Schedule of Quantities
I No. Description of Item Qty Unit
Sub. Head: - Earth work
1
4512.00 Cu.m.
2
2670.00 Cu.m.
3
(a) All kinds of soil. 3992.00 Cu.m.
4
2245.00 Cu.m.
NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (FDallupura) and Strenthening /Improvement of riding quality and construction of storm
Disposal and carriage of excavated malba, lime,moorum and earth etc by machenical transportincluding loading, unloading and stacking for all leadsand lifts (Beyond initial lead of 50 m , lift upto 1.5 mor as per direction of Engieer - in - Charge )
Earth work in excavation by mechanical means(Hydraulic excavator) / mannual labour over areas(exceeding 30cm in depth, 1.5m in width as well as 10sq.m.on plan) i/c disposal of excavated earth lead upto50m and lift upto 1.5m, .disposed earth to be levelledand neatly dressed.
Earth work in excavation by mechanical means(Hydraulic excavator) / mannual labour in foundationtrenches or drain (not exceeding 1.5 m in width or 10sqm.on plan) including dressing of sides and ramming
of bottom lift up to 1.5 m including getting out theexcavated soil as directed with in a lead of 50m.
Filling available excavated earth (excluding rock) intrenches, plinth sides of foundations etc. in layers notexeceding 20cm in depth: consolidating each
deposited layer by ramming and watering lead upto50m and lift upto 1.5m.
-
8/8/2019 IIIrd RA Bill Dallupura
2/351
5
555 Cu.m.
Sub. Head: - Concrete Work
6
(a)
260.00 Cu.m.
(b)
32.00 Cu.m.
Sub. Head: - Reinforced Cement Concrete Work
Desilting of drains by getting out the manure/ sludgerubbish etc in or under water or liquid mud in foulposition in restricted working condition i/c disposal ofexcavated material by machenical transport includingloading, unloading and stacking for all leads and lifts(Beyond initial lead of 50m, lift upto 1.5m or as perdirection of Engieer - in - Charge)
P/L in position cement concrete of specified gradeexcluding the cost of centering and shuttering all workupto plinth level.
1:5:10 ( 1 cement : 5 coarse sand : 10 graded stoneaggregate 40 mm nominal size).
1:2:4 ( 1 cement : 2 coarse sand : 4 graded stoneaggregate 20 mm nominal size).
-
8/8/2019 IIIrd RA Bill Dallupura
3/351
7
1340.00 Cu.m.
8
(a) TMT bars. 100486 Kg.
9
(a)
1949.00 Sqm
(b)
250.00 Sqm
(c)
5130.00 Sqm
Providing and laying in position ready mixed concretemanufactured in fully automatic batching plant andtransported to site of work in transit mixer for a leadup to 10kms having continuous agitated mixer, manuf-actured as per mix design of specified grade forreinforced cement concrete work including pumpingof R.M.C. from transit mixer to site of laying ,excluding the cost of centering, shuttering finishingand reinforcement including cost of admixtures inrecommended proportions as per IS : 9103 toaccelerate/ retard setting of concrete, improveworkability without impairing strength and durabilityas per direction of the Engineer - in - charge. M-25grade Reinforced cement concrete by using 410kg ofcement per cum of concrete.
Reinforcement for RCC work including straightening,cutting, bending placing in position and binding allcomplete.
Centring and shuttering including strutting, proppingetc. and removal of form for.
Suspended floors, roofs, landings, balconies andaccess platform..
Small lintels not exceeding 1.5m clear span, mouldingas in cornices, window sills, string courses, bands,copings, bed plates, anchor blocks and the like.
Walls (any thickness) including attached pilasters,butteresses, plinth and string courses etc.
-
8/8/2019 IIIrd RA Bill Dallupura
4/351
(d)
4222.00 Sqm
10
771.00 Sqm
Sub. Head: - Brick Work
11
(a) 1:6 (1 cement: 6 coarse sand). 145.00 Cu.m.
Sub. Head: - Finishing
12 12 mm cement plaster of mix.
(a) 1:4 ( 1 cement : 4 coarse sand ) 773.00 Sqm
13
450.00 Sqm
14
(a)
3360.00 Sqm
Walls (any thickness) including attached pilasters,butteresses, plinth and string courses etc.( with shutterfinish surface for central verge kerbstones )
Providing and fixing in position precast RCC draincover of approved manufacturere i.e. KK. S&S orequivalent make of size 1150 x 400 x 100mm(thickness) or required size with ten hole by using M-30 grade of concrete & reinforced of approvedmanufacture with two layers of 8 mm dia of steel withsix nos along the length & 14 Nos along the widtheach layer suitable distributed & manufactured byvibrator compaction process using joint less FRPmoulds to active shuttering finish on five faces as topface with have broom finish complete as per directionof Engineer-in-Charge.
Brick work with FPS bricks of class designation 75 infoundation and plinth in cement mortar :-
Neat cement punning with OP Cement of approvedmanufacture and grade
Painting with synthetic enamel paint of approvedbrand and manufacture of required colour to give aneven shade.
Two or more coats on new work over an under coat ofsuitable shade with ordinary paint of approved brandand manufacture
-
8/8/2019 IIIrd RA Bill Dallupura
5/351
15
116.00 Cu.m.
Sub. Head: - Road Work
16
6375.00 Sqm
17
(a) 90mm to 45mm 772.00 Cu.m.
(b) 63mm to 45mm 579.00 Cu.m.
(c) 53mm to 22.4mm 1157.00 Cu.m.
18
2071.88 Cu.m.
19
(a) On bituminous surface @ 0.50 Kg / sqm.
99774.00 Sqm
(b) On W.B.M. @ 0.75 Kg / sqm. 6375.00 Sqm
Demolishing RCC work including stacking of steelbars and disposal of unserviceable material within 50metres lead.
Consolidation of subgrade with power road roller of 8to 12 tonne capacity including making good theundulations etc. with earth or quarry spoils etc. andrerolling the subgrade
Supplying & Stacking of graded stone aggregate atsite of size range.
Laying spreading and compacting stone aggregate ofspecified sizes to WBM specifications includingspreading in uniform thickness, hand picking, rollingwith 3 wheeled road / vibratory roller 8-10 tonne instages to proper grade and camber, applying and brooming requisite type of screening / bindingmaterial to fill up interstices of coarse aggregatewatering and compacting to the required density .
Providing and applying tack coat using hot straightrun bitumen of grade 80/ 100 including heating the bitumen, spraying the bitumen with mechanicallyoperated spray unit fitted on bitumen boiler, cleaningand preparing the existing road surface as per
specifications :
-
8/8/2019 IIIrd RA Bill Dallupura
6/351
20
(a)
510.00 cum
21
(a)
2110.00 Cu.m.
Providing and laying Bituminous Macadam onprepared surface with specified graded crushed stoneaggregate for profile corrective base/ binder courseincluding loading of aggregate with F.E. loader , hotmixing of stone aggregates and bitumen in hot mixplant, transporting the mixed material by tippers topaver and laying the mixed material with paver finisher
fitted with electronic sensing device to the requiredlevel and grade and rolling with road rollers, as perMORTH specification to achieve the desired densityand compaction but excluding the cost of primer/ tackcoat.
80mm average compacted thickness with bitumen of60/70 grade @ 3.5% (Percentage by weight of total
mix)
Providing & laying dense bituminous macadam onprepared surface with specified graded crushed stoneaggregate for profile corrective base/binding courseincluding loading of aggregate with FE loader and hotmixing of stone aggregate, filler and bitumen in batchtype hot mix plant transporting the mixed material bytipper to paver and laying the mixed material withpaver finisher fitted with electronic sensing device tothe required level and grade and rolling by road rollersas per MORTH specifications to achieve the desired
density, but excluding cost of primer/tack coat.
50/75mm average compacted thickness with bitumenof 60/70 grade @ 5% (percentage by weight of totalmix) and lime filler @ 2% (percentage by weight of
Aggregate).
-
8/8/2019 IIIrd RA Bill Dallupura
7/351
22
(a)
1376.00 Cu.m.
23
754.00 Sqm
Providing & laying dense bituminous concrete on prepared surface with specified graded stoneaggregate for wearing course including loading ofaggregate with FE loader, hot mixing of bitumen fillerand aggregates in batch type hot mix planttransporting the mixed material by tipper to paver andlaying the mixed material with mechanically paverfinisher fitted with electronic sensing device to therequired level and grade and rolling by road rollers as per MORTH specifications to achieve the desireddensity, but excluding cost of primer / tack coat.
(a) 40/50 mm compacted thickness with bitumen ofgrade 60/70 @ 5.50% and lime @ 3% (percentage byweight of total mix ) and adding waste plastic additive@ 8% weight of bitumen used. The plastic waste powder shall be dust free and the partical size ofplastic waste powder should be less than 2 mm.
Providing & applying 2.5mm thick road marking
stripd (retro-reflective) of specified shades/coloursusisng hot tharmoplastic material by fully/semiautomatic thermo -plastic paint applicator machinefitted with profile shoe,glass beads dispenser, propanetank heater and profile shoe heater, driven byexperienced operator on road surface including cost ofmaterial, labour, T & P, cleaning the road surface ofall dirt, seals oil, grease and foreign materials etc.complete as per direction of Engineer-in-charge andaccoardance with applicable specifications.
-
8/8/2019 IIIrd RA Bill Dallupura
8/351
24
(a) 250 mm dia. R.C.C. pipe 48.00 Metre
25
2800.00 Metre
26
720.00 Sqm
27
600.00 Sqm
28
42.00 Each
Providing and laying non-pressure NP2 class (lightduty) R.C.C. pipes with collars jointed with stiffmixture of cement mortar in the proportion of 1:2(1cement : 2 fine sand) including testing of joints etc.complete :
Taking out existing / old kerb stone and disposal withall head and lift complete as per direction of Engineer-in-charge.
Providing & making 30cm wide channel 50mm Thickof conc 1:3:6 (1 cement : 3 coarse sand : 6 gradedstone aggregate 20mm nominal size) over 75 mm bedof dry bbrick ballast 40 mm nominal size wellramamed and consolidated and grouted with fine sand
including finishing the top smooth etc. complete andas per direction of Engineer-in-charge.
Providing and laying 60mm thick factory madecement concrete interlocking paver block of M-30grade made by block making machine with strongvibratory compaction and of approved size and
design/ shape laid in required colour and pattern overand including 50mm thick compacted bed of coursesand, filling the joints with coarse sand etc. allcomplete as per the direction of Engineer-in-charge.
