Page 1: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal
Page 2: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

1

In Situ Thermal Approaches toIn Situ Thermal Approaches to NAPL Remediation for RCRANAPL Remediation for RCRA

Corrective ActionCorrective Action

Jim CummingsJim CummingsOSRTI/OSWER/USEPAOSRTI/OSWER/USEPA

Page 3: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

WhyWhy In SituIn Situ Treatment?Treatment?

�� Avoid cost/risk of excavation/transportationAvoid cost/risk of excavation/transportation

�� Address contamination not readily amenable toAddress contamination not readily amenable to excavationexcavation�� Beneath buildings/structureBeneath buildings/structure�� Beneath water tableBeneath water table�� At DepthAt Depth

2

Page 4: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Beneficial Effects of IncreasedBeneficial Effects of Increased TemperatureTemperature

�� Increased VolatilityIncreased Volatility

�� Reduced ViscosityReduced Viscosity

�� (Slightly) Increased Solubility(Slightly) Increased Solubility

�� Mixture of Water and Contaminants boil at lowerMixture of Water and Contaminants boil at lower temperature than normal contaminant boiling pointtemperature than normal contaminant boiling point

�� Increased hydrolysis ratesIncreased hydrolysis rates

�� Thermal processes less affected by heterogeneityThermal processes less affected by heterogeneity

3

Page 5: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Heating ApproachesHeating Approaches

�� Steam Enhanced Extraction (SEE)Steam Enhanced Extraction (SEE)

�� Electrical Resistive Heating (ERH)Electrical Resistive Heating (ERH)

�� Thermal Conductive Heating/In SituThermal Conductive Heating/In Situ ThermalThermal DesorptionDesorption )ISTD)ISTD

4

Page 6: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

5

STEAM ENHANCEDSTEAM ENHANCED EXTRACTION (SEE)EXTRACTION (SEE)

Page 7: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

6

Steam Injection CrossSteam Injection Cross--SectionSection ––Visalia, Ca Pole Yard NPL SiteVisalia, Ca Pole Yard NPL Site

Page 8: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Visalia 1995Visalia 1995--97:97: 1.2M lb Creosote Removed1.2M lb Creosote RemovedQ A yield equivalent to 3500 years of pump-and-treat

204,000 lb 607,000 lb Prior to steam injection Vapor Hydrocarbon Free Product the removal rate was Burned In Boilers LNAPL & DNAPL

7

210,000 lb In Situ Destruction (Removed CO2)

195,000 lb Dissolved Hydrocarbon

Activated Carbon Filtration

approximately 10 lb per week

Page 9: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

ISTDISTDProcessesProcesses

QQ Thermal ConductionThermal Conduction into Soilinto Soil

QQ Vaporization of FluidsVaporization of Fluids and Contaminants withinand Contaminants within SoilSoil

QQ Collection of VaporsCollection of Vapors

QQ InIn--Situ Oxidation andSitu Oxidation and PyrolysisPyrolysis -- >95>95--99% In99% In--SituSitu DestructionDestruction

QQ Aboveground TreatmentAboveground Treatment of Vapors (may be simplerof Vapors (may be simpler than illustrated)than illustrated)

8

Page 10: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

9 EW-4 S-9 S-8

EW-3 S-7

S-14

EW-1

S-15

EW-2

Groundwater

Gradient

Visalia ProgressVisalia Progress Groundwater QualityGroundwater Quality ­-Pentachlorophenol & CreosotePentachlorophenol & Creosote

Before Treatment

Current (4/02)

PCP Creosote

(ppb) (ppb)

3,890 2,700

ND 5

Highest Recorded Concentrations Most Recent Concentrations

1,100 63,000

ND 752

105 10,600

ND 159

1,300 93,400

ND 2,550189 15,400

ND >1

371 544

3 3 0.58 ND ND ND

ND ND

Page 11: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Costs at VisaliaCosts at Visalia¾¾ Total Project CostTotal Project Cost -- $21.5$21.5 million 1996 through midmillion 1996 through mid--20012001¾¾ Unit Cost per Cubic Yard of Soil TreatedUnit Cost per Cubic Yard of Soil Treated

¾¾ Actual CostsActual Costs $57$57¾¾ With Lessons LearnedWith Lessons Learned $38$38

¾¾ Comparative Cost per Gallon of Creosote RemovedComparative Cost per Gallon of Creosote Removed¾¾ Pump and TreatPump and Treat $26,000$26,000 ¾¾ SteamSteam $130$130

¾¾ Estimated Time to Remove 1.2 Million Pounds of CreosoteEstimated Time to Remove 1.2 Million Pounds of Creosote¾¾ Pump and TreatPump and Treat 3,2503,250 yearsyears¾¾ SteamSteam 3 years3 years

