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 15 of 31

2. COST ESTIMATES FOR VOCATIONAL TRAINING AND OPERATING SMALL-SCALE BUSINESS

A VOCATIONAL TRAINING AND OPERATING SMALL SCALE BUSSINESS ( DoLISA )

A-1 TRAINING COURSES

A-1-a

Vocational training courses Vocationaltraining types

Days oftrainingcourse

Unit cost/ per/course

Admin. Cost/per/ course

Allowance forfood/trainee(25000d/day)

TransportAllowance /

trainee

Accomodationallowance/

day

Estimated Cost/Trainee

4+5+(6*2)+7+8

1 2 3 4 5 6 7 8 9

Short training course (6 months) Electricity 90 615 000 31 000 25 000 200 000 5 340 000 8 436 000

Intermediate training course (1 year)Motorbikerepair 150 582 000 28 000 25 000 200 000 8 940 000 13 500 000

Training for small business Tailor 120 609 000 29 000 25 000 200 000 7 140 000 10 978 000

A-1-b Total Costs for Training

Type of Training Nb trainee(see table 1.1

)

Unit cost/trainee/course

Amount oftraining cost

(VNĐ)

Equivalent to USD

Short training course (6 months) 14 8 436 000 118 104 000 5 667Intermediate training course (1 year) 15 13 500 000 202 500 000 9 717Training for small business 64 10 978 000 702 592 000 33 714Total 93 1 023 196 000 49 098

B INPUT FOR SMALL BUSINESS MODELS

1 2 3 4Nb trainee Unit Cost

/HHTotal cost

(VND)Total cost

( USD )Short training course (6 months) 14 12 000 000 168 000 000 8 061

Intermediate training course (1 year) 15 15 000 000 225 000 000 10 797Input for small business (materials) 64 15 000 000 960 000 000 46 065TOTAL 93 1 353 000 000 64 923Input for small business (materials + equipment ): based on other similar projects *HCMC Long Thanh Dau Giay, SCCP)

Cost for Training Course for 1 Trainee

items

Page 56: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 16 of 31

C

C-1 NUMBER OF WORKSHOPS AND LOCATIONOrganize: Two workshops for in Cao Lanh City (Cao Lanh City and Cao Lanh District) after 1 year and at the endParticipants: DOLISA staff (1), VTC staff (2), WU Staff (4); trainees: 141; Total: 148

Location Cao Lanh city Lap Vo Town Participantsone time after 1 year 1 1 93one time at the end 1 1 93Total of workshop 2 2 186

C-2 DETAILED ESTIMATED COSTS FOR WORKSHOPS

ContentsUnit Cost Quantity Total for 2

WorkshopEquivalent to

USD1 2 3

Renting meeting room 3 500 000 1 14 000 000 672 Referto Cir.219/2009/TT-BTC;Art.7(2(d))Renting Projector ( . . .) 500 000 1 2 000 000 96 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Water for participants 50 000 95 19 000 000 912 Refer to Cir.192/2011/TT-BTC;Art.5(d)Issuance and delivery of invitationsto HH/( print invitation, write andinvite to HH ) estimated in 1 day willinvite 15 HHs in commune 150 000 7 4 000 000 192 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Stationary 50 000 95 19 000 000 912 Refer to Cir.219/2009/TT-BTC;Art.7(2(d))Allowance for participants (for 2workshops) 75 000 93 27 900 000 1 339 Refer toCir.192/2011/TT-BTC;Art.5(d)Allowance for other local staffs (for2 workshops) 150 000 5 3 000 000 144 Refer to Cir.192/2011/TT-BTC;Art.5(d)

TOTAL 88 900 000 4 266Notice:Allowance for participants is 1/2 labor day value ( 150000d/2 =75000 đ)

ORGANIZATION OF EVALUATION WORKSHOP:

Legal Basis/Justification

Page 57: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 17 of 31

D ESTIMATED COST FOR LOCAL STAFFSD-1 BASIS TO CALCULATE WAGES FOR STAFF

Positions QuanlityExperience

for workWage Wage level

coefficientProvince , team leader Main Eng Over 9 years

ofexperiences

5,42 5

Project officers Eng Over 4 yearsof

experiences

3,66 5

Staffs at commune level cadre over 3 years 2,25 2

D-2

Requested positionsWage

coefficientBasis Wage

ODA projectallowance

cir.192/2011);art2( 1)

