1 1 2 2 3 3 4 4 A A B B C C D D Drawn Date Drawing No. Sheet of Rev Nevco, Inc. Greenville, Illinois 62246 Dim "A" Dim "C" 8' max Pier Depth 24" Power In Important. Read before installation. This is not an engineered drawing. It is intended for representational purposes only. The dimensions called out on this drawing are intended to be used as a guide only, and are not intended to be suitable for all conditions. Information specific to the units being used, such as assembly instructions and electrical connections, may be found in the installation manual for that message center or sign. Nevco recommends that you consult a professional engineer or architect familiar with the area before attempting installation. They can verify that the selected mounting beams or posts along with the brackets, screws, and other hardware items provided by you or Nevco are adequate for your local soil conditions, wind loads and other conditions. If procedures are used that are not covered in this drawing, careful analysis of the installation is urged. Important. Read before installation. This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. All personnel who work with electrical connections must be educated in the safe procedures for installing and repairing electrical connections before they are given the responsibility of performing such tasks. Conduit and fittings are supplied by installer. 8" x 8" Square Steel Tube - supplied by others - see sheets 2 and 3 for thickness requirements. - A992 Steel (50ksi) Installation of Marquee Style Message Center and Sign BRS 8/27/2019 1 8 DWG-0171 3" minimum of concrete between post and earth Slope concrete away from post When Using Round Pipe: Optional adapter for 7 5/8" round pipe is available from Nevco See sheets 2 and 3 for pipe thickness requirements. (A992 Steel: 50ksi) B Note: See sheets 2 and 3 for weights, dimensions, column requirements and pier requirements. Dim "A" 33" Overall Depth 30 1/2" Cabinet Depth Dim "B"

Upload: others

Post on 16-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Dim "A"

Dim "C"

8' max

Pier Depth

24"

Power In

Important. Read before installation.This is not an engineered drawing. It is intendedfor representational purposes only. The dimensionscalled out on this drawing are intended to be usedas a guide only, and are not intended to be suitablefor all conditions. Information specific to the unitsbeing used, such as assembly instructions and electrical connections, may be found in the installationmanual for that message center or sign.Nevco recommends that you consult a professionalengineer or architect familiar with the area beforeattempting installation. They can verify that theselected mounting beams or posts along with the brackets, screws, and other hardware items provided byyou or Nevco are adequate for your local soil conditions,wind loads and other conditions. If procedures are usedthat are not covered in this drawing, careful analysis of the installation is urged.

Important. Read before installation.This sign is intended to be installed in accordance with the requirements of Article 600 of the National Electrical Code and/or other applicable local codes. This includes proper grounding and bonding of the sign. All personnel who work with electrical connections must be educated in the safe procedures for installing andrepairing electrical connections before they are given the responsibility of performing such tasks.Conduit and fittings are supplied by installer.

8" x 8" Square Steel Tube- supplied by others- see sheets 2 and 3 for thickness requirements.- A992 Steel (50ksi)

Installation ofMarquee Style

Message Centerand Sign

BRS 8/27/2019 1 8

DWG-0171

3" minimum ofconcrete between post and earth

Slope concrete awayfrom post

When Using Round Pipe:Optional adapter for 7 5/8" round pipe isavailable from Nevco

See sheets 2 and 3 for pipethickness requirements.

(A992 Steel: 50ksi)

B

Note: See sheets 2 and 3for weights, dimensions, column requirements andpier requirements.

Dim "A"

33" Overall Depth30 1/2" Cabinet Depth

Dim "B"

Page 2: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

EXPOSURE C

BRS

Installation ofMarquee Style

Message Centerand Sign

8/27/2019 2 8

DWG-0171

90 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" 1/8" 5' 6" 17' 3" 6123' 2' 6' 3/16" 1/8" 5' 6" 18' 3" 7203' 2' 8' 3/16" 1/8" 5' 6" 18' 3" 8464' 2' 8' 3/16" 3/8" 6' 19' 9" 9154' 2' 10' 3/16" 3/8" 6' 6" 20' 3" 960

130 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" 3/8" 7' 18' 9" 6123' 2' 6' 3/16" 3/8" 7' 6" 20' 3" 7203' 2' 8' 3/16" 3/8" 7' 6" 20' 3" 8464' 2' 8' 3/16" 3/8" 8' 21' 9" 9154' 2' 10' 3/16" 3/8" 8' 6" 22' 3" 960

150 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" Round Post Can't Be Used 7' 6" 19' 3" 6123' 2' 6' 3/16" Round Post Can't Be Used 8' 20'9" 7203' 2' 8' 3/16" Round Post Can't Be Used 8' 20' 9" 8464' 2' 8' 1/4" Round Post Can't Be Used 8' 6" 22' 3" 9154' 2' 10' 5/16" Round Post Can't Be Used 9' 6" 23' 3" 960

B

Chart Notes:1. Wind loading figured at Exposure "C" - Open terrain with scattered obstructions having heights generally less than 30 feet. This category includes flat open country, grasslands, and all water surfaces in hurricane prone areas.2. The dimensions in the charts were calculated using ASCE 7-05, IBC 2009 (pier depth), and the Manual of Steel Construction (13th Edition). Lateral bearing pressure was considered to be 150 psf/f.3. Although these calculations were made using the latest information, the information is intended to beused as a guide only, and are not suitable for all conditions. Nevco recommends you consult a professional engineer or architect familiar with the area before attempting installation. They will be familiar with local conditions, codes, etc. 4. All structural steel to be grade A992 (50 ksi) steel.

Page 3: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

EXPOSURE B

BRS

Installation ofMarquee Style

Message Centerand Sign

8/27/2019 3 8

DWG-0171

90 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" 1/8" 4' 6" 16' 3" 6123' 2' 6' 3/16" 1/8" 5' 17' 9" 7203' 2' 8' 3/16" 1/8" 5' 17' 9" 8464' 2' 8' 3/16" 1/8" 5' 18' 9" 9154' 2' 10' 3/16" 1/8" 5' 6" 19' 3" 960

130 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" 3/8" 6' 18' 9" 6123' 2' 6' 3/16" 3/8" 6' 6" 19' 3" 7203' 2' 8' 3/16" 3/8" 7' 19' 9" 8464' 2' 8' 3/16" 3/8" 7' 6" 21' 3" 9154' 2' 10' 3/16" 3/8" 8' 21' 9" 960

150 MPH

Dim "A" Dim "B" Dim "C" Post Thickness Post Thickness (Round Column) Pier Depth Length of Column Est. Weight2' 2' 6' 3/16" 3/8" 6' 6" 18' 3" 6123' 2' 6' 3/16" 3/8" 7' 19' 9" 7203' 2' 8' 3/16" 3/8" 7' 19' 9" 8464' 2' 8' 3/16" 3/8" 7' 6" 21' 3" 9154' 2' 10' 3/16" 3/8" 8' 21' 9" 960

B

Chart Notes:1. Wind loading figured at Exposure "B" - Urban and suburban areas, wooded areas, or other terrain with numerous closely spaced obstructions having the size of single-family dwellings or larger. These areas prevail in the upwind direction for a distance of 2600 feet or 20 times the structure height, whichever is greater.2. The dimensions in the charts were calculated using ASCE 7-05, IBC 2009 (pier depth), and the Manual of Steel Construction (13th Edition). Lateral bearing pressure was considered to be 150 psf/f.3. Although these calculations were made using the latest information, the information is intended to beused as a guide only, and are not suitable for all conditions. Nevco recommends you consult a professional engineer or architect familiar with the area before attempting installation. They will be familiar with local conditions, codes, etc. 4. All structural steel to be grade A992 (50 ksi) steel.

Page 4: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Installation ofMarquee Style

Message Center and Sign

BRS 8/27/2019 4 8

DWG-0171

Step 1. Install 8 x 8 steelpost in concrete. Make surepost is plumb and concreteis set before installing signsor message centers.

7/8" electricalholes to be at

90 degrees fromface of sign/

message center (if running wires

inside of tube -see sheet 5)

Step 2. Install message centers on horizontal frame using 3/8 x 1¼ bolts and washers supplied by Nevco.

3/8 x 1¼ bolts and washers.Six required for each side

of each frame (24 total)

B

Page 5: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

Welding Detail

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Installation of Marquee Style

Message Centerand Sign

BRS 8/27/2019 5 8

Step 3. Lift message centersand frame using lifting bracketssupplied by Nevco. Use 1/2" x 2"bolts, washers and nuts. Position assemblyover post (use a stop weldedto the post at the desired heightto aid in this step).

Step 4. Lower assembly down post to desired location. Thereis approximately 1/4" gap betweenframe and post. Use spacers shownabove to center on post and weld or bolt (5/8 x 10" supplied by others) to post as required.

Spacer

Use four spacers each ontop and bottom frame tocenter on post. Slide spacerdown so that top flange restson top framework. Slide spacer up on bottom framework.

DWG-0171

Attach cables to liftbrackets here

B

1/47018

Page 6: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Installation ofMarquee Style

Message Centerand Sign

BRS 8/27/2019 6 8

Step 5. Assemble Signsto framework as describedin Step 2. If installed,remove the sign faces to aid in the next two steps. Step 6. Install signs

and framework asdescribed in step 4. Use spacers on top frame to ensureassembly is centered on post.

Bolt top message centerframe to bottom sign

frame to stabilize signson post (both sides).

Use 1/2" x 2" bolts suppliedby Nevco.

DWG-0171

Use lift bracketsshown in step 3.

B

Page 7: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

DETAIL D

D

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Installation ofMarquee Style

Message Centerand Signs

BRS 8/27/2019 7 8

DWG-0171

Main Power In (Adjust circuits asrequired; refer tochart below)

Amps @ 120V per cabinet 20mm color 3 x 8 - 8.8 4 x 8 - 12.3 4 x 10 - 15.8 32/16mm monochrome 2 x 6 - 1.8 3 x 6 - 2.7 3 x 8 - 4.9 4 x 8 - 6.5 4 x 10 - 7.9

Installation with conduitoutside of steel tube Installation with wire

inside of steel tube

Main Power(Adjust circuits asrequired; refer tochart below)

"Signal Out" from 'PARENT'message center to "Signal In"on 'CHILD' message center - cable supplied by Nevco- Ethernet (straight through)

20 AMP CIRCUIT REQUIREMENTS (8' WIDE MARQUEE)Sign Height 16 or 32mm MC 3 ' Tall 16 or 32mm MC 4 ' Tall 20mm MC 4' Tall

2' 1 circuits required 2 circuits required 2 circuits required

20 AMP CIRCUIT REQUIREMENTS (10' WIDE MARQUEE)Sign Height 16 or 32mm MC 4' Tall 20mm MC 4' Tall

2' 2 circuits required 3 circuits required

Message Center Rain-Tight BoxInstall box on framework (see print 275-0567)

Signal from rain-tightbox to "Signal In" onPARENT message center

Photocell/TempSensor (see printDWG-0693) Photocell/Temp

Sensor (see printDWG-0693)

Client Bridge(see print 275-0567)

Client Bridge(see print 275-0567)

Message CenterRain-Tight BoxInstall box on framework (see print 275-0567)

"Signal Out" from 'PARENT'message center to "Signal In"on 'CHILD' message center - cable supplied by Nevco- Ethernet (straight through)

Note: Refer to print 275-0567 for details on connecting power and signal to message centers.

Black - LINEWhite - NEUTRALGreen - GROUND

Sign Power

Sign Power

Signal from rain-tightbox to "Signal In" on

PARENT message center

B

Signs (per sign)2 x 6 - 0.62 x 8 - 0.9 2 x 10 - 1.1

20 AMP CIRCUIT REQUIREMENTS (6' WIDE MARQUEE)Sign Height 16 or 32mm MC 2' Tall 16 or 32mm MC 3' Tall

2' 1 circuit required 1 circuit required

Connect power to2x4 boxes on signsand message centers

Page 8: Important. Read before installation. Nevco recommends that ... Centers... · post in concrete. Make sure post is plumb and concrete is set before installing signs or message centers

STEP THREE

STEP ONE

STEP TWO

DETAIL Vertical Angle

1

1

2

2

3

3

4

4

A A

B B

C C

D D

Drawn Date

Drawing No.

Sheet of

Rev

Nevco, Inc. Greenville, Illinois 62246

Install Trim Pieces

Installation ofMarquee Style

Message Centerand Sign

BRS 8/27/2019 8 8

DWG-0171

Drill screw small anglepieces (both sides) to frame as shown set in approx. 1/8" from end of display.

Mount vertical anglepieces to small angles

as shown using (4) 1/8"pop rivets at each joint.

Rivet vertical anglesto small angles using

(4) 1/8" rivets top and bottom (supplied by

Nevco)

Drill screw top trim piece to frame: - Trim fits between cabinets.- Drill screw every 10 inches both sides.- Caulk both seams

Drill screw bottom trim pieces to frame:- Trim fits between cabinets- Drill screw every 10 inches

Note: Mount top and bottom trim pieces aftermounting side trim

Install Side Trim:- Drill screw to vertical angles- Drill screw every 10 inches- Mount before mounting top

and bottom pieces

B