iiird seasearch full group meeting limassol, cyprus tuesday may 25-27, 2004 seadatanet-design study...

21
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposa

Upload: dwayne-craig

Post on 02-Jan-2016

219 views

Category:

Documents


1 download

TRANSCRIPT

IIIrd SeaSearch Full Group Meeting

Limassol, Cyprus Tuesday May 25-27, 2004

SeaDataNet-Design Study proposal

2

lfre

mer

SeaDataNet-DSMay2004

Rationale and overall objectives

The key of the success of scientific and technical oceanographic projects are the speed and the ease, which wich users can identify, locate, access exchange and use marine data and informationSeaDataNet infrastructure aims to integrate and develop, in the context of new communication technology, past actions undertaken to secure, standardize and make available Pan-European marine data, meta-data and products.

3

lfre

mer

SeaDataNet-DSMay2004

SEADATANET Long Term Key Objectives

To give an easy access to marine data currently collected by hundredths of organisations under as many different systemsTo construct a standardized system for managing the large and diverse data sets collected by the oceanographic fleets and the new automatic observation systems. To prepare synthetic value added information products

4

lfre

mer

SeaDataNet-DSMay2004

SeaDataNet concept

Based on a semi-distributed model that incorporates, but enhances, the currently existing infrastructures and technology:Networking of the data centres in a unique virtual data management system to provide on-line access to integrated data sets from the various sources. Development of common standards based on ISO19115 and Marine XML Use of the most adapted communication technology.

5

lfre

mer

SeaDataNet-DSMay2004

Steps of development

The project presents several technical and organizational challenges, which make necessary to progress by steps to get a fully operational system:

1. Design Study2. Development and start of System

Implementation 3. Operation and Maintenance of the

system on routine mode, with adaptability to other new observations and new technologies

6

lfre

mer

SeaDataNet-DSMay2004

Step 1: SeaDataNet-Design Study

Full title: Pan-European infrastructure for Ocean & Marine Data management – Design Study for on line integrated data access to distributed heterogeneous systems Specific objective: to prepare a blue print for the infrastructure, to create a prototype portal, organize and test the networking, to explore expansion of the network from NODC’s to other major institutes, and to report on feasibility, expected costs and funding options, nationally and internationallySubmitted: March 2004 – proposal reference number: FP6-011990

7

lfre

mer

SeaDataNet-DSMay2004

Design Study Partnership: 42 partners from 35 countries

8

lfre

mer

SeaDataNet-DSMay2004

SeaDataNet-DS Workpackages

WP1: ManagementWP2: Prototyping of the software componentsWP3: StandardsWP4: Data and products BenchmarkWP5: Market Research WP6: Financial planning and funding WP7: Preparation of the implementation and operation plan

9

lfre

mer

SeaDataNet-DSMay2004

WP 1 Project Management

Task Year 1 Year 2 Year 3

1.1 Prj. administration & monitoring

                                   

1.2 Steering Committee

                                   

1.3Advisory Board

                                   

1.4 Co-ordination & plenary meetings

                                   

10

lfre

mer

SeaDataNet-DSMay2004

WP2: Prototype architecture

User portal

SeaDataNet-DS Virtual Private Network

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

User portal

NE-Atlantic Node E-Mediterranean Node

W-Mediterranean Node

Black-Sea Node

Normalization Interface

Baltic Database

Normalization Interface

North-EastAtlantic

Database

Normalization Interface

EasternMediterranean

Database

Normalization Interface

Black Sea Database

Normalization Interface

WesternMediterranean

Database

Baltic Node

11

lfre

mer

SeaDataNet-DSMay2004

System viewed from the data manager side

Sea

Dat

aNet

-DS

Virt

ual N

etw

ork

New availablearchived data set

Local Database

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

ReplicatedCommonCatalogue

NearestReplicatedCommonCatalogue

Checkingtagginginsert

Updatebroadcast

12

lfre

mer

SeaDataNet-DSMay2004

System viewed from the user side

UserUser

portalNearest

ReplicatedCommonCatalogue

Sea

Dat

aNet

-DS

Vir

tual

Dat

a N

etw

ork

Local normalization interfaces

13

lfre

mer

SeaDataNet-DSMay2004

WP2: Prototyping of the software components

Task Year 1 Year 2 Year 3

2.1Technical specifications for the network and communication protocol

                                   