Monthly wage( 1*2*3)

1 2 3 4Province , team leader 5,42 1 050 000 1,5 8 536 500Project officers 3,66 1 050 000 2 7 686 000Staffs at commune level 2,25 1 050 000 2 4 725 000

Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Local staffs participate 12 months will be calculated as artice 2 in Circular 192/2011/TT-BTC dated 26/12/2011 ):Coeficient of wage allowance: 1,5 ( 12months) 2 ( 24 months )

5

Circular 204/2004/NĐ-CPdated 14/12/2004: salaryand wage coeficientCircular 204/2004/NĐ-CPdated 14/12/2004: salaryand wage coeficientDecision No 92/2009 /ND-CP

MONTHLY WAGES FOR STAFF

Legal Basis/Justification

Legal Basis/Justification

Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Page 58: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 18 of 31

D-3 ALLOW ANCES FOR LOCAL STAFFSa It is estimated that local staff will work on the fie ld durng 15 working days/month ( 2/3 month)

Positions Totalallowance

Province , team leader 1,246,667 Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)Project officers 1,246,667 Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)Staffs at commune level 1,246,667 Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)

D-4

OrganizationNumber of

staffMonths

MonthlyW age

allowances( 2/3 month

)/ month

Amount inVND ( 4+6)*5

Equivalentto USD

1 5 4 6 8 9DOLISA City level - -Team leader 1 12 8,536,500 1,246,667 117,398,000 5,633Assistant 1 24 7,686,000 1,246,667 214,384,000 10,287Accounting specialist 1 24 7,686,000 1,246,667 214,384,000 10,287Vocational training center - -Project officer Thot Not District 1 12 8,536,500 1,246,667 117,398,000 5,633Project Officer Vinh Thanh District 1 24 7,686,000 1,246,667 214,384,000 10,287TOTAL 5 877,948,000 42,128

192/2011/TT-BTC Circular Article 2, Section 1. dependingwith rates are 1,5 for part time and 2 for full timeDecision No 219/2009/TT-BTC dated 19/11/2009 Artice 6 (3(b)and decision 40/2010/QĐ-UBND Dong Thap provinceAllowance for staying: circular No 219/2009/TT-BTC dated 19/11/2009 artice 6 (3), allowance for traveling: decision No40 dated 31/12/2010 Dong Thap province PC. Artice 2 ( 2)

if part-time basis shall be calculated as salary allowance with coefficient K=1.5 ; if full-time, in addition to salary plus

220,000

Legal Basis/Justification

ESTIMATED COSTS FOR LOCAL STAFF

220,000

Accomo- dationallowance

( 2/3 month )/ month

1,026,6671,026,6671,026,667

Allowance ( 1000đ/1km)about 15 km/ month

for traveling

220,000

Page 59: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 19 of 31

E LOGISTICS FOR IMPLEMENTATION OF IRP.

Project Office for IRP Unit(Numberof staffs

Months Unit Cost(hire/month)

Amount in VND Equivalent USD

Office computers will be rent.Renting cost:300.000đ/comp/month x 5 compu x24 months)for 5 staffs in 24 months 4 24 300 000 28 800 000 1 382Miscellaneous( fax, internet, etel, photocopy,stationary..) 4 24 200 000 19 200 000 921

48 000 000 2 303

* Price to rent computer and printer : base on information of Sieu thi Vien Thong 18/9/ 2012*Miscellaneous: stationary, telephone…for 24 months ( temporary calculation ) including internetaccording to Circular No 219 /TT- BTC dated 19/11/2009 Ministry of Finance (MoF); Art. 7 (2) & Circular No 192/2011/TT- BTC of MoF; Art.5 (d )