Providing and fixing post delineators (made of ABSroundbody fitted with 2 nos 100mm dia) reflective
and reflectors and mounted on MS pipe of 65mm diadully powder coated anti-rust and anti theft steel to beinstalled as per direction of Engineer-in-charge.
-
8/8/2019 IIIrd RA Bill Dallupura
9/351
29
800.00 Each
30
756.00 cum
Providing and fixing Glow studs of size 100x20 mmmade of heavy duty body shall be moulded ASA(Acrylic styrene Acryloretrite) or HIP (High impact polystyrene) or ABS having electronically weldedmicro- prismatic lens with abrasion resistant coatingas approved by Engineer in charge. The Glow studsshall support a load of 13635 kg tested in accordancewith ASTM D4280. The slope of retro- reflectivesurface shall be 35 +/-5 degress to base .The reflectivepanels on both sides with at least 12 cm of reflectivearea up each side. The luminance intensity should beas per the specification and shall be tested asdescribed in ASTM I: 809 as recommended in BS:873 part 4 : 1973. The studs shall be fixed to the Roadsurface using the adhesive conforming to IS, as per procedure recommended by the manufacturercomplete and as per direction of Engineer-in-charge.
Supplying and stacking of good earth at site includingroyalty and carriage up to 1 km (earth measured in
stacks will be reduced by 20% for payment).
-
8/8/2019 IIIrd RA Bill Dallupura
10/351
31
400.00 Metre
32
2900 Kg.
Total Of All Sub. Heads.
Providing and placing barricading 2.00 metre highconsisting of 2.50x2.00m panels made of 1.63mmthick M.S. sheet with frame of 40x40x6mm angleiron horizontal & vertical braces of M.S. flat30x5mm, 2 nos.MS Channel ISLC-75-500MM Longat base as per appoved drawing including applying apriming coat of approved steel primer and painting as per direction of Engineer-in-charge. This item shallalso include arrangement for traffic diversion such astraffic signals diversion signs, marking, flages etc. asdirected by the Engineer-in-charge. The barricading provided shall be retained in position at sitecontinuously during the execution of the entire worktill its completion including its maintenance fordamages & painting & shall not be removed at anystage prior approval of Engineer-in-charge., for theshifting to the next location & shall include allincidental, labour, material, equipment & worksrequired to execute the job.
NOTE:- One time payment shall be made for each
running meter of barricading, fabrication& providedfrom start of work i/c its shifting from place to placeas also its maintenance, the barricading providedshall remain to be property of the contractor oncompletion of work.
Deduct on account of old C.T.D. bars received fromthe demolishing of RCC work at site.(Credit to Work)
Assistant Engineer (P)PWD Zone M-2MSO Building New Delhi
Executive Engineer (P)PWD Zone M-2
MSO Building New Delhi
-
8/8/2019 IIIrd RA Bill Dallupura
11/351
-
8/8/2019 IIIrd RA Bill Dallupura
12/351
Rate Amount
50.66 228578
101.85 271940
103.40 412773
45.70 102597
om DDA Chilla Sports Complex towater drain at one side.
-
8/8/2019 IIIrd RA Bill Dallupura
13/351
210.92 117061
1132949
2237.75 581815
3257.45 104238
686053
-
8/8/2019 IIIrd RA Bill Dallupura
14/351
4263.58 5713197
42.70 4290752
187.35 365145
119.25 29813
180.40 925452
-
8/8/2019 IIIrd RA Bill Dallupura
15/351
270.60 1142473
3493.91 2693805
15160637
2121.75 307654
307654
82.55 63811
21.40 9630
51.30 172368
-
8/8/2019 IIIrd RA Bill Dallupura
16/351
537.55 62356
308165
1.07 6821
742.30 573056
768.45 444933
810.55 937806
192.55 398940
17.15 1711124
23.90 152363
-
8/8/2019 IIIrd RA Bill Dallupura
17/351
4,242.20 2163522
5366.50 11323315
-
8/8/2019 IIIrd RA Bill Dallupura
18/351
6213.90 8550326
497.30 374964
-
8/8/2019 IIIrd RA Bill Dallupura
19/351
258.20 12394
9.42 26376
198.80 143136
0
346.35 207810
786.35 33027
-
8/8/2019 IIIrd RA Bill Dallupura
20/351
536.60 429280
144.05 108902
-
8/8/2019 IIIrd RA Bill Dallupura
21/351
786.40 314560
-20.55 -59595
27853060
45448518
-
8/8/2019 IIIrd RA Bill Dallupura
22/351
-
8/8/2019 IIIrd RA Bill Dallupura
23/351
ABSTRACT OF COST- IInd R/A BILL
SITUATION :- Mayur vihar Phase- III. Delhi
AGENCY :- Sh. Mahavir Prasad Gupta
AGGREMENT NO :- 32 / EE / PWD / M-212 / 2009- 2010
DATE OF START :- 8/12/2009
D.O.C. (Stipulated) 7/6/2010
D. O. C.(Actual) :- Work in Progress
DATE OF ABSTRACT :- 11/5/2010I. No. Description of Item Quantity Unit Rat
Sub. Head: - Earth work FR
1
Qty B/F from EMB-27 / P-49 1316.63
Qty B/F from TEMB / P-3 227.77
Qty B/F from TEMB / P-9 265.13
Qty B/F from TEMB / P-15 292.68
2102.21 Cu.m. 50.66
2
Qty B/F from EMB-27 / P-49 1880.92
Qty B/F from TEMB / P-5 7.92
1888.84 Cu.m. 101.85
NAME OF WORK :- Widening of Dallupura Road, at Mayur Vihar Phase- III (From DDDallupura) and Strenthening /Improvement of riding quality and construction of storm water drain
Disposal and carriage of excavated malba,lime, moorum and earth etc by machenicaltransport including loading, unloading andstacking for all leads and lifts (Beyondinitial lead of 50 m , lift upto 1.5 m or as
per direction of Engieer - in - Charge )
Earth work in excavation by mechanicalmeans (Hydraulic excavator) / mannuallabour over areas (exceeding 30cm indepth, 1.5m in width as well as 10 sq.m.on
plan) i/c disposal of excavated earth leadupto 50m and lift upto 1.5m, .disposedearth to be levelled and neatly dressed.
-
8/8/2019 IIIrd RA Bill Dallupura
24/351
I. No. Description of Item Quantity Unit Rat
3
(a) All kinds of soil.
Qty B/F from EMB-27 / P-50 956.71
Qty B/F from TEMB / P-1 325.39
Qty B/F from TEMB / P-5 378.76
Qty B/F from TEMB / P-12 418.11
2078.97 Cu.m. 103.40
Sub. Head: - Concrete Work6
(a)
Qty B/F from EMB-27 / P-50 22.87
Qty B/F from TEMB / P-2 1.36
Qty B/F from TEMB / P-3 9.87Qty B/F from TEMB / P-10 14.70
Qty B/F from TEMB / P-17 22.20
71.00 Cu.m. 2237.75
Earth work in excavation by mechanicalmeans (Hydraulic excavator) / mannuallabour in foundation trenches or drain (notexceeding 1.5 m in width or 10 sqm.on
plan) including dressing of sides andramming of bottom lift up to 1.5 mincluding getting out the excavated soil asdirected with in a lead of 50m.
P/L in position cement concrete ofspecified grade excluding the cost ofcentering and shuttering all work upto
plinth level.
1:5:10 ( 1 cement : 5 coarse sand : 10graded stone aggregate 40 mm nominalsize).
-
8/8/2019 IIIrd RA Bill Dallupura
25/351
I. No. Description of Item Quantity Unit Rat
7
Qty B/F from EMB-27 / P-49 46.83
Qty B/F from TEMB / P-11 38.92
Qty B/F from TEMB / P-22 107.66
Qty B/F from TEMB / P-37 64.13
257.54 Cu.m. 4263.58
8
(a) TMT bars.
Qty B/F from EMB-27 / P-51 10103.99
Qty B/F from TEMB / P-3 298.22
Qty B/F from TEMB / P-6 222.38
Qty B/F from TEMB / P-7 1531.19
Qty B/F from TEMB / P-13 3716.20
Qty B/F from TEMB / P-16 3763.29
Qty B/F from TEMB / P-19 1962.15
Qty B/F from TEMB / P-21 4069.12Qty B/F from TEMB / P-22 3126.25
Qty B/F from TEMB / P-27 1478 80
Sub. Head: - Reinforced CementConcrete Work
Providing and laying in position readymixed concrete manufactured in fullyautomatic batching plant and transported tosite of work in transit mixer for a lead up to10kms having continuous agitated mixer,manuf -actured as per mix design ofspecified grade for reinforced cementconcrete work including pumping ofR.M.C. from transit mixer to site of laying ,excluding the cost of centering, shutteringfinishing and reinforcement including costof admixtures in recommended proportionsas per IS : 9103 to accelerate/ retard settingof concrete, improve workability withoutimpairing strength and durability as perdirection of the Engineer - in - charge. M-25 grade Reinforced cement concrete byusing 410kg of cement per cum of
concrete.
Reinforcement for RCC work includingstraightening, cutting, bending placing in
position and binding all complete.
-
8/8/2019 IIIrd RA Bill Dallupura
26/351
I. No. Description of Item Quantity Unit Rat
33304.50 Kg. 42.70
9
(b)
Qty B/F from EMB-27 / P-52 89.03
Qty B/F from TEMB / P-2 1.93
Qty B/F from TEMB / P-4 5.08
Qty B/F from TEMB / P-10 10.50
Qty B/F from TEMB / P-14 18.64
Qty B/F from TEMB / P-17 15.00
Qty B/F from TEMB / P-20 15.75Qty B/F from TEMB / P-25 15.75
Qty B/F from TEMB / P-34 4.50
176.18 Sqm 119.25
(c)
Qty B/F from EMB-27 / P-52 199.68
Qty B/F from TEMB / P-4 493.92
Qty B/F from TEMB / P-9 136.80
Qty B/F from TEMB / P-13 122.40
Qty B/F from TEMB / P-16 250.20
Qty B/F from TEMB / P-19 216.00
Qty B/F from TEMB / P-21 108.00
Qty B/F from TEMB / P-25 216.00
Qty B/F from TEMB / P-34 162.00
1905.00 Sqm 180.40
Centring and shuttering including strutting,propping etc. and removal of form for.
Small lintels not exceeding 1.5m clearspan, moulding as in cornices, windowsills, string courses, bands, copings, bed
plates, anchor blocks and the like.
Walls (any thickness) including attached pilasters, butteresses, plinth and stringcourses etc.