10

Page 12: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

11

ELECTRICAL RESISTIVEELECTRICAL RESISTIVE HEATING (ERH)HEATING (ERH)

Page 13: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

12

FullFull--Scale ERH Subsurface XScale ERH Subsurface X--SectionSection

DNAPL

Co-Located Perimeter Electrode

with Deep and Shallow SVE Wells

Co-Located Internal

Electrode with Shallow SVE

Walnut Formation (Competent Bedrock)

Walnut Formation(Competent Bedrock)

Goodland Formation

Highly Weathered Limestone

Angled Co-Located

Electrode and SVE

AST

Sanitary Sewer

System

Silty Clay (Medium

Plasticity)

Silty Gravel

Shallow Ground

Rods

Temperature Monitoring Point with

Thermocouples

T

T

T

T

T

T

T

12’

26’

32’

2’

7’

12’

17’

22’

26’

32’

Silty Clay With Sand And Gravel

Seams

Courtesy of URS

Page 14: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

13

FullFull--Scale Implementation Scale Implementation Multiple ArraysMultiple Arrays

SPHArray

HeatingZone

Page 15: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

14

ERHERH -- TCE DNAPL RemediationTCE DNAPL RemediationAir Force Plant FourAir Force Plant FourFort Worth, TexasFort Worth, Texas

Photo Courtesy of

URS

Page 16: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

FullFull--Scale ERH at AF Plant 4Scale ERH at AF Plant 4

�� 1/2 acre area inside/outside of Bldg. 1811/2 acre area inside/outside of Bldg. 181 --manufacturingmanufacturing opnsopns 24/724/7

�� 70 electrodes and co70 electrodes and co--located Vapor Recovery wells in andlocated Vapor Recovery wells in and around existing tanks/ piping/equipment (around existing tanks/ piping/equipment (32° angles)32° angles)

�� Heterogeneous silt, clay and gravel with a highlyHeterogeneous silt, clay and gravel with a highly weathered limestone, competent bedrock at 32 ft bgweathered limestone, competent bedrock at 32 ft bg�� GroundwaGroundwater at 27 ft bgter at 27 ft bg

�� ERERH operations May to Aug 200H operations May to Aug 20022;; reducedreduced –– Dec ‘02Dec ‘02

�� GoalGoal –– AvgAvg 90% reduction based on a 95% UCL90% reduction based on a 95% UCL 15

Page 17: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

16

Angled Electrode BoringAngled Electrode Boring

Courtesy of URS

Page 18: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

17

ERH Remediation Beneath Air Force Plant Four

ERH Remediation BeneathERH Remediation BeneathAir Force Plant FourAir Force Plant Four

SVEpiping

electrical cable electrode

SVE well

Photo Courtesy of

URS

Page 19: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Continuous Indoor Air MonitoringContinuous Indoor Air Monitoring

�INNOVA System sampled air for TCE every 5 minutes

� Would shutdown ERH system if TCE >3 ppm

� Online remote monitoring

� Never exceeded background TCE concentrations inside Bldg. 181

Courtesy of URS

18

Page 20: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Maximum Subsurface TemperaturesMaximum Subsurface Temperatures AchievedAchieved

Dep

th (

ft b

gs)

0

-10

-20

-30

-40

Courtesy of URS

0 30 60 90 120

Temperature (Degrees C)

TMP5

TMP6

TMP7

TMP8

TMP9

TMP10

TMP11

TMP12

TMP13

TMP14

73 Deg C

19

Page 21: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Pre and Post Soil Data withPre and Post Soil Data with DepthDepth

TCE Concentration (ug/Kg)

0 100 0 200 0 3000 400 0 500 0 6000 700 0

6229

680

244

68

2838

2095

746

78

280

149

All non-detect

All non-detect

0-5

6-10

11-15

16-20

21-25

26-31

Depth (ft bgs)

Pre-ERH Data

Post-ERH Data

Courtesy of URS 20

Page 22: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

10,000

Final TCE ConcentrationsFinal TCE Concentrations

21

in Groundwaterin Groundwater

0

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

TC

E C

on

cen

trat

ion

(u

g/L

) 13-Nov 4-Sep

August July

June April

Site C leanup

Go al

10, 000

Outside of Remediation

Area

Monitoring Well Locations

Page 23: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Results at AF Plant 4Results at AF Plant 4

�� Area/Area/VolVol. treated:. treated: 22,000 sq. ft./27,400 c.22,000 sq. ft./27,400 c. ydsyds�� Average weekly power inputAverage weekly power input –– 563 kW563 kW �� Recovered ~ 1,600 lbs. TCERecovered ~ 1,600 lbs. TCE�� Met GW goal following 4 months ofMet GW goal following 4 months of opnsopns -- ~~