F SUB-TOTAL3 391 044 000 162 640

TOTAL

Page 60: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 20 of 31

3. SUPPORT FROM WOMEN’S UNION

A TRAINING ACTIVITIES BY WU

A-1 ESTIMATED COST PER TRAINEE

Days oftrainingcourse

Unit cost/per /course

Admin. Cost/per/ course

Allowance forfood/ trainee

/day

Transportallowance/

person

Accomodationallowance/

day

Total Cost/Trainee /course

3+4+(5*2)+6

2 3 4 5 6 7 8Vocational training courses(make artificial flowers ) 25 712 000 34 000 25 000 200 000 1 440 000 3 011 000Refer to Dec.No 693/2010/QĐ-UBND.HC .Art.1(II(3))

A-2 TOTAL TRAINING COSTS

Type of Training Nbtrainee

Unit cost/trainee

Amount oftraining cost

(VNĐ)

Equivalent to USD

1 3Vocational training courses

(make artificial flowers )25 3 011 000 75 275 000 3 612

Total 25 3 011 000 75 275 000 3 612

B INPUT FOR SMALL SCALE HANDICRAFT BUSINESS

1 2 3 4Nb

traineecost for

input/HH

Total cost(VND)

Total cost ( USD )

Input for handicafts (materials) 25 7 000 000 175 000 000 8 397TOTAL 175 000 000 8 397Input (equipment and materials for HHs estimated at : 7,000,000 đ/ HH based on current practices in WU's consultant

Training for handicaftsmodels

items

Page 61: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 21 of 31

C ESTIMATED COST FOR LOCAL STAFFSC-1 BASIS TO CALCULATE WAGES FOR STAFF

Positions Level Experiencefor work

WageCoefficient

Province , team leader Main Eng Over 9 yearsof

experiences

5,42

Project officers Eng Over 4 yearsof

3,66

Staffs at commune level cadre 2,25

C-2

Positions Wagecoefficient

Basis Wage ODA projectallowance

( cir.192/2011);art2( 1)

Monthly wage( 1*2*3)

1 2 3 4Province , team leader 5,42 1 050 000 1,5 8 536 500Project officers 3,66 1 050 000 2 7 686 000Staffs at commune level 2,25 1 050 000 2 4 725 000

C-3 ALLOWANCES FOR LOCAL STAFFSIt is estimated that local staff will work on teh field durng 15 working days/month ( 2/3 month)

Positions Total ofallowance

Province , team leader 1 246 667Project officers 1 246 667Staffs at commune level 1 246 667Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)

1 026 667 220 0001 026 667 220 0001 026 667 220 000

Accomdation allowance( 2/3 month )/ month

allowance ( 1000đ/1km) about15 km/ month

MONTHLY WAGES FOR STAFF

Legal Basis/Justification

5Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Legal Basis/Justification

Circular 204/2004/NĐ-CP dated 14/12/2004:salary and wage coeficientCircular 204/2004/NĐ-CP dated 14/12/2004:salary and wage coeficientDecision No 92/2009 /ND-CP of position andwage and policies for commune cadres

Local staffs participate 12 months will be calculated as artice 2 in Circular 192/2011/TT-BTC dated

Page 62: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 22 of 31

C-4

Organization Number ofstaff

Months Monthly Wage Totalallowances/

month

Amount inVND

( 4+6+7)*5

Equivalent toUSD

1 5 4 6 8 9City WU 1 12 8 536 500 1 246 667 117 398 000 5 633WU Thot Not District 1 24 7 686 000 1 246 667 214 384 000 10 287WU Vinh Thanh District 1 24 7 686 000 1 246 667 214 384 000 10 287WU Commune level 2 24 4 725 000 1 246 667 143 320 000 6 877TOTAL 5 689 486 000 33 085

D LOGISTICS FOR IMPLEMENTATION OF IRP.

Project Office for IRP Numberof staffs

Months Unit Cost(hire/month)

Amount inVND

EquivalentUSD

3 24 300 000 21 600 000 1 036

3 24 200 000 14 400 000 69136 000 000 1 727

* Price to rent computer and printer : base on information of Sieu thi Vien Thong 18/9/ 2012*Miscellaneous: stationary, telephone…for 24 months ( temporary calculation ) including internetaccording to Circular No 219 /TT- BTC dated 19/11/2009 Ministry of Finance (MoF); Art. 7 (2) & Circular No 192/2011/TT- BTC of MoF; Art.5 (d )

E SUB-TOTAL975 761 000 46 799

ESTIMATED COSTS FOR LOCAL STAFF

if part-time basis shall be calculated as additional salary allowance K=1.5 ; if full-time, in addition to salary plus allowance on

Miscellaneous ( fax, internet, etel,photocopy, stationary..)