-
8/8/2019 IIIrd RA Bill Dallupura
27/351
I. No. Description of Item Quantity Unit Rat
10
Qty B/F from TEMB / P-37 189.06
189.06 Sqm 3493.91
11
(a) 1:6 (1 cement: 6 coarse sand).
Qty B/F from TEMB / P-37 17.80
17.80 Cu.m. 2121.75
Sub. Head: - Road Work
16
Qty B/F from EMB-27 / P-52 4286.18
Qty B/F from TEMB / P-8 18.09
4304.27 Sqm 1.07
17
(a) 90mm to 45mm
Qty B/F from EMB-27 / P-53 518.71
Qty B/F from TEMB / P-9 192.15
710.86 Cu.m. 742.30
Providing and fixing in position precastRCC drain cover of approvedmanufacturere i.e. KK. S&S or equivalentmake of size 1150 x 400 x 100mm(thickness) or required size with ten hole
by using M-30 grade of concrete &reinforced of approved manufacture withtwo layers of 8 mm dia of steel with six nos
along the length & 14 Nos along the widtheach layer suitable distributed &manufactured by vibrator compaction
process using joint less FRP moulds toactive shuttering finish on five faces as topface with have broom finish complete as
per direction of Engineer-in-Charge.
Brick work with FPS bricks of classdesignation 75 in foundation and plinth incement mortar :-
Consolidation of subgrade with power roadroller of 8 to 12 tonne capacity includingmaking good the undulations etc. withearth or quarry spoils etc. and rerolling the
subgrade
Supplying & Stacking of graded stoneaggregate at site of size range.
-
8/8/2019 IIIrd RA Bill Dallupura
28/351
I. No. Description of Item Quantity Unit Rat
Qty B/F from TEMB / P-10 12.67
402.76 Cu.m. 768.45
(c) 53mm to 22.4mm
Qty B/F from EMB-27 / P-53 777.82
Qty B/F from TEMB / P-12 12.25
790.07 Cu.m. 810.55
18
Qty B/F from EMB-27 / P-54 1314.46
Qty B/F from TEMB / P-10 1.81
Qty B/F from TEMB / P-12 1.36
Qty B/F from TEMB / P-15 26.81
Qty B/F from TEMB / P-18 26.81
1371.25 Cu.m. 192.55
19
(a) On bituminous surface @ 0.50 Kg / sqm.
Qty B/F from TEMB / P-28 2683.59
Qty B/F from TEMB / P-29 3280.13
Qty B/F from TEMB / P-30 3478.32
Qty B/F from TEMB / P-32 2607.55
Qty B/F from TEMB / P-33 3038.55
Qty B/F from TEMB / P-34 2999.31
Qty B/F from TEMB / P-35 2721.06
Qty B/F from TEMB / P-36 3512.4524320.96 Sqm 17.15
Laying spreading and compacting stoneaggregate of specified sizes to WBMspecifications including spreading inuniform thickness, hand picking, rollingwith 3 wheeled road / vibratory roller 8-10tonne in stages to proper grade and camber,applying and brooming requisite type ofscreening / binding material to fill upinterstices of coarse aggregate watering andcompacting to the required density .
Providing and applying tack coat using hotstraight run bitumen of grade 80/ 100including heating the bitumen, spraying the
bitumen with mechanically operated sprayunit fitted on bitumen boiler, cleaning and
preparing the existing road surface as perspecifications :
-
8/8/2019 IIIrd RA Bill Dallupura
29/351
I. No. Description of Item Quantity Unit Rat
Qty B/F from TEMB / P-23 1114.43
Qty B/F from TEMB / P-24 1469.42
Qty B/F from TEMB / P-26 1465.43
4049.28 Sqm 23.90
20
(a)
Qty B/F from TEMB / P-38 307.75
307.75 cum 4,242.20
Providing and laying Bituminous Macadamon prepared surface with specified graded
crushed stone aggregate for profilecorrective base/ binder course includingloading of aggregate with F.E. loader , hotmixing of stone aggregates and bitumen inhot mix plant, transporting the mixedmaterial by tippers to paver and laying themixed material with paver finisher fittedwith electronic sensing device to therequired level and grade and rolling withroad rollers, as per MORTH specificationto achieve the desired density andcompaction but excluding the cost of
primer/ tack coat.
80mm average compacted thickness with bitumen of 60/70 grade @ 3.5%(Percentage by weight of total mix)
-
8/8/2019 IIIrd RA Bill Dallupura
30/351
I. No. Description of Item Quantity Unit Rat
21
(a)
Qty B/F from TEMB / P-38 1732.871732.87 Cu.m. 5366.50
Providing & laying dense bituminousmacadam on prepared surface withspecified graded crushed stone aggregatefor profile corrective base/binding courseincluding loading of aggregate with FEloader and hot mixing of stone aggregate,filler and bitumen in batch type hot mix
plant transporting the mixed material by
tipper to paver and laying the mixedmaterial with paver finisher fitted withelectronic sensing device to the requiredlevel and grade and rolling by road rollersas per MORTH specifications to achievethe desired density, but excluding cost of
primer/tack coat.
50/75mm average compacted thicknesswith bitumen of 60/70 grade @ 5%(percentage by weight of total mix) andlime filler @ 2% (percentage by weight ofAggregate).
-
8/8/2019 IIIrd RA Bill Dallupura
31/351
I. No. Description of Item Quantity Unit Rat
31
Qty B/F from EMB-27 / P-55 37.50
37.50 Metre 786.40
Gross of Agmt. Items
Less already paid vide Ist R/A Bill
Net Gross of Agmt. Items
Providing and placing barricading 2.00metre high consisting of 2.50x2.00m
panels made of 1.63mm thick M.S. sheetwith frame of 40x40x6mm angle ironhorizontal & vertical braces of M.S. flat30x5mm, 2 nos.MS Channel ISLC-75-500MM Long at base as per appoveddrawing including applying a priming coat
of approved steel primer and painting as per direction of Engineer-in-charge. Thisitem shall also include arrangement fortraffic diversion such as traffic signalsdiversion signs, marking, flages etc. asdirected by the Engineer-in-charge. The
barricading provided shall be retained in position at site continuously during theexecution of the entire work till itscompletion including its maintenance fordamages & painting & shall not beremoved at any stage prior approval of
Engineer-in-charge., for the shifting to thenext location & shall include all incidental,labour, material, equipment & worksrequired to execute the job.
NOTE:- One time payment shall be madefor each running meter of barricading,fabrication& provided from start of worki/c its shifting from place to place as alsoits maintenance, the barricading providedshall remain to be property of thecontractor on completion of work.
Add Contractors Enhancement @ 7.25 %above
-
8/8/2019 IIIrd RA Bill Dallupura
32/351
I. No. Description of Item Quantity Unit Rat
Secured Advance
Quantity fresh brought at site NIL kg
Qty. consumed at site -20000.00 "
Quantity outstanding in this bill -20000.00 kg
Amount of this Bill -20000.00 kg 37.00
Total=RECOVERIES
1 Security deposited @ 5 % on Rs 18118975
Less already recovered as EMD
Now recovered
2 Income Tax @ 2% on Rs 18118975
Less already recovered in Ist R/A Bill
Now recovered
3 Surcharge @ 10% on Rs 362380
Less already recovered in Ist R/A Bill
Now recovered
4 Education Cess @ 3% on Rs 335367
Less already recovered in Ist R/A Bill
Now recovered
5 Sale Tax / vat @ 3 % on Rs 18118975
Less already recovered in Ist R/A Bill
Now recovered
6 Labour Cess @ 1% on Rs 18118975
Less already recovered in Ist R/A Bill
Now recovered
7
3 % on Rs 48743536
Less already recovered in Ist R/A Bill
Now recovered
Total recoveries ,Marked as 'C' Rs.
Net Payable A + B - C
Net Payable 15243952 -620000 -1440724
CERTIFIED THAT:-
1.The work has been executed as per C.P.W.D. Specification.
2.Necessary Recoveries has been made in this Bill.
3.Contractor has made his own arrangement of water.
4.No labour complaints have been received so far.
5.Contractor has appointed Engineers as per Clause-36
Marked as 'B'
Amount Withheld for Not achieving Ist ,IInd & IIIrd milestone @ 3%
-
8/8/2019 IIIrd RA Bill Dallupura
33/351
-
8/8/2019 IIIrd RA Bill Dallupura
34/351
Amount
PR
- 106498.06
- 192377.90
A Chilla Sports Complex toat one side.
