• jv a, p11: i M, PWROG BWR OWNERS" GROUP P im q ) Owners Industry Plan to Assess Clad Performance Margins for LOCA PWR and BWR Owners Groups NRC Public Meeting August 12, 2010

Upload: others

Post on 09-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

• jv

a, p11: i M,

PWROG BWROWNERS" GROUP

P

imq

)

Owners

Industry Plan to Assess CladPerformance Margins for LOCA

PWR and BWR Owners GroupsNRC Public Meeting

August 12, 2010

Page 2: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Agenda

* Presentation Objectives" Background* Industry Response Activities" Industry Participation* Industry Approach" Milestones/Targets

* Anticipated Deliverables* Advantages* Conclusion

2

Page 3: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Presentation Objectives

* Provide an overview of industry planto provide an assessment of clad performancemargins in response to NUREG/CR-6967research findings.

* Present the project scope, process,and deliverables.

schedule

1 Receive feedback on project plan.

3

Page 4: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Background

* NRC LOCA research program identifiedpreviously unknown embrittlementmechanisms.

" NRC determined current 50.46(b) criteriaare not consistent with new high-burnupresearch findings.

* NRC requested plant-specific informationto support initial safety assessment(ML090340073) of sufficient cladperformance margin.

Page 5: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Industry Response Activities

Post - NRC April 28-29 2010 Workshop:* NEI followed up with NRC on information requests and

options for an industry response." Requests for clad performance margin assessments

conveyed to PWROG/BWROG (project authorizationsinitiated).

* Industry leadership met to determine clad performancemargin assessment scope, resource requirements,implementation and coordination logistics.

" PWROG/BWROG developed plan for clad performancemargin assessments as the first piece of industry plan tosupport 50.46(b) rulemaking and implementation.

5

Page 6: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Industry Participation" NEI - Policy, NRC Interface, Consensus

" RegTAC (EPRI-FRP) - Performance-basedrule language, fuel performance research, collaborationwith vendor test programs.

° PWR Owners Group - Joint clad performanceassessment project, 69 reactors.

° BWR Owners Group - Joint clad performanceassessment project, 35 reactors.

" Fuel Vendors: AREVA, GEH/GNF, Westinghouse -

Project management, clad performance assessments.

6

Page 7: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Industry Approach toClad Performance Margin Assessment

" Compile essential information for LOCA Analysesof Record: PCT; Max. Local Oxidation; Times above transitiontemperature; Evaluation Models.

* Group plants by key design basis features(e.g., NSSS type, fuel design, methodology).

" Identify plant and fuel cladding information that allowsconservatisms to be quantified/justified (e.g., App. K tobest-estimate LOCA methods; credits for LBLOCARedefinition where applicable).

" Perform additional sensitivity studies to evaluate otherconservatisms, if necessary.

" Complete report and provide to NRC.

7

Page 8: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

General Approach forClad Performance Margin Assessment

LOCA Criteria, ECR vs Hydrogen

18

16 - • N

14 N N -- N-- Proposed Limits I

0wj 8

6-

4 i2

00 100 200 300 400 500 600 700 800 900

Cladding Hydrogen, ppm

Page 9: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Illustration of Approach - Group A(Max. ECR = 10%, Older BE Method)

LOCA Criteria, ECR vs Hydrogen

18

16

14

12

10

8

- Proposed Limits

Current Limit f

0LU

6

4

2

00 100 200 300 400 500 600 700 800 900

Cladding Hydrogen, ppm

9

Page 10: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Milestones/Targets

* Develop project scope, resource requirements, andfunding requests - Complete

* PWROG/BWROG authorize projects - T= 0(Target September 2010)

* Vendors compile plant data - T+2 months* Vendors group plant data, perform sensitivity studies, assess

conservatisms - T+3 months* Vendors issue draft clad performance margin assessment report to

PWROG/BWROG forreview - T+4 months (January 2011)

* Vendors/OGs resolve comments - T+5 months(February 2011)

* NEI provides Clad Performance Margin Assessment toNRC - T+6 months (March 2011)

10

Page 11: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Anticipated Deliverables

For Each Plant Grouping:* Define group populations* Estimated PCT value(s) w/ credits" Estimated %ECR margin(s) w/ credits

* Time above 800 0C (breakaway oxidation)* Basis for acceptability of credits

" Inputs/assumptions needed to define cladperformance margins, if required

11

Page 12: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Advantages to Project Approach

* Efficient use of vendor, industry resources.

" Consistent approach for plants with similarmethods, systems, fuel designs, licensingbases.

" Supports implementation planning andresource management.

12

Page 13: imq POwners Industry Plan to Assess Clad Performance ... · * Industry leadership met to determine clad performance margin assessment scope, resource requirements, implementation

Conclusion

Industry project will provide a timelyassessment of clad performance marginsin response to NUREG/CR-6967 researchfindings.

13