TOTAL

192/2011/TT-BTC Circular Article 2, Section 1. dependingwith rates are 1,5 for part time and 2 for full timeDecision No 219/2009/TT-BTC dated 19/11/2009 Artice 6 (3(b)and decision 40/2010/QĐ-UBND Dong Thap province dated

allowance for staying: circular No 219/2009/TT-BTC dated 19/11/2009 artice 6 (3), allowance for traveling: decision No 40

Office computers (will be rent. Rentingcosts estimated at 300.000đ/comp/monthx 5 compu x 24 months)for 5staffs in 24months

Page 63: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 23 of 31

4. SUPPORT FROM CFLD

A PARTICIPATION OF THE CFLD TO THE WORKING GROUP

A-1 BASIS TO CALCULATE WAGES FOR STAFF

Positions Level Experiencefor work

WageCoefficient

Province , team leader Main Eng Over 9 yearsof

experiences

5,42

Project officers Eng Over 4 yearsof

3,66

Staffs at commune level cadre 2,25

A-2

Positions Wagecoefficient

Basis Wage ODA projectallowance

(cir.192/2011);

art2( 1)

Monthly wage( 1*2*3)

1 2 3 4Province , team leader 5,42 1 050 000 1,5 8 536 500Project officer 3,66 1 050 000 2 7 686 000

A-3 ALLOWANCES FOR LOCAL STAFFSIt is estimated that local staff will work on teh field durng 15 working days/month ( 2/3 month)

Positions Total ofallowance

Province , team leader 1 246 667Project officers 1 246 667Dec.No 40/2010/QĐ-UBND;art.2(2(a,b)

Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

Legal Basis/Justification

Circular 204/2004/NĐ-CP dated 14/12/2004:salary and wage coeficientCircular 204/2004/NĐ-CP dated 14/12/2004:salary and wage coeficientDecision No 92/2009 /ND-CP of position andwage and policies for commune cadres

MONTHLY WAGES FOR STAFF

Legal Basis/Justification

5Cir. 192 /2011/TT-BTC ;Art.2 ( 1 )

1 026 667 220 0001 026 667 220 000

Local staffs participate 12 months will be calculated as artice 2 in Circular 192/2011/TT-BTC dated

Accomdation allowance( 2/3 month )/ month

allowance ( 1000đ/1km) about15 km/ month

Page 64: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 24 of 31

A-4

Organization Number ofstaff

Months MonthlyWage

Totalallowances/

month

Amount inVND

( 4+6+7)*5

Equivalent toUSD

1 5 4 6 8 9Dong Thap CHLFD Expert 1 2 8 536 500 1 246 667 19 566 333 939Dong Thap CLFD Staff 1 4 7 686 000 1 246 667 35 730 667 1 715TOTAL 2 55 297 000 2 653

D LOGISTICS FOR IMPLEMENTATION OF IRP.

Project Office for IRP Numberof staffs

Months Unit Cost(hire/month)

Amount inVND

EquivalentUSD

2 24 200 000 9 600 000 4619 600 000 461

* Price to rent computer and printer : base on information of Sieu thi Vien Thong 18/9/ 2012*Miscellaneous: stationary, telephone…for 24 months ( temporary calculation ) including internetaccording to Circular No 219 /TT- BTC dated 19/11/2009 Ministry of Finance (MoF); Art. 7 (2) & Circular No 192/2011/TT- BTC of MoF; Art.5 (d )

E SUB-TOTAL64 897 000 3 113

Miscellaneous ( fax, internet, etel,photocopy, stationary..)