-
8/8/2019 IIIrd RA Bill Dallupura
35/351
Amount
- 214965.50
- 158880.25
-
8/8/2019 IIIrd RA Bill Dallupura
36/351
Amount
4100.00 1055914.00
-
8/8/2019 IIIrd RA Bill Dallupura
37/351
Amount
- 1422101.99
- 21009.47
- 343662.00
-
8/8/2019 IIIrd RA Bill Dallupura
38/351
Amount
3200.00 604992.00
- 37767.15
- 4605.57
- 527674.58
-
8/8/2019 IIIrd RA Bill Dallupura
39/351
Amount
- 309502.27
- 640394.80
- 264033.56
- 417104.46
-
8/8/2019 IIIrd RA Bill Dallupura
40/351
Amount
- 96777.79
- 1305517.03
-
8/8/2019 IIIrd RA Bill Dallupura
41/351
Amount
5275.00 9140880.81
-
8/8/2019 IIIrd RA Bill Dallupura
42/351
Amount
- 29490.00
16894149.19
1224825.82
18118975.01
Say 18118975
-2875023
A 15243952
-
8/8/2019 IIIrd RA Bill Dallupura
43/351
Amount
31.00 -620000
-620000
905949
-974871
0
362380
-57500
304880
36238
-5750
30488
10061
-1898
8163
543569
-86251
457318
181190
-28750
152440
1462306
-974871
487435
1440724
13183228
-
8/8/2019 IIIrd RA Bill Dallupura
44/351
Amount
-
8/8/2019 IIIrd RA Bill Dallupura
45/351
I.No. Description No. L B D or
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.10
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.10Deduction for chamber 1 3.00 1.20 0.10
Deduction for bus stand 1 7.00 0.90 0.10
Deduction for bus stand 1 6.90 0.60 0.10
Deduction for trees 3 0.60 0.60 0.10
Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
1 15.00 (2.00+1.90)/2 0.07
1 15.00 (1.90+1.65)/2 0.07
1 15.00 (1.65+1.60)/2 0.07
1 15.00 (1.60+1.60)/2 0.07
1 15.00 (1.60+1.40)/2 0.07
1 15.00 (1.40+1.55)/2 0.07
1 15.00 (1.55+1.60)/2 0.07
1 15.00 (1.60+1.90)/2 0.07
1 15.00 (1.90+1.25)/2 0.07
1 15.00 (1.25+1.45)/2 0.07
1 15.00 (1.45+1.35)/2 0.07
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
Ist layer, 90- 45mm
Laying spreading and compacting stone aggregate of specified
sizes to WBM specifications including spreading in uniform
IInd layer, 63-45mm
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
IIIrd layer, 53-22.50mm
Budh Singh Marg,Vasundhara Enclave Bound
-
8/8/2019 IIIrd RA Bill Dallupura
46/351
1 13.00 (1.35+1.34)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07
Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
1 15.00 (2.00+1.90)/2 0.07
1 15.00 (1.90+1.65)/2 0.07
1 15.00 (1.65+1.60)/2 0.071 15.00 (1.60+1.60)/2 0.07
1 15.00 (1.60+1.40)/2 0.07
1 15.00 (1.40+1.55)/2 0.07
1 15.00 (1.55+1.60)/2 0.07
1 15.00 (1.60+1.90)/2 0.07
1 15.00 (1.90+1.25)/2 0.07
1 15.00 (1.25+1.45)/2 0.07
1 15.00 (1.45+1.35)/2 0.07
1 15.00 (1.35+1.30)/2 0.07
1 15.00 (1.30+1.22)/2 0.071 15.00 (1.22+1.35)/2 0.07
1 13.00 (1.35+1.34)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07
Total=
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
VIth layer, 53-22.50mm
Budh Singh Marg,Vasundhara Enclave Bound
-
8/8/2019 IIIrd RA Bill Dallupura
47/351
-
8/8/2019 IIIrd RA Bill Dallupura
48/351
Quantity Unit
3.65 Cum
-0.33 "-0.36 "
-0.63 "
-0.41 "
-0.11 "
1.81 Cum
2.74 Cum
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "1.36 Cum
2.74 Cum
2.19 "
2.00 "
1.83 "
1.80 "
1.69 "
1.66 "
1.77 "
1.97 "
1.77 "
1.52 "
1.58 "
-
8/8/2019 IIIrd RA Bill Dallupura
49/351
1.31 "
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
2.74 Cum
2.19 "
2.00 "
1.83 "1.80 "
1.69 "
1.66 "
1.77 "
1.97 "
1.77 "
1.52 "
1.58 "
1.49 "
1.42 "1.45 "
1.31 "
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
-
8/8/2019 IIIrd RA Bill Dallupura
50/351
-
8/8/2019 IIIrd RA Bill Dallupura
51/351
DATE OF MEASUREMENTS :-
I.No Description No L B
2
Noida Bound
Near RD(-12.30) to Drain Edge RD199.50 1 12.30 (0.80+0.90)/2
1 9.40 (3.40+2.80)/21 15.00 (2.80+1.60)/2
1 15.00 (1.60+2.10)/2
1 15.00 (2.10+1.60)/2
1 15.00 (1.60+1.50)/2
1 15.00 (1.50+1.40)/2
1 15.00 (1.40+1.40)/2
1 15.00 (1.40+1.25)/2
1 15.00 (1.25+1.20)/2
1 9.60 (1.20+1.10)/2
1 13.50 (1.20+1.10)/2
1 12.00 (4.08+4.55)/2
1 15.00 (4.55+5.30)/2
1 15.00 (5.30+4.25)/2
1 5.00 (4.25+4.20)/2
Deduction 1 13.50 (0.80+0.90)/2
After BudhSingh Marg Cut RD-283.50 to 309.00
1 15.00 (2.40+1.95)/2
1 1.50 (1.95+2.00)/2
1 1.30 (2.00+1.50)/2
1 7.70 (4.35+4.90)/2
Deduction for chamber Edge 1 1.70 (1.10+1.20)/2
Noida Bound R.D 293.70 to R.D-350.00 1 6.30 (2.90+2.85)/2
1 15.00 (2.85+3.45)/2
1 15.00 (3.45+2.55)/2
1 15.00 (2.55+3.10)/2
1 5.00 (3.10+3.16)/2
Noida Bound R.D 390.00 to R.D-480.00 1 15.00 (2.87+3.00)/2
1 15.00 (3.00+2.60)/2
1 15.00 (2.60+2.70)/2
1 15.00 (2.70+2.95)/2
1 15.00 (2.95+2.80)/2
1 15.00 (2.80+3.00)/2
Deduction For slab 1 1.15 2.85
Noida Bound R.D 505.00 to R.D 780.00 1 5.00 (2.95+2.95)/2
1 15.00 (2.95+2.65)/2
Earth work in excavation by mechanical means(Hydraulic excavator) / mannual labour over areas
-
8/8/2019 IIIrd RA Bill Dallupura
52/351
1 15.00 (2.65+2.80)/2
1 15.00 (2.80+2.75)/2
1 15.00 (2.75+2.50)/2
1 15.00 (2.50+2.90)/2
1 15.00 (2.90+3.40)/2
1 15.00 (3.40+3.85)/2
1 15.00 (3.85+4.60)/2
1 15.00 (4.60+5.45)/21 15.00 (5.45+5.70)/2
1 15.00 (5.70+5.93)/2
1 15.00 (5.93+6.05)/2
1 15.00 (6.05+6.00)/2
1 15.00 (6.00+5.55)/2
1 15.00 (5.55+5.05)/2
1 15.00 (5.05+5.25)/2
1 15.00 (5.25+5.40)/2
1 15.00 (5.40+5.50)/2
Deduction For M.H. 2 3.14./4 0.85
Deduction For M.H. 1 1.50 1.70
Noida Bound R.D 780.00 to R.D-905.50 1 15.00 (5.50+5.90)/2
1 15.00 (5.90+6.20)/2
1 15.00 (6.20+6.80)/2
1 15.00 (6.80+7.15)/2
1 15.00 (7.15+7.22)/2
1 15.00 (7.22+7.45)/2
1 15.00 (7.45+7.82)/2
1 15.00 (7.82+7.90)/2
1 5.50 (7.90+7.90)/2
Noida Bound R.D 922.00 to R.D-1023.40 1 8.00 (4.95+4.75)/2
1 15.00 (4.75+4.75)/2
1 15.00 (4.75+4.90)/2
1 15.00 (4.90+4.90)/2
1 15.00 (4.90+5.00)/21 15.00 (5.00+5.35)/2
1 13.20 (5.35+5.80)/2
Flair 2./3 5.20 5.8
Budhsingh Marg Cut C/v 1 10.55 (1.80+1.80)/2
Noida Bound R.D.96.00 to R.D 117.00 1 15.00 (1.80+2.20)/2
1 6.00 (2.20+2.50)/2
BudhSingh Marg Vasundhara Bound 1 15.00 (2.30+2.50)/2
1 9.10 (2.50+2.95)/2
1 5.40 (2.95+3.20)/2
1 22.00 (1.35+1.20)/2
-
8/8/2019 IIIrd RA Bill Dallupura
53/351
C/V Budh singh Marg Cut 1 10.55 (1.80+1.80)/2
Cutting By Jalboard 1 6.70 (2.00+2.00)/2
1 9.45 (2.25+2.30)/2
1 4.30 (2.65+2.62)/2
1 5.10 (2.75+2.80)/2
Vasundhara Cut 1 14.00 (3.55+3.50)/21 2.20 (1.20+1.20)/2
Noida Bound R.D 350.00 to R.D-390.00 1 10.00 (3.16+3.22)/2
1 15.00 (3.22+3.05)/2
1 15.00 (3.05+2.87)/2
Noida Bound R.D 480.00 to R.D-505.00 1 15.00 (3.00+3.00)/2
1 10.00 (3.00+2.95)/2
Noida Bound R.D 905.50 to R.D-922.00 1 9.50 (5.25+5.25)/2
1 7.00 (5.25+4.95)/2
-
8/8/2019 IIIrd RA Bill Dallupura
54/351
D or H Quantity Unit
0.45 4.70 Cum.
0.45 13.11 "0.45 14.85 "
0.43 11.93 "
0.43 11.93 "
0.43 10.00 "
0.43 9.35 "
0.43 9.03 "
0.43 8.55 "
0.43 7.90 "
0.43 4.75 "
0.43 6.68 "
0.43 22.27 "
0.43 31.77 "
0.43 30.80 "
0.43 9.08 "
0.43 -4.93 "
0.43 14.03 "
0.43 1.27 "
0.43 0.98 "
0.43 15.31 "
0.43 -0.84 "
232.52 Cum.
0.43 7.79 Cum.
0.43 20.32 "
0.45 20.25 "
0.45 19.07 "
0.45 7.04 "
0.45 19.81 "
0.45 18.90 "
0.45 17.89 "
0.45 19.07 "
0.45 19.41 "
0.45 19.58 "
0.45 -1.47 "
187.66 Cum.
0.46 6.79 Cum.
0.46 19.32 "
-
8/8/2019 IIIrd RA Bill Dallupura
55/351
0.46 18.80 "
0.46 19.15 "
0.46 18.11 "
0.44 17.82 "
0.41 19.37 "
0.43 23.38 "
0.45 28.52 "
0.45 33.92 "0.45 37.63 "
0.45 39.25 "
0.45 40.43 "
0.45 40.67 "
0.45 38.98 "
0.45 35.78 "
0.45 34.76 "
0.43 34.35 "
0.43 35.15 "
0.43 -0.57 "
0.43 -1.10 "
540.51 "
0.40 34.20 "
0.42 38.12 "
0.44 42.90 "
0.45 47.08 "
0.43 46.34 "
0.43 47.31 "
0.43 49.25 "
0.45 53.06 "
0.45 19.55 "
377.81 "
0.42 16.80 "
0.44 31.35 "
0.45 32.57 "
0.43 31.61 "
0.43 31.93 "0.43 33.38 "
0.45 33.12 "
0.49 9.75 "
0.50 9.50 "
0.47 14.10 "
0.45 6.35 "
0.45 16.20 "
0.42 10.41 "
0.45 7.47 "
0.45 12.62 "
-
8/8/2019 IIIrd RA Bill Dallupura
56/351
0.45 8.55 "
305.71 "
0.43 5.76 Cum.
0.44 9.46 "
0.41 4.65 "
0.43 6.09 "
0.45 22.21 "0.45 1.19 "
0.45 14.36 "
0.45 21.16 "
0.45 19.98 "
0.45 20.25 "
0.45 13.39 "
0.45 22.44 "
0.45 15.75 "
176.69 "
-
8/8/2019 IIIrd RA Bill Dallupura
57/351
I.No Description No L B
Measurement on dated:-
3
(a) All kinds of soil.
