Page 1: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

Pete CraigALLTERRA Construction Ltd

In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction

www.vertexenvironmental.ca

SMART RemediationVancouver, ON

February 11, 2016

SMART isPowered by:

Page 2: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

1

In Situ Stabilization and 3-D Environmental

Construction

Smart Methods in Advanced Remediation Technologies (SMART)VancouverFebruary 11, 2016

www.allterraconstruction.ca●250.658.3772 ●[email protected]●2158 Millstream Road, Victoria, BC V9B 6H4

Concepts for the Future of Ground Improvement

Page 3: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

2

State of the Practice:Solidification/Stabilization (S/S)and Isolation

Solidification – bind target in a solid block of low permeability material

Stabilisation – transform contaminants and reduce leachability

Page 4: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

3

Isolation - cut off contaminants from receptors

Page 5: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

4

Page 6: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

5

Page 7: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

6

EPA-542-R-07-012 (2005 Data)

Page 8: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

7

Portland cement, cement kiln dustFly ash - Class F and C (pozzolanic fly ashes)Lime - quicklime, hydrated lime, lime kiln dustSlag - ground granulated blast furnace slagSilicate, (super) phosphate, sulfateProprietary mixturesActivated carbonOrganoclay®

EnviroBlend®

Bentonite, ZVI/Bentonite

Reagents

Page 9: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

8

Excavator-mounted Soil Mixers

• Stick-mounted head & feed system• Walls to 7m+• High rate bulk (mass) mixing• Position, energy and dose control• Low vibration, fast• New heads, techniques

Page 10: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

9

Page 11: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

10

Page 12: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

11

Page 13: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

12

Page 14: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

13

Page 15: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

14

3D Construction

Page 16: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

15

Yingchuang (WinSun), Shanghai, 2015

MX3D, Amsterdam

Contour CraftingUSC (Behrokh Khoshnevis)

WASP Project, Italy

Page 17: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

16

Contour CraftingUniversity of Southern CaliforniaViterbi School of Engineeringhttp://www.contourcrafting.org/(Behrokh Khoshnevis)

Page 18: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

17

Page 19: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

18

Design Space Construction Space

“Cyberspace” “Meat Space”

• Modelling, simulation and scenario analysis• Visualization & fly-through for stakeholders• Accurate schedules, sequencing and quantities• Lean crews• Faster setup• No forms• Precise work• Detailed progress information• Extensive QA/QC data

Page 20: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

19

Increased Bearing CapacityReduced SettlementExcavation Support

Seepage ControlSeismic Stability

StabilisationSolidification

Isolation

Vancouver Island Conference Centre

Page 21: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

20

Vancouver Island Conference CentreSubsurface

(2006: Golder/GAIA)

Page 22: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

21

www.allterraconstruction.ca●250.658.3772 ●[email protected]●2158 Millstream Road, Victoria, BC V9B 6H4

Page 23: In Stabilization Emerging of 3...Pete Craig ALLTERRA Construction Ltd In Situ Stabilization and the Emerging World of In‐Situ 3‐D Environmental Construction SMART Remediation

22

Select Resources

Al Tabbaa, Amir, and Julia A. Stegemann (eds). 2005. Stabilisation/Solidification Treatment and Remediation - Advances in S/S for Waste and Contaminated Land. Proceedings of the International Conference on Stabilisation/Solidification Treatment and Remediation, 12-13 April 2005, Cambridge, UK. CRC Press. ISBN 978041537447.

Cement Association of Canada. Remediation of Contaminated Sites. http://www.cement.ca/en/Remediation-of-Contaminated-Sites.html

Conner, Jesse R. 1997. Guide to Improving the Effectiveness of Cement-Based Stabilization/Solidification. Portland Cement Association. ISBN 0-89312-176-2.

U.S. Army Corps of Engineers. 1995. Technical Letter No. 1110-1-158: Treatability Studies for Solidification/Stabilization of Contaminated Material. ETL 1110-1-158.

U.S. Environmental Protection Agency (US EPA). 2013. Superfund Remedy Report, 14th Edition. EPA-542-R-13-016.

US EPA. 2009. Technology Performance Review: Selecting and Using Solidification/Stabilization Treatment for Site Remediation. EPA-600-R-09-148

US EPA. 2007. Treatment Technologies for Site Cleanup: Annual Status Report (Twelfth Edition). EPA-542-R-07-012

Cory Hastings (ALLTERRA)

250.658.3772

[email protected]

Chuck Wilk (ALLU Group)

847.714.2754

[email protected]

Brian Wilson (Pacific Ground Engineering/Norland)

604.205.6866 

[email protected]

Brad Warrington (Brandt Tractor Ltd Positioning Technology Division/Topcon)

604.882.8888 

[email protected]

Contact Information