TOTAL

ESTIMATED COSTS FOR LOCAL STAFF

if part-time basis shall be calculated as additional salary allowance K=1.5 ; if full-time, in addition to salary plus allowance on192/2011/TT-BTC Circular Article 2, Section 1. dependingwith rates are 1,5 for part time and 2 for full timeDecision No 219/2009/TT-BTC dated 19/11/2009 Artice 6 (3(b)and decision 40/2010/QĐ-UBND Dong Thap province dated

allowance for staying: circular No 219/2009/TT-BTC dated 19/11/2009 artice 6 (3), allowance for traveling: decision No 40

Page 65: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 25 of 31

5. COST ESTIMATES FOR NEED ASSESSMENT WORKSHOP

Contents

Unit Cost unit price of1 workshop

Cost for 2workshops

Equivalent to USD

1 2 3

Renting meeting room 3,500,000 1 7,000,000 336 Cir.219/2009/TT-BTC;Art.7(2(d))Renting Projector ( . . .) 500,000 1 1,000,000 48 Cir.219/2009/TT-BTC;Art.7(2(d))

Water for participants 50,000 171 17,100,000 821 Cir.192/2011/TT-BTC;Art.5(d)Issuance and delivery of invitations toHH/(print invitation, write and invite toHH) estimated in 1 day will invite 15 HHs incommune 150,000 11 3,420,000 164 Cir.219/2009/TT-BTC;Art.7(2(d))Stationary 50,000 171 17,100,000 821 Cir.219/2009/TT-BTC;Art.7(2(d))Allowance for participants (for2 75,000 171 25,650,000 1,231 Cir.192/2011/TT-BTC;Art.5(d)Allowance for local staffs (for 2workshops) 150,000 40 12,000,000 576 Cir.192/2011/TT-BTC;Art.5(d)

TOTAL 83,270,000 3,994

legal basis

Page 66: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 26 of 31

6. COST ESTIMATES FOR IMPLEMENTATION

Specialist UNIT Quantity Rate(USD)

Total Payments Supportingdocuments Legal basis

1 FEES

1.1 International Resettlement Specialist

International ResettlementSpecialist, Intermitent Mobilization

Man/month

Covered by IRP Dong Thap Fixed price TimesheetBased on the DDIS - CIPM contract forthe international specialist titled"Resettlement Specialist"

1.2 National Resettlement/Social Specialists

Resettlement Specialist Man/monthCovered by IRP Dong Thap

Fixed price Timesheet Based on salary per month that haveconsultancy contract approved in thetitle national experts on resettlementand social.

Resettlement Specialist Man/month Fixed price Timesheet

Gender -Social Dev - specialist Man/month Fixed price Timesheet1.3 Sub Total Fees -2 EXPENSES

2.1International staff per diem/Accommodation- short term Day

Covered by IRP Dong Thap

Fixed price Timesheet Based on unit price of Consultantcontract

2.2 International Air Travel Trip Fixed price Timesheet Based on unit price of Consultantcontract

2.3

Miscellaneous Travel expenses inViet Nam (From HCMC to CT and DT2 trips/1 month) Trip

Fixed price Timesheet Based on unit price of Consultantcontract

2.4 Renting Office (located in Thot Not) Month 24 300 7,200 Cir.219/2009/TT-BTC;Art.9

2.5 Printer Item 24 00 4,800 Cir.219/2009/TT-BTC;Art.9

2.6

Rent a motorcycle to go to thecommunes, villages and households(rent of 800,000 VND / month / carx24 month x 1 motorbike) for theentire program

motorbike/month

Covered by IRP Dong Thap Refer toCir.219/2009/TT-BTC;Art.9

Sub Total Expenses 12,000 -Total 1+2 12,000 -

Page 67: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 4: Detailed Cost Estimates

Page 27 of 31

7. SUMMARY FOR COST ESTIMATES

No. Activity Amount in VND Equivalent to USD

1 Agriculture Activities 2 567 086 000 123 122

2 Training and Operation Small Business 3 391 044 000 162 640

3 Support from Women's Union 975 761 000 46 799

4 Support from CFLD 64 897 000 3 113

5 Need Assessment Workshop 83 270 000 3 994

6 Implementation 250 200 000 12 000

7 Sub-Total 7 332 258 000 351 667

8 CONTINGENCY : 5 % of Total Cost 366 612 900 17 583

9 TOTAL COST (6+7) 7 698 870 900 369 250

Page 68: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 5: Need Assessment Form for Agriculture Activities