Noida Bound
R.D 930.00 to 1019.20
1 15.00 (2.05+2.10)/2
1 15.00 (2.10+2.20)/21 15.00 (2.20+2.25)/2
1 15.00 (2.25+2.25)/2
1 15.00 (2.25+2.20)/2
1 14.20 (2.20+2.15)/2
Measurement on dated:-
3
(a) All kinds of soil.Noida Bound
R.D 351.00 to 387.00 1 15.00 (2.40+2.30)/2
1 15.00 (2.30+2.40)/2
1 6.00 (2.40+2.40)/2
Deduction, Pipe Line 1 36.00 1.20
R.D 483.50 to 501.00 1 15.00 (2.10+2.10)/2
1 2.50 (2.10+2.00)/2
R.D 900.00 to 930.00 1 15.00 (1.85+1.95)/2
1 15.00 (2.30+2.05)/2
1 20.00 (2.10+2.05)/2
1 16.90 (2.05+2.05)/2
Earth work in excavation by mechanical means(Hydraulic excavator) / mannual labour in foundation
Earth work in excavation by mechanical means(Hydraulic excavator) / mannual labour in foundation
At Dallupura Road & Rd No. 102 T-Point, R.D1019.20 to 1039.20
At Dallupura Road & Rd No. 102 T-Point, R.D1039.20 to 1056.10
-
8/8/2019 IIIrd RA Bill Dallupura
58/351
D or H Quantity Unit
2.20 68.48 Cum.
2.20 70.95 "2.20 73.43 "
2.20 74.25 "
2.20 73.43 "
2.20 67.95 "
428.49 "
1.48 52.17 "
1.48 52.17 "
1.48 21.31 "
0.90 -38.88 "
1.42 44.73 "
1.42 7.28 "
1.48 42.18 "
1.48 48.29 "
2.00 83.00 "
2.00 70.14 "
-
8/8/2019 IIIrd RA Bill Dallupura
59/351
I.No. Description No. L B D or
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.10
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.10Deduction for chamber 1 3.00 1.20 0.10
Deduction for bus stand 1 7.00 0.90 0.10
Deduction for bus stand 1 6.90 0.60 0.10
Deduction for trees 3 0.60 0.60 0.10
Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
1 15.00 (2.00+1.90)/2 0.07
1 15.00 (1.90+1.65)/2 0.07
1 15.00 (1.65+1.60)/2 0.07
1 15.00 (1.60+1.60)/2 0.07
1 15.00 (1.60+1.40)/2 0.07
1 15.00 (1.40+1.55)/2 0.07
1 15.00 (1.55+1.60)/2 0.07
1 15.00 (1.60+1.90)/2 0.07
1 15.00 (1.90+1.25)/2 0.07
1 15.00 (1.25+1.45)/2 0.07
1 15.00 (1.45+1.35)/2 0.07
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
Ist layer, 90- 45mm
Laying spreading and compacting stone aggregate of specified
sizes to WBM specifications including spreading in uniform
IInd layer, 63-45mm
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
IIIrd layer, 53-22.50mm
Budh Singh Marg,Vasundhara Enclave Bound
-
8/8/2019 IIIrd RA Bill Dallupura
60/351
1 13.00 (1.35+1.34)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07
Total=
18
Noida Bound
RD- 1215.00 to1225.00
1 10.00 (3.70+3.60)/2 0.07
1 15.00 (2.00+1.90)/2 0.07
1 15.00 (1.90+1.65)/2 0.07
1 15.00 (1.65+1.60)/2 0.071 15.00 (1.60+1.60)/2 0.07
1 15.00 (1.60+1.40)/2 0.07
1 15.00 (1.40+1.55)/2 0.07
1 15.00 (1.55+1.60)/2 0.07
1 15.00 (1.60+1.90)/2 0.07
1 15.00 (1.90+1.25)/2 0.07
1 15.00 (1.25+1.45)/2 0.07
1 15.00 (1.45+1.35)/2 0.07
1 15.00 (1.35+1.30)/2 0.07
1 15.00 (1.30+1.22)/2 0.071 15.00 (1.22+1.35)/2 0.07
1 13.00 (1.35+1.34)/2 0.07
Dallupura Bound
Deduction for bus stand 1 9.40 0.35 0.07
Deduction for chamber 1 3.00 1.20 0.07
Deduction for bus stand 1 7.00 0.90 0.07
Deduction for bus stand 1 6.90 0.60 0.07
Deduction for trees 3 0.60 0.60 0.07
Total=
Laying spreading and compacting stone aggregate of specifiedsizes to WBM specifications including spreading in uniform
VIth layer, 53-22.50mm
Budh Singh Marg,Vasundhara Enclave Bound
-
8/8/2019 IIIrd RA Bill Dallupura
61/351
-
8/8/2019 IIIrd RA Bill Dallupura
62/351
Quantity Unit
3.65 Cum
-0.33 "-0.36 "
-0.63 "
-0.41 "
-0.11 "
1.81 Cum
2.74 Cum
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "1.36 Cum
2.74 Cum
2.19 "
2.00 "
1.83 "
1.80 "
1.69 "
1.66 "
1.77 "
1.97 "
1.77 "
1.52 "
1.58 "
-
8/8/2019 IIIrd RA Bill Dallupura
63/351
1.31 "
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
2.74 Cum
2.19 "
2.00 "
1.83 "1.80 "
1.69 "
1.66 "
1.77 "
1.97 "
1.77 "
1.52 "
1.58 "
1.49 "
1.42 "1.45 "
1.31 "
-0.25 "
-0.27 "
-0.47 "
-0.31 "
-0.08 "
26.81 Cum
-
8/8/2019 IIIrd RA Bill Dallupura
64/351
-
8/8/2019 IIIrd RA Bill Dallupura
65/351
I.No Description No. L B
5
Dallupura Bound, DDA Drain
Start from R.D 607.50
Ist cut, RD 607.50 to 683.00 2 30.00 2.40
1 16.65 2.40IInd cut, RD- 1215.00 to1225.00 3 30.00 2.40
1 7.60 2.40
IIInd cut, RD- 1215.00 to1225.00 3 30.00 2.40
1 12.85 2.40
IVth cut, RD- 1215.00 to1225.00 4 30.00 2.40
1 7.75 2.40
Desilting of drains by getting out the manure/ sludgerubbish etc in or under water or liquid mud in foul positionin restricted working condition i/c disposal of excavatedmaterial by machenical transport including loading,unloadin and stackin for all leads and lifts Be ond initial
-
8/8/2019 IIIrd RA Bill Dallupura
66/351
D or H Quantity Unit
0.50 72.00 Cum.
0.50 19.98 "0.50 108.00 "
0.50 9.12 "
0.50 108.00 "
0.50 15.42 "
0.50 144.00 "
0.50 9.30 "
485.82 "
-
8/8/2019 IIIrd RA Bill Dallupura
67/351
I.No Description No L B
6
(a)
Noida Bound, Box Drain
R.D 930.00 to 1019.20 2 30.00 1.40
1 29.20 1.40
6
(a)
Noida Bound
R.D 351.00 to 387.00 1 15.00 (1.40+1.25)/2
1 15.00 (1.25+0.85)/2
1 6.00 (0.85+1.40)/2
R.D 483.50 to 501.00 1 15.00 1.40
1 2.50 1.40
R.D 900.00 to 930.00 1 15.00 1.40
1 15.00 1.40
1 20.00 1.70
1 16.90 1.70
6
(a)
Budh Singh Marg, Dallupura bound 1 15.00 (1.16+1.37)/2
Ist Cut 1 15.00 (1.37+1.58)/2
1 15.00 (1.58+2.04)/2
1 10.20 (2.04+2.38)/2
flair 1./3 0.60 2.38
IIIrd Cut 2./3 1.57 2.50
1 15.00 (2.50+2.65)/2
1 4.25 (2.65+2.63)/2
IVth Cut 1 5.00 (2.65+2.63)/2
Budh Singh Marg, Vasundhara bound 1 15.00 (2.20+2.67)/2
1 15.00 (2.67+2.45)/2
1 15.00 (2.45+2.55)/2
1 15.00 (2.55+2.45)/2
1 15.00 (2.45+2.42)/2
1 15.00 (2.68+2.58)/2
1 6.65 (2.58+2.60)/2
1 17.50 (2.55+2.45)/2
Ramp Dustbin, (10.70+10.75+12.15/3=11.20)
1 11.20 (3.45+4.00+4.65)/3
1./3 10.70 0.40
P/L in position cement concrete of specified gradeexcluding the cost of centering and shuttering all work
1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone
P/L in position cement concrete of specified gradeexcluding the cost of centering and shuttering all work
1:5:10 (1 cement : 5 coarse sand : 10 graded stone
At Dallupura Road & Rd No. 102 T-Point, R.D1019.20 to 1039.20
At Dallupura Road & Rd No. 102 T-Point, R.D1039.20 to 1056.10
P/L in position cement concrete of specified gradeexcluding the cost of centering and shuttering all work
1:5:10 ( 1 cement : 5 coarse sand : 10 graded stoneaggregate 40 mm nominal size).
-
8/8/2019 IIIrd RA Bill Dallupura
68/351
D or H Quantity Unit
0.10 8.40 Cum.
0.10 4.09 "
12.49 "
0.10 1.99 Cum.
0.10 1.58 "
0.10 0.68 "
0.10 2.10 "
0.10 0.35 "
0.10 2.10 "
0.10 2.10 "
0.10 4.15 "
0.10 3.51 "
0.08 1.42 Cum.