93%93% avgavg reduction in TCE GW conc.reduction in TCE GW conc.�� Met soil goalMet soil goal -- 90% average reduction90% average reduction�� TCE levels never exceeded background inTCE levels never exceeded background in

indoor breathing spaceindoor breathing space �� No impacts on manufacturingNo impacts on manufacturing opnsopns�� $57 per cubic yard$57 per cubic yard�� Evidence of heat enhanced biodegradationEvidence of heat enhanced biodegradation

22

Page 24: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

23

THERMAL CONDUCTIVETHERMAL CONDUCTIVE HEATING/IN SITU THERMALHEATING/IN SITU THERMAL

DESORPTION (ISTD)DESORPTION (ISTD)

Page 25: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

ISTDISTDProcessesProcesses

QQ Thermal ConductionThermal Conduction into Soilinto Soil

QQ Vaporization of FluidsVaporization of Fluids and Contaminants withinand Contaminants within SoilSoil

QQ Collection of VaporsCollection of Vapors

QQ InIn--Situ Oxidation andSitu Oxidation and PyrolysisPyrolysis -- >95>95--99% In99% In--SituSitu DestructionDestruction

QQ Aboveground TreatmentAboveground Treatment of Vapors (may be simplerof Vapors (may be simpler than illustrated)than illustrated)

24

Page 26: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

25

.

Process Trailer→

Heater Wells

Heater-Vacuum Well

ISTD: Simultaneous Application of Heat and VacuumISTD: Simultaneous Application of Heat and Vacuum

Heater-Vacuum Well

Hexagonal Well Pattern

Page 27: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

26

S. Glens Falls, NY Drag Strip (PCBs)S. Glens Falls, NY Drag Strip (PCBs)

Waste oil sprayed on soil

Sharp boundary of ISTD treatment zone

Page 28: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

27

Adjacent Residences, Portland,Adjacent Residences, Portland, ININ

ISTD Well Field

Page 29: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

28

ISTD at Former Shell BulkISTD at Former Shell Bulk Storage Terminal, Eugene ORStorage Terminal, Eugene OR

Page 30: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

ISTD at Eugene, OR (cont.)ISTD at Eugene, OR (cont.)

�� Maximum soil concentrations of 9,300 mg/kgMaximum soil concentrations of 9,300 mg/kg(DRO), 3,500 mg/kg (gasoline); GW 1,300(DRO), 3,500 mg/kg (gasoline); GW 1,300 µµg/lg/l (benzene);(benzene); �� as much as 7.9 ft of free product in monitoringas much as 7.9 ft of free product in monitoring

wells.wells. �� Gravel layer 1Gravel layer 1--4’, over silt to ~114’, over silt to ~11--16’ bgs.16’ bgs.

�� Project goals:Project goals: �� Removal of free product and benzeneRemoval of free product and benzene�� Closure of site under Oregon DEQ RBCA USTClosure of site under Oregon DEQ RBCA UST

programprogram

29

Page 31: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

Eugene, OR ISTD Project ResultsEugene, OR ISTD Project Results�� Free phase LNAPL removed from the 1Free phase LNAPL removed from the 1--acre siteacre site

�� Estimated 200,000 lbs of hydrocarbons removedEstimated 200,000 lbs of hydrocarbons removed and treated during 120and treated during 120--day heatingday heating

�� PostPost--remediation soil and GW samples below theremediation soil and GW samples below the ODEQ’sODEQ’s Tier 1 RiskTier 1 Risk--Based Concentrations:Based Concentrations:�� Benzene concentrations in GW w/in treatment area reducedBenzene concentrations in GW w/in treatment area reduced

from 1,300from 1,300 µµg/L tog/L to ≤≤2.502.50 µµg/L.g/L.�� PostPost--treatment offtreatment off--site GW samples below the analyticalsite GW samples below the analytical

detection limit (i.e., <0.5detection limit (i.e., <0.5 µµg/L)g/L)

�� Oregon DEQ issued a “No Further Action” letter forOregon DEQ issued a “No Further Action” letter for the site on March 14, 2000the site on March 14, 2000

30

Page 32: In Situ Thermal Approaches to NAPL Remediation for … · NAPL Remediation for RCRA NAPL Remediation for RCRA Corrective Action ... ISTD at Eugene , OR (cont.) ... In Situ Thermal

31

Information ResourcesInformation Resources

�� Jim CummingsJim Cummings�� 703703-- 603603--71977197�� [email protected]@epa.gov

�� Database:Database: cluin.orgcluin.org/products/thermal/products/thermal

�� Archived webArchived web--based seminar:based seminar: cluin.org/studio/naplcluin.org/studio/napl