Page 28 of 31

Appendix 5: Needs Assessment Form for Agriculture Activities

PHIẾU ĐÁNH GIÁ / EVALUATION ON

NHU CẦU VÀ KHẢ NĂNG THỰC HIỆN MÔ HÌNH KHUYẾN NÔNG/ NEED AND CAPACITYTO CONDUCT AGRICULTURE MODEL

1. Hộ bị ảnh hưởng nặng/SAHH: Tái định cư /Business Relocated Mất từ 10% đất nông nghiệp/ Lost 10% or more ofland or assess

2. Hộ dễ bị tổt thương/Vul.HHs: Hộ nghèo/ PoorGia đình chính sách/Phụ nữ đơn thân/ HH headed womanNgười tàn tật, bệnh hiểm nghèo(Ghi rõ là bệnh gì:……………………………)Trẻ em và người già neo đơn có hoàn cảnh khó khănNgười dân tộc thiểu số

I. THÔNG TIN TỔNG QUÁT / ABOUT THE HOUSEHOLD

1.1 Tên chủ hộ /Name of owner:………………………Tuổi/Age:…...Giới tính/Gender:

1.2 Nghề nghiệp /Occupation of owner: ……………………………………………….

1.3 Địa chỉ thường trú của hộ/Address: …………………………….…………………….

……………………………….................................Điện thoại/Tel: .………..……..……...

1.4 What is the household main source of income?............................

1.5 What is the household secondary source of income?.........................

1.6 Average monthly household income from main source of income:………………………………..VND/month

1.7 Average monthly household income from all source of income:…………………………………….VND/month

1.8 Do u have to relocate? 1. Yes 2. No

1.9 If yes, do u plan to relocated: 1. In a RS (which one); 2. Individually

II. NEED AND CAPACITY TO CONDUCT AGRICULTURE MODEL

2.1 Diện tích đất nông nghiệp còn lại sau khi bị thu hồi bởi dự án/Agriculture land viable after beingacquired by the project: ………………………..m2.

2.2 Số người trong độ tuổi lao động (hiện làm việc tại địa phương) của hộ gia đình/No. of labours who areworking in the local: ……người/person

2.5 Đánh giá các hoạt động chăn nuôi (heo, bò…), trồng trọt (cây ăn quả, rau…) mà gia đình Anh/Chị đã làmtrước đó/ what agricultural activities did you work on (such as poultry, pig/cow rearing or fruit,vegetable planting)?

Page 69: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

CMDCP Appendix 5: Need Assessment Form for Agriculture Activities

Page 29 of 31

TT/No

Tên các hoạt động/Activity

Năm bắt đầu/Started year

Thời gian /Crop/Cycle

(tháng/month)

Chi phí/ Cost(đồng/vụ/dong/crop)

Thu nhậpIncome

(dong/month)

2.3 Anh/Chị đã từng tham gia các khóa học khuyến nông tại địa phương hay không/ Did you participatedany training course?

Có/Yes Không/No

Nếu có, đó là các khóa học gì/If yes, what type of the training course:…………………………

Thời lượng tập huấn/Duration: …………………………………….

Nếu không, vì sao/ If no, why not? ……………………………………………………

2.4 Theo Anh/Chị, tại địa phương có thể thực hiện được mô hình chăn nuôi, trồng trọt gì? (ví dụ: nuôi bò,nuôi heo đẻ, nuôi ếch, nuôi vịt siêu thịt, gà ta, nuôi cá rô đồng trên ruộng lúa; trồng nấm …), vì sao/According to you, what agriculture models can be suitable with the local condition (e.g. cow, pig, duck,chicken raising or vegetable, mushroom planting…..) and why?

……………………………………………………………………………………………………

2.5 Anh/Chị có những kinh nghiệm gì để thực hiện được các mô hình chăn nuôi trồng trọt nói trên/ Do youhave any experience to conduct the agriculture demonstration?

……………………………………………………………………………………………………

2.6 Anh/Chị đang và dự định thực hiện mô hình chăn nuôi/ trồng trọt gì/ What demonstration/model areyou going to conduct?

……………………………………………………………………………………………………

Nguồn vốn để thực hiện/What is your source of capital? ………………………………………

2.7 Trong trường hợp Dự án hỗ trợ vốn và kỹ thuật cho hộ gia đình của anh chị để thực hiện mô hình chănnuôi và trồng trọt (nêu trên) tại địa phương thì anh/chị sẽ lựa chọn/ If provided with finance and technicalsupports, what demonstration do you want to conduct?