0.08 1.66 "
0.08 2.04 "
0.08 1.69 "
0.08 0.04 "
0.08 0.2 "
0.08 2.9 "
0.08 0.84 "
0.08 0.99 "
0.08 2.74 "
0.08 2.88 "
0.08 2.81 "
0.08 2.81 "
0.08 2.74 "
0.08 2.96 "
0.08 1.29 "
0.08 3.28 "
0.08 3.39 "
0.08 0.11 "
-
8/8/2019 IIIrd RA Bill Dallupura
69/351
I.No Description No L B
7
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 1 1 5.20 2.88
2 2.88 0.10
Top Slab, Panel No 2 1 5.20 2.80
2 2.80 0.10
Top Slab, Panel No 3 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 4 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 5 1 5.20 2.832 2.83 0.10
Top Slab, Panel No 6 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 7 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 8 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 9 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 10 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 11 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 12 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 13, culvert
(3.16+2.90)/2 1 0.95 3.03
1 2.90 0.10
Top Slab, Panel No 14 1 5.20 2.85
2 2.85 0.10
Providing and laying in position ready mixedconcrete manufactured in fully automatic batching
-
8/8/2019 IIIrd RA Bill Dallupura
70/351
Top Slab, Panel No 16 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 17 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 18 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 19 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 20 1 5.20 2.87
2 2.87 0.10
Top Slab, Panel No 21 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 22 1 5.20 2.832 2.83 0.10
Top Slab, Panel No 23 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 24 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 25 1 5.20 2.842 2.84 0.10
Top Slab, Panel No 26 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 27 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 28 1 3.08 2.842 2.84 0.10
Top Slab, Panel No 29, culvert 1 3.08 2.90
1 2.90 0.10
Top Slab, Panel No 30 1 5.20 2.88
2 2.88 0.10
Top Slab, Panel No 31 1 5.20 2.86
2 2.86 0.10
T Sl b P l N 32 1 5 20 2 84
-
8/8/2019 IIIrd RA Bill Dallupura
71/351
Top Slab, Panel No 33 1 5.20 2.87
2 2.87 0.10
Top Slab, Panel No 34 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 35 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 36 1 5.20 2.80
2 2.80 0.10
Top Slab, Panel No 37 1 5.20 2.86
2 2.86 0.10
Top Slab, Panel No 38 1 5.20 2.87
2 2.87 0.10
Top Slab, Panel No 39 1 5.20 2.842 2.84 0.10
Top Slab, Panel No 40 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 41 1 5.20 2.86
2 2.86 0.10
Top Slab, Panel No 42 1 5.20 2.84
2 2.84 0.10
Top Slab, Panel No 43 1 5.20 2.87
2 2.87 0.10
Top Slab, Panel No 44 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 45 1 2.28 2.76
2 2.76 0.10
Top Slab, Panel No 46 1 2.74 1.36
1 1.36 0.10
Top Slab, Panel No 47 1 3.84 2.83
2 2.83 0.10
Top Slab, Panel No 48 1 5.20 2.81
2 2.81 0.10
Top Slab, Panel No 49 1 5.20 2.812 2.81 0.10
-
8/8/2019 IIIrd RA Bill Dallupura
72/351
Top Slab, Panel No 51 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 52 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 53 1 5.20 2.81
2 2.81 0.10
Top Slab, Panel No 54 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 55 1 5.20 2.82
2 2.82 0.10
Top Slab, Panel No 56 1 5.20 2.80
2 2.80 0.10
Top Slab, Panel No 57 1 5.20 2.85
2 2.85 0.10
Top Slab, Panel No 58 1 0.95 2.80
1 2.80 0.10
Top Slab, Panel No 59 1 5.20 2.78
2 2.78 0.10
Top Slab, Panel No 60 1 5.20 2.822 2.82 0.10
Top Slab, Panel No 61 1 5.20 2.81
2 2.81 0.10
Top Slab, Panel No 62 1 5.20 2.83
2 2.83 0.10
Top Slab, Panel No 63 1 5.20 2.80
2 2.80 0.10
Top Slab, Panel No 64 1 5.20 2.81
2 2.81 0.10
Top Slab, Panel No 65 1 5.20 2.80
2 2.80 0.10
Top Slab, Panel No 66 1 4.10 2.82
1 2.82 0.10
7 P idi d l i i iti d i d
-
8/8/2019 IIIrd RA Bill Dallupura
73/351
Raft.
Noida Bound, Box Drain
R.D 840.00 to 900.00 2 30.00 1.30
Wall
R.D 810.00 to 900.00 2x2 30.00 0.15
7
Noida Bound, Box Drain
Raft.
Noida Bound, Box Drain
R.D 930.00 to 1019.20 2 30.00 1.30
1 29.20 1.30
Wall
R.D 930.00 to 1019.20 2x2 30.00 0.15
1x2 29.20 0.15
7
Raft.
Noida Bound, Box Drain
R.D 351.00 to 387.00 1 5.00 (1.27+1.08)/2
1 5.00 (1.08+0.95)/2
1 5.00 (0.95+0.93)/2
1 5.00 (0.93+1.15)/2
1 5.00 (1.15+1.28)/2
1 5.00 (1.28+1.30)/2
1 6.00 (1.30+1.30)/2
R.D 483.50 to 501.00 1 15.00 1.30
1 2.50 1.30
R.D 900.00 to 930.00 1 15.00 1.30
1 15.00 1.30
R.D 1019.20 to .00
Wall
Noida Bound, Box Drain
R.D 351.00 to 387.00 1x2 15.00 0.15
1x2 15.00 0.15
1x2 6.00 0.15
R.D 483.50 to 501.00 1x2 15.00 0.15
1x2 2.50 0.15
R.D 900.00 to 930.00 1x2 15.00 0.15
1x2 15.00 0.15
R.D 1019.20 to .00
Wall
R.D 348.00 to R.D 1019.20 2 12.00 (0.05+0.05)/2
2 15.00 (0.05+0.10)/2
Providing and laying in position ready mixed
concrete manufactured in fully automatic batching
Providing and laying in position ready mixedconcrete manufactured in fully automatic batching
-
8/8/2019 IIIrd RA Bill Dallupura
74/351
2 15.00 (0.21+0.21)/2
2 15.00 (0.21+0.28)/2
2 15.00 (0.28+0.25)/2
2 15.00 (0.25+0.25)/2
2 15.00 (0.25+0.21)/2
2 15.00 (0.21+0.22)/2
2 15.00 (0.22+0.22)/2
2 15.00 (0.22+0.20)/2
2 15.00 (0.20+0.27)/22 15.00 (0.27+0.23)/2
2 15.00 (0.23+0.22)/2
2 15.00 (0.22+0.24)/2
2 15.00 (0.24+0.23)/2
2 15.00 (0.23+0.24)/2
2 15.00 (0.24+0.21)/2
2 15.00 (0.21+0.25)/2
2 15.00 (0.25+0.32)/2
2 15.00 (0.32+0.33)/2
2 15.00 (0.33+0.45)/22 15.00 (0.45+0.43)/2
2 15.00 (0.43+0.45)/2
2 15.00 (0.45+0.45)/2
2 15.00 (0.45+0.52)/2
2 15.00 (0.52+0.50)/2
2 15.00 (0.50+0.54)/2
2 12.00 (0.54+0.57)/2
2 3.00 (0.57+0.58)/2
2 15.00 (0.58+0.60)/2
2 15.00 (0.60+0.66)/22 15.00 (0.66+0.75)/2
2 15.00 (0.75+0.77)/2
2 15.00 (0.77+0.78)/2
2 15.00 (0.78+0.75)/2
2 15.00 (0.75+0.70)/2
2 15.00 (0.70+0.67)/2
2 15.00 (0.67+0.72)/2
2 15.00 (0.72+0.77)/2
2 15.00 (0.77+0.85)/2
2 15.00 (0.85+0.87)/22 15.00 (0.87+0.85)/2
2 14.20 (0.85+0.83)/2
7
Slab
R.D 303.80 to R.D 967.00 1 11.20 (1.30+1.30)/2
1 15.00 (1.30+1.30)/2
Providing and laying in position ready mixedconcrete manufactured in fully automatic batching
-
8/8/2019 IIIrd RA Bill Dallupura
75/351
1 15.00 (1.20+1.26)/2
1 15.00 (1.26+1.29)/2
1 15.00 (1.29+1.25)/2
1 15.00 (1.25+1.26)/2
1 15.00 (1.26+1.27)/2
1 15.00 (1.27+1.28)/2
1 15.00 (1.28+1.22)/2
1 15.00 (1.22+1.26)/2
1 15.00 (1.26+1.28)/21 15.00 (1.28+1.26)/2
1 15.00 (1.26+1.29)/2
1 15.00 (1.29+1.28)/2
1 15.00 (1.28+1.24)/2
1 15.00 (1.24+1.33)/2
1 15.00 (1.33+1.32)/2
1 15.00 (1.32+1.32)/2
1 15.00 (1.32+1.25)/2
1 15.00 (1.25+1.24)/2
1 15.00 (1.24+1.29)/21 15.00 (1.29+1.30)/2
1 15.00 (1.30+1.26)/2
1 15.00 (1.26+1.35)/2
1 15.00 (1.35+1.29)/2
1 15.00 (1.29+1.29)/2
1 15.00 (1.29+1.34)/2
1 15.00 (1.34+1.38)/2
1 15.00 (1.38+1.36)/2
1 15.00 (1.36+1.30)/2
1 15.00 (1.30+1.28)/21 15.00 (1.28+1.27)/2
1 15.00 (1.27+1.28)/2
1 15.00 (1.28+1.23)/2
1 15.00 (1.23+1.31)/2
1 15.00 (1.31+1.31)/2
1 15.00 (1.31+1.27)/2
1 15.00 (1.27+1.29)/2
1 15.00 (1.29+1.32)/2
1 15.00 (1.32+1.29)/2
1 15.00 (1.29+1.33)/21 7.00 (1.33+1.30)/2
R.D 967.00 to R.D 974.10,Culvert 1 7.10 (1.30+1.28)/2
R.D 974.10 to R.D 1019.20 1 0.90 (1.28+1.28)/2
1 15.00 (1.28+1.22)/2
1 15.00 (1.22+1.34)/2
1 14.20 (1.34+1.35)/2
Less for openings 126 1.22 1.17
Culvert at Dallupura Mkt. 1 5.70 1.20
Culvert at Bhudh Singh Chowk 1 4.00 1.40
At D ll R d & Rd N 102 T P i t
-
8/8/2019 IIIrd RA Bill Dallupura
76/351
7
Budh Singh Marg Dallupura bound 1 7.50 (1.10+1.20)/2
Ist Cut 1 7.50 (1.20+1.35)/2
1 7.50 (1.35+1.43)/2
1 7.50 (1.43+1.61)/21 6.35 (1.61+1.84)/2
1 7.50 (1.84+2.17)/2
1 7.50 (2.17+2.34)/2
1 1.30 (2.34+2.40)/2
1./3 1.00 2.40
Deduction For I.Tiles
Deduction For Tree 1 0.40 0.40
IInd Cut 2./3 1.43 2.80
1 5.40 (2.80+2.98)/2
1 15.00 (2.98+2.80)/21 15.00 (2.80+2.80)/2
1 15.00 (2.80+2.80)/2
1 4.15 (2.80+2.82)/2
2./3 1.35 2.82
IIIrd Cut 2./3 1.57 2.5
1 15.00 (2.50+2.65)/2
1 4.25 (2.65+2.63)/2
Deduction For Block Area
IVth Cut 1 1.33 (2.52+2.60)/21 15.00 (2.60+2.60)/2
1 15.00 (2.60+2.55)/2
1 15.00 (2.55+2.65)/2
1 15.00 (2.65+2.63)/2
1 15.00 (2.63+2.55)/2
1 15.00 (2.55+2.60)/2
1 15.00 (2.60+2.40)/2
1 3.50 (2.40+2.32)/2
Deduction For Block Area
Deduction For Tree 6 0.40 0.41 1.44 1.4
Budh Singh Marg Vasundhara Bound 1 10.00 (1.90+2.24)/2
1 10.00 (2.24+2.23)/2
1 6.05 (2.23+2.23)/2
Deduction For Block Area
Budh Singh Marg Vasundhara Bound 1 15.00 (2.20+2.67)/2
1 15.00 (2.67+2.45)/2
1 15.00 (2.45+2.55)/2
1 15.00 (2.55+2.45)/21 15.00 (2.45+2.42)/2
1 15 00 (2 42 2 48)/2
Providing and laying in position ready mixedconcrete manufactured in fully automatic batching
plant and transported to site of work in transit
-
8/8/2019 IIIrd RA Bill Dallupura
77/351
1 15.00 (2.55+2.50)/2
1 15.00 (2.50+2.58)/2
1 15.00 (2.58+2.58)/2
1 15.00 (2.58+2.68)/2
1 15.00 (2.68+2.58)/2
1 6.65 (2.58+2.60)/2
Deduction For Block Area
Deduction For Tree 9 0.40 0.40
Ramp Dustbin 1 (10.70+10.75+12.15)/3 (3.05+3.90+4.55)/31./3 10.70 0.40
-
8/8/2019 IIIrd RA Bill Dallupura
78/351
D or H Quantity Unit
0.20 3.00 Cum.
