improvement projects 2008

7
DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti New Packaging Line - Cambé Description of status after implementation •Direct Labor reduction (Reduction of 16 and avoidance of 8 FTEs) •Insource of Alu x Alu packaging •Increase of packaging flexibility and decrease of TPC (Alu x Alu forming station) •Avoidance of quality complaints (quality improvement) Saving Category Direct Labor reduction / Insource of 3rd party packaging Status before implementation Old-fashioned primary packaging line (Blipack 204) with impact on frequent customers complaints due to the lack of vision system requiring manual inspection of 100% of the blisters • Manual secondary packaging line requiring a large number of FTEs • Outsourcing of Alu x Alu blistering because Blipack 204 does not have forming station for Alu x Alu blisters • Additional FTEs would be required with the current setup to serve long term volume increase

Upload: marcelo-costa

Post on 24-May-2015

94 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Improvement Projects 2008

Page: 1, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

New Packaging Line - Cambé

Description of status after implementation•Direct Labor reduction (Reduction of 16 and avoidance of 8 FTEs)

•Insource of Alu x Alu packaging

•Increase of packaging flexibility and decrease of TPC (Alu x Alu forming station)

•Avoidance of quality complaints (quality improvement)

Saving CategoryDirect Labor reduction / Insource of 3rd party packaging

Status before implementation

• Old-fashioned primary packaging line (Blipack 204) with impact on frequent customers complaints due to the lack of vision system requiring manual inspection of 100% of the blisters

• Manual secondary packaging line requiring a large number of FTEs

• Outsourcing of Alu x Alu blistering because Blipack 204 does not have forming station for Alu x Alu blisters

• Additional FTEs would be required with the current setup to serve long term volume increase

Page 2: Improvement Projects 2008

Page: 2, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

New Packaging Line - Cambé

How we did it / once off costAcquisition of one full packaging line (primary and secondary) in order to eliminate existing Blipack 204, some secondary manual packaging and third party operation / Mio US$ 1,409

Date of implementation, responsible local project managerJan/09, Frederico Giunchetti (Engineering Head)

Annualized savings•Reduce of third party costs

•Headcount cost savings

•Headcount avoidance (Additional shifts)

Total savings:Th US$ 836/year

Page 3: Improvement Projects 2008

Page: 3, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

Packaging Outsourcing - Cambé

Saving Category 3rd party manufacturing

Status before implementation

Sandoz FTEs performing manual packaging of displays and operating the bottles filling equipment

Description of status after implementation Displays primary and secondary packaging outsourcing

Cost reduction with headcounts

Liberation of physical space to a new packaging equipment

How we did it / once off costOutsourcing products with low production and large quantity of FTEs / Th US$ 0

Date of implementation, responsible local project managerFeb, Sep, and Nov/08, Wilson Gonçalves (Packaging Head)

Annualized savingsTh US$ 64/year

Page 4: Improvement Projects 2008

Page: 4, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

Performance Increase (OEE) - Cambé

Saving Category Lean / OEE

Status before implementation Poor performance measurement and lack of improvement initiatives

OEE TABLETING 20,7% YTD 2007

OEE PACKAGING 26,5% YTD 2007

Description of status after implementation Implementation of performance KPIs and Process Improvement team

OEE TABLETING 41,8% (YTD SEP/08)

OEE PACKAGING 40,6% (YTD SEP/08)

How we did it / once off cost Better products allocation in packaging equipment,

Shop floor production planning,

TPM (Total Productive Maintenance) implementation

Small focused improvements on the equipment

Cost of Th US$ 57/year (TPM Consultancy)

Page 5: Improvement Projects 2008

Page: 5, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

Performance Increase (OEE) - Cambé

Date of implementation, responsible local project managerMar/08, Frederico Giunchetti (Engineering Head)

Annualized savingsImproving the Production Performance (Manufacturing and Packaging) in 2008, we have avoided 23 new

FTEs to perform the 2008 Volumes considering the 2007 performance

Total savings: Th USD 246/year

Packaging

37

45

0,39

0,46

26,5

40,6

-5

101520253035404550

2007 2008

Mio

Pac

ks,

OE

E%

0,34

0,36

0,38

0,40

0,42

0,44

0,46

0,48

Mio

Pac

ks/

FT

E

Volume Volume / FTE OEE

Temp. 9 11

0,39

FTE 95,5 116,1

Tableting

1.041

689

80,1

58,4

20,7

41,8

-

200

400

600

800

1.000

1.200

2007 2008

Mio

SD

U

-

10,0

20,030,0

40,0

50,0

60,070,0

80,0

90,0

OE

E%

, M

io S

DU

/FT

E

Volume Volume / FTE OEE

Page 6: Improvement Projects 2008

Page: 6, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

Throughput Time Reduction - Cambé

Saving CategoryLean / OEE

Status before implementation Total TPT in days: 45 days YTD 2007

Description of status after implementation Total TPT in days: 27,6 days YTD SEP/08

How we did it / once off cost A large number of improvement actions were implemented:

Tight inventory policy,

Better sales forecast accuracy,

Improvement in the Manufacturing and Packaging planning,

OEE measurement implementation,

Multi-disciplinary team focusing on troubleshooting, etc.

Date of implementation, responsible local project managerJan/08, Frederico Giunchetti (Engineering Head)

Page 7: Improvement Projects 2008

Page: 7, DRIVE Project – Projects of Common Interest – Sandoz Cambe / Frederico Giunchetti

Throughput Time Reduction - Cambé

Annualized savings