- Mô hình/Demonstration: ………………...…………………………………………………….

- Địa bàn thực hiện/ Place of implementation: …………………………………………………..

- Số người trong gia đình sẽ tham gia/ No. of member to participate: …………….người/person

- Tập huấn kỹ thuật/technical training: + Số người tham gia/No. of person:……….…;

+ Nội dung muốn được tập huấn/Subject to be train: ……………………

…………………………………………………………………………….

2.8 Các yêu cầu/mong muốn khác của hộ gia đình (về việc phân phối, thị trường tiêu thụ sảnphẩm,…)/ Do you have any other needs (e.g. delivery of products or outputs….)

……………………………………………………………………………………………………

CHÂN THÀNH CẢM ƠN ANH CHỊ / THANK YOU

Page 70: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

Page 30 of 31

Appendix 6: Needs Assessment for Vocational Training and Small Business

ĐÁNH GIÁ / EVALUATION FORMNHU CẦU NÂNG CAO NĂNG LỰC CHO CÁN BỘ ĐỊA PHƯƠNG / CAPACITY BUILDING TO

CONDUCT THE INCOME RESTORATION PROGRAM

Ngày/Day tháng/month năm/year 2013

I./ THÔNG TIN CÁ NHÂN /PERSONAL INFORMATION

1. Họ và tên/ Name:……………………………………ĐT/Tel: …………………………

2. Đơn vị công tác/Place of work: ……………………………………………………..….

3. Trình độ văn hóa/Education level:…… Trình độ chuyên môn/Professional level: ……

4. Vị trí công tác trong dự án (đề nghị)/Position applies for the project:…………...…….

5. Thời gian tham gia CT-PHTN của dự án /Duration of participation (tháng/man-month):…………………….…….................

6. What is the household main source of income?............................

7. What is the household secondary source of income?.........................

8.Average monthly household income from main source of income:………………………………..VND/month

9. Average monthly household income from all source of income:…………………………………….VND/month

10. Do u have to relocate? 1. Yes 2. No

11. If yes, do u plan to relocated: 1. In a RS (which one); 2. Individually

II./ ĐÁNH GIÁ NĂNG LỰC CÁN BỘ/ CAPACITY OF PARTICIPATING STAFF

12. Các chương trình đào tạo đã theo học/ What was your educational level?

Chương trình / Program Thời gianhọc /

Duration

Nơi học/ Place ofstudy

Ghi chú/Remark

1. Đại học/Bachelor2. Cao đẳng/ College3. Trung học chuyên nghiệp/Intermediate4. Các khóa tập huấn khác (kể tên)/ Othertraining (specify)4.1……………………………………….4.2……………………………………….4.3……………………………………….4.4……………………………………….4.5……………………………………….

Page 71: Income Restoration Program - Asian Development …...NOTE In this report, "$" refers to US dollars This income restoration program is a document of the borrower. The views expressed

Page 31 of 31

6. Kinh nghiệm làm việc có liên quan đến phát triển cộng đồng hoặc quản lý dự án…/ Experiencesregarding community development or rural project management?

Cơ quan đã làmviệc/Company have worked

for

Nội dung công việc/Position

Thời gian/Duration

Ghi chú/Remark

13. Kinh nghiệm xã hội khác / Other social experience:

………………………………………………………...……...……………………………

……………….…………………………..……………………….…………………..……

………………………………………….………………………………………………….

………………………………………….………………………………………………….

14. Thời gian có thể bố trí theo các buổi tập huấn nâng cao năng lực cán bộ:….……..… ngày/tuần /Please, tell us how many day per week you can arrange to follow the training for capacity buildingin conducting different activities of the project.

15. Những tài liệu, kiến thức cần bổ sung (theo kiến nghị của người được tập huấn)/ Whatnecessary knowledge and documents do you want to be provided?

……………………………………………………………………………………………

……………………………………………………………………………………………

16. Các đề xuất khác/ Other requirements:

……………………………………………………………………………………………

……………………………………………………………………………………………