0.10 0.06 "
0.20 2.91 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.94 Cum.0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 0.58 Cum.
0.10 0.03 "
0.20 2.96 Cum.
0.10 0.06 "
-
8/8/2019 IIIrd RA Bill Dallupura
79/351
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.98 Cum.
0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 2.94 Cum.0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.95 Cum.0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 1.75 Cum.0.10 0.06 "
0.20 1.79 Cum.
0.10 0.03 "
0.20 3.00 Cum.
0.10 0.06 "
0.20 2.97 Cum.
0.10 0.06 "
0 20 2 95 C
-
8/8/2019 IIIrd RA Bill Dallupura
80/351
0.20 2.98 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.91 Cum.
0.10 0.06 "
0.20 2.97 Cum.
0.10 0.06 "
0.20 2.98 Cum.
0.10 0.06 "
0.20 2.95 Cum.0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 2.97 Cum.
0.10 0.06 "
0.20 2.95 Cum.
0.10 0.06 "
0.20 2.98 Cum.
0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 1.26 Cum.
0.10 0.06 "
0.20 0.75 Cum.
0.10 0.01 "
0.20 2.17 Cum.
0.10 0.06 "
0.20 2.92 Cum.
0.10 0.06 "
0.20 2.92 Cum.0.10 0.06 "
-
8/8/2019 IIIrd RA Bill Dallupura
81/351
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.92 Cum.
0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 2.93 Cum.
0.10 0.06 "
0.20 2.91 Cum.
0.10 0.06 "
0.20 2.96 Cum.
0.10 0.06 "
0.20 0.53 Cum.
0.10 0.03 "
0.20 2.89 Cum.
0.10 0.06 "
0.20 2.93 Cum.0.10 0.06 "
0.20 2.92 Cum.
0.10 0.06 "
0.20 2.94 Cum.
0.10 0.06 "
0.20 2.91 Cum.
0.10 0.06 "
0.20 2.92 Cum.
0.10 0.06 "
0.20 2.91 Cum.
0.10 0.06 "
0.20 2.31 Cum.
0.10 0.03 "
185.69
-
8/8/2019 IIIrd RA Bill Dallupura
82/351
0.15 11.70 Cum.
1.20 21.60 "
Total= 33.30 Cum.
0.15 11.70 Cum.
0.15 5.69 "
1.20 21.60 "
1.20 10.51 "
Total= 49.50 Cum.
0.15 0.88 Cum.
0.15 0.76 "
0.15 0.71 "
0.15 0.78 "
0.15 0.91 "
0.15 0.97 "
0.15 1.17 "
0.15 2.93 "
0.15 0.49 "
0.15 2.93 "
0.15 2.93 "
1.20 5.40 Cum.
1.20 5.40 "
1.20 2.16 "
1.20 5.40 "
1.20 0.90 "
1.20 5.40 "
1.20 5.40 "
0.15 0.18 Cum.
0.15 0.34 "
-
8/8/2019 IIIrd RA Bill Dallupura
83/351
-
8/8/2019 IIIrd RA Bill Dallupura
84/351
0.15 2.77 "
0.15 2.87 "
0.15 2.86 "
0.15 2.82 "
0.15 2.85 "
0.15 2.87 "
0.15 2.81 "
0.15 2.79 "
0.15 2.86 "0.15 2.86 "
0.15 2.87 "
0.15 2.89 "
0.15 2.84 "
0.15 2.89 "
0.15 2.98 "
0.15 2.97 "
0.15 2.89 "
0.15 2.80 "
0.15 2.85 "0.15 2.91 "
0.15 2.88 "
0.15 2.94 "
0.15 2.97 "
0.15 2.90 "
0.15 2.96 "
0.15 3.06 "
0.15 3.08 "
0.15 2.99 "
0.15 2.90 "0.15 2.87 "
0.15 2.87 "
0.15 2.82 "
0.15 2.86 "
0.15 2.95 "
0.15 2.90 "
0.15 2.88 "
0.15 2.94 "
0.15 2.94 "
0.15 2.95 "0.15 1.38 "
0.15 1.37 "
0.15 0.17 "
0.15 2.81 "
0.15 2.88 "
0.15 2.86 "
0.15 -26.98 "
111.18 "
0.20 1.37 "
0.20 1.12 "
-
8/8/2019 IIIrd RA Bill Dallupura
85/351
32.40 "
0.08 0.65
0.08 0.72
0.08 0.78
0.08 0.860.08 0.82
0.08 1.13
0.08 1.27
0.08 0.23
0.08 0.06
0.08 -0.01
0.08 0.2
0.08 1.17
0.08 3.250.08 3.15
0.08 3.15
0.08 0.87
0.08 0.19
0.08 0.2
0.08 2.9
0.08 0.84
0.08 0.260.08 2.93
0.08 2.9
0.08 2.93
0.08 2.97
0.08 2.91
0.08 2.9
0.08 2.81
0.08 0.62
0.08 -0.070.08 -0.15
0.08 1.55
0.08 1.68
0.08 1.03
0.08 2.74
0.08 2.88
0.08 2.81
0.08 2.810.08 2.74
0 08 2 76
-
8/8/2019 IIIrd RA Bill Dallupura
86/351
0.08 2.84
0.08 2.86
0.08 2.9
0.08 2.96
0.08 2.96
0.08 1.29
0.08 -0.11
0.13 5.370.08 0.11
91.32
-
8/8/2019 IIIrd RA Bill Dallupura
87/351
I.No Description No L B
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 1 to 4
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m, 6
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 5 to 8
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA DrainStart from R.D 607.50
Top Slab Panel No 9 to 12
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
88/351
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between R.D.407 to R.D.410(3m)
Top Slab, Culvert Panel No. 13
16mm Dia.
Top & Bottom, main 2x2 3.10
2x2 3.00
2x3 2.85
Top Slab, Panel No 14 to 16
Bottom main, crank 3x35 2.83
Bottom main,straight, at both ends 3x2 2.78
Top, Extra 3x35 0.75
@ 1.579 kg/m,
Marked
Top Slab, Culvert Panel No. 13
10mm Dia.
Top & Bottom, Distribution 2x19 1.00
Chair 2x2 1.05
Top Slab, Panel No 14 to 16
Bottom, Distribution 3x19 5.35
Top, Distribution 3x10 5.15
Bottom, Chair 3x6 1.05
@ 0.617 kg/m, 5
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 17 to 20
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
89/351
-
8/8/2019 IIIrd RA Bill Dallupura
90/351
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Top Slab, Culvert Panel No. 2916mm Dia.
Top & Bottom, main 2x20 2.82
Top Slab, Panel No 30 to 32
Bottom main, crank 3x35 2.83
Bottom main,straight, at both ends 3x2 2.78
Top, Extra 3x35 0.75
@ 1.579 kg/m,
Marked
Top Slab, Culvert Panel No. 2910mm Dia.
Top & Bottom, Distribution 2x19 3.02
Chair 2x2 1.05
Top Slab, Panel No 30 to 32
Bottom, Distribution 3x19 5.35
Top, Distribution 3x10 5.15
Bottom, Chair 3x6 1.05
@ 0.617 kg/m, 5
MarkedTotal Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 33 to 36
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
91/351
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 37 to 40
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 41 to 44
16mm Dia.
Bottom main, crank 4x35 2.83
Bottom main,straight, at both ends 4x2 2.78
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
Top Slab
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50Top Slab, Panel No 45
16mm Dia
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
92/351
Top, Extra 13 0.75
Top Slab, Panel No 46
Bottom main, crank 8 2.75
Bottom main,straight, at both ends 2 2.70
Top, Extra 8 0.75
Top Slab, Panel No 47 to 48
Bottom main, crank 2x35 2.80
Bottom main,straight, at both ends 2x2 2.75
Top, Extra 2x35 0.75
@ 1.579 kg/m,
Marked
Top Slab, Panel No 45
10mm Dia.
Bottom, Distribution 19 2.20
Top, Distribution 10 2.20
Chair 2x2 1.05
Top Slab, Panel No 46
Bottom, Distribution 19 1.31Top, Distribution 10 1.31
Chair 2x2 1.05
Top Slab, Panel No 47 to 48
Bottom, Distribution 2x19 5.35
Top, Distribution 2x10 5.15
Bottom, Chair 2x2 1.05
@ 0.617 kg/m, 4
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 49 to 52
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
93/351
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 53 to 56
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75
@ 1.579 kg/m,Marked
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 57 to 60
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75
@ 1.579 kg/m,
Marked
10mm Dia.
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
Top Slab, Panel No 61 to 64
16mm Dia.
Bottom main, crank 4x35 2.80
Bottom main,straight, at both ends 4x2 2.75
Top, Extra 4x35 0.75
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
94/351
Bottom, Distribution 4x19 5.35
Top, Distribution 4x10 5.15
Bottom, Chair 4x6 1.05
@ 0.617 kg/m,
Marked
Total Weight [A] + [B] =
8(a) TMT bars.
Dallupura Bound, DDA Drain
Start from R.D 607.50
16mm Dia.