2.2 Specification for the common catalogue

                                   

2.3 Development of the common catalogue

                                   

2.4 Specification for the prototype web portal

                                   

2.5 Development of the prototype web portal

                                   

2.6Specifications for the local normalisation interfaces

                                   

2.7Development of the normalisation interfaces by each data centre

                                   

2.8 Quality assurance of software

                                   

2.9Technical co-ordination and specifications for implementation phase

                                   

14

lfre

mer

SeaDataNet-DSMay2004

WP3: Standards

Tasks Year 1 Year 2 Year 3

3.1Tagging system and content of the common catalogue

                                   

3.2Quality assurance for data and meta data

                                   

3.3Exchange formats for data

                                   

3.4Quality assurance for services and products

                                   

3.5QC manual for the test phase

                                   

3.6Co-ordination and reporting on standards

                                   

15

lfre

mer

SeaDataNet-DSMay2004

WP4: Benchmark Data & Products

Tasks Year 1 Year 2 Year 3

4.1Specification and compilation of national benchmarks

                                   

4.2Integration and QC of Benchmark data sets from national sources

                                   

4.3Specification for benchmark products

                                   

4.4Development of benchmark products

                                   

4.5QC of benchmark products

                                   

4.6

Co-ordination and reporting on data, meta-data and product management

                                   

16

lfre

mer

SeaDataNet-DSMay2004

WP5: Marine Data Marketing

Tasks Year 1 Year 2 Year 3

5.1 Inventory of national data users

                                   

5.2 Inventory of national potential providers

                                   

5.3International data sources and interfaces

                                   

5.4 Market the users and providers

                                   

5.5 Coord. & reporting - data market

                                   

17

lfre

mer

SeaDataNet-DSMay2004

WP6: Financial Planning & Funding

Tasks Year 1 Year 2 Year 3

6.1National funding

                                   

6.2International funding

                                   

6.3Infrastructure costs

                                   

6.4Coord. & reporting on financial issues

                                   

18

lfre

mer

SeaDataNet-DSMay2004

WP7: Implementation Plan

Task Year 1 Year 2 Year 3

7.1 Organisation of the prototype system

                                   

7.2 Monitoring the prototype system

                                   

7.3Performance analysis

                                   

7.4Blueprint & implementation planning

                                   

19

lfre

mer

SeaDataNet-DSMay2004

Prototype technical analysis& development

Balticnode

NE Atlantic node

W Mediterraneannode

E Mediterranean node

Black Sea node

Standards Quality

Assurance

Prototype data, metadata

and product benchmarking

study

Organisation &monitoring

Financialplanning

and fundingexploration

MarketResearch

Advisory Board

Steering Committee

CoordinationProject Office

Technical coordination

EC representative

National coordination

Fig.5 : SEADATANET-DS Management Tasks Organization

20

lfre

mer

SeaDataNet-DSMay2004

Budget requested

shared cost project total budget 5.4 M€2.7 M€ requested to EC

the tables in the proposal indicate the calculations by tasks and partners according to the kind of tasks and institutes (FC or SC) and the way the overheads should be includedAs the total should be no more than total budget/2., it has been necessary to apply some general reduction coefficient about 0.8 on the tasks costs. Final budget proposed in form A3

21

lfre

mer

SeaDataNet-DSMay2004

Next steps

June : EC project reviewJuly : reviewers comments ?Fall: contract negociation or resubmission ?

information will be dissemnated as soon as received

to the mailing list (official coordinators +)on the project web site:

WWW.seadatanet.org