Top Slab, Panel No 65
Bottom main, crank 35 2.80
Bottom main,straight, at both ends 2 2.75
Top, Extra 35 0.75
Top Slab, Panel No 66
Bottom main, crank 27 2.80Bottom main,straight, at both ends 1 2.75
Top, Extra 27 0.75
@ 1.579 kg/m,
Marked
10mm Dia.
Top Slab, Panel No 65
Bottom, Distribution 19 5.35
Top, Distribution 10 5.15
Bottom, Chair 6 1.05
Top Slab, Panel No 66.
Bottom, Distribution 19 4.05
Top, Distribution 10 3.90
Bottom, Chair 5 1.05
@ 0.617 kg/m, 2
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.825 to 870(45m)
Raft & Wall
10mm Dia.
Bottom, main 300 6.15
Top, main 300 5.55
Bottom, Chair 150 1.00
Wall, U- Chair 44 0.60
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
95/351
Raft & Wall
8mm Dia.
Bottom, Distribution 8 15.00
Top, Distribution 7 15.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18 45.00
STP Boundary Side Wall, Distribution,(9+9)
18 45.00
Over Lap 105 0.50
@ 0.395 kg/m, 19
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.870 to 900(30m)
Raft & Wall10mm Dia.
Bottom, main 200 6.20
Top, main 200 5.60
Bottom, Chair 100 1.00
Wall, U- Chair 30 0.60
@ 0.617 kg/m, 24
Marked
Raft & Wall
8mm Dia.Bottom, Distribution 8 30.00
Top, Distribution 7 30.00
Over Lap 30 0.50
Road side wall, Distribution ,(9+9) 18 30.00
STP Boundary Side Wall, Distribution,(9+9)
18 30.00
Over Lap 72 0.50
@ 0.395 kg/m, 15
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.900 to 930(30m)
Raft & Wall
10mm Dia.
Bottom, main 200 6.10
Top, main 200 5.50
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
96/351
@ 0.617 kg/m, 24
Marked
Raft & Wall
8mm Dia.
Bottom, Distribution 8 30.00
Top, Distribution 7 30.00
Over Lap 30 0.50
Road side wall, Distribution ,(9+9) 18 30.00
STP Boundary Side Wall, Distribution,(9+9)18 30.00
Over Lap 72 0.50
@ 0.395 kg/m, 15
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box DrainBetween RD.930 to 975.00(45m)
Raft & Wall
10mm Dia.
Bottom, main 300 6.20
Top, main 300 5.60
Bottom, Chair 150 1.00
Wall, U- Chair 44 0.60
@ 0.617 kg/m, 37
MarkedRaft & Wall
8mm Dia.
Bottom, Distribution 8 45.00
Top, Distribution 7 45.00
Over Lap 45 0.50
Road side wall, Distribution ,(9+9) 18 45.00
STP Boundary Side Wall, Distribution,(9+9)
18 45.00
Over Lap 105 0.50
@ 0.395 kg/m, 23
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.975.00 to 1019.20 (44.20m)
Raft & Wall
10mm Dia.
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
97/351
Wall, U- Chair 44 0.60
@ 0.617 kg/m, 37
Marked
Raft & Wall
8mm Dia.
Bottom, Distribution 8 44.20
Top, Distribution 7 44.20
Over Lap 43 0.50Road side wall, Distribution ,(9+9) 18 44.20
STP Boundary Side Wall, Distribution,(9+9)
18 44.20
Over Lap 105 0.50
@ 0.395 kg/m, 23
Marked
Total Weight [A] + [B] =
8(a) TMT bars.
Noida Bound, Box Drain
Between RD.303.80 to 382.00
Slab (13+1 Nos.)
10mm Dia.
Bottom, main 13x30 1.25
Top, main 13x30 1.25
Bottom, Chair 13x7 0.90
Bottom, main 24 1.25
Top, main 24 1.25
Bottom, Chair 6 0.90
@ 0.617 kg/m, 10
Marked
Slab
8mm Dia.
Bottom, Distribution 13x8 4.35
Top, Distribution 13x8 4.35
Bottom, Distribution 8 3.62
Top, Distribution 8 3.62
@ 0.395 kg/m, 9
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.382.00 to 460.00
Slab (14 Nos.)
10mm Dia.
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
98/351
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
@ 0.395 kg/m, 9Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.460. to 540.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25Top, main 14x30 1.25
Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
@ 0.395 kg/m, 9
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.540.00 to 617.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
99/351
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.617.00 to 695.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(1+1) 2 20.00STP Boundary Side Wall, Distribution,(1+1)
2 20.00
Over Lap 4 0.50
@ 0.395 kg/m, 10
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.695.00 to 775.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(1+1) 2 80.00
STP Boundary Side Wall, Distribution,(1+1)
2 80.00
Over Lap 24 0.50
@ 0.395 kg/m, 13
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
100/351
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.775.00 to 850.00
Slab (14 Nos.)
10mm Dia.
Bottom, main 14x30 1.25
Top, main 14x30 1.25
Bottom, Chair 14x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 14x8 4.35
Top, Distribution 14x8 4.35
Wall
Road side wall, Distribution ,(2+2) 4 75.00
STP Boundary Side Wall, Distribution,(2+2)4 75.00
Over Lap 40 0.50
@ 0.395 kg/m, 15
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.850.00 to 930.00
Slab (13+1 Nos.)
10mm Dia.
Bottom, main 13x30 1.25
Top, main 13x30 1.25
Bottom, Chair 13x7 0.90
Bottom, main 19 1.25
Top, main 19 1.25
Bottom, Chair 5 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 13x8 4.35
Top, Distribution 13x8 4.35
Bottom, Distribution 8 2.88
Top, Distribution 8 2.88
Wall
Road side wall, Distribution ,(2+2) 4 80.00
STP Boundary Side Wall, Distribution,(2+2)
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
101/351
@ 0.395 kg/m, 16
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.930.00 to 967.00
Slab (6 Nos.+1 Nos. Culvert)10mm Dia.
Bottom, main 6x30 1.25
Top, main 6x30 1.25
Bottom, Chair 6x7 0.90
Bottom, Distribution, Culvert 7 7.05
Top, Distribution, Culvert 7 7.05
Bottom, Chair, Culvert 7 1.00
@ 0.617 kg/m, 5
MarkedSlab
8mm Dia.
Bottom, Distribution 6x8 4.35
Top, Distribution 6x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 37.00
STP Boundary Side Wall, Distribution,(3+3)
6 37.00
Over Lap 36 0.50
@ 0.395 kg/m, 8
Marked
Culvert
16mm Dia.
Bottom, main 45 1.20
Top, main 45 1.20
@ 0.617 kg/m, 1
Marked
Total Weight [A] + [B] +[C] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.974.10 to 1019.20
Slab (8 Nos.)
10mm Dia.
Bottom, main 8x30 1.25
Top, main 8x30 1.25
Bottom, Chair 8x7 0.90
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
102/351
8mm Dia.
Bottom, Distribution 8x8 4.35
Top, Distribution 8x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 45.10
STP Boundary Side Wall, Distribution,(3+3)
6 45.10
Over Lap 36 0.50
@ 0.395 kg/m, 1
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
Noida Bound, Box Drain
Between RD.974.10 to 1019.20
Slab (8 Nos.)
10mm Dia.Bottom, main 8x30 1.25
Top, main 8x30 1.25
Bottom, Chair 8x7 0.90
@ 0.617 kg/m, 11
Marked
Slab
8mm Dia.
Bottom, Distribution 8x8 4.35
Top, Distribution 8x8 4.35
Wall
Road side wall, Distribution ,(3+3) 6 45.10
STP Boundary Side Wall, Distribution,(3+3)
6 45.10
Over Lap 36 0.50
@ 0.395 kg/m, 1
Marked
Total Weight [A] + [B] =
8
(a) TMT bars.
16mm Dia.
Culvert at Dallupura Mkt.
Bottom, main 39 1.15
Top, main 39 1.15
Culvert at Bhudh Singh Chowk
Bottom, main 36 1.34
Top, main 36 1.34
@ 1.579 kg/m, 1
Reinforcement for RCC work including straightening, cutting,
Reinforcement for RCC work including straightening, cutting,
-
8/8/2019 IIIrd RA Bill Dallupura
103/351
Bottom, Distribution 7 5.65
Top, Distribution 7 5.65
Bottom, Chair 8 1.05
Culvert at Bhudh Singh Chowk
Bottom, Distribution 8 3.75
Top, Distribution 8 3.75
Bottom, Chair 6 1.05
@ 0.617 kg/m,Marked
Total Weight [A] + [B] =
-
8/8/2019 IIIrd RA Bill Dallupura
104/351
D or H Quantity Unit
396.20 m
22.24 "105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "
25.20 "
Total 637.80 m37.80 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
396.20 m
22.24 "
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "
25.20 "
Total 637.80 m
637.8 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
-
8/8/2019 IIIrd RA Bill Dallupura
105/351
22.24 "
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "25.20 "
Total 637.80 m
637.8 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
12.40 m
12.00 "
17.10 "
297.15 m
16.68 "
78.75 "Total 434.08 "
34.08 x1.579= 685.41 kg.
[A] 685.41 kg.
38.00 m
4.20 "
304.95 m
154.50 "
18.90 "
Total 520.55 m
20.55 x 0.617= 321.18 kg.
[B] 321.18 kg.
1006.59 kg.
-
8/8/2019 IIIrd RA Bill Dallupura
106/351
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "
25.20 "Total 637.80 m
637.8 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
396.20 m
22.24 "
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "
25.20 "
Total 637.80 m
637.8 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
396.20 m
22.24 "
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
-
8/8/2019 IIIrd RA Bill Dallupura
107/351
Total 637.80 m
637.8 x 0.617= 393.52 kg.
[B] 393.52 kg.
1220.03 kg.
112.80 m
297.15 m
16.68 "
78.75 "
Total 505.38 "
05.38 x1.579= 798.00 kg.
[A] 798.00 kg.
114.76 m
4.20 "
304.95 m
154.50 "
18.90 "
Total 597.31 m
97.31 x 0.617= 368.54 kg.
[B] 368.54 kg.1166.54 kg.
396.20 m
22.24 "
105.00 "
Total 523.44 m
23.44 x1.579= 826.51 kg.
[A] 826.51 kg.
406.60 m
206.00 "
25.20 "
Total 637.80 m
637.8 x 0.617= 393.52 kg.
-
8/8/2019 IIIrd RA Bill Dallupura
108/351
396.20 m
22.24 "
105.00 "Total 523.44 m
23.44 x1.579= 826.51